Loading...
HomeMy WebLinkAbout1991-3422 Increasing fees ORDINANCE NO. 3 4 2 2 AN ORDINANCE relating to buildings; increasing mechanical permit fees and enacting Section 11.32.077 of the City of Yakima Municipal Code as a new section. B IT ORDAINED BY TEE CITY OF YAKIM Section 1. Section 11.32.077 of the City of Yakima Municipal Code is hereby enacted to read as follows: "11.32.077 Amendment to Table No. 3 -A. Amendment to Table No. 3 - of the Uniform Mechanical Code adopted by this chapter is hereby amended to read as follows: Table No. 3-A - Mechanical Permit Fees EFFECTIVE 1/21/92 Permit Issuance 1. For the issuance of each permit $15.00 2. For issuing each supplemental permit $ 6.50 Unit Fee Schedule 1. For the installation or relocation of each forced -air gravity -type furnace or burner, including ducts and vents attached to such appliance, up to and including 100,000 Btu /h $11.00 2. For the installation or relocation of each forced -air or gravity -type furance or burner, including ducts and vents attached to such appliance over 100,000 Btu /h $13.00 3. For the installation or relocation of each floor furnace, including vent $11.00 4. For the installation or relocation of each suspended heater recessed wall heater or floor mounted unit heater $11.00 5. For the installation, relocation or replace- ment of each appliance vent installed and not included in an appliance permit $ 6.50 6. For the repair or alteration of, or addition .• to each heating appliance, refrigeration unit, cooling unit,‘absorption unit, or each heating, cooling, absorption, or evaporative cooling system, including installation of controls regulated by this code. $11.00 7. For the installation or relocation of each boiler or compressor to and including three horsepower, or each absorption system to and including 100,000 Btu /h $11.00 8. For the installation or relocation of each boiler or compressor over three horsepower to and including 15 horsepower, or each absorption system over 100,000 Btu /h and including 500,000 Btu /h $18.50 9. For the installation or relocation of each boiler or compressor over 15 horsepower to and including 30 horsepower, or each absorption system over 500,000 btu /h to and including 100,000,000 Btu /h $25.50 10. For the installation or relocation of each boiler or compressor over 30 horsepower to and including 50 horsepower, or for each absorption system over 1,000,000 Btu /h to and including 1,750,000 Btu /h $35.50 11. For the installation or relocation of each boiler or refrigeration compressor over 50 horsepower, or each absorption system over 1,750,000 Btu /h $58.00 12. For each air - handling unit to and including 10,000 cubic feet per minute, including ducts attached thereto $ 8.50 NOTE: This fee shall not apply to an air - handling unit which is a portion of a factory - assembled appliance, cooling unit evaporative cooler or absorption unit for which a permit is required elsewhere in this code. 13. For each air - handling unit over 10,000 cfm $13.00 14. For each evaporative cooler other than portable type $ 8.50 15. For each ventilation fan connected to a • single duct $ 6.50 • 16. For each ventilation system which is not a portion of any heating or air - conditioning system authorized by a permit $ 8.50 17. For the installation of each hood which is served by mechanical exhaust, including the ducts for such hood $ 8.50 18. For the installation or relocation of each domestic -type incinerator $13.00 19. For the installation or relocation of each commercial or industrial -type incinerator $47.00 20. For each appliance or piece of equipment regulated by this code but not classed in other appliance categories, or for which no other fee is listed in this code $ 8.50 21. When Chapter 22 is applicable (see Section 103), permit fees for fuel -gas piping shall be as follows: 4111 For each gas - piping system of 1 -4 outlets $ 5.00 For each gas - piping system of 5 or more outlets, per outlet $ 1.50 22. When Chapter 24 is applicable (see Section 103), permit fees for process piping shall be as follows: For each hazardous process piping system (HPP) of 1 -4 outlets $ 5.00 For each piping system of 5 or more outlets, per outlet $ 1.50 For each nonhazardous process piping system (NPP) of 1 -4 outlets $ 5.00 For each piping system of 5 or more outlets, per outlet $ 1.50 Other Inspections and Fees: 1. Inspections outside or normal business hours • h ate• (minimum charge - two hours) $30 per hr* 2. Reinspection fees assessed under provisions • of Section 305 (g) $30 per hr* 3. Inspections for which no fee is specifically indicated (minimum charge - one -half hour) $30 per hr* 4. Additional plan review required by changes, additions or revisions to approved plans $30 per hr* (minimum charge - one -half hour) *Or the total hourly cost to the jurisdiction, whichever is greatest. This cost shall include supervision, overhead, equipment, hourly wages and fringe benefits of the employees involved." Section 2. This ordinance shall be in full force and effect thirty days after its passage, approval and publication as provided by law and by the City Charter. PASSED BY THE CITY COUNCIL, signed and approved this // day of , 1991. MAYOR ATTEST: �,Q > C-4-1 / CITY CLERK PUBLICATION DATE 46 oh/ EFFECTIVE DATE '// i /9a,