HomeMy WebLinkAboutR-2018-098 2019-2024 Six-Year TIP and Metropolitan Transportation PlanRESOLUTION NO. R-2018-098
A RESOLUTION adopting the Six -Year Transportation Improvement Program for the period
of 2019 through 2024 for the construction of streets and arterial streets in
the City of Yakima and amending the Metropolitan Transportation Plan
WHEREAS, the City of Yakima annually prepares, reviews and adopts a Six -Year
Transportation Improvement Program for the construction of streets and arterial streets in the City
of Yakima for the ensuing six year period, all as contemplated and required by State RCW
35.77 010 and applicable federal law; and
WHEREAS, the City of Yakima desires to amend the Metropolitan Transportation Plan to
ensure compliance with the Growth Management Act and the regional transportation plan for the
construction of streets and arterial streets in the City of Yakima, all as contemplated and required
by State and Federal law, and
WHEREAS, after public hearings on the matter, held at the regular meeting of the Yakima
City Council on August 6, 2018 and August 21, 2018, with proper public notice as required by
RCW 35 77 010, the City Council finds that the plan attached hereto should be adopted as the
Six -Year Transportation Improvement Program for the period of 2019 through 2024 for the
construction of streets and arterial streets in the City of Yakima, and
WHEREAS, adopting the Six-year Transportation Improvement Program and amending
the Metropolitan Transportation Plan is in the best interest of the City and its residents, now,
therefore,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA:
The Six -Year Transportation Improvement Program for the period of 2019 through 2024,
a copy of which is attached hereto and by this reference made a part hereof, is hereby adopted
as the official Six -Year Transportation Improvement Program for the City of Yakima, including
proposed amendments to the Metropolitan Transportation Plan along with Street Improvements,
which are also approved
ADOPTED BY THE CITY COUNCIL this 21st day of August, 2018.
ATTEST
SonyaZ`I a Tee, City Clerk
ITEM TITLE:
SUBMITTED BY:
BUSINESS OF THE CITY COUNCIL
YAKIMA, WASHINGTON
AGENDA STATEMENT
1
Item No. 10.
For Meeting of: August 21, 2018
Public Hearing to consider: A) Resolution adopting the Six -Year
Transportation Improvement Program for the years 2019 to 2024,
and to amend the Metropolitan Transportation Plan; and B)
Resolution amending the Yakima Urban Area Comprehensive Plan
Capital Facilities Element
Scott Schafer, Director of Public Works
Brett Sheffield, Chief Engineer - 576-6797
SUMMARY EXPLANATION:
A) Each year the City of Yakima (City) is required by RCW 35.77.010 and RCW 36.81.121 to
update its Six -Year Transportation Improvement Program (T I P) for submittal to the Washington
State Department of Transportation. This Plan must include all transportation projects for which
state gas tax revenue and federal revenue will be used.
The proposed 2019-2024 TIP includes fifteen projects that have funding. The funded projects
are listed below by Priority Number:
#3 — Garfield Elementary Safety Improvements
#4 — Yakima Valley Transportation Company Preservation
#5 — Spring Creek Road Reconstruction
#6 — South 36th Avenue Reconstruction
#7 — Sorenson Road Reconstruction
#8 — Bravo Company Boulevard
#11 — Cowiche Canyon Trail
#12 — N.34th Avenue/Fruitvale Boulevard & N. 34th Avenue/River Road Roundabouts
#13 — Complete Street Projects
#14 — East Nob Hill Boulevard and Fair Avenue Intersection Improvements
#15 — S. 80th Avenue Wide Hollow Creek Bridge
#16 — Wide Hollow Road Bridge in the Vicinity of 89th Avenue
#17 — West River Road Improvements
#22 — 64th Avenue and Ahtanum Road Intersection Improvements
2
#24 — McClure Elementary School Vicinity Safety Improvements
Attached is the complete 2019 — 2024 Six -Year TI P, which describes each project. The City will
continue to seek funding for the remainder of the projects included in the 2019-2024 TIP. Per
City Council directive, the Northside Alley Paver project will remain on the 2019-2024 Six -Year
T I P.
City Council and the public are welcome to add other arterial system projects to the list. The Six -
Year TI P project listing will be finalized at the August 21st hearing and sent to the Yakima Valley
Conference of Governments (YVCOG) after approval.
In order to utilize federal funds, such as those administered by the Federal Highway
Administration (FHWA) and the Federal Transit Authority (FTA), projects must be included in the
Statewide Transportation Improvement Program (STIP). The STIP is a prioritized program of
transportation projects, complied from local and regional plans, along with the Washington
Transportation System Plan (WTP), which provides a backbone for developing projects for the
intermodal transportation network in the State of Washington.
The STI P contains federally funded projects plus state and local projects that are regionally
significant. These projects have been identified through the planning process as the highest
priority for the available funding to the state's Transportation Program. Planning activities of state
and local governments are essential parts of integrated regional planning processes. Long range
transportation planning is a part of the comprehensive land use planning carried out by local
governments. Citizen participation is an integral part of the planning process at all levels. Local
agencies are required to develop and adopt a Six-year Transportation Program; holding at least
one public hearing during its development.
B) The City is required to amend the Yakima Urban Area Comprehensive Plan Capital Facilities
Element by incorporating the adopted Six -Year TI P for 2019 to 2024. This will ensure that we
are in compliance with the Growth Management Act and that we are consistent with the
Comprehensive Plan as required. The amendment is limited to incorporating only those projects
that are adopted in the Six -Year TIP and is not subject to the "once a year" change required under
the laws of the Growth Management Act.
The Public Hearing notice has been provided to all Yakima -area media, including to Decides',
KDNA Radio, El Sol de Yakima, Hispanavision, Bustos Media, and El Mundo.
