HomeMy WebLinkAbout08/01/2017 06G Planning and Engineering Agreement with RH2 Engineering, Inc; Amendment 1BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDASTATEMENT Item No. 6.G. For Meeting of: August 1, 2017 ITEM TITLE: Resolution authorizing amendment No. 1 to the existing agreement with RH2 Engineering, Inc. for $271,633 to include engineering and consulting services required for construction of Beech Street Interceptor, Lift Station, and Force Main SUBMITTED BY: Mike Price, Wastewater/StormwaterManager 509.249.6815 Scott Schafer, Director of Public Works SUMMARY EXPLANATION: The construction of City Project No. 2365 — Beech Street Interceptor, Lift Station, and Force Main ("project") requires construction phase engineering professional services including inspection, control system programming, final testing, training, and project acceptance. The City already has an existing professional services agreement with RH2 Engineering pertaining to the design of the project and RH2 is qualified to provide the additional required construction phase services. The Wastewater Division is requesting approval to supplement the existing agreement with RH2 in order to include compensation for the required construction phase services. This approval would allow Wastewater staff to continue work with RH2 and the Engineer of Record during the construction and commissioning of the project. The terms of Amendment No. 1 ( Contract Supplemental Agreement) would be in an amount not to exceed $271,633 (See attached Contract Supplemental Agreement with Exhibit A and B). Exhibit A of the Agreement describes the Scope of Work in more detail. Exhibit B describes the Schedule of Rates in more detail. ITEM BUDGETED: STRATEGIC PRIORITY: Yes APPROVED FOR„� �� SUBMITTAL: City Manager STAFF RECOMMENDATION: Adopt resolution. BOARD/COMMITTEE RECOMMENDATION: ATTACHMENTS: Description Upload Date Type RH2 amend 1 resol ution 7/26/2017 CD%r Memo RI -2 Beech PSA Amendment No, 1 7/13/2017 Contract RESOLUTION NO. R -2017- A RESOLUTION authorizing execution of amendment 1 to the engineering and consulting services agreement with RH2 Engineering, Inc. for $271,633 to provide construction phase engineering services for City Project No. 2365 — Beech Street Interceptor, Lift Station, and Force Main. WHEREAS, the City of Yakima owns and operates wastewater collection and treatment facilities in accord with applicable Federal, State and Local regulations; and WHEREAS, professional wastewater engineering services are required for environmental mandates, community growth, replacement needs, and operational efficiencies; and WHEREAS, the City is currently engaged through City Contract No. 2015-203 with RH2 Engineering for the design of the Beech Street Interceptor, Lift Station, and Force Main Project in the Wastewater Collection System; and WHEREAS, construction phase engineering services outside of the original scope for the design project were identified as design phase work neared completion; and WHEREAS, Section 11.4 of City Contract No. 2015-203 states that Supplemental Agreements may be entered into upon mutual written agreement that would increase or decrease the scope and associated costs and payment; and WHEREAS, there is a need to increase the scope of the Contract to include additional engineering services and work to be done on the Project; and WHEREAS, RH2 Engineering can provide these additional engineering services and will agree to do so for an additional cost not to exceed $271,633; and WHEREAS, the City finds the amendment to the current contract with RH2 Engineering necessary to successfully complete the project, which amendment is set forth as Amendment No. 1 to the existing contract with RH2 Engineering, and which amendment is attached hereto and incorporated herein by this reference; now therefore; BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The City Manager is hereby authorized to execute the attached Contract Supplemental Agreement to the Professional Services Agreement with RH2 Engineering, Inc., attached hereto and incorporated herein by this reference, not to exceed Two Hundred Seventy -One Thousand Six Hundred Thirty-three Dollars ($271,633), to provide the professional services as described in the amendment. ADOPTED BY THE CITY COUNCIL this 1St day of August, 2017. ATTEST: Sonya Claar-Tee, City Clerk Kathy Coffey, Mayor ORIGINAL I PAGENO OF 12- PAGES amm��M Supplemental Agreement Organization and Address - Number: 1 RH2 Engineering, Inc. 114 Columbia Point Dr., Suite C Richland, WA 99352 Original Contract Number, Execution Date of Supplement: 2015-203 July 11, 2017 City Engineering Project Number: 2365 Completion Date of Supplement: August 31, 2018 Project Title: Maximum Amount Payable this Supplement: Beech Street Interceptor, Lift Station, and $401,633 Force Main Maximum Total Amount Payable for the $1,023,358 Agreement: IWINION will -wow- 1*0111111 W" 1 (1111110r, The changes to the agreement are described as follows: Section 11A - Scope of Services 4, 1 + : 4, *16, *' "ah Opaces below and return to this office for final action, B L y: Cgpss;By- 4e�c' , V-R fix 3A Consultant Signature City Manager Date CRIGINAL-1 PAGE NI F 12- PAGES City of Yakima Beech Street Lift Station and Force Main PHASE 4 - Services During Construction