Loading...
HomeMy WebLinkAbout09/05/2017 11 Plumbing, Mechanical and Building Permit Fee ScheduleITEM TITLE: SUBMITTED BY: BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDASTATEMENT Item No. 11. For Meeting of: September 5, 2017 Resolution adopting a fee schedule for Plumbing, Mechanical and Building Permit Fees for the City of Yakima Joan Davenport, Community Development Director Sara Watkins, Senior Assistant City Attorney SUMMARY EXPLANATION: This resolution creates the fee schedule referenced in the building permit, mechanical permit and plumbing permit ordinance sections. The fees in this resolution are those that have been charged since 2014. The fees are not increasing as a result of this resolution, rather, it is taking the fees that were being charged through the ordinance, and putting them into a fee resolution, which is easier to amend and may be easier for the public to obtain fee information. As historical background, in approximately 2005, the City adopted the tables outlining the permit fees for building permits. That table included the following language: "Beginning January 1, 2006 and on January 1 of each subsequent year, the fees in this table shall be adjusted automatically to account for any increase in the Consumer Price Index (CPI) for the Seattle Area (Seattle CPI - W)." Each year the fees were increased but the ordinance was not amended to show the new table. This happened each year until 2014, when the Council passed an ordinance amending the tables to remove the CPI increase language. The Council amended the ordinance to remove the CPI language, but did not amend the table to reflect the fees being charged in 2014. The fees charged in 2014 are the fees still being charged today. Those fees are reflected in the fee resolution attached. The fees being charged have not increased since 2014, and are not increased in this proposed fee resolution. ITEM BUDGETED: NA STRATEGIC PRIORITY: Neighborhood and Community Building APPROVED FOR SUBMITTAL: City Manager STAFF RECOMMENDATION: Adopt resolution BOARD/COMMITTEE RECOMMENDATION: The Neighborhood and Community Building Committee heard a presentation regarding this matter to the extent it dealt with the fee amounts that will be placed in the resolution. ATTACHMENTS: Description Upload Date Type Resolution- Plumbing, Mcci mica) Fees Building Permit 9.'2^4'201 7 Resoldion 2 3 RESOLUTION NO. R -2017- A RESOLUTION adopting a Fee Schedule for Plumbing, Mechanical and Building Permit Fees for the City of Yakima WHEREAS, prior to 2014 the permit fees under YMC 11.04.030 increased automatically to conform with the Consumer Price Index, and had been increasing regularly for approximately ten years; and WHEREAS, in 2014 the permit fees were set by the Consumer Price Index according to then -existing ordinance language requiring that fees be increased yearly based on the CPI; and WHEREAS, the City Council determined that there should no longer be an automatic increase in the fees and permits authorized by the ordinance, and removed the language indicating the increase per the Consumer Price Index from the ordinance; and WHEREAS, at that time the City Council did not retract all the previous increases or set the fees and permits at any amount other than the amount set at the beginning of 2014; and WHEREAS, the City Council amended the ordinance to remove the Consumer Price Index increase language, but did not amend the ordinance to reflect the current amounts being charged for fees and permits; and WHEREAS, the