ITEM BUDGETED:
NA
STRATEGIC PRIORITY: Public Trust and Accountability
APPROVED FOR
SUBMITTAL:
STAFF RECOMMENDATION:
Adopt resolutions.
BOARD/COMMITTEE RECOMMENDATION:
ATTACHMENTS:
Description Upload Date
O Resdution 2019 - 2024 TIP Adoption 8/7/2018
O Resdution No 2 8/7/2018
O Six Year TIP 8/7/2018
Type
Cover Memo
Cover Memo
Cover Memo
3
Agency: Yakima
Co. No.: 39
City No.: 1485
1
2
4 1
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to Be Done
3
North 1st Street Revitalization, Phase 2
N. 1st Street
from: 'HStreet to: 'N'Street
Improve North 1st Street by rehabilitating the pavement
and lane markings, removing on -street parking,
enhancing street and pedestrian lighting, constructing
median islands and installing various pedestrian and
decorative elements.
4
5
7
T
5
Six Year Transportation Improvement Program
From 2019 to 2024
Hearing Date: 8/6/18 & 8/21/18 Adoption Date: 8/21/2018
Amend Date:
Project Costs in Thousands of Dollars
8
Phase
Start
9
CN 1/1/2020
Totals
14 2 North lst Street Revitalization, Phase
N. 1st Street
from: MLK Blvd. to: 'kr Street
Improve North 1st Street by rehabilitating the pavement
and lane markings, removing on -street parking,
enhancing street and pedestrian lighting, constructing
median islands and installing various pedestrian and
decorative elements.
Garfield Elementary Safety provements
Various Streets
from: to:
This project will make various pedestrian safety
improvements in the vicinity of Garfield Elementa
School, such as, constructing sidewalk, improving
roadway crossings, installing flashers.
4 4 Yakima yokel, Tronsportation6Mpany Preservation
Yakima Avenue
from: Yakima Avenue to: 6th Avenue
This project will remove and replace a portion of the
existing trolley rail in the vicinity of the intersection
of 6th Avenue and Yakima Avenue.
06
12
0.48
P CN 1/1/2020
T
G
5
T
CN
Fund Source Information
Federal Funding
Federal State
Federal Fund
Cost by Fund Code
Code
Phase
10
UILD
4,320
TIB
BUILD
4,320
4,320
State Local Total
Funds Funds Funds
14 15
1,080 0 5,400
TIB
1,080
5,400
5,400
Resolution No.:
Expenditure Schedule
(Local Agency)
1st
6
Federally Funded
Projects Only
Envir,
2nd 3rd 4th Type
17
5,400
5,400
5,400
Totals 4,320 5,400 0 5,400
2019
SRTS
Totals
CN 1/1/2019
STP(E)
4
4
52
4
4
41 4
2
52
Tota Is 52 52 52
CE
CE
CE
CE
R/W
Required
Date
(MM/YY)
21
Yes
2/31/2018
Yes
12/31/20
Yes
1/2019
0
0)
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co
MPO/RTPO: YVCOG
t; Project identification
A. PIN/Federal Aid No. B Bridge No.
C. Project Trtle
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to Be Done
1 2
3
Six Year Transportation Improvement Program
From 2019 to 2024
Hearing Date: 8/6/18 & 8/21/18 Adoption Date: 8/21/2018
Resolution No.:
Amend Date:
Project Costs in Thousands of Dollars
Federal Funding
Federal Fund
Code
Fund Source Information
Federal
Cost by
Phase
State
Fund Code
State
Funds
Loca
Funds
Total
Funds
Expenditure Schedule
(Local Agency)
2nd
3rd
4th
Federally Funded
Projects Only
Envir.
Type
R/W
Required
Date
(MM/YY)
Spring Creek Road Reconstruction
Spring Creek Road
rom: Washington Ave. to: 36th Avenue
Widen roadway to three lanes, install curb, gutter,
sidewalk, storm drainage system and street lights.
5. 36th Avenue Reconstruction
36th Avenue
ram. Spring Creek Rd. to: Sorenson Rd.
Widen roadway to three lanes,instal i curb, gutter,
sidewalk, storm drainage system and street lights.
Sorenson Rood Reconstruction
Sorenson Road
ram: 360 Avenue to: 38th Avenue
Widen roadway, inqall curb, gutter, sidewalk, gornn
drainage system and street lights.
16 8 Bravo Company Boulevard
North 10th Street
ram: 'HStreet
to: Lincoln Ave.
Construct four- ane roadway section with median,
bike lanes and roundabouts, install curb, gutter,
sidewalk, street lighting and storm drainage system,
along with water and sewer systems.
06
To
0.65 P CN 2019
T
5
0
Totals
LIFT 15,000 15,000 15,000
15,000 0 15,000 15,000
2019
Agency: Yakima
Co. No.: a
City No.: 1485
I1--, Functional
16
16
00
14
9
10
11
12
Project Identification
A. PIN/Federal Aid No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to Be Done
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
B. Bridge No.
3
E. '1-i' Street Extension, Ph. 1
E. 'H' Street
from: 1st Street
to: 7th Street
Construct new roadway including water, sewer, curb,
gutter, sidewalk, detached pathway, street lighting
and storm drainage system.
E. 'th Street Extension, Ph.
E. Street
from: 7th Street to: 1-82
Construct new roadway including water, sewer, curb,
gutter, sidewalk, street lighting and storm drainage
system.