Amendment PT6 Loll 4 rogyn-fawl III I ilm F1 W. -- 0 -III --- 4 0 1 qq�1111111pg A 10.TAU L, M 4 A C+1'i i a 11 Z, M I To" re W. Task I ® Services During Construction — Schedule A Objective: Provide professional engineering services for the City during construction of Schedule A - Beech Street Interceptor. Approach: Su task 1.1: Provide Construction Contract Documents IIIIII I M I 6/20/17 3:32 PM 2:\Bothell\Data\YAK\715-114\Contract\IISA—Amend_No. 1—SOW_Beech Street LS and FM-SDC.docx ORIGINAL I PAGE NO_5_OF_14_PAGES 6 City of Yakima Exhibit A — Scope of Work Beech Street Lift Station and Force Main, Phase 4 — SDC Amendment No. I Subtask 13: Assist with Construction Contract Administration 1.11 Review the contractor schedule, subcontractor requirements, and required administrative submittals provided by the contractor as requested by the City. 1.3.2 Prepare and distribute meeting minutes. 1.3.3 Manage RH2 ShareFile site for uploading and downloading of project documents. Subtask 1.4: Review Technical Submittals 1.4.1 Review submittals, resubmittals, shop drawings, plans, and other substitutions for conformance with project technical specifications up to the level provided in the Fee Estimate. 1.4.2 Coordinate submittal review with the City as required, and prepare a compiled set of review comments for return to the contractor. 1.4.3 Coordinate with the City regarding requests for substitute and "or -equal" items proposed for use by the contractor. Su task 1.5: Accept and Respond to Requests for Information (RFIs) 1.5A Coordinate review and approval with the City and provide response(s) to the contractor, 1.5.2 Prepare RFI form and documentation for City. Su task 1.6: Review and Respond to Change Order Proposal Requests (CPRs) 1.6.1 Coordinate review and approval with the City and provide response(s) to the contractor. 1.6.2 Prepare the CPR form and documentation for the City. Su_ task 13: Coordinate Materials Testing 1.7.1 Perform materials testing and inspection — Baer Testing, Inc., (Baer Testing) will provide field and laboratory testing SDC of Schedule A as a subconsultant to RH2. 1.71 Review materials testing data for consistency with the plans and specifications. Su task 1.8: Review Pay Requests 1.8.1 Review, and recommend for payment, the contractor's Request for Progress Payment and Request for Final Payment. This subtask assumes that there wiff be up to four (4) pay estimate reviews throughout the construction period. j N H i"*1,1111011116 1W., # 41 0 11 11!111 2 Ilin I pi iii I I I' ii 11 I ;!! R 2 6120/17 3:32 PM Z:\Botheli\Data\YAK\715-114\Contract\PSA_Amend—No, 1-50W—Beech Street LS and FM-SDC.docx ORIGINAL I PACED q _r 0F_J2,,_PACES City of Yakima Exhibit A — Scope of Work Beech Street Lift Station and Force Main, Phase 4 — SDC Amendment No. 1 Subtask 1.10: Respond to Technical Questions and Participate in the Startup and Testing 1.10,1 Review the contractor's testing and startup plan, and assist the City in testing and startup of the interceptor. It is assumed that testing and startup will be conducted over a period of one (1) to two (2) days. 1.102 Conduct final inspection with City staff and contractor and prepare punchlist. 1.10.3 Prepare a letter recommending project acceptance following completion of construction. Su task 1.11: Compile Notes and Photos and Conform Record Drawings 1.11.1 Prepare daily notes for all on-site observation by RH2, 1.11.2 Compile construction photos taken by RH2 by date. 1.11.3 Utilize daily notes, construction photos, and contractor redline documents to prepare record drawings. Assumptions: RH2 Deliverables: • Conformed for construction drawings and specifications, in PDF and hardcopy format as previously noted. • Pre -construction meeting agenda and minutes in PDF. • Construction progress reports and infographics in PDF. ® Submittal and shop drawings review and documentation in PDF, 0 Clarifications and change orders review and documentation, if required, in PDF. 3 6/20/17 3:32 PM Z:\Botheil\DataNYAX\715-114\Contract\P5A_Amend_No, 1-50W—Beech Street LS and FM-SDC.docx ORIGINAL I PAGE NO_5OF_U- PAGES City of Yakima Exhibit A - Scope of Work Beech Street Lift Station and Force Main, Phase 4 - SDC - — - -------- Amendment No. 1 • Construction observation and correspondence with City and the contractor, as requested, within the budgeted hours authorized. Construction observation reports from site visits to be provided to the City in PDF, • Electronic copies of materials testing reports at the completion of construction, • Review and recommendation of contractor requests for payment in PDF. • Punchlist following final inspection in PDF and hard copy. • Letter recommending substantial completion and project acceptance in PDF and hard copy. • Record drawings in PDF. Project Schedule The pre -construction meeting occurred on june 19, 2017. The contractorfor Schedule A will receive a Notice to Proceed from the City no later than June 23, 2017, with construction scheduled to be_qin on June 26.. 