HomeMy WebLinkAbout12/07/2010 18 Lighting Upgrades Supplemental Agreement wtih Conley Engineering, Inc. • BUSINESS OF THE CITY COUNCIL
YAKIMA, WASHINGTON
AGENDA STATEMENT
Item No` I
For Meeting of December 7, 2010
ITEM TITLE Consideration of a Resolution authorizing the City Manager to execute
Supplement No 1 of the Professional Services Agreement with Conley
Engineering, Inc. to complete the design for upgrading existing lighting features
in several city buildings
SUBMITTED BY Michael Morales, Director of Community & Economic Development f
CONTACT PERSON/TELEPHONE Doug Mayo, P E , City Engineer — 576 -6678
SUMMARY EXPLANATION
The City has engaged Conley Engineering, Inc. to review the audit supplied by Pacific Power,
specify the light fixture replacement types and develop plans for upgrading the lighting fixtures
in six City buildings to be more energy efficient. During Conley's initial review of the Pacific
Power audit, it became apparent that the recommendations made by Pacific Power would not
necessarily supply the same lighting levels that currently exist. This supplement provides for
the lighting calculations required to determine the recommended lighting levels and quantities of
new lighting fixtures in each room The cost to perform the work required in this supplement is
0 in an amount not to exceed $11,000
Resolution XX Ordinance Contract XX Other (Specify)
Funding Source Energy Efficiency and Conservation Block Grant (EECBG)
APPROVED FOR SUBMITTAL. °� ,�
- City Manager
STAFF RECOMMENDATION Staff respectfully requests that Council adopt the resolution
authorizing the execution of Supplement No 1 for the
Consultant Services Agreement with Conley Engineering, Inc
• BOARD /COMMITTEE /COMMISSION RECOMMENDATION
COUNCIL ACTION
RESOLUTION NO 2010 -
A RESOLUTION authorizing the City Manager to execute Supplement No 1 of the
Professional Services Agreement with Conley Engineering, Inc. for
engineering services required to calculate the recommended lighting
levels and determine the quantities and locations of the new lighting
fixtures in each room.
WHEREAS, in September, 2010, the City contracted with Conley Engineering, Inc. for
professional services required for the design of the City Facilities Lighting Upgrade project; and
WHEREAS, additional engineering and consulting services are required to calculate the
recommended lighting levels for the various rooms scheduled for lighting upgrades, and to
determine the location and quantity of the new lighting fixtures, and
WHEREAS, it is requested that the City Manager have the authority to execute a
supplemental agreement for additional engineering and consulting services to ensure that the
rooms will have the correct and desired lighting levels while reducing energy consumption, and,
WHEREAS, the City Council deems it to be in the best interests of the City to authorize
the City Manager to execute a supplemental agreement with Conley Engineering, Inc. for
additional engineering and consulting services to calculate the recommended lighting levels and
determine the quantity and location of the new lighting fixtures in each room, now therefore
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA.
The City Manager is hereby authorized to execute a supplemental agreement with
Conley Engineering, Inc., for additional engineering and consulting services to calculate the
recommended lighting levels and determine the quantity and location of the new lighting fixtures
in each room scheduled for a lighting upgrade as detailed in the attached memorandum from
Conley labeled "Exhibit A" The total additional compensation authorized by said supplement
shall not exceed $11,000 The form of said supplemental agreement shall be reviewed and
approved by the City Attorney or his designee
ADOPTED BY THE CITY COUNCIL this 7th day of December, 2010
Micah D Cawley, Mayor
ATTEST
City Clerk
•
• W W ashington State
IA Department of Transportation
Supplemental Agreement Organization and Address
u
p p g Conley Engineering, Inc
Number 1 1433 Lakeside Court, Suite 100
Yakima, WA 98902
Original Agreement Number
2010 -80 Phone (509) 965-9872
Project Number Execution Date Completion Date
12/7/2010 8/31/2011
Project Title New Maximum Amount Payable
City Facilities Lighting Upgrade Project $ 20,900.00
Description of Work
Design work beyond the original scope of work to perform lighting calculations to determine the recommended
lighting levels, location and quantity of new lighting fixtures for each room scheduled for updating.
The Local Agency of City of Yakima
desires to supplement the agreement entered into with Conley Engineering, Inc.
and executed on , 9 -21 -2010 and identified as Agreement No
All provisions in the basic agreement remain in effect except as expressly modified by this supplement.
0 The changes to the agreement are described as follows.
Section 1, SCOPE OF WORK, is hereby changed to read:
The, scope of work shall also include performing lighting calculations to determine the, recommended lightir a levels,
lncatinn and quantity of new ligjiting fixtures for each room scheduled for updating
11
Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for
completion of the work to read No change
111
Section V, PAYMENT, shall be amended as follows.