Cowiche Canyon Trait
Cowiche Canyon
from: Powerhouse Road to: Trailhead
Construct a 10 -foot wide pathway, including bridges
over Cowiche Creek,
N. 34th Ave./Fruftvafe Blvd. & N. 34th Ave./River
Road Roundabouts
34th Avenue
from: Fruitvale Blvd. to: River Road
Improve the intersections of N. 34th Avenue &
Fruitvale Boulevard and N. 34th Avenue & River Road
by installing roundabouts
--
E
4
01
08
01
08
28
03
12
5
5
5
1.10
0.55
2.00
N/A
7
5
0
P
P
0
5
w
ic Phase
Start
8
CN
CN
2020
Totals
1/1/2021
Six Year Transportation Improvement Program
From 2019 to 2024
Hearing Date: 8/6/18 & 8/21/18 Adoption Date: 8/21/2018
Amend Date:
Project Costs in Thousands of Dollars
Fund Source Information
Federal Fundin
Federal Fund
Code
Totals
RW 7/1/2019
CN 1/1/2020
Totals
CN 1/1/2019
Totals
10
BUILD
Federal
Cost by
Phase
11
4,800
State
Fund Code
12
TIB
FISIP
IFT
788
State
Funds
Local
Funds
14
1,200
Total
Funds
15
6,000*
Resolution No.:
Expenditure Schedule
(Local Agency)
1st
16
0 6,000 0
2,0000 500
CWA 105
CWA 1,695
2,5000
500 2,500
105
1,695
2nd
17
6,000
3rd
8
2,500
105
1,695
1,800 105 1,695
88
876
876
788 88 876 876
4th
19
2,500 0
Federally Funded
Projects Only
R/w
Envir. Required
Type Date
(MM/YY)
20 21
CE
CE
CE
CE
No
12/1/2018
Yes
1/1/2019
Yes
1/1/2020
Yes
1/1/2019
03
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
2 C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to Be Done
19
2 3
• 13H Complete Streets Projects
Various Streets
,from: to: N/A
i.Construct sidewalk on the south side of Swan Avenue from McGuiness
Park to Campbell Lane, on Race St between 8th St and bathes Ave.,
Routh side of Prasch Ave. from 20th to 16th, south side of Viola from loth
Ave to 4th Ave. and on Powerhouse road from Robertson Elementary to
11 Englewood,
4 14 E. Nob Hill Blvd, & Fair Ave. 1/5 Improvements
Nob Hill Boulevard
from: E, Nob Hill Blvd. to: Fair Ave.
Widen Nob Hill Boulevard through the intersection,
construct left -turn lane, curb, gutter, sidewalk, street
lighting and drainage. Upgrade signal by installing mast
arm structures.
03
04
17 15 5. BOth Avenue Box Culvert
S. 80th Avenue
from: Wide Hollow Rd. to: Platt) Ave.
Install box culvert adjacent to the 80th Avenue Bridge
to reduce flooding issues. The City's involvement is
only to pass through of an Ecology grant in
conjunction with the County's flood plain
management project.
17 16 Wide Hollow Road Box Culvert
Wide Hollow Road
from: 89th Avenue to: 88th Avenue
Install box culvert adjacent to Wide Hollow Road
Bridge to reduce flooding issues. The City's
involvement is only to pass through of an Ecology
grant in conjunction with the County's flood plain
management project.
09
N/A
0.0
0.05
T
T
Project Costs in Thousands of Dollars
Fund Source Information
Federal Funding
Federal Fund
Code
Federal
Cost by
Phase
State
Fund Code
2
State
Funds
13
365
CN 1/1/2025
STP(1.1)
I
1,457
Six Year Transportation Improvement Program
From 2019 to 2024
Hearing Date: 8/6/18 & 8/21/18 Adoption Date: 8/21/2018
Amend Date: Resolution No.:
Local
Funds
14
227
Total
Funds
15
365
1st
16
365
365 365
1,684
Expenditure Schedule
(Local Agency)
2nd
17
3rd
18
4th
Thru
6th
19
1,684
Federally Funded
...ProjectsOnly
Envir,
Type
20
CE
R/W
Required
Date
(MM/YY)
21
Yes
2519
Yes
2025
Totals
CN
201
Totals
CN 1/1/2019
,457
DO
DOE
90
90
227 1,684
0 90
Totals 90
90
90
90 90
90 90
6
CE
CE
0
(.0
Agency: Yakima
Co. No.: a
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Project identification
a:a
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
Le.
8 E. Beginning MP or Road - Ending MP or Road
F . Describe Work to Be Done
2
17 West River Road Improvements
River Road
from: 40th Avenue to: 34th Avenue
Reconstruct and widen roadway to three lanes, install
curb, gutter, sidewalk, street lights and drainage.
0.
4
03
04
Project Costs in Thousands 06 Dolla
Fund Source Information
Federal Funding
Federal Fund
Code
10
Federal
Cost by
Phase
State
Fund Code
2
TIB
State
Funds
550
Six Year Transportation Improvement Program
From 2019 to 2024
Hearing Date: 8/6/18 & 8/21/18 Adoption Date: 8/21/2018
Amend Date: Resolution No.:
Local
Funds
14
364
522
Total
Funds
15
364
1,172
1st
16
364
1,172
650 886 1,536 1,536
Expenditure Schedule
(Local Agency)
2nd
17
3rd
4th
19
Federally Funded
Projects Only
Envir,
Type
20
CE
R/W
Required
Date
YY)
21
Yes
4/1/2019
00 18 Northside Alley Paver
Alleys between Folsom Ave. and Fruitvale Blvd.
from: 16th Ave. to: 6th Ave.
Pave the east/west gravel alleys between Folsom
Avenue and Fruitvale Boulevard from 16th Avenue to
6th Avenue.
07
19 Powerhouse Bike Lanes and Sidewalk 05
Powerhouse Road 12
from: Mobil Home Park to Cowiche Canyon Rd
Construct 5 -foot wide bike lanes on both sides,
construct a 5 -foot wide sidewalk on the east side of
Powehouse Road and install a crosswalk across
Powerhouse Road at Cowiche Canyon Road.
