2018 POLICY ISSUES
Distributed at the
Meeting 10-0-17
QPLI1S.PI //1J�
This section outlines and discusses various Policy Issues for consideration by Council that have not been
included in the proposed 2018 Budget as yet. Staff is seeking Council direction on these or other options
for inclusion in the 2018 Preliminary Budget. Further study or amendment of budget options may be
considered by Council until adoption of the 2018 Budget which is scheduled for December.
Policy Issues
• Legal - Domestic Violence Conference
• Citywide Services Information Fair
• Trolley - Facility Operations
• Randall Park Completion
• Aquatic Center (Construction Bond)
Policy Revenue Options
• Adjust Utilities Cap
• Fund Transportation Benefit District - Vehicle Tab Fee
• Parking Fee in Downtown Core
2018 Council Budget Presentation - 231
CITYWIDE WELLNESS FAIR
•
•
•
2018 POLICY ISSUE
SUMMARY PROPOSAL
Support a non-profit organization to host a Citywide Wellness Fair where various social service, faith -
based, education and non-profit organizations convene a community gathering to share information about
services they provide. Funding would be redirected from the extra funding provided for the 2017 4 of July
celebration.
IMPACTS
1. Fiscal Impact - $5,000.
2. Proposed Funding Source - General Fund.
3. Public Impact - Important sharing of community care providers with public.
4. Personnel Impact - Coordination of event.
5. Required Changes in City Regulations or Policies - None.
6. Legal Constraints, if applicable - Minor insurance requirements.
7. Viable Alternatives - As far as we know this service in not offered to the general public in the City
of Yakima.
2018 Council Budget Presentation - 235
•
•
•
2018 PARKS & RECREATION POLICY ISSUE
RANDALL PARK
Le4
SUMMARY PROPOSAL
Continued improvements are being completed on Randall Park. This multi -phased project is nearing
completion. The 48th Avenue parking lot, foot bridge and pond improvements will be completed in 2017.
The 44th Avenue parking lot and the reconstruction of the walkways are planned for 2018. The project has
been funded through private donations, a grant and Parks Capital funds. Matching funds for the grant
have been met by various local service club donations. This renovation project, started in 2015, has a total
estimated cost of $1,425,200. Details of the service club donations, grant and capital funds used are listed
on the following page.
History
In 2013, the City of Yakima received two anonymous gifts of $50,000 and $100,000 designated for Randall
Park. A committee was created and a master plan was created for the improvements needed to the park
that was built in 1974. The master plan was shared with local service clubs and with individual donors.
Various service clubs agreed to complete portions of the project, similar to the collaborative projects that
were completed at Kiwanis Park/Gateway Sports Complex and Franklin Park. With the donations, the
commitments from our donors and a commitment of REET funds to the project, a grant proposal was
given to RCO and we were awarded the $500,000 grant in October of 2015 for the project. The previous
City Council agreed to accept the grant funds, the donations and proceed with the project with RCO.
IMPACTS
1. Fiscal Impact - Cost of renovation for the walkways is estimated at $150,000 and 44th Avenue
parking lot is estimated at $225,000 for a total of $375,000.
2. Proposed Funding Source - Parks and Recreation Capital fund, Washington State RCO grant,
donations.
3. Public Impact - Improvement to a highly utilized park in Yakima, safer parking area and
walkways and additional parking spaces for park users.
4. Personnel Impact - None.
5. Required Changes in City Regulations or Policies - None.
6. Legal Constraints, if applicable - None.
7. Viable Alternatives - None.
2018 Council Budget Presentation - 239
(1)
(2)
(3)
(4)
(5)
(6)
(7)
RANDALL PARK EXPENDITURES/MATCHES
Funding Sources
Grant Funding
RCO Grant
Donations (exceed 50% RCO Match requirement)
Anonymous Donations
Downtown Rotary/Playground
Sunrise Rotary/2 Picnic Shelters
Southwest Rotary/Basketball Court
Lions Club/Bridge
West Valley Kiwanis/Bench
Southwest Rotary/Wildlife Observation Deck
Stormwater Allocation
Parks Capital Fund
Total Sources of Funding
Expenditures
Restroom
48th Ave Parking Lot
Bridge
Randall Pond Renovations''
44th Ave Parking Lot
Walkways
Items provided by service clubs
City costs for service club items
Total Expenditures
$ 500,000
170,000
105,000
40,000
35,000
25,000
500
70,000
225,000
304,700
1,475,200
200,000
236,500
90,000
248,000
225,000
150,000
216,500
109,200
1,475,200
Spring 2016
90% Complete
90% Complete
October 2017
Spring 2018
Summer 2018
2015-2017
Donation of $150,000 is currently valued by the Community Foundation at an estimated $170,000.
