HomeMy WebLinkAboutR-2018-087 2018-2023 Six-Year Transportation Improvement Program AmendmentRESOLUTION NO. R-2018-087
A RESOLUTION to amend the Six-year Transportation Program (TIP) for the period of 2018
through 2023 to include projects affecting the City's Transportation Plan
WHEREAS, the City of Yakima annually prepares, reviews and adopts a Six-year TIP for
the construction of, and repair of streets in the City of Yakima for the ensuing six year period, all
as contemplated and required by State RCW 35 77 010 and applicable federal law; and,
WHEREAS, the City of Yakima desires to amend the adopted 6 -Year TIP, as
contemplated and required by RCW 36 70A.070(6) to ensure compliance with the Growth
Management Act and consistency of the Comprehensive Plan and the 6 -Year TIP; and
WHEREAS, this amendment is limited to incorporation of the projects listed in the 6 -Year
TIP for the period of 2018 to 2023 and the Capital Facilities Element of the Yakima Urban Area
Comprehensive Plan, which is contemplated and provided for under RCW 36 70A.130(2B) and
RCW 35 77 010, and
WHEREAS, a public hearing has been held by the Yakima City Council to amend the 6 -
Year TIP on Monday, August 6, 2018, with proper public notice as required by RCW 35 77 010,
and
WHEREAS, the City Council finds it is in the best interest of the City and its residents to
amend the six-year Transportation Improvement Program, now, therefore,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA:
The adopted 6 -Year Transportation Improvement Program for the period of 2018 through
2023 for the City of Yakima, shall be amended to delete the Powerhouse Road Sidewalk project
and change the Status of the Northside Alley Paver project from Selected (S) to Planned (P) as
shown on the attached spreadsheet.
ADOPTED BY THE CITY COUNCIL this 6th day of August, 2018.
ATTEST
6/11
Sdya�tlar\Tee, City Clerk
l
tNe
III
•
t �1
Agency: Yakima
Co. No. 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2018 to 2023
Hearing Date: 6/6/17 & 6/20/17 Adoption Date: 6/20/2017
Amend Date: 8/6/18
Resolution No.
U
c
Z
_,•
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP orRoad•EndmgMPorRoad
F Describe Work to Be Done
Improvement
Type(s)
Status
Total Length
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federal y Funded
Projects Only
Utility Codes
Project Phase
Phase
Start
Fund Source Information
Federal Funding
State
Fund Code
State
Funds
Local
Funds
Total
Funds
Envir
Type
R1
Required
Date
(MM/YY)
Federal Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
1
2
3
4
5 6 7 3
9
10
11
12
13
14
15
16
17
18
19
20
21
14
1
North 1st Street Revitalization
North 1st Street
from: 'N' Street to• SR 12
Improve North 1st Street by rehabilitating the pavement
and lane markings, removing on -street parking,
enhancing street and pedestrian lighting, constructing
median islands and installing various pedestrian and
decorative elements,
3
06
S 0.42 P CN
T
0
0
W
5
Totals
1/1/2018
STP(U)
2,718
424
3,142
3,142
CE
No
2,718 424 3,142 3,142
14
2
,North 1st Street Revitatrzation, Phase 2
N. 1st Street
from: '14' Street to: 'N' Street
improve North 1st Street by rehabilitating the pavement
and lane markings, removing on -street parking,
enhancing street and pedestrian lighting, constructing
median islands and installing various pedestrian and
decorative elements
06
12
5 0.50
P CN
T
0
C
W
S
0
1/1/2018
FASTLANE
4,250
TIB
750
0
5,000
5,000
CE
Yes
12/31/2017
Totals 4,250 5,000 5.000 0
14
3
North 1st Street Revitalization, Phase 3
N. 1st Street
from. MLi<Blvd. to' 'H'Street
Improve North 1st Street by rehabilitating the pavement
and lane markings, removing on -street parking,
enhancing street and pedestrian lighting, constructing
mecian islands and installing various pedestrian and
decorative elements.
06
12
5 0.48
P CN
T
G
C
W
5
1/1/2018
CASTLA:NE
4,250
TIB
750
0
5,000
5,000
CE
Yes
12/31/2018
Totals 4,250 5,000 5.000 0
17
4
Powerhouse Road Sidewalk
Powerhouse Road
fromPCow ,e CO/ona toBobielorTPark DELETED
Widen westbound lane to provide a 14 -foot wide
shared bike lane and construct curb, gutter and
sidewalk on the north side of the road.
05
12
5 0.6 0 CN
C
Totals
1/1/2018
TAP
245
245
245
CE
No
245 245 245
Agency: Yakima
Co. No.. 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2018 to 2023
Hearing Date: 6/6/17 & 6/20/17 Adoption Date: 6/20/2017
Amend Date: 8/6/2018
Resolution No.:
L)
4
LL
Priority Number I
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road -Ending MP or Road
F Describe Work to Be Done
Improvement
Type(s)
u.i
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
Fund Source Information
Federal Funding
State
Fund Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/W
Required
Date
(MM/YY)
Federal Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
17
9
Sorenson Road Reconstruction
Sorenson Road
from: 36th Avenue to: 38th Avenue
Widen roadway, install curb, gutter, sidewalk and
street lights.