3.50
T
PE 1/1/2020
DJ 1/1/2021
CMAQ
CMAQ
38
476
5
74
CE
0.60
T
0
PE
RW
CN
Totals
9/1/2019
1/1/2020
1/1/2021
Yes
/1/2021
Totals
17 20 24th Avenue Road Diet
24th Avenue
from: Nob Hill Blvd.
Re -stripe this four -lane section to be a three -lane
section with bike lanes on each side of 24th Avenue.
to: Tieton Drive
2
0.96
PE
CN
9
2019
2020
Totals
PedAlike-
Ped/Bike
2
20
243
872 70 60 742
20
223
20
223
243 20 223
CE
0
0
Agency: Yakima
Co. No.: 39
City No.: 1485
0
-.,
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Project Identification
`El'I A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to Be Done
2
4 5
6 7
8
Phase
Start
9
Six Year Transportation Improvement Program
From 2019 to 2024
Hearing Date: 8/6/18 & 8/21/18 Adoption Date: 8/21/2018
Amend Date: Resolution No.:
Project Costs in Thousands of Dolla
Fund Source Information
Federal Funding
Federal State
Federal Fund
Cost by Fund Code
Code Phase
10
11 12
State
Funds
13
Local
Funds
4
4
2
16th Ave. & Tieton Or. Intersection improvements
16th Avenue
from: 16th Ave. to: Tieton Dr,
Reconstruct and widen 16th Avenue and Tieton Drive
by adding left -turn lanes for all movements at the
intersection. Upgrade the traffic signal.
22 l8th Street Underpass
Yakima Avenue
rom: Yakima Ave.
to: 18th Street
Replace the bridge on E. Yakima Avenue that crosses
over 18th Street.
7
23 64th Ave. & Ahtanum intersection Improvements
64th Avenue
from: 64th Ave. to: Ahtanum Rd.
Improve the 64th Avenue and Ahtanum Road
intersection by constructing a westbound right -turn
lane on Ahtanum and installing a traffic signal.
14
24 South 16th Avenue Sidewalks
6th Avenue
from: Washington Ave.
to: Nob Hill Blvd.
Install 7 -foot sidewalk on the west side of 16th
Avenue.
2
2
12
P
T
0
C
0.02
N/AT
S
P
T
PE
RW
CN
V1./2020
1/1/2021
4/1/2022
STP(U)
STP(U)
STP(U)
260
3,460
1,300
14
40
540
200
Total
Funds
Expenditure Schedule
(Local Agency)
1st
15 16
2nd
3rd
4th
Federally Funded
Projects Only
Envir,
Type
7 18 19
R/V)/
Required
Date
(MM/YV)
20 21
Totals 5,020
PE 1/1/2020
CN 1/1/2021
BRAC 240
BRAC 2,288
780
60
572
300
4,000
1,500
300
3,460
00 300 3,460
00
2,860
00
2,860
Totals 2,528 632 3,160 300 2,860
0.88
P
T
c
Totals
PE' 1/1/2020 PBP
RW 6/1/2020 PBP
CN 6/1/2021 PBP
2019
2020
CMAQ
CMACI.
Totals
43
404
447
54
234
369
657
7 50
467
0
209
258
70 517 50 209 258
6
26
41
73
60
260
410
730
60
260
410
320 410
1,500
1.500
CE Yes
CE
CE
CE
4/1/2022
No
Yes
/1/2020
Yes
6/1/2021
Agency: Yakima
Co. No.: a
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Project identification
g A. PIN/Federal Aid No. B. Bridge No.
2 C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to Be Done
2
- =
•tra.
E PA 19- 717.
Phase
Start
Project Costs in Thousands of Dollars
Fund Source Information
Six Year Transportation Improvement Program
From 2019 to 2024
Hearing Date: 8/6/18 & 8/21/18 Adoption Date: 8/21/2018
Amend Date: Resolution No.:
Federal Funding
Federal State State
Federal Fund
Cost by Fund Code Funds
Code Phase
4 5 6 7 8 9 10
11 12
Local
Funds
Total
Funds
1st
13 14 15
Expenditure Schedule
(Local Agency)
2nd
7
3rd
4th
9
Federally Funded
Projects Only
Envir,
Type
20
9
25 McClure Elementary Schaaf Safety improvements
Various locations
from: to:
This project will make various pedestrian safety
improvements in the vicinity of McClure Elementary
'School, such as, constructing sidewalk, ADA ramps
and improving crosswalks.
19 26 McKinley Elemento chool Safety Improvements
Various locations
from: to:
This project will make various padestrian safety
improvements in the vicinity of McKinley Elementary
School, such as, replacing delapitated sidewalk,
constructing ADA ramps, and installing a HAWK
pedestrian crossing system.
9
27 6th Avenue Rood ay I prove eats
6th Avenue
from: Walnut Street to: River Road
Reconstruct the existing trolley rail and impacted
roadway, grind and overlay the remaining width of
6th Avenue.
2
28 SR 12 & 16th Avenue Interchange
Westbound ramps of SR 12
from: 16th Avneue to: 58 22
Construct a roundabout where the westbound ramp
intersect with N, 16th Avenue.