The Southwest Rotary Wildlife Observation Deck. This project was completed in May of 2015 for $70,000 before the
grant award and was not eligible for reimbursement, but added to the overall project scope.
Streets Division completed the grading, gravel and asphalt - now an Engineering Division project.
Now an Engineering Division project.
Pond improvements were identified in the grant.
Streets Division to complete the grading, gravel and asphalt - Spring 2018
Streets Division to complete the grading, gravel and asphalt - Summer 2018
2018 Council Budget Presentation - 240
Budget Explanation
BEYOND THE BELL (514) 2017 Budget YTD
131 5141110 (Permanent Salaries) $50,751.00 $38,026.05
Recreation Coordinator
131 5141120 (Temporary Salaries) $2,246.75 $ .00
7-12 temporary employees for the after school and playground program.
131 5143110 (Office and Operating) $12,000 $10,671.76
Program supplies for the Beyond the Bell after school program and the summer
playground program. I.e. Snacks, books, arts and craft supplies, water play toys,
sunscreen first aid supplies, cups, hand sanitizer, water coolers, tennis balls, basket
balls, footballs, soccer balls, canopy, office supplies, paper supplies, board games
COMMUNITY RECREATION (519)
131 5191110 (Permanent Salaries) $49,928.64 $38,567.58
Recreation Supervisor (50%)
Recreation Specialist (50%)
131 5191120 (Temporary Salaries) $85,542.98 $86,020.59
These monies have been transferred to 514 for the 2018 budget
131 5193110 (Office and Operating) $1,000.00 $906.60
Porta Potties for special events, promotional banner for concert series
131 5194100 (Professional Services) $30,000.00 $27,651.49
Outdoor Summer Cinema Series; public performance licenses, Franklin Park Summer
Sunset Concert Series; bands and sound technicians, development of promotional
posters and fliers, printing of promotional posters and fliers, design and printing of
promotional banners, 50K 4Kids 2017 additional summer program services.
Streets 2018 Budget Follow-up
Fund 412 — Snow & Ice Control
The 2017 Amended Budget for Snow & Ice Control is $314,594. Actual expenses to
date is $488,307.25 with anticipated end of year expenses to be $594,297.
The proposed 2018 funding for Snow and Ice Control is $499,059. Although this a
reduction from the expected end of year expenses for 2017, it is a $40,000 increase for
materials and $140,000 increase for contracted services over the 2017 budget. The
budget increase is a better reflection of typical annual snow and ice control costs
thereby reducing the reliance on reserve funds to cover winter maintenance needs.
In order to get through the remainder of the year with minimal impact to the budget,
contractors will not be used for clearing snow should we have snowstorms that exceed
3 inches. Personnel form other public works divisions will utilized wherever possible to
maximize the city's response to storms. No change should be evident to the public on
higher priority snowplow routes such as arterials, collectors, hillsides, and schools.
Residential streets will see a delayed response from previous years and driveways will
not be cleared. We will return to our normal response plan on January 1.
2017 Amended Budget 2018 Proposed Budget Difference
$314,594
$499,059 + $184,465
Fund 413 — Roadway Maintenance
Roadway Maintenance is the fund that covers all road repairs and much of the
miscellaneous tasks assigned to the Streets Division. The 2017 Amended Budget for is
$2,018,851. We expect to be at that number or slightly over at the end of the year. The
higher expenses is due to overtime costs from winter maintenance and flood control
efforts. Employee costs are distributed proportionately across all funding categories
resulting in the impacts of extraordinary events being distributed throughout the Streets
budget.
The proposed 2018 budget for Roadway Maintenance is $2,074,929. The increase is
due to employee salaries and benefits.
2017 Amended Budget 2018 Proposed Budget Difference
$314,594
$499,059 + $56,078
Streets biggest challenge this past year was the nearly continuous snow fall in January
and February and the flooding in March. It has taken the remainder of the year to date
to repair the road damage created by the severe weather. Most work programs have
been negatively affected due to lack of personnel not the lack of funding. There are 21
FTE's in Streets but with vacations, illness, and injuries we averaged about 16 available
employees a day and often had as few as 12.