03
5
0.14
S
W
CN
1/1/2018
SIED
180
140
320
320
Yes
3/1/2017
Totals 180 140 320 320
16
10
Brovo Company Boulevard
North 10th Street
from: 'H' Street to• Lincoln Ave.
Construct new roadway including water, sewer, curb,
gutter, sidewalk, street lighting and storm drainage
system
01
06
S
0.65
P
T
W
5
0
RW 11/1/20181
CN 1/1/2018
LIFT
LIFT
800
4,480
2001 1,000
1,1201 5,600
1,000
5,600
1
CE
Yes
1/1/2018
Totals
5,280 1,320 6,600 1,000 5,600
16
11
E 'H' Street Extension, Ph. 1
E. 'H' Street
from' 1st Street to: 10th Street
Construct new roadway including water, sewer, curb.
gutter, sidewalk, street lighting and storm drainage
system.
01
08
P
1.10
P
T
W
S
0
RW
CN
1/1/2018
1/1/2019
TIB
1,500
500
3,100
500
4,600
500
4,600
CE
Yes
12/1/2018
Totals 3,600 5,100 500 4,600
00
12
Northside Alley Paver
Alleys between Folsom Ave. and Fruitvale Blvd.
from: 16th Avenue to: 6th Avenue
Pave the east/west gravel alleys between Folsom
Avenue and Fruitvale Boulevard from 16th Avenue to
6th Avenue
07
P
3.5
P
T
C
0
CN
1/1/2018
CMAQ
353
57
410
410
CE
No
Totals 353 57 410 410
BUSINESS OF THE CITY COUNCIL
YAKIMA, WASHINGTON
AGENDA STATEMENT
1
Item No. 9.
For Meeting of: August 6, 2018
ITEM TITLE: Public Hearing and Resolution to amend the 2018 through 2023
Six -Year Transportation Improvement Program
SUBMITTED BY: Scott Schafer, Director of Public Works
Brett Sheffield, PE, Chief Engineer - 576-6797
SUMMARY EXPLANATION:
The Six -Year Transportation Improvement Program (TIP) is a list developed by the City of
Yakima (City) that includes all of its transportation related projects. The City's existing Six -Year
TIP has a list of 55 projects that amount to approximately $106,000,000. Only projects on the list
are eligible for federal and state funds.
Each year, near the end of June, the City is required by RCW 35.77.010 and RCW 36.81.121 to
update its Six -Year TIP for submittal to the Washington State Department of Transportation. This
Plan must include all transportation projects for which state gas tax revenue or federal revenue will
be utilized. Once the TIP has been approved by the City Council, projects are eligible to be
included on the Statewide Transportation Improvement Program (STIP). Only projects that are
listed on the STI P can utilize federal funds. The STI P is a prioritized program of transportation
projects, compiled from local and regional plans, along with the Washington Transportation
System Plan, which provides a backbone for developing projects for the intermodal transportation
network in the State of Washington.
Once established, the STI P can be amended at any time during the year to add and/or remove
projects. The first step to amend the STIP is for the City to amend its Six -Year TIP which
requires a Public Hearing. The proposed amendment would remove two projects: Priority
Project #4, Powerhouse Road Sidewalk; and, Priority Project #12, Northside Alley Paver, from
the Six -Year TI P. The City will continue to pursue funding for these two important projects.
1. Powerhouse Road Sidewalk Project
During the design of the Powerhouse Road Sidewalks project, Engineering staff were contacted
by members of the biking community with concerns that the proposed construction of the
sidewalk on Powerhouse Road would hinder the construction of future bike lanes on this section
of Powerhouse Road. The section of Powerhouse Road beginning at the mobile home park
where the bike lanes end heading west to Cowiche Canyon Road is a dangerous section of a
popular bike ride referred to as the Naches Loop Trail. Staff agreed with their concerns, and
2
applied for other grants that would provide funding to construct bike lanes at the same time as the
sidewalk. As the City has not yet been successful in securing a grant for the bike lanes and it
would not be prudent to construct the sidewalk as currently funded. It became necessary to return
the funds. The City has submitted an application for this project in the 2018 Bike/Ped call for
projects.
2. Northside AIIey Paver Project
Due to demands on Engineering Design staff for other priority projects, the design for the
Northside AIIey Paver project never initiated, and time ran out with the funding. The available
funds for this project were always tight, thereby not allowing for a contract with an Engineering
consultant. The project was to pave the east/west gravel alleys between Folsom Avenue and
Fruitvale Boulevard from 16th Avenue to 6th Avenue.
The Public Hearing notice has been provided to all Yakima -area media, including to Decides',
KDNA Radio, El Sol de Yakima, Hispanavision, Bustos Media, and El Mundo.
ITEM BUDGETED: NA
STRATEGIC PRIORITY:
APPROVED FOR
SUBMITTAL:
City Manager
STAFF RECOMMENDATION:
Adopt resolution.