12
2
N/A
T
/2019
1/2019
Totals
PE 1/1/2020
CN 1/1/2021
SRTS
SRTS
SRTS
SRTS
To als
20
22
248
40
460
500
03
06
P
N/A 0
PE
CN
1/1/2019 STP(U)
1/1/2020 STP(U)
20 20
228 228
248 248
10 50
460
10 510
50
460
OTHER 2001 400
OTHER 1,650 3,350
86
779
Totals 865
3,750
4
121
600
5,000
5,600
100
900
CE
R/W
Required
Date
(MM/YY)
Yes
2019
CE
No
600
5,000
0 0 5,600
100
900
35 1,000 100 900
CE
CE
No
Agency: Yakima
Co. No.: 39
City No.: 1485
tf, Project Identification
-2 A. PIN/Federal Aid No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
7 F. Describe Work to Be Done
Co. Name: Yakima Co
MPO/RTPO: YVCOG
B. Bridge No.
14
14
2
29 S. 1stSt. & 6. Washington Ave. provements
South 1st Street
from: S. 1st Street to: E Washington Ave.
Realign intersection, widen E. Washington Avenue to
accommodate an additional lane, replace curb, gutter
and sidewalk, and install a new traffic signalization
system.
30 Washington Ave. & Longfiber Rd. intersection
Washington Avenue
from: Washington Ave. to: Longfiber Rd.
Improve the Washington Avenue and Longfiber Road
intersection by constructing an eastbound left -turn
lane on Washington and a northbound left -turn lane
an Longfiber, install or replace curb, gutter, sidewalk,
street lighting, storm drainage and safety flashing
signal
14
31 E. Nob Hill Boulevard Reconstruction
E. Nob Hill Boulevard
from: S. 6th Street
to: S. 18th Street
Reconstruct and widen roadway to 5 lanes with
intersection improvements, curb, gutter, sidewalk,
street lighting and drainage system
14 32 N. 40th Ave. & Summitview Ave. Intersection
N. 40th Avenue
from: N. 40th Ave. to: Summitview Dr.
Improve the intersection by constructing larger
corner radii, lengthening the turn lanes, and
upgrading the traffic signal system.
4
03
06
N/A C
T
03 P
PE
CN
Totals
Phase
Start
9
15152021
15152022
15152023
PE 1,11T2020
CN
Project Costs in Thousands of Dollars
Fund Source Information
Federal Funding
Federal State
Federal Fund
Code Cost by Fund Code
Phase
10
STP(U)
STP(U)
STP(U)
0
100
100
688
2
State
Funds
Totals
0.85 C PE 1/1/2020 STP(U)
T RW 1/1/2021 STP(U)
W , CN 1/2022 STP(U)
0
P
Totals
PE
RW
CN
/1/2020
1/2021
1/2022
STP(U)
STP(U)
STP(U)
Totals
888
545
1,090
6,532
8,187
126
130
692
Six Year Transportation Improvement Program
From 2019 to 2024
Hearing Date: 8/6/18 & 8/21/18 Adoption Date- 8/21/2018
Amend Date: Resolution No.:
Local
Funds
14
300
300
1,400
Total
Funds
15
300
300
1,400
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
1st
16
2,000 2,000
18
14
107
114
114
795
135 1,023
85 630
170 1,260
1,020 7552
1,275 9,442
17 1.43.
20 10
108
948 145 1,093
2nd
7
3rd
114
300
Enyir.
4th Type
19 20
300
CE
300
114
79
114 114 795
630
1,260
7,552
CE
CE
630 1 1,260 7.552
43
150
800
143 150 800
CE
R/W
Required
Date
YY
21
Yes
2023
Yes
/1/2022
Yes
1/1/2022
Yes
1/1/2022
Agency: Yakima
City No.: 1485
z
Co. Name: Yakima Co.
Six Year Transportation Improvement Program
From 2019 to 2024
MPO/RTPO: YVCOG Hearing Date: 8/6/18 & 8/21/18 Adoption Date: 8/21/2018
Amend Date: Resolution No.:
Project Identification
A. PIN/Federal Aid No. 5, Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to Be Done
2
4
N. 16th Avenue & Fruitvole Blvd, 1/5
N. 16th Avenue
from: N. 16th Ave. to: Fruitvale Blvd.
Improve the intersection by constructing larger curb
radii, installing ADA ramps, and upgrading the traffic
signal system.
16 34
E. Meod Avenue Pecans ruc ion
E. Mead Avenue
from: Rudkin Rd. to: Fair Ave.
Partner with Union Gap to reconstruct E. Mead
Avenue, install curb, gutter, sidewalk and storm
drainage system.
7
7
5 5. 48th Avenue Reconstruction
South 48th Avenue
from: Summitview Ave.
to: Nob Hill Blvd.
Reconstruct and widen 48th Avenue, install curb,
gutter, sidewalk, street lighting and drainage system,
6 Powerhouse Rd. & Englewood Ave. 1/.5
Powerhouse Rd.
from: Powerhouse Rd. to: Englewood Ave.
Realign intersection, install curb, gutter, sidewalk and
safety flashing signal. Possibly construct a
roundabout.
4
5 6
Project Costs in Thousands of Dollars
T
0
03
05
2
.00
N/A
T
5
Phase
Start
9
PE 1/1/2020
RW 1/1/2021
CN 1/1/2022
Fund Source Information
Federal Funding
Federal
Federal Fund Cost by
Code
10
STP(IN
STP( IJ)
STP(U)
Phase
11
126
173
800
State State
Fund Code Funds
Totals
PE 1/1/2021 SINS)
CN 1/1/2022 STP(S)
Totals
1,099
146 TPP
1,920 TPP
PE 1/1/2020 STP(U)
RW 1/1/2021 STP(U)
CN 1 1/1/2022 STP(U)
Totals
P PE 1/1/2020
T RW 1/1/2021
C CN 1/1/2022
0
w
STP(S)
STP(S)
STP(S)
2,066
268
623
1,782
2,673
25
50
289
Totals 364
2
27
360
Local
Funds
4
Total
Funds
15
70 1,289
9
120
129
42
97
278
182
2,400
2,582
310
720
2,060
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
1st
16
2nd
7
3rd
200
44 200
310
182
4th
Thru
6 h
R/W
Envir, Required
Type Date
(MM/YY)
20
CE
925
925.