There are 44 miles of alleys in the city, most are unpaved. Annual alley grading was not
done this summer. Alleys that had severe rutting after the winter did have some work
done in the spring but the majority of the gravel alleys were not touched.
The Engineering Division has received an air quality grant to pave several alleys in the
northeast area of town. Implementation of the project will reduce the time required to
annually maintain the alleys. The project schedule is unknown at this time. Given a
more normal winter and spring, we should be able to return to the normal alley grading
program next year. Any areas that develop severe rutting in the meantime will be
repaired.
Pavement crack sealing is program normally conducted in the spring and fall. The
urgent road work required in the spring forced us to defer that work. We may be able to
accomplish so some crack sealing later this fall, weather permitting.
Very few sidewalk repairs were accomplished this summer. Sidewalk repairs require
much more advance planning than pavement patching. The variability in available
personnel made it very difficult to schedule and accomplish the sidewalk repair work
while still accomplishing other work programs. In order to avoid this problem next year,
there will be a predetermined period during the summer when sidewalk repairs will be
our primary mission with other programs delayed if necessary.
Street sweeping and weed spraying were also done at a lower level than normal this
year. One Tess pass through the City was done in each of these programs than is
normal. These programs may be minimized again next year but they are also the type of
work that can be used for fill-in work if our scheduled work plan is disrupted. This means
it is work we have a better chance of catching up on if we do fall behind.
Fund 417 - Roadside Maintenance
Roadside Maintenance is the personnel costs for maintain road shoulders, ditches and
nuisance cleanup. Any materials costs for the work comes from Fund 413, Roadway
Maintenance. The 2017 Amended Budget for Roadside Maintenance is $84,246. We
expect to be at that number or slightly over at the end of the year. The higher expenses
is due to overtime costs from winter maintenance and flood control efforts.
The proposed 2018 budget for Roadway Maintenance is $84,757. The increase is due
to employee salaries and benefits.
2017 Amended Budget 2018 Proposed Budget Difference
$84,246 $84,757 + $511
Fund 423 — General Services
General Services is the fund that covers interfund transfers to other city divisions for
their services, primarily insurance and Public Works Administration. The 2017 budget is
$247,525. The redistribution of Public Works Administration costs from the consolidation
of Water, Wastewater and Engineering into Public Works has resulted in a reduction of
$28,458 to this item.
2017 Amended Budget 2018 Proposed Budget Difference
$247,525
$219,067 + $24,458
Fund 439 — Traffic Administration
The Traffic Maintenance Administration fund covers office equipment expenses and
training for Traffic Operations staff. $4,800 was budgeted in 2017 with year-end
expenses expected to be $7,600. The additional expenses are from unanticipated
computer replacements and additional training costs for staff to maintain required
certifications. The budget is to remain at $4,800 for 2018.
2017 Amended Budget 2018 Proposed Budget Difference
$4,800
Fund 444 — Traffic Planning
$4,800 $0
Traffic Planning includes the salary and benefits for the Traffic Signal System Analyst
along with funding for traffic consultants and miscellaneous office supplies. The 2017
budget is $67,568 reducing to $66,636 in 2018. The adjustment of the Analyst base
salary to a lower pay level resulted in the lower budget estimate for 2018.
The Traffic Signal System Analyst's primary responsibility is to monitor, maintain, and
adjust traffic signal timing plans for the city's 109 traffic signals. The position has been
vacant since last January as a cost savings measure. Staff is exploring the potential for
hiring a person whose responsibilities would involve elements of the Analyst position
and a position in the Engineering Division in order to cover workload needs in both
Divisions. Benefits include cost savings for both divisions, and improved communication
and project coordination between the divisions. The timing of this change has not been
determined.
2017 Amended Budget 2018 Proposed Budget Difference
$67,568 $66,636 - $932
Fund 449 — Traffic Engineering Administration
Traffic Engineering Administration is the fund that covers interfund transfers to other city
divisions for their services including insurance, Facilities, and Public Works
Administration. The 2017 budget is $207,829. The redistribution of Public Works
Administration costs from the consolidation of Water, Wastewater and Engineering into
Public Works has resulted in a reduction of $12,956 to this item.