The maximum amount payable shall he increased by ,!l 1 6(15 to a maximum amount ofV0 900
as set forth in the attached Exhibit A, and by this reference made a part of this supplement.
If you concur with this supplement and agree to the changes as stated above, please sign in the appropriate spaces
below and return to this office for final action.
By Conley Engineering Inc By City of Yakima
® Consultant Signature Approving Authority Signature
DOT Form 140 -063 EF Date
Revised 9/2005
Conley Engineering, Inc.
Consulting Electrical Engineers
MEMORANDUM
November 15, 2010
To Dan Ford E.I.T
City of Yakima
From Bob Blehart
Re Design Services Proposal — Exhibit "A"
City of Yakima — City Facilities Lighting Upgrade Project
CY 199
Thank you for the opportunity to amend our electrical engineering services for the City Facilities
Lighting Upgrade Projecc located in Yakima, Washington. Based on conversations with you and
Brett Sheffield, we have been tasked to include lighting calculations as well as existing lighting
footcandle measurements for the following areas
• City Hall, 129 N 2nd St.
• Y- PAC/YCTV, 1.24 S 2nd St.
• Fire Station 94, 2404 W Washington Ave
• Fire Station 95, 807 E Nob Hill Blvd.
110
• Publix Works Coinplex, 2301 Fruitvale Blvd.
• SE Community Canter, 1211 S 7 St.
We have based our revised proposal on the following scope of services
Scope of Services
The following tasks are to be performed at each of the five locations as described above
Task 1 Take lighting measurements in each facility in order to obtain the current
lightin levels in each space.
Task 2 Review each existing space in each building for room size and ceiling height
in order to complete lighting calculations for new lighting fixtures.
Task 3 Preparation of a lighting level spreadsheet for each building that shows the
recommended lighting levels and quantities of new lighting fixtures in each
room. The calculations will typically be based on a one - for -one lighting
fixture replacement with new energy efficient luminaires and ballasts based on
types cf lamps and ballasts as agreed upon with the City and as coordinated
with Pacific Power We understand that the City wants to avoid relocating
lighting fixtures unless absolutely necessary in order to keep the project in
C and SettingslbsheffielLocal Settings\Temporary Internet FilesIOLK2Imemo -brb- 101115- Design Services Proposal Exhibit A.DOC
P 0 Box 8326, (akima, WA 98908 205 North 40th Avenue Suite 201 Yakima, WA 98908
Voice: 509- 965 -9872 Fax: 509- 965 -9873
CY -199 - DESIGN SERVICES PROPOSAL
0 budget. Our fees include minor lighting design changes to each facility if
fixtures need to be relocated (If it turns out that lighting levels in many of the
rooms need to be revised, we will provide you with a revised fee proposal for
our scope of work to complete the lighting revisions and to prepare Contract
Documents that show the revisions) This will include showing the revised
locations for lighting fixtures and revised circuiting.
Please note that without completing the site lighting surveys (existing lighting fixture types,
locations and mounting heights) and completing the lighting calculations, we have no way of
knowing whether lighting fixtures will need to be relocated. After we have completed our site
reviews and calculations, we will meet with you to review the calculations and provide
recommendations for any fixture relocations (if desired by the City)
Each task will be completed by the Engineer in the timeframe agreed to by the City and Conley
Engineering and shall begin on the date agreed to by the City and Conley Engmeenng following
written authorization to proceed.
Below is a breakdown of the fee, in hours and hourly rates, for each scope of work.
Project Registered
Engineer Engineer (PE)
110 Time Fee Fee
(Hr) ($) Time (Hr) ($) Total
City Hall,_ 129 N 2 St. 8 $100 9 $120 $1,880
Y- PAC/YCTV, 124 S 2 St. 6 $100 5 $120 $1,200
Fire Station 94, 2404 W Washington
Ave 4 $100 35 $120 $820
Fire Station 95, 807 E Nob Hill
,Blvd. 7 $100 9 $120 $1,780
Pub lix Works Complex, 2301
Fruitvale Blvd. 15 $100 13 $120 $3,060
SE Community Center, 1211 S 7th
St. 10 $100 10 $120 $2,200
Fee Summary*
Services through Bidding — Time and Expense ** City of Yakima
Field visits and lighting calculations. $10,940 00
*Construction services are not included in the above fee summary These may be provided on an
• as needed basis at a time and expense rate
Conley Engineering, Inc. Page 2
CY -199 - DESIGN SERVICES PROPOSAL
* *Please note that this is in addition to the design work that has been previously approved by the S
City
Please call if you have any questions or comments
CC Job File / Chron File
0
i
Conley Engineering, Inc. Page 3