City of Yakima continues to charge the amounts for fees and permits from the year 2014 when the City Council removed the Consumer Price Index increase and those permit charges and fees should be reflected in the ordinance to provide the best information possible to residents online and in the code; and WHEREAS, the City Council amended Yakima Municipal Code sections 11.32.106.5.2 (mechanical fees), 11.44.040 (plumbing fees), and 11.04.030 (building permits), to reference specifically a separate fee resolution rather than updating the fees through code updates; and WHEREAS, in so amending the municipal code, the City Council required that it also pass a fee resolution outlining the fees for mechanical, plumbing and building permits; and WHEREAS, this resolution and the attached Fee Schedule does not increase the fee or permit amounts from what have been charged since 2014, rather, it amends the ordinance language to properly reflect the amounts that have been charged since 2014 when the Council determined the fees should no longer automatically increase; and WHEREAS, the City Council of the City of Yakima hereby finds that it is in the best interest of the City and its residents to amend the code to reflect the amounts being charged by the City for fees and permitting under YMC 11.32.106.5.2, 11.44.040, and 11.04.030 in a fee schedule adopted and approved by resolution; now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The attached schedule of fees for mechanical permitting, plumbing permitting and building is hereby adopted and shall become effective immediately. 4 ADOPTED BY THE CITY COUNCIL this 5'h day of September, 2017. ATTEST: Kathy Coffey, Mayor Sonya Clear Tee, City Clerk 5 Fee Schedule for Plumbing, Mechanical and Building Permit Fees for the City of Yakima Effective: Resolution: City of Yakima Mechanical Fees Basic Permit Fee $23.86 Supplemental Permits $7.29 Furnaces 100,000 BTU or less (forced air gravity type furnace or burner, including ducts & vents attached to such appliance) $17.51 Over 100,000 BTU (forced air or gravity type furnace or burner, including ducts & vents attached to such appliance) $20.69 Floor furnace, including vent/gas logs $17.51 Suspended heater, recessed or floor mounted heater $17.51 Appliance vents (each appliance vent not included in appliance permit) $10.36 Repair or alteration or addition to each heating appliance, refrigeration unit, cooling unit, absorption unit or each heating, cooling, absorption or evaporative cooling system, incl. installation of controls regulated by this code. $19.45 Boiler or compressor to and including 3 HP, or each absorption system to and including 100,000 BTU $17.58 Boiler or compressor over 3 HP to and including 15 HP (or 3.1 to 15 Tons cooling) for ea. absorption system over 100,000 BTU/H & incl. 500,000 BTU/H $29.38 Boiler or compressor over 15 HP to and including 30 HP (or 15.1 to 30 Tons cooling), for each absorption $39.00 1 6 system over 500,000 BTU/H to and incl. 1,000,000 BTU/H Boiler or compressor over 30 HP to and including 50 HP (or 30.1 to 50 Tons cooling) for each absorption system over 1,000,000 BTU/H to & including 1,750,000 BTU/H $53.18 Boiler or refrigeration compressor over 50 HP (or 50.1 Tons cooling or more) for each absorption system over 1,750,000 BTU/H $89.02 Air handling unit to and incl. 10,000 cubic feet per minute, incl. ducts attached thereto. NOTE: This fee shall not apply to an air-handling unit which is a portion of a factory assembled appliance, cooling unit, evaporative cooler or absorption unit for which a permit is required elsewhere in this code. $13.54 Air handling unit over 10,000 cubic ft. per minute $18.41 Evaporative cooler other than portable type $13.54 Ventilation fan connected to a single duct $10.36 Ventilation system which is not a portion of any heating or air conditioning system authorized by a permit. $10.36 Installation of each hood, which is served by mechanical exhaust, including the ducts for such hood. $17.51 Domestic type incinerator $25.85 Commercial or industrial type incinerator $104.37 Each appliance or piece of equipment regulated by this code not classified in other appliance categories, or for which no other fee is listed in this code. $10.36 Gas piping (1-4 outlets) $8.04 2 7 3 (5 or more outlets—per outlet) $3.20 Hazardous (1-4 outlets) $3.20 process piping (5 or more (hpp) outlets—per outlet) $1.70 Nonhazardous (1-4 outlets) $3.20 process piping (5 or more (nhpp) outlets—per outlet) $0.82 Woodstove/pellet stove (no new home construction) $37.06 Inspections outside of normal business hours $81.43 Re -inspection fees assessed $81.43 Inspections for which no fee is specifically indicated (minimum charge is one-half hour) $81.43 Additional plan review required by change, additions or revisions to approved plans, minimum charge is 1/2 hour. Per hour $81.43 3 8 City of Yakima Plumbing Fees Basic Permit Fee $31.82 Supplemental Permits $16.01 UNIT FEE SCHEDULE IN ADDITION TO ITEMS ABOVE Fixture Fee Schedule (Per Fixture or Trap) Each plumbing fixture on one trap or a set of fixtures on one trap (including water, drainage piping & backflow protection thereof) $11.23 Each building sewer and each trailer park sewer $21.53 Rainwater systems—per drain (inside building) $11.23 Cesspool (where permitted—obtain permit from Yakima County Health District) Private sewage disposal system (where permitted—obtain permit from Yakima County Health District Water heater and/or vent $11.23 Industrial waste pretreatment interceptor including trap & vent, excepting kitchen type grease interceptors functioning as fixture traps $19.07 Installation, alteration or repair of water piping and/or water treating equipment, each $11.23 Repair or alteration of drainage/vent piping, each fixture $11.23 Atmospheric type vacuum breakers $8.04 Backflow protective device (RPBA/DCVA) Two-inch diameter & smaller $11.23 Over two-inch diameter $24.95 OTHER INSPECTIONS AND FEES 4 9 Inspections outside of normal business hours $81.43 Re -inspection fees $81.43 Inspections for which no fee is specifically indicated $81.43 Additional plan review required by change, additions or revisions to approved plans, minimum charge is 1/2 hour. Per hour $81.43 5 10 BUILDING PERMIT AND PLAN REVIEW SCHEDULE OF FEES 6 SCHEDULE OF FEES - Table 1 S.F. Valuation from Table 3 Building Permit Plan Review Subtotal $1.00 - $500.00 $21.45 $13.94 $35.39 $501.00 - $600.00 $24.32 $15.81 $40.13 $601.00 - $700.00 $27.21 $17.69 $44.90 $701.00 - $800.00 $30.08 $19.56 $49.64 $801.00 - $900.00 $32.96 $21.42 $54.38 $901.00 - $1,000.00 $35.83 $23.30 $59.13 $1,001.00 - $1,100.00 $38.72 $25.16 $63.88 $1,101.00 - $1,200.00 $41.60 $27.03 $68.63 $1,201.00 - $1,300.00 $44.47 $28.91 $73.38 $1,301.00 - $1,400.00 $47.36 $30.78 $78.14 $1,401.00 - $1,500.00 $50.23 $32.65 $82.88 $1,501.00 - $1,600.00 $53.11 $34.53 $87.64 $1,601.00 - $1,700.00 $56.00 $36.40 $92.40 $1,701.00 - $1,800.00 $58.87 $38.26 $97.13 $1,801.00 - $1,900.00 $61.75 $40.14 $101.89 $1,901.00 - $2,000.00 $64.63 $42.01 $106.64 $2,001.00 - $3,000.00 $77.49 $50.37 $127.86 $3,001.00 - $4,000.00 $90.35 $58.73 $149.08 $4,001.00 - $5,000.00 $103.22 $67.09 $170.31 $5,001.00 - $6,000.00 $116.08 $75.45 $191.53 $6,001.00 - $7,000.00 $128.94 $83.81 $212.75 $7,001.00 - $8,000.00 $141.80 $92.17 $233.97 $8,001.00 - $9,000.00 $154.67 $100.53 $255.20 $9,001.00 - $10,000.00 $167.53 $108.90 $276.43 $10,001.00 - $11,000.00 $180.38 $117.26 $297.64 $11,001.00 - $12,000.00 $193.24 $125.61 $318.85 $12,001.00 - $13,000.00 $206.11 $133.97 $340.08 $13,001.00 - $14,000.00 $218.97 $142.33 $361.30 $14,001.00 - $15,000.00 $231.83 $150.69 $382.52 $15,001.00 - $16,000.00 $244.70 $159.05 $403.75 $16,001.00 - $17,000.00 $257.56 $167.41 $424.97 $17,001.00 - $18,000.00 $270.42 $175.77 $446.19 $18,001.00 - $19,000.00 $283.28 $184.13 $467.41 $19,001.00 - $20,000.00 $296.15 $192.49 $488.64 $20,001.00 - $21,000.00 $309.00 $200.85 $509.85 $21,001.00 - $22,000.00 $321.86 $209.21 $531.07 $22,001.00 - $23,000.00 $334.72 $217.57 $552.29 $23,001.00 - $24,000.00 $347.59 $225.93 $573.52 $24,001.00 - $25,000.00 $360.45 $234.30 $594.75 $25,001.00 - $26,000.00 $369.76 $240.33 $610.09 6 11 $26,001.00 - $27,000.00 $379.06 $246.38 $625.44 $27,001.00 - $28,000.00 $388.37 $252.43 $640.80 $28,001.00 - $29,000.00 $397.67 $250.22 $647.89 $29,001.00 - $30,000.00 $406.98 $264.54 $671.52 $30,001.00 - $31,000.00 $416.28 $270.58 $686.86 $31,001.00 - $32,000.00 $425.59 $276.63 $702.22 $32,001.00 - $33,000.00 $434.88 $282.68 $717.56 $33,001.00 - $34,000.00 $444.18 $288.73 $732.91 $34,001.00 - $35,000.00 $453.49 $294.78 $748.27 $35,001.00 - $36,000.00 $462.80 $300.82 $763.62 $36,001.00 - $37,000.00 $472.10 $306.87 $778.97 $37,001.00 - $38,000.00 $481.41 $312.92 $794.33 $38,001.00 - $39,000.00 $490.71 $318.97 $809.68 $39,001.00 - $40,000.00 $500.02 $325.02 $825.04 $40,001.00 - $41,000.00 $509.32 $331.06 $840.38 $41,000.00 - $42,000.00 $518.63 $337.11 $855.74 $42,001.00 - $43,000.00 $527.93 $343.15 $871.08 $43,001.00 - $44,000.00 $537.24 $349.20 $886.44 $44,001.00 - $45,000.00 $546.55 $355.24 $901.79 $45,001.00 - $46,000.00 $555.84 $361.29 $917.13 $46,001.00 - $47,000.00 $565.15 $367.34 $932.49 $47,001.00 - $48,000.00 $574.45 $373.39 $947.84 $48,001.00 - $49,000.00 $483.76 $379.44 $863.20 $49,001.00 - $50,000.00 $593.06 $385.50 $978.56 $50,001.00 - $51,000.00 $599.50 $389.68 $989.18 $51,001.00 - $52,000.00 $605.93 $393.85 $999.78 $52,001.00 - $53,000.00 $612.37 $398.05 $1,010.42 $53,001.00 - $54,000.00 $618.81 $402.22 $1,021.03 $54,001.00 - $55,000.00 $625.25 $406.40 $1,031.65 $55,001.00 - $56,000.00 $631.68 $410.59 $1,042.27 $56,001.00 - $57,000.00 $638.12 $414.77 $1,052.89 $57,001.00 - $58,000.00 $644.56 $418.95 $1,063.51 $58,001.00 - $59,000.00 $650.99 $423.14 $1,074.13 $59,001.00 - $60,000.00 $657.43 $427.32 $1,084.75 $60,001.00 - $61,000.00 $663.87 $431.50 $1,095.37 $61,001.00 - $62,000.00 $670.30 $435.69 $1,105.99 $62,001.00 - $63,000.00 $676.74 $439.87 $1,116.61 $63,001.00 - $64,000.00 $683.18 $444.04 $1,127.22 $64,001.00 - $65,000.00 $689.61 $448.24 $1,137.85 $65,001.00 - $66,000.00 $696.05 $452.42 $1,148.47 $66,001.00 - $67,000.00 $702.49 $456.60 $1,159.09 $67,001.00 - $68,000.00 $708.92 $460.80 $1,169.72 $68,001.00 - $69,000.00 $715.35 $464.98 $1,180.33 7 12 $69,001.00 - $70,000.00 $721.79 $469.17 $1,190.96 $70,001.00 - $71,000.00 $728.22 $473.35 $1,201.57 $71,001.00 - $72,000.00 $734.66 $477.53 $1,212.19 $72,001.00 - $73,000.00 $741.10 $481.72 $1,222.82 $73,001.00 - $74,000.00 $747.53 $485.90 $1,233.43 $74,001.00 - $75,000.00 $753.97 $490.08 $1,244.05 $75,001.00 - $76,000.00 $760.41 $494.27 $1,254.68 $76,001.00 - $77,000.00 $766.84 $498.45 $1,265.29 $77,001.00 - $78,000.00 $773.28 $502.63 $1,275.91 $78,001.00 - $79,000.00 $779.72 $506.82 $1,286.54 $79,001.00 - $80,000.00 $786.15 $511.00 $1,297.15 $80,001.00 - $81,000.00 $792.59 $515.18 $1,307.77 $81,001.00 - $82,000.00 $799.03 $519.37 $1,318.40 $82,001.00 - $83,000.00 $805.47 $523.55 $1,329.02 $83,001.00 - $84,000.00 $811.90 $527.73 $1,339.63 $84,001.00 - $85,000.00 $818.34 $531.92 $1,350.26 $85,001.00 - $86,000.00 $824.78 $536.10 $1,360.88 $86,001.00 - $87,000.00 $831.21 $540.28 $1,371.49 $87,001.00 - $88,000.00 $837.65 $544.47 $1,382.12 $88,001.00 - $89,000.00 $844.09 $548.65 $1,392.74 $89,001.00 - $90,000.00 $850.52 $552.84 $1,403.36 $90,001.00 - $91,000.00 $856.96 $557.02 $1,413.98 $91,001.00 - $92,000.00 $863.40 $561.20 $1,424.60 $92,001.00 - $93,000.00 $869.83 $565.39 $1,435.22 $93,001.00 - $94,000.00 $876.27 $569.57 $1,445.84 $94,001.00 - $95,000.00 $882.71 $573.75 $1,456.46 $95,001.00 - $96,000.00 $889.14 $577.94 $1,467.08 $96,001.00 - $97,000.00 $895.57 $582.12 $1,477.69 $97,001.00 - $98,000.00 $902.01 $586.30 $1,488.31 $98,001.00 - $99,000.00 $908.44 $590.49 $1,498.93 $99,001.00 - $100,000.00 $914.88 $594.67 $1,509.55 $100,001.00 - $500,000.00 $914.88 For the first 100,000 plus $5.25 for each additional 1,000 or fraction thereof. The Plan Review fee will be 65% of the calculated Building Permit fee. $500,001.00 - $1,000,000.00 $2924.74 For the first 500,000 plus $4.48 for each additional 1,000 or fraction thereof. The Plan Review fee will be 65% of the calculated Building Permit fee. $1,000,001.00 - And up $5070.22 For the first 1,000,000 plus $3.02 for each additional 1,000 or fraction thereof. The Plan Review fee will be 65% of the calculated Building Permit fee. 8 13 SCHEDULE OF FEES -OTHER FEES 1. After Hours Inspection (minimum two-hour charge) $81.43/hour" 2. Re -inspection fees $81.43/hour" 3. Inspections for which no fee is specifically indicated $81.43/hour" 4. Additional plan review for revisions of approved plans $81.43/hour" (minimum charge one-half hour) 5. Outside consultants for plan review or inspections Actual costs*** 6. Manufactured homes Single Wide $319.24 Double Wide $377.26 Triple Wide $435.35 7. Commercial coach Single Wide $319.24 Double Wide $377.26 Triple Wide $435.35 8. Demolitions (all structures) - plus sewer cap, if applicable $79.44 9. Structure Move Permits $309.12 (Residential/Ag/Storage/Garage/Shed) 10. Re -roof (Commercial) roofs up to 10,000 square feet $144.67 Re -roof (Commercial) roofs greater than 10,000 square feet $153.90 plus $78.19 for each additional 10,000 sq ft or fraction thereof 11. Re -roof (residential) $79.44 12. Signs $79.44 13. Swimming pools $119.02 ** Or the total hourly cost to the jurisdiction, whichever is greatest. The cost shall include supervision, overhead, equipment, hourly wages and fringe benefits of the employees involved. "' Actual costs include administrative and overhead costs. PERMITS ADD: SBCC (State Building Code Council) surcharge $4.50 for first unit, $2.00 for each additional unit (except manufactured homes). 9 BUILDING VALUATION TABLE Occupancy Type Occupancy Description Construction Types Other IA IB IIA IIB IIIA IIIB IV VA VB A-1 Assembly, theaters with stage $198.49 $189.34 $184.98 $177.31 $165.01 $164.16 $171.67 $152.87 $147.29 A-1 Assembly, theaters without stage $183.32 $174.18 $169.82 $162.16 $149.84 $149.01 $156.52 $137.69 $132.14 A-2 Assembly, nightclubs $146.18 $142.08 $138.52 $133.33 $124.73 $123.21 $128.46 $113.62 $109.86 A-2 Assembly, restaurants, bars, banquet halls $144.94 $140.85 $136.05 $132.10 $122.27 $121.99 $127.24 $111.16 $108.63 A-3 Assembly, churches $184.87 $175.73 $171.36 $163.69 $151.33 $150.48 $158.06 $139.17 $133.62 A-3 Assembly, general, community halls, libraries, museums $147.87 $138.07 $132.46 $126.02 $112.51 $112.88 $120.38 $100.57 $96.03 A-4 Assembly, arenas $144.94 $140.85 $136.05 $132.10 $122.26 $121.97 $127.23 $111.15 $108.59 B Business $148.04 $142.71 $138.08 $131.62 $117.53 $116.92 $126.37 $104.73 $100.81 E Educational $158.57 $153.22 $148.84 $142.26 $131.23 $128.13 $137.55 $117.25 $112.88 F-1 Factory and industrial, moderate hazard $91.57 $87.31 $82.05 $79.51 $68.71 $69.93 $76.27 $58.57 $55.65 F-2 Factory and industrial, low hazard $90.33 $86.07 $82.05 $78.26 $68.71 $68.70 $75.04 $58.57 $54.42 H-1 High hazard, explosives $86.16 $81.60 $77.87 $74.08 $64.76 $64.75 $70.85 $54.64 NP H-2, 3, 4 High hazard $86.16 $81.88 $77.87 $74.08 $64.76 $64.75 $70.85 $54.64 $50.50 H-5 HPM $148.04 $142.71 $138.08 $131.62 $117.53 $116.92 $126.37 $104.73 $100.81 1-1 Institutional, supervised environment $147.23 $142.18 $138.36 $132.75 $121.81 $121.73 $128.74 $111.96 $107.53 1-2 Institutional, incapacitated $247.49 $241.33 $237.54 $231.08 $216.56 NP $225.82 $203.76 NP 10 Occupancy Type Occupancy Description Construction Types Other IA IB IIA IIB IIIA IIIB IV VA VB 1-3 Institutional, restrained $169.87 $165.13 $160.51 $154.03 $141.39 $139.55 $148.77 $128.61 $122.22 1-4 Institutional, day care facilities $147.23 $142.19 $138.36 $132.75 $121.81 $121.73 $128.74 $111.96 $107.53 M Mercantile $108.89 $104.79 $99.99 $96.70 $86.78 $86.49 $91.17 $75.67 $73.15 R-1 Residential, hotels $148.63 $143.59 $139.76 $134.17 $123.27 $123.22 $130.21 $113.42 $109.00 R-2 Residential, multifamily $123.93 $118.89 $115.06 $109.45 $98.76 $98.70 $105.68 $88.91 $84.50 R-3 Residential, one- and two-family $118.82 $115.52 $112.67 $109.45 $104.39 $104.12 $107.74 $99.38 $92.25 S-1 Storage, moderate hazard $84.92 $80.65 $75.39 $72.84 $62.30 $63.52 $69.62 $52.16 $49.26 S-2 Storage, low hazard $83.68 $79.42 $75.39 $71.60 $62.29 $62.28 $68.39 $52.16 $48.03 U Utility, miscellaneous $64.58 $61.06 $57.42 $54.56 $47.32 $47.32 $51.49 $38.91 $37.05 CA warehouse $66.95 $63.53 $60.31 $57.30 $49.82 $49.66 $54.70 $41.72 $38.41 Mini -storage warehouses $91.23 $86.57 $82.18 $79.40 $67.90 $67.89 $74.53 $56.86 $52.35 Attics (walk around) unfinished storage only $20.15 Basement (unfinished) $20.20 Enclosed sleeping or service porch $48.75 Balcony $27.00 Conversion of attached garage into living space $51.81 Deck -no cover $8.07 Interior remodel $32.49 Porches $27.00 11 12 Occupancy Type Occupancy Description Construction Types Other IA IB IIA IIB IIIA IIIB IV VA VB Accessory sheds, buildings $26.02 Footings (replacement or for moved building—per lineal foot) $41.98 Carport—open all sides $20.75 Carport—partially enclosed (one or more walls) $25.44 Garage—private use (wood frame and pole type) $40.38 Loading docks and roofs Steel or concrete piers, heavy slab $17.89 Timber piers, heavy wood floor $15.44 Dirt fill, concrete retaining wall & slab $12.74 Light wood piers and girders/plank floor $10.85 Loading docks roof— wood, steel, metal or composition $9.14 NOTES: Private garages use utility misc. 80% for shell -only building. 50% for nonstructural tenant improvements ('TI") for new Tls. All other Tls based on evaluation. NP = Not Permitted. 12 13