2017 Amended Budget 2018 Proposed Budget Difference
$207,829
$194,873 - $12,956
DEPARTMENT OF PUBLIC WORKS
2301 Fruitvale Blvd, Yakima, Washington 98902
Phone (509) 575-6005
Public Works
Budget Presentation Follow Up
DATE: October 18, 2017
TO:
Honorable Mayor and Members of City Council
FROM: Cliff Moore, City Manager
Scott Schafer, Public Works Director
Mike Price, Wastewater/Stormwater DivisioManager
RE: 16th Ave & Nob Hill Stormwater Issue
The City is aware of a stormwater issue that exists at 16th Ave. and Nob Hill
following a heavy rain event.
There is a capacity issue within the right turn lane between the island and the
sidewalk adjacent to Taco Time along Nob Hill. Map attached. The
infrastructure is "undersized." This area "ponds up" but eventually drains once
the capacity is restored within the main stormwater trunk line.
"Upsizing" the stormwater trunk line would be a significant cost. As businesses
along Nob Hill redevelop, they will be required to retain their stormwater runoff on
site per developing standards and in accordance to the City's stormwater permit
with the Department of Ecology. This will reduce the amount of runoff into the
trunk lines.
In the meanwhile, staff acknowledges this location as a priority during and
following a heavy rain event. Crews utilize a Vactor to reduce the amount of
standing water to address safety concerns for motorists and pedistrians.
Administration 575-6005 • Engineering 575-6111 • Equipment Rental 575-6005 • Parks & Recreation 575-6020 • Refuse 575-6005
Street 575-6005 • Traffic 575-6005 • Transit 575-6005 • Wastewater/Stormwater 575-6077 • Water/Irrigation 575-6154
Yakima
briatIg
li/mrka lay
2015
1994
CityMap
October 18, 2017
Street Labels4000
2017 Aerial Photo
Red: Layer_1
Green: Layer _2
Blue: Layer3
2015 Aerial Photo - Selah
111 Red: Layer 1
Green:Layer_2
■
ortho2005e.sid
Blue: Layer 3
Red: Band_1
Green: Band_2
Blue: Band_3
1:564
0 0.00475 0.0095
0
0 019 mi
t l r l t1
0.03 km
0.0075 0.015
Sources. Esri, HERE, DeLorme, Intermap, increment P Corp, GEBCO,
US GS, FAO, NPS, NRCAN, GeoBase, IGN, KMaster NL, Ordnance Surmy,
City of Ya kin a, VYashirg ton
rift, rd vaItina %A6 chi nntm. 91117
DEPARTMENT OF PUBLIC WORKS
2301 Fruitvale Blvd., Yakima, Washington 98902
Phone (509) 575-6005
Public Works
Budget Presentation Follow Up
DATE: October 18, 2017
TO;
Honorable Mayor and Members of City Council
FROM: Cliff Moore, City Manager
Scott Schafer, Public Works Director
Mike Price, Wastewater/Stormwater Division Manager
RE: 72nd Ave. Wastewater Serve Extension
John S. Moore, a developer, originally filed suit against the Washington State
Boundary Review Board et al over annexation issues within the subject area.
One of the 'et al' was the City of Yakima.
The City entered into Wastewater System Reimbursement Agreement and
Conveyance (Agreement) dated October 3, 2001 with the developer wherein the
City would pay for labor and material expenses to extend sewer service to the
subject area in exchange for the developer to dismiss the lawsuit with the City.
As part of the Agreement, the City also obtained the latecomer reimbursement
rights to future connections to the line once installed.
In December 2002, the developer transferred all rights and interests of the
Agreement to Dale and Rhea Murphy, so now the Agreement is between the City
and the Murphy's.
Attachments:
1. City of Yakima — Latecomer Agreement, dated May 12, 2015
2. Assignment — Transfer of rights and interest to Dale and Rhea Murphy,
dated December 16, 2002.
3. Wastewater System Reimbursement Agreement and Conveyance, dated
October 3, 2001
Administration 575-6005 • Engineering 575-6111 • Equipment Rental 575-6005 • Parks & Recreation 575-6020 • Refuse 575-6005
Street 575-6005 • Traffic 575-6005 • Transit 575-6005 • Wastewater!Stornaater 575-6077 • Water/Irrigation 575-6154
Yakima
2015
1994
LEGAL DEPARTMENT
200 South Third Street
Yakima, Washington 98901-2830
May 12, 2015
Dale Murphy
1308 South 72°d Avenue
Yakima, WA 98908
Re: City of Yakima - Latecomer Agreement
Dear Mr. Murphy:
This letter will acknowledge your request submitted in or about February, 2015 regarding the
construction of a sewer line, by the City of Yakima, in accordance with the "Wastewater System
Reimbursement Agreement and Conveyance" ("Agreement") dated October 3, 2001. The
beneficial interest in such Agreement was assigned by John S. Moore to yourself and Rhea A.
Murphy by instrument dated December 16, 2002.
The City of Yakima acknowledges that your request for construction of the sewer line has been
timely submitted in accordance with the provisions of the Agreement. As discussed by City
Engineer Debbie Cook, we will work with you regarding timing of the construction, and
anticipate that the actual construction will occur next year when sufficient funds have been
included in the 2016 City Budget.
We look forward to working with you as this project proceeds.
Very truly yours,
Mark Kunkler
Senior Assistant City Attorney
MK
cc: Debbie Cook, City Engineer
Civil Division (509) 575-6030 Prosecution Division (509) 575-6033 Fax (509) 575-6160
Yakkrnn
ASSIGNMENT
Undersigned, John S. Moore, for good and valuable consideration, does hereby
transfer, assign, and set over unto Dale B. Murphy and Rhea A. Murphy, husband and wife,
as owners of Yakima County Parcels No. 181329-34006, -34007, and -34008, all right, title
and interest of undersigned in and to the certain Wastewater System Reimbursement
Agreement and Conveyance between undersigned and the City of Yakima, dated
October 3, 2001, and recorded in the office of the Auditor of Yakima County, Washington
on October 2, 2002 Auditor's File No. 7295396.
Signed at Yakima, Washington this 1, 4 d y of December, 2002.
STATE OF WASHINGTON )
)ss.
County of Yakima )
On this day personally appeared before me John S. Moore to me known to be the
individual described in and who executed the within and foregoing instrument, and
acknowledged that he signed the same as his free and voluntary act and deed, for the uses
and purposes therein mentioned.
4.
Given under my hand and official seal this/4day of December, 2002.
6-yv
Print Name: E .j✓ 6
NOTARY PUBLIC in and for the State of
Washington, residing at-,,-.:.
My appointment expires: 6 -0 t -- e'..3
WASTEWATER SYSTEM
REIMBURSEMENT AGREEMENT AND CONVEYANCE
„..,,ACHIS .AGREEMENT (the "Agreement") is entered into and effective on this
37:— day of 4c , 2001, by and between the CITY OF YAKIMA, a
municipal corporation located in Yakima County, Washington, hereinafter referred
to as "CITY" and JOHN S. MOORE, hereafter referred to as "DEVELOPER";
WHEREAS, The Developer may wish to have certain sewer lines and
appurtenances thereto installed at, near, or within the property described in
Section 1 below and connect same to the City's wastewater System so that such
improvements constitute an integral part thereof; and
WHEREAS, no other property owners or users are presently available to
share in the cost and expense of construction of such improvements and the
parties hereto having in mind the provisions and terms of RCW 35.91.020; and
WHEREAS, Developer and the City anticipate that the Property will be
annexed into the City upon resolution of the litigation that is pending in Moore u.
Washington State Boundary Review Board et al., Yakima County Superior Court
No. 01-2-02094-2 (the "Litigation"); and
WHEREAS, the City and Developer agree the construction and installation of
said improvements is in the public interest and in furtherance of public health
and sanitation;
NOW, THEREFORE, in consideration of the mutual covenants, promises,
and agreements set forth herein, it is agreed by and between the City and the
Developer as follows:
1. Property Owned by Developer. The Developer represents that it is the
owner of the following described property (the "Property"):
Yakima County Parcel No. 181329-34006 (hereafter "Parcel A");
Yakima County Parcel No. 181329-34007 (hereafter "Parcel B"); and
Yakima County Parcel No. 181329-34008 (hereafter "Parcel C").
2. Wastewater System Improvements. The following described wastewater
system improvements will be installed by the City upon the request of Developer
in connection with the Property (the "Improvements"):
The Improvements will consist of the installation of approximately one
hundred forty five (145) feet of wastewater collection piping that will cross
72nd Avenue and includes a manhole at the eastern boundary of Parcel B.
3. Corn.pliancc with :Applicable Codes/Regulations. The Developer agrees
that said Improvements shall be designed to comply with all applicable codes and
regulations of the City of Yakima. The Developer agrees that said Improvements
Moore Reimbursement Agreement 1
and all facilities operated by the Developer pursuant to this Agreement are subject
to all City codes, ordinances, and regulations regarding wastewater facilities in
general, as now or hereafter adopted.
4. Payment of :LabojMatcrial Expenses. Except as provided in Section 7
below, the Developer shall be responsible for payment of all expenses and claims
in connection with the construction and installation of the aforesaid
Improvements, including without limitation labor and materials ("Improvernent
Costs").
5. Connection Charge. Developer shall be responsible for payment of the
connection charge established by Yakima Municipal Code (YMC) Chapter 7.58 at
the time Developer requests connection of Parcel C to the City's wastewater
system; provided, however, that the base collection pipes charge shall be waived
pursuant to YMC 7.58.070(a).
6. Reimbursement for Improvements.
A. Parcels A and B shall be subject to a pro -rata reimbursement obligation
for the Improvement Costs incurred pursuant to Section 4 above. The legal
description of the Property (including the boundaries of Parcels A, B, and C)
affected by this Agreement and a map outlining the land affected by such
additional charges per the terms of this Agreement are contained in Exhibit A,
which is attached and hereby incorporated into this Agreement; The total amount
of Improvement Costs shall be utilized to determine the pro -rata reimbursement to
the Developer by any owner of Parcel A or Parcel B who wishes to tap into or
connect to said Improvement, all subject to the laws and ordinances of the City of
Yakima, the State of Washington, and the provisions of this Agreement. The pro -
rata reimbursement obligation shall be determined on a per -square -foot basis
upon completion of the Improvements. Reimbursement payments shall be made
as provided in Section 6.B. below.
B. No person, firm, corporation, or other entity shall be granted a permit
or be authorized to tap into the facility for wastewater service to Parcels A and B
during a period of fifteen (15) years from the date this Agreement is recorded
pursuant to Section 11, without first paying to the City, in addition to any and all
other costs, fees and charges made or assessed for each tap, or for the main
facility constructed in connection therewith, the amount required by the
provisions of this Agreement except such charges shall not apply to any extension
of the main facility. All amounts so received by the City, up to the amount of the
Improvement Costs allocable to Parcels A and B on a pro rata basis, shall be paid
to the Developer under the terms of this Agreement within thirty (30) days after
receipt thereof unless Developer has assigned its reimbursement right to the City
pursuant to Section 8 below. Upon expiration of the aforementioned fifteen (15)
year term, the City shall be under no further obligation to collect or make any
further payments to the Developer for said Improvements. The decision of the
City Engineer or his authorized representative in determining or -computing the
Moore Reimbursement Agreement 2
IIII IeIlIIIIIII S I I:II
fl,7�'
7
��
S1A
AOR 125. YRklt0 Co, RA
amount due from any benefited owner/party who wishes to hook up to said
Improvements, shall be final and conclusive in all respects.
7. City Assumption of Developer Obligation to Pay for Improvements. In
consideration of Developer's voluntary dismissal with prejudice of the Litigation
and Developer's assignment to the City of its right to reimbursement payments,
the City hereby agrees to assume all of Developer's obligations to pay for
Improvement Costs under Section 4 above. Such assumption of obligations shall
be effective upon the later of (a) the Yakima County Superior Court's entry of an
order dismissing Developer's complaint in the Litigation with prejudice and
without attorney's fees or costs; and (b) recordation of this Agreement as set forth
in Section 11 below.
8. Developer Assignment to City of Right to Reimbursement. In
consideration of the City's assumption of Developer's obligation to pay
Improvement Costs, Developer hereby agrees to dismiss the Litigation as set forth
in the Settlement Agreement entered into between the parties dated October 2,
2001, and to assign to the City Developer's right to partial reimbursement of
payment for Improvements. Such assignment shall be effective upon the City's
assumption of the payment obligation as set forth in Section 7 above.
9. Ownership of Improvements by City. Improvements shall be part of the
City of Yakima wastewater system and shall be owned exclusively by the City.
Notwithstanding the waiver of Developer's obligation to pay a base collection
charge in Section 5, the Developer agrees to pay the City such service fees or other
charges that are or may be imposed by ordinance of the City of Yakima to like
users of the same class.
10. Extension/Addition. The City reserves the right, without affecting the
validity or terms of this Agreement, to make or cause to be made, extensions or
additions to said Improvements and to allow service connections to be made to
said extensions or additions, without liability on the part of the City.