BOARD/COMMITTEE RECOMMENDATION:
ATTACHMENTS:
Description Upload Date
Resdution 7/20/2018
Deleted Projects 7,'23/2018
Type
Coker Memo
Coyer Memo
Agency: Yakima
Co. No.: 39
City No.: 1485
ca
Co. Name:. Yakima Co,
MPO/RTPO: YVCOG
Project Identification
A PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to Be Done
2
7
9
orenson Rood Reconstruction
orenson Road
om: 36th Avenue to: 38th Avenue
Uiden roadway, install curb, gutter, sidewalk and
treet lights.
6
4
0
0 Brovo Company Boulevard 01
North 10th Street 06
from: 'H' Street to: Lincoln Ave.
Construct new roadway including water, sewer, curb,
gutter, sidewalk, street lighting and storm drainage
system.
6
E. 'H' Street Extension, Ph.
E. 'H' Street 'I 08
from: 1st Street to: 10th Street
Construct new roadway including water, sewer, curb,',{...
gutter, sidewalk, street lighting and storm drainage
system.
01
00
2 Northside Ailey Paver
Alleys between Folsom Ave. and Fruitvale Blvd
jrt5rrt. 160 TTAY7yettit l 0th Avenue
Pave the leyayt n F m
Avenue and Fruitvale Boulevard from 16th Avenue to
6th Avenue
7
0.65
0
5
T
S
P
T
S
T
Phase
Start
9'
2'.
Costs in Thousands
Fund Source 1rr0
Fede Funding
Federal State
Federal Fund Cost by bund Ctsde'
Code
Phase
T
RW
CN
1/2018
2018
10
To
RW
CN
201
2
ED
LtFT
LIFT
TIB
Six Year Transportation Improvement Program
From 2018 to 2023
Hearing Date: 6/6/17 & 6/20/17 Adoption Date: .6/20/2017
Amend Date: Resolution No.:.
rat
State
Funds
L®Cai
Funds
4
14.
Total
Funds
5
0 140 320'
800
4,480
2
.280. 1320 tx„600.
1,50
00
00,
4
Expenditure Schedule
(Local Agency)
1st
6
20
20
2nd
17
3rd
CN
T
Totals
2
E D
CMA
7
4
0 .500 46r
41
TCatkls 353 57 410 410
4th
9
Federally Funded
Projects Only
Envir,
Type
2
Required
Date
CE
CE
CE
Yes
7
Yes
2018
Ye
2/1/2018 '..
0
Agency: Yakima
Co. No.: 39
City No.: 1485
72
0
0
14
14
14
17
0
5.
2
4
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Project Identification
A. 5 N/6ederal Aid No. B. Bridge No.
C. Project Title
p Street/Road Name or Number
8, Beginning MP or Road - Ending MP or Road
5, Describe Work to Be Done
North lst Street Revitalization
North 1st Street
from NStreet to: 50 12
Improve North 1St Street by rehabilitating the pavement
and lane markings, removing on -street parking,
enhancing street and pedestrian iighting, constructing
median islands and installing various pedestrian and
decorative elements.
North 1st Street Revitaiiza ion, Phase 2
N. 10 Street
from: 'H' Street tor Street
Improve North 1st Street by rehabilitating the pavement
and lane markings, removing on -street parking,
enhancing street and pedestrian lighting, constructing
median islands and installing various pedestrian and
decorative elements.
North 1st Street Revitalization, Phose 3
N. 1st Street
from: VLK 8Ivd. to: `1 -Street
Improve North 1st Street by rehabilitating the pavement
and lane markings, removing on -street parking,
enhancing street and pedestrian lighting, constructing
median islands and installing various pedestrian and
decorative elements.
Powerhouse Road Sidewalk
Powerhouse Road
frornowRe C e oncrPark D
Widen westbound lane to provide a 14 -foot wide
shared bike lane and construct curb, gutter and
sidewalk on the north side of the road.
g
E
4
3
06
06
12
06
12
05
12
5 6
a
u
gt
5 0.42
T
0
5
00
Phase
Start Federal Fund
Code
Project Costs in Thousands of Dopers
Fund Source Information
Federal Funding
Six Year Transportation Improvement Program
From 2018 to 2023
Hearing Date: 6/6/17 & 6/20/17 Adoption Date: 5/20/2017
Amend Date:
Resolution No.:
Expenditure Schedule
(Local Agency)
Federal State State Local Total
Cost by Fund Code Funds Funds Funds 1st 2nd rd 4th
Phase
9 10 11
2
13 14 15 16 17 4- 18 19
STP(U) 2,718 424 3,142 3,142
Totals 2,718 424 3,142 3,142
0.505 CN /2018 FASTLANE 4,250 118
T
0
750
5,000 5,000
Totals 4 250 5,000 5,000
048 P CN 1/1/2018 FASTLANE 4,250 TVG 750 0 5,000 5,000
T
5
0
Totals
Federally Funded ,
Projects OnLY
R/W
Envir. Required
Type Date
(MM/YY)
20
CE
CE
21
No
Yes
12/31/2017
4,250 5,000 5,000 0
5 0.6 0 CN 1/1/2018 TAP 245
LE TED
Totals
245
245 24
245
245
CE
Yes
12/31/2018
CE
0
(0