201 Z T A Task 2 — Services During Construction — Schedule IS Objective: Provide professional engineering services to the City during construction of Schedule B - Beech Street lift station and force main project. Approach: Subtask 2.1: Provide Construction Documents 2.1.1 Produce two (2) full-size and twelve (12) half-size >sets of construction drawings and twelve (12) sets of specifications for use by the contractor, City, and RH2. This subtask assumes that the documents will be distributed as follows: one (1) full-size plan, four (4) half-size plans, and four (4) specifications for contractor use; (1)full-size plan, five (5) half-size plans, andfive r specifications for City use; and three (3) half-size plans and three (3) specifications for RH2 use. to task 2.2: Attend a Pre -construction Conference 2.11 Prepare for and attend the pre -construction conference. 2.2.2 Prepare and distribute meeting invitations and agenda. 2.2.3 Prepare and distribute meeting minutes. Su task 2.3: Assist with Construction Contract Administration 2.3.1 Review the contractor schedule, subcontractor requirements, and required administrative submittals provided by the contractor as requested by the City. 2.3.2 Prepare and distribute meeting minutes. 2.3.3 Manage RH2 ShareFile site for uploading and downloading of project documents. Subtask 2.4: Review Technical Submittals 2.4.1 Review submittals, resubmittals, shop drawings, plans, and other substitutions for conformance with project technical specifications up to the level provided in the Fee Estimate. 4 6/20/17 3:32 PM 2:1Bothell\Data\YAK\715-114\Contract\PSA—Amend_No. 1_SOW —Beech Street LS and FM-SDC.docx City of Yakima Exhibit A – Scope of Work Beech Street Lift Station and Force Main, Phase 4 – SDC Amendment No. 1 2.4.2 Coordinate submittal review with the City as required, and prepare a compiled set of review comments for return to the contractor. 2.4.3 Coordinate with the City regarding requests for substitute and "or -equal" items proposed for use by the contractor. Su task 2.S: Accept and Respond to Requests for Information 2.5.1 Coordinate review and approval with the City and provide response(s) to the contractor. 2.5.2 Prepare RFI form and >documentation for the City. Su task 2.6: Review and Respond to Change Order Proposal Requests 2.6.1 Coordinate review and approval with the City and provide response(s) to the contractor. 2.6.2 Prepare the CPR form and documentation for the City. Su as 23: Coordinate Materials Testing 2.7.1 Perform materials testing and inspection -Baer Baer Testing will provide field and laboratory testing SDC of Schedule A as a subconsultant to RH2. 2.7.2 Review materials testing data for consistency with the plans and specifications, Ste as 2.8: Provide Geological Inspections of Structure Subgracle 2.8.1 Observe excavation and shoring conditions, and observe sub rade conditions for soil composition, density, and moisture for comparison to geotechnical evaluation findings. 2.8.2 Prepare field observation reports with any recommendations for additional testing. Subtask 2.9: Review Pay Requests 2.9.1 Review, and recommend for payment, the contractor's Request for Progress Payment and Request for Final Payment. This subtask assumes that there will be up to ten (10) pay estimate reviews throughout the construction period. Subtask 2.10: Perform On-site Construction Observation and Attend Construction Meetings 2.10.1 Conduct site visits approximately two (2) times per week, or as required by construction progress or requested by City, to observe construction progress and conformance with the construction documents. The Fee Estimate reflects a total of sixteen (1 6) hours per week of on-site observations by an RH2 engineer for the duration of the physical construction period (assumed to be forty (40) weeks). 2.101 Prepare construction observation reports, including relevant photographs. 2.10.3 Attend bi-weekly on-site construction meetings and respond to field questions. This subtask assumes that RH2s on-site work will be scheduled to coincide with the construction meetings. Subtask 2.11: Respond to Technical Questions and Participate in the Startup and Testing 2.11.1 Review the contractor's testing and startup plan, and assist the City in testing and startup of the lift station and force main. It is assumed that testing and startup will be conducted aver a period of2 (two) to 3 (three) days. 2,11.2 Conduct final inspection with City staff and contractor and prepare punchlist, 2113 Prepare a letter recommending project acceptance following completion of construction. 5 6/20/17 3:32 PM Z:\BothLll\Data\YAK\715-114\Contract\PSA_Amend_No. 1_50W Beech Street LS and FM-SDC.docx City of Yakima Exhibit A — Scope of Work Beech Street Lift Station and Force Main, Phase 4 — SOC Amendment No. 1 Su task 2.12: Compile Notes and Photos and Conform Record Drawings 2.12.1 Prepare daily notes for on-site observation by RH2. 2.12.2 Compile construction photos taken by R by date, 2.12.3 Utilize daily notes, construction photos, and contractor redline documents to prepare record drawings. Assumptions: FIMMM IVIM.I. M_; • Conformed for construction drawings and specifications in PDF and hardcopy format as previously noted. • Pre -construction meeting agenda and minutes in PDF. • Construction progress reports and infographics; in PDF. • Submittal and shop drawings review and documentation in PDF. • Clarifications and change orders review and documentation, if required, in PDF, 0 Construction observation and correspondence with the City and contractor, as requested, within the budgeