Loading...
HomeMy WebLinkAboutR-2020-021 Fair Avenue Sanitary Sewer Improvements Phase A - Hurst Construction, LLC.RESOLUTION NO. R-2020-021 A RESOLUTION authorizing a contract with Hurst Construction, LLC for City of Yakima Project No 2487A Fair Avenue Sanitary Sewer Main Improvements WHEREAS, the City of Yakima owns and maintains the Wastewater Collections System in accordance with applicable Federal, State and Local regulations, and WHEREAS, the City of Yakima is planning and preparing for the Mill Site Development; and WHEREAS, a sewer system capacity analysis found that the existing eight (8)-inch sewer main between East Spruce Street and Beech Street does not have adequate capacity to accommodate Mill Site development, and WHEREAS, by resolution R-2018-141 the City entered into an agreement with HLA Engineering and Land Surveying, Inc., to provide engineering design, bidding, and construction services for Fair Avenue Sanitary Sewer Main Improvements to provide adequate sewer main capacity to accommodate full Mill Site development; and WHEREAS, the City of Yakima used the procedure established by the State of Washington for competitively bidding projects; and WHEREAS, Hurst Construction, LLC submitted the low bid and has the ability to perform the contract specified work, and WHEREAS, the City Council finds that it is in the best interest of the City of Yakima to enter into a contract with Hurst Construction, LLC. to perform the work detailed in the contract documents for the installation of 1,540 linear feet of new fifteen (15)-Inch diameter sanitary sewer main, reconstruction of existing roadway, sidewalk, curb and gutter and other related work; now, therefore BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The City Manager is hereby authorized to execute the attached contract with Hurst Construction, LLC, in the amount of One Million One Hundred and Fifty -Nine Thousand Five Hundred and Fifty -Five Dollars ($1,159,555 ) for the installation of 1,540 linear feet of new fifteen (15)-inch diameter sanitary sewer main, reconstruction of existing roadway, sidewalk, curb and gutter and other related work on Fair Avenue between Beech Street and East Spruce Street ADOPTED BY THE CITY COUNCIL this 18th day of February, 2020 ATTEST Sonya Claar iFe ()Oa) City Clerk • .4 (/)atricia Byers, IV): yor CONTRACT THIS AGREEMENT, made and entered in triplicate, this day of 20a by and between the City of Yakima , hereinafter called the Owner, and c�r° a Washington Corporation, hereinafter called the Contractor. WITNESSETH: That in consideration of the terms and conditions contained herein and attached and made a part of this agreement, the parties hereto covenant and agree as follows: I. The Contractor shall do all work and furnish all tools, materials, labor and equipment for THE BID AMOUNT OF: $ _/,, /5 9, 553 c'G? for Fair Avenue Sanitary Sewer Main Improvements (FA-6), City of Yakima Project No. 2487A, all in accordance with, and as described in the attached plans and specifications and the 2018 Standard Specifications for Road, Bridge, and Municipal Construction which are by this reference incorporated herein and made a part hereof, and shall perform any alterations in or additions to the work provided under this contract and every part thereof. Work shall start within ten (10) days after the Notice to Proceed and shall be completed in Fifty (50) working days. If work has not commenced within the ten (10) days after the notice to proceed, the first chargeable working day shall be the eleventh (11th) working day after the date on which the City issues the Notice to Proceed. If said work is not completed within the time specified, the Contractor agrees to pay to the Owner the sum specified in the Standard Specifications for each day said work remains uncompleted after expiration of the specified time, as liquidated damages. The Contractors shall provide and bear the expense of all equipment; work and labor of any sort whatsoever that may be required for the transfer of materials and for constructing and completing the work provided for in this contract and every part thereof, except such as are mentioned in the specifications to be furnished by the City of Yakima . II. The City of Yakima hereby promises and agrees with the Contractor to employ, and does employ the Contractor to provide the materials and to do and cause to be done the above described work and to complete and finish the same according to the attached plans and specifications and the terms and conditions herein contained and hereby contracts to pay for the same according to the attached specifications and the schedule of unit or itemized prices hereto attached, at the time and in the manner and upon the conditions provided for in this contract. III. INDEMNIFICATION. The Contractor shall defend, indemnify, and hold harmless the City, its officers, elected officials, employees and agents from and against all claims, causes of action, damages, losses, and expenses of any kind or nature whatsoever, including but not limited to, attorney's fees and court costs, arising out of, relating to, or resulting from The Contractor's performance or non-performance of the services, duties and obligations required of it under this Agreement. IV. The Contractor for himself, and for his heirs, executors, administrators, successors, and assigns, does hereby agree to the full performance of all the covenants herein contained upon the part of the Contractor. V. It is further provided that no liability shall attach to the City of Yakima by reason of entering into this contract, except as expressly provided herein. IN WITNESS, WHEREOF the parties hereto have caused this agreement to be executed the day and year first herein above written. Countersigned: CITY OF YAKIMA this day of, 20 t 1 -J"4,4 ,a LAX Corporation Contetor � s• CITY CONTRACT NO. irvv pec docx Its': Address: 4-2 CONTRACTOR (Print Name) (Prstdant, Owner, etc) 1 ITEM TITLE: SUBMITTED BY: BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEM ENT Item No. 6.H. For Meeting of: February 18, 2020 Resolution authorizing a contract with Hurst Construction, LLC. for Project No. 2487A Fair Avenue Sanitary Sewer Improvements Phase A Scott Schafer, Director of Public Works David Brown, Assistant Director of Public Works Mike Price, Wastewater/Stormwater Division Manager, 249-6815 SUMMARY EXPLANATION: City of Yakima (City) Project No. 2487A Fair Avenue Sanitary Sewer Main Improvements Phase A provides for the construction of the first of two phases (A & B) of sewer main capacity improvements required to serve a fully developed Mill Site. Phase A uses open trenching to replace 1,540 linear feet of existing 8-inch diameter sewer main along Fair Avenue between East Spruce Street and East Beech Street (see attached Project Location Map) with a new 15-inch sewer main. The project also reconstructs the existing roadway, sidewalk, curb and gutter and other related work. The City previously entered into an agreement with HLA Engineering and Land Surveying, Inc. under resolution R-2018-141 to provide engineering design, bidding, and construction services for the Fair Avenue Sanitary Sewer Main Improvements. The City utilized the procedure established by the State of Washington for competitively bidding projects. Eight contractors submitted bids, with Hurst Construction, LLC. submitting the lowest bid of $1,159,555.06 for Phase A of the project. The contract is attached for City Council review. The project is funded by Wastewater Capital Fund 476. Phase B of the project will go out to bid in spring of 2020 and will consist of utilizing trenchless technology to upsize approximately 2,000 linear feet of sewer main between the Interstate 82/Fair Avenue off -ramp and East Chestnut Avenue. ITEM BUDGETED: Yes STRATEGIC PRIORITY: Economic Development APPROVED FOR SUBMITTAL BY THE CITY MANAGER 2 RECOMMENDATION: Adopt Resolution ATTACHMENTS: Description Upload Date Type D Resolution 1/342020 Resolution D Project Location Mao 1133'2020 Backup Material D Contract 21512020 Contract May 20, 2020 OWNER. PROJECT NAME. City Project No HLA PROJECT NO CONTRACTOR. CHANGE ORDER NO. 1 City of Yakima Fair Avenue Sanitary Sewer Main Improvements (FA-6) 2487A 18182C Hurst Construction, LLC THE FOLLOWING CHANGES ARE HEREBY MADE TO THE CONTRACT DOCUMENT. Original Contract Price (Including State Sales Tax). $1,159,555 06 Current Contract Price Adjusted by Previous Change Order(s) (Including State Sales Tax) $1,159,555 06 Change in Contract Price Due to This Change Order (Including State Sales). ($1,121 41) Adjusted Contract Price Due to This Change Order (Including State Sales Tax) $1,158,433 65 Original Contract Completion Date. May 1, 2020 Current Contract Completion Date Adjusted by Non -Working Days and/or Previous Change Order May 1, 2020 Change in Contract Completion Date Due to This Change Order 23 Working Days Revised Contract Completion Date. June 4, 2020 CONTRACTOR. ENGINEER. OWNER: Digitally signed by Brett S k u be Date: 2020 06 03 15'16 06-07'00' Hurst Construction, LLC HLA En tj�jeering and Land urve yin g, Inc. 6621 City of akima Date. 6/3/2020 Date. Date. b/ovAd 7-49 CITY CONTRACT NO:T� �O -6 C4 at/ Nancy, 0 rote r 1 RESOLUTION NO:.-- 202,6— Uo11 G\PROJECTS\2018\18182C VA FAIR AVE SEWER MAIN - HURST CONST\CHANGE ORDERS \220.06-01 CHANGE ORDER 1.0W May 20, 2020 City of Yakima Fair Avenue Sanitary Sewer Main Improvements (FA-6) City Project No 2487A HLA Project No 18182C CHANGE ORDER NO. 1 ITEM NO. DESCRIPTION UNIT QTY UNIT PRICE AMOUNT 1-1 Add 890 TONS to Bid Item 6, Crushed Surfacing Base Course TON 890 $27.50 $24,475 00 1 2 Deduct 410 TONS from Bid Item 7, Crushed Surfacing Top Course TON 410 ($27 50) ($11,275 00) 1-3 Add 500 TONS to Bid Item 9, HMA 1/2-Inch PG 64-28 TON 500 $78 00 $39,000 00 1-4 Deduct 4,140 TONS from Bid Item 18, Select Backfill TON 4,140 ($30 00) ($124.200 00) 1-5 Excavation and disposal of additional depth of asphalt (see backup information) LS 1 $27,937 94 $27,937 94 1 6 Traffic Control for 13 additional working days, $800/day x 13 days LS 1 $10,400 00 $10,400 00 1 7 COVID impacts to work force and schedule (10 working days) $0 00 1-8 Additional project signing and message Boards (Add to Change Order No 1 and deduct from Minor Change) FA --- $6,560.39 $6,560.39 1-9 Irrigation piping removal and replacement - (add to Change Order No 1 and deduct from Minor Change) LS 1 $9,131 76 $9,131.76 1-10 Revisions to apartment complex manhole connection (add to Change Order No 1 and deduct from Minor Change) FA --- $11,911 03 $11,911 03 1-11 Manhole No 6 connection conflicts (add to Change Order No 1 and deduct from Minor Change) FA --- $5,063 70 $5,063 70 CHANGE ORDER NO 1 SUBTOTAL ($995 18) 8.2% STATE SALES TAX THROUGH 03/31/20 $3,577 67 8.3% STATE SALES TAX BEGINNING 04/01/20 ($3,703 90) CHANGE ORDER NO 1 TOTAL ($1,121 41) G PROJECI S\2018\18182C VA FAIR AVE SEWER MAIN - HURST CONSTCHANGE ORDERS\220.06.01 CHANGE ORDER I xisx 2 REASON Items 1-1 to 1-5 The asphalt in the existing road section is 1-3" thick while only 6" was expected The contractor had added costs associated with the removal and disposal of the extra depth asphalt. The aspalt design depth will increase from 4" to 6" to better match the adjacent roadways and to occomadate this busy arterial and bus route Most of the existing native material was suitable for backfill, so the quantity of select backfill could be significantly reduced Item 1-6 13 additional working days were requested and are hereby granted to the contractor for Change Order Items 1-5, 1-9, 1-10, and 1-11 Traffic control costs were calculated by dividing the original contract bid amount of $40,000 by the number of working days, 50, or $800/day Item 1-7 The contractor requested 10 additional contract days for their work force and schedule impacts due to the COVID 19 pandemic. 10 additional working days are hereby granted with no additional compensation. Item 1-8 The addition of project message boards and additional construction signing was deemed necessary by the City for the State Basketball Tournament at the Sun Dome and for truck detours. See attached backup documentation. Items 1-9 to 1-11 These three items involved work outside the original contract that had significant schedule and monetary impacts. These three items represent 8 of the 13 additional working days mentioned in Items 1-6 above. See attached backup documentation G \PROJECTS\2018\18182C YA FAIR AVE SEWER MAIN HURST CONSTTCHANGE ORDERS\220-06-01 CHANGE ORDER 1 Asx 3 OWNER: PROJECT NAME: City Project No, HLA PROJECT NO.: CONTRACTOR: August 24, 2020 CHANGE ORDER NO. 2 City of Yakima Fair Avenue Sanitary Sewer Main Improvements (FA-6) 2487A 18182C Hurst Construction, LLC THE FOLLOWING CHANGES ARE HEREBY MADE TO THE CONTRACT DOCUMENT: Original Contract Price (Including State Sales Tax): Current Contract Price Adjusted by Previous Change Order(s) (Including State Sales Tax): Change in Contract Price Due to This Change Order (Including State Sales): Adjusted Contract Price Due to This Change Order (Including State Sales Tax): Original Contract Completion Date: Current Contract Completion Date Adjusted by Non -Working Days and/or Previous Change Order: Change in Contract Completion Date Due to This Change Order: Revised Contract Completion Date: CONTRACTOR: ENGINEER: OWNER: Digitally signed by Bret! Skube Brett Skube Dale: 2020 00,28 10140:45-07W' Hurst Construction, LLC HLA Engine and Land Su.',ii1j, Inc. City of Yakima CITY CONTRACT NO' RESOLUTION P10 1 G. IPROJECTSI201811011120 TA FAIR AVE SEWER MAIN - HURST CONSTICHANGE ORDERSICHANGE PRDER NO 22020-08 MAP CHANGE ORDER aMm $1,159,555.06 $1,158,433.65 $42,443.04 $1,200,876.69 May 1, 2020 June 4, 2020 Zero (0) Additional Working Days Date: 8/28/2020 Date: June 4, 2020 3/2-r Date: I 'ITEM NO. 2-1 2-2 2-3 City of Yakima Fair Avenue Sanitary Sewer Main Improvements (FA-6) City Project No. 2487A HLA Project No.: 18182C CHANGE ORDER NO. 2 DESCRIPTION Add 612 TONS to Bid Item 5, Unclassified Excavation Add 2 EA to Bid Item 15, Manhole 48 In, Diam. Type 1 Add 31 CY to Bid Item 33, Controlled Density Fill UNIT CY EA CY QTY 612 2 31 UNIT PRICE $28.50 $7,000.00 $250.00 CHANGE ORDER NO. 2 SUBTOTAL 8.2% STATE SALES TAX THROUGH 03/31/20 August 24, 2020 AMOUNT $17,442.00 $14,000.00 $7,750.00 $39,192.00 $155.51 REASON: Item 2-1 Item 2-2 Item 2-3 8.3% STATE SALES TAX BEGINNING 04/01/20 CHANGE ORDER NO. 2 TOTAL $3,095.53 $42,443.04 The contractor requested payment for asphalt removal in the sewer trench area which during project design was considered part of excavation for the sewer trench. Since the entire roadway was being removed, the City agreed that the asphalt removal should be a separate payment from trench excavation. The contractor replaced an existing brick manhole at approximate Station 13+65, left (west leg of East Spruce Street). An additional manhole was needed when the connection to an existing manhole was not possible at approximate 'Station 13+98, right, because of existing utility conflicts. The manhole provides connection to an apartment complex. Additional Controlled Density Fill (CDF) was used throughout the project at locations where utilities crossed and normal compaction methods were not practical. Many of the CDF locations were at crossings with City water facilities. G TROJECT592018V 8162C YA FAIR AVE SEWER MAIN - MUMMY CONSMCHANGE ORDERS1CHANGE PRDER NO 2t202MOR Matt CHANGE ORDER 2Msx