11. Recordation. This Agreement shall be recorded by the City Clerk with the
Auditor of each county in which any of the benefited Property is situated, and
shall remain in full force and effect for a period of fifteen (15) years after the date
of such recording, or until the Developer, or its successors or assigns, is fully
reimbursed all Improvement Costs, whichever event occurs earlier; provided, that
in the event the Improvements described herein shall, during the term of this
Agreement, be rendered useless by the redesign or reconstruction of a portion of
the City's wastewater system facilities, such determination of uselessness to be in
the absolute judgment of the City Engineer, then the City's collection obligation
pursuant to Section 6.3. of this Agreement shall cease.
12. Binding Nature. Each of the covenants, terms, and provisions in this
Settlement Agreement shall be binding upon and inure to the benefit of the parties
hereto, and their respective legal representatives, successors, and assigns. The
Moore Reimbursement Agreement 3
parties hereby agree that the obligations contained in this Agreement touch and
concern the Property and shall constitute a covenant that shall run with the
Property.
13. Exxtire. A. reement. This Agreement, including the Exhibits attached hereto
which are hereby incorporated by this reference, constitutes the entire 'agreement:
between the parties with respect to the subject matter hereof and merges all prior
and contemporaneous communications and proposals, whether electronic, oral or
written, between the parties with respect to such subject matter. This Agreement
shall not be modified except by a written agreement dated subsequent to the date
of this Agreement and signed on behalf of the parties by their respective duly
authorized representatives.
-- r i> j
DATED this day of a 7beP , 2001.
CITY OF YAKIMA, WASHINGTON, JOHN S. MOORE
a Municipal Corporation
By: ,1-- •- �
R. A. Zais, City Manager
ATTEST:
City Clerk
Contract Number: cvAOO I- l l(
n S. Moore
Resolution Number:
STATE OF WASHINGTON)
County of Yakima
I certify that I know or have satisfactory evidence that .- ai' 1 Yt al 06 (e---)
is the person who appeared before me, and said person acknowledged that he
signed this instrument , having acknowledged to me that he signed and sealed the
said instrument as his free and voluntary act and deed for the uses and purposes
therein mentioned.
DATED: i (- 0
Moore Reimbi. ent Agreement
tk.t.A
Printed Name: ' t'. r '") c`4
Notary Public in and for the State of
(..(t,;., 1\c..''Cr‘ , residing at 'jab f"I
My Comm ssion expires: /cf.'. h...!;.4 `'c'
Certifir d In he a trite and correct copy of the
igin.ul filed in ivy office. WO Z
CITY CLERK
ilw
iuty
or
n
St S
MOMS
rallINNINO
.moi~
EXHIBIT A
Description of Moore Property
Parcel ;A ;Parcel No. 181329-34006 All that part of the Southeast quarter of the
Southwest quarter of Section 29, Township 13 North, Range 18, E. W. M.,
described as follows: Commencing at the Southeast corner of said subdivision;
thence North 1°3' West along the East line of said subdivision 1046 feet to the
true point of beginning; thence South 1°3' East 100 feet; thence South 88057'
West 434 feet, thence North 1°3' West to a point West of the true point of
beginning; thence East 433.5 feet to the true point of beginning, EXCEPT, the
East 25 feet for road.
Parcel B Parcel No. 181329-34007 All that part of the Southeast 1/4 of the
Southwest 1/4 of Section 29, Township 13 North, Range 18, E. W. M., described as
follows: Beginning at a point on the East line of said subdivision 876.7 feet North
1°3' West of the Southeast corner thereof; thence South 1°3' East 315 feet; thence
North 87°35' West 434 feet, thence North 1°3' West to a point South 88°57' West
of the point of beginning; thence North 88°57' East to the point of beginning,
EXCEPT road on the East.
Parcel C Parcel No. 181329-34008: That part of the Southwest 1/4 of Section 29,
Township 13 North, Range 18, E. W. M., described as follows: Beginning at a
point on the East line of said subdivison a distance of 876.7 feet North 1°3' West
of the Southeast corner thereof; thence North 1°3' West 69.3 feet; thence South
88°57' West 434 feet, thence South 1°3' East 69.3 feet to a point South 88°57'
West from the point of beginning; thence North 88°57' East 434 feet to the point of
beginning, EXCEPT road on the East side thereof.
`` l�� l 11 k / a e9:5IR
10111111111111111111111111111111
:T1' t3E YAKT 1 • R t 5::: Y kiaa Co, NA