CE
2,400
182 2,400
720
2,060
417 3,090 310 720 2,060
50
289
50
100
578
50
100
578
CE
2
Yes
/1/2022
0
Yes
1/1/2022
CE Yes
1/1/2022
364 728 100 578
Agency: Yakima
Co. No.: .11
City No.: 1485
1 1
11 .71
72
0
1 1
14
16
2
37
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to Be Done
W. Lincoln Ave. & MLK Blvd, Realiqsme.nt
W. Lincoln Avenue
from: N. 5th Ave. to: Custer St.
Realign W. Lincoln Avenue, install curb, gutter,
sidewalks, street lighting, drainage,
38 Tieton Dr. & S, Sth Ave. 1/5 Improvements
Tieton Drive
from: Tieton Dr. to: S. 5th Ave.
Remove existing traffic signal and construct a
roundabout, remove and replace curb, gutter,
sidewalk, street lighting and drainage
17
14
39
40
T4
E
4..
01
12
2
Yakimo Downtown Future Initiatives, Phase 5 06
12
from: 1st Street to: 9th Street
Install historic lighting, sidewalk modifications and
other improvements. Exact improvement ares(s) to
be determined
E. Nob Hill Blvd. & S. 18th Street 1/5 Improvements
E. Nob Hill Boulevard
from: E. Nob Hill Blvd. to: S. 18th Street
Widen south leg for double left turn from westbound
Nob Hill, install curb, gutter, sidewalk, upgrade traffic
signal system
01
04
5
P
P
6
0.50
N/A
N/A
0.10
03
15
7
c
T
P
G
W
T
T
c
S
c
T
W
S
Phase
11 Start
2
PE
RW
CN
1/1/2020
1/1/2021
1/1/2022
Project Costs in Thousands of Dollars
Fund Source information
Six Year Transportation Improvement Program
From 2019 to 2024
Adoption Date: 8/21/2018
Resolution No.:
Hearing Date: 8/6/18 & 8/21/18
Amend Date:
Federal Fundin
Federal Fund Federal State
Cost by Fund Code
Code Phase
10
STP( 6)
STP( 6)
STP( Ei
11
324
1,047
2,162
12
State
Funds
13
Local Total
Funds Funds
14
51
163
338
15
Expenditure Schedule
(Local Agency)
1st
2nd 3rd
375
1,210
2,500
Totals 3533 552 4,085
PE 1/1/2020
RW 1/1/2021
CN 1/1/2022
STP(U)
STP(U)
STP(U)
130
104
1,038
20 150
16 120
162 1,200
6
17
18
375
4th
Thru
6th
1,210
19
2,500
375 1,210 2,500
150
120
Totals 1,272 198 1,470
PE
CN
1/1/2021
4/1/2022
.:Totals
PE 1/1/2021
RW 1/1/2022
CN 1/1/2023
STP(U)
STP(U)
STPIU)
OTHER
OTHER
500
5,500
500
5,500
1,200
150 120 1,200
6,000 6,000
75
75
623
Totals 773
12
12
81
87
87
704
105 878
500
5,500
500 5,500
87
87
704
87 7
Federally Funded
Projects Only
R/W
Envir, Required
Type Date
(MM/YY)
20
CE
CE
CE
CE
21
Yes
1/1/2022
Yes
1/1/2022
No
Yes
1/1/2023
Agency: Yakima
Co. No.:
City No.: 1485
Project Identification
A. PIN/Federal Aid No,
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
oE F. Describe Work to Be Done
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
B. Bridge No.
2
4
0.
E
4
41 S. 48th Ave. & Summitview Ave. Signoilzatiori
Summitview Avenue
from: Summitview Ave. to: S. 48th Ave.
Install traffic signal at the intersection of Summitvie
Avenue and 48th Avenue,
14
42 S. 72nd Ave. & W. Washington Ave. VS
S. 72nd Avenue
from: s. 72nd Ave. to: W. Washington Ave.
Improve intersection by installing a traffic signal
system or roundabout.
4
43 N, 40th Ave, & Englewood Ave. Intersection
N. 40th Avenue
from: N. 40th Ave.
to: Englewood
Replace traffic signal poles and upgrade controller,
4
44 Nob Hill Boulevard Sidewaik Improvements
Nob Hill Boulevard
from: S. 16th Ave. to: S. 6th Street
Construct sidewalk in locations where it doesn't exis
on the south side of Nob Hill
2
2
06
2
5
6
N/A
N/A
P
P
T
0
8
PE
RW
CN
Phase
Start
9
1/1/2022
6/1/2023
1/1/2024
Totals
N/A
/2020
1/2021
1/2022
Totals
PE 1/1/2021
CN 6/1/2022
Totals
2
• 2.50
P
T
5
PE
'21
1/1/2022
/1/202
Totals
Project Costs in Thousands of Dollars
Fund Source Information
Six Year Transportation Improvement Program
From 2019 to 2024
Hearing Date: 8/6/18 & 8/21/18 Adoption Date: 8/21/2018
Resolution No.:
Amend Date:
Federal Funding
Federal State State Local
Federal Fund
Cost by Fund Code Funds Funds
Code
Phase
0
STP(S)
STP(S)
STP(S)
STP(C)
STP(C)
STP(C)
12
69
69
692
830
4
Expenditure Schedule
(Local Agency)
Total
Funds 1st 2nd
5
11 80
11 80
108 800
0 96
STP(U)
STP(U)
STP(S)
STP(S)
STP(S)
86
86
778
950
43
311
354
43
173
389
605
14
14
122
100
100
900
6
7
8
4th
Thru
6th
19
00
150 1,100 100
7 50
49 360
56 410
7
27
61
50!
200,
450
95 700
100
Federally Funded
Projects Only
R/W
Envir. Required
Type Date
(MM/YY)
20 2
80 CE Yes
80
800
960
900
100 900
0
50
360
200
450
650
CE
CE
CE
2024
Yes
/1/2022
No
Yes
1/1/2023
Agency: Yakima
Co. No.: a
City No.: 1485
14
16
19
17
5
46
47
48
Project identification
A. PIN/Federal Aid No.
C. Project Title
D. StreettRoad Name or Number
Begioning MP or Roue Embug MP or Road
F. Describe Work to Be Done
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
B. Bridge No.
3
E.
r,
0
0
Project Costs in Thousands of Dollars
Fund Source Information
24
Six Year Transportation Improvement Program
From 2019 to 2024
Hearing Date: 8/6/18 & 8/21/18 Adoption Date: 8/21/2018
Resolution No.:
Amend Date:
Federal Funding
Federal Fund
Code
Yakima Ave. & Fair Ave. Signolization
Yakima Avenue
from: E. Yakima Ave. to: Fair Ave.
Install traffic signal at the intersection of Yakima
Avenue and Fair Avenue.
S. 3rd Avenue & W. Washington Ave, Signal
5. 3rd Avenue
from: 5. 3rd Ave. to: W. Washington Ave.
Upgrade the traffic signalization system
75th Avenue Improvements
75th Avenue
from: Mead Ave. to: Nob Hill Blvd.
Construct a new two-lane roadway and widen
portions of existing roadway, construct bridge over
Wide Hollow Creek, install curb, gutter, sidewalk,
street lighting and storm drainage system.
5. 66th Avenue Improve
66th Avenue
from: Summitview Ave. to: Scenic Dr.
Reconstruct and widen roadway to three lanes, install
curb, gutter, sidewalk, storm drainage system and
utilities.
ents
12
12
01
08
03
04
6
P N/A
N/A
P 0.50
P 0.76
7
T
s
0
T
T
8
10
PE 1/1/2021 STP(U)
CN 6/1/2022 STP(U)
Totals
PE
CN
Totals
PE
RW
CN
Totals
4/1/2020
1/1/2021
1/1/2021
1/1/2022
1/1/2023
PE
RW
CN
1/1/2020
1/1/2021
1/1/2022
Totals
Federa
Cost by
Phase
State
Fund Code
Expenditure Schedule
(Local Agency)
86
519
STP(U)
STP(U)
STP(LJ)
STP(U)
STP(U)
STP(U)
14 100 100
81 600
605
130
173
1,297
86
173
1,096
1.355
95 700
20
210
20
210
230 230
230
20
27
203
230
150
200
250 1,850
14 100
27 200
164 1260
205 6560
19
600
100 600
20
210
20 210
100
150
200
1.516)
150 1,700
200
1,2
100 200 1,260
Federally Funded
Projects Only
R/W
Envir. Required
Type Date
(MM/YY)
20 21
CE
CE
CE
CE
No
No
Yes
1/1/2023
Yes
/1/2022
Agency: Yakima
Co. No.: 39
City No.: 1485
z
Project Identification
A. PIN/Federal Aid No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to Be Done
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
B. Bridge No.
2
4
6
8
Project Costs in Thousands of Dollars
Fund Source Information
Phase — Federal Funding
F
Start Federal Fundederal State State
9
Cost by Fund Code Funds
Code Phase
0
2
17
49 Rudkin Road Reconstruction
Rudkin Road
from: E. Viola Ave.
to: Rainier PL
Reconstruct roadway, install curb, gutter, sidewalk
and storm drainage. Partner with Union Gap to
install additional sewer force main.
7
50 Englewood Avenue improvements
Englewood Avenue
from: N. 40th Ave. to: N. 56th Ave.
Grind and overray existing roadway, construct 5 -foot
bike lanes, install curb, gut -ter, sidewalk, street
lighting arid storm drainage system, water and sewer
lines.
17
0
06
5
06
51 Englewood Avenue Improvements
Englewood Avenue
from: N. 16th Ave. to: N. 24th Ave.
bike lanes, install curb, gutter, sidewalk, street
lighting and storm drainage system, water and sewer
lines.
17
2 S. 80th Avenue Improvements
5. 80th Avenue
from: Tieton Drive
to: Zier Road
Widen roadway to three lanes, install curb, gutter,
sidewalk, street lighting and storm drainage system.
05
06
04
0.76
P PE
T CN
1/1/2022 STP(C)
1/9/2023 STP(C)
Totals
.00
0.50
.30
P
T
5
0
PE
RW
CN
Totals
1/1/2022
1/1/2023
1/1/2024
P PE 8/1/2022
T RW 1/1/2023
CN 1/1/2024
5
T
0
STNC)
STP(C)
STP(C)
STP(U)
STP(LJ)
STP(IJ)
109
945
TPP
TPP
1
1,054
272
349
2,329
2,9
6
173
1,164
Tota Is
PE
RW
CN
1/1/2022
1/1/3023
3/112024
Totals
1,47
TI 8
TIB
TIB
00
945
Six Year Transportation Improvement Program
From 2019 to 2024
Hearing Date: 8/6/18 & 8/21/18 Adoption Date: 8/21/2018
Amend Date: Resolution No.:
Local
Funds
4
27
106
Total
Funds
236
1,996
,045 133 2,232
280
400
2,520
43
SS
363
46
21
27
182
313
404
2,692'
3,4131:
7
200
1,346
230 1,703
70
100
630
350
500
3,150
3,200 800 4,000
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
1st
16
2nd
7
3rd
8
4t h
Thru
6th
19
236
1,996
2,232
315
404
2,692
3.411
57
200
1,346
1,703
350
500
3,150
Envir,
Type
20
CE
CE
CE
4,000
R/W
Required
Date
(MM/YY)
21
No
CE
Yes
1/2024
Yes
/2024
Yes
1/1/2024
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Project Identification
A. PIN/Federal Aid No, B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to Be Done
2
17
7
17
53 Englewood Avenue Improvements
Englewood Avenue
from: N, 24th Ave. to: N. 40th Ave.
Grind and overlay existing roadway, construct S400t
bike lanes, install curb, gutter, sidewalk, street
lighting and storrr drainage system, water and sewer
lines.
6
4 88th Avenue improL;ements
88th Avenue
from: Tieton Dr. to: Summitview Ave.
Construct curb, gutter, sidewalk and storm drainage
system on the east side of 88th Avenue,
5 54th Avenue improvements
64th Avenue
from: Washington Ave.
to: Nob Hill Blvd.
Widen roadway to three lanes, install curb, gutter,
sidewalk, street lighting and storm drainage system.
56 (-82 & LThcoIn Avenue Interchange
Lincoln Avenue
from: E. 'G' Street to: 1-82
Reconstruct/extend off -ramp from existing 1-82 off -
ramp for Lincoln Avenue to E. '0" Street.
4
03
05
06
06
12
03
04
06
5
01
0.4
1.00 P
1-
N A
P
Phase
Start
9
Project Costs in Thousands of Dollars
Fund Source Information
Federal Funding
Federal State State
Federal Fund
Cost by Fund Code Funds
Code Phase
1/1/2022 STP(U)
1/1/2023 STP(U)
17172024 STP(U)
17172020
170021
1/172022
PE 111/2021
CN 17172022
STP(u)
STP(U)
1
21
327
2,789
12
Six Year Transportation Improvement Program
From 2019 to 2024
Hearing Date: 8/6/18 & 8/21/18 Adoption Date: 8/21/2018
Amend Date: Resolution No.:
Local
Funds
Total
Funds
4 15
34 252
5 378
435 3,224
<334::::::::::::5•o 3,854
SRTS
SRTS
SRTS
200
1,600
41
55
403
24
34
242
65
90
645
0 800
2
249
Expenditure Schedule
(Local Agency)
2
1,849
PE
CN
17172020
171/2021
67172022
STP( 1J)
STP( J)
STP(U)
6
7
6
8
90
545
S. 735
2
4th
Thru
6th
9
Federally Funded
Projects Only
Envir,
Type
20
252 CE
378
3,228
.3:S54
1,849
002812 8 232 49
250
173
1,730
40 300
27 200
270 2,000
300
200
2,000
CE
2,163 337 2,500 .300 200 2,000
CE
CE
R/W
Required
Date
YY)
2
Yes
1/1/2024
Yes
2022
No
Yes
/1/2022
to
Agency: Yakima
Co. No.: a
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to Be Done
4
2
3
7 l6thAve,we Corridor improvement
16th Avenue
from: 58 12 to: Washington Ave.
Study to determine strategies for improving the 16th
Avenue corridor
4
58 40th Avenue Corridor Improvements
40th Avenue
Irom: SR 12 to: Washington Ave.
Study to determine strategies for improving the 4
Avenue corridor.
14 59 Nob Hilt Boulevard Corridor improvements
Nob Hill Boulevard
from: 1-82 to: 16th Ave.
Study to determine strategies for improving the Nob
Hill Boulevard corridor.
4 60 North/South Connector to West Valley
Unknown Road
from: Ahtanum Rd. to: Summitview Ext.
Corridor study to determine the best location for a
north/south limited access route in West Valley. City
and County joint project
Project Costs in Thousands of Dol ars
Six Year Transportation Improvement Program
From 2019 to 2024
Hearing Date: 8/6/18 & 8/21/18 Adoption Date: 8/21/2018
Amend Date: Resolution No.:
Fund Source Information
Federal Funding
Federal Fund Federal State
•
Code Cost by Fund Code
Phase
4
10
STP(U
1
12
7
State
Funds
Lo ca
Funds
13 14
04
06
3.20
2.70
6.00
T
T
0
T
5
PE
2021
STP(U
7
27
Total
Funds
15
200
Expenditure Schedule
(Local Agency)
1st
16
2nd
17
3rd
4th
Thru
6th
18 19
200
27 200 200
27
200
200
Federally Funded
Projects Only
Envir,
Type
20
R/VV
Required
Date
11 Totals
PE 1/2020
STP(U)
17
173
27 200 200
27
200
00
PE
1/1/202
STP(U
173
432
27 200
68
500
200
500
432 68 500 500
CE
Yes
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2018 to 2023
Hearing Date: 6/6/17 & 6/20/17 Adoption Date: 6/20/2017
Amend Date: Resolution No.:
co
6
2
MaliEll
14
61
Project Identification
A. PIN/Federal Aid No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to Be Done
B. Bridge No.
S, 1st Street/Moin Street CorridorImprovements
S. 1st Street/Main Street
rom: Nob Hill Blvd. to: Barker Mill Bridge
Joint project with Union Gap. Stucy to determine
strategies for improving the 1st Street/Main Street
corridor.
0
Project Costs in Thousands of Dollars
0
Phase
Start
Fund Source Information
Federal Funding
Federal Fund
Code
01
2.00
T
0
S
w
G
10
Federal
Cost by
Phase
State
Fund Code
State
Funds
Local
Funds
Total
Funds
Expenditure Schedule
(Local Agency)
4th
Thru
bth
120 17 137 137
Federally Funded
Projects <Jots
Envir,
Type
20
R/VV
Required
Date
(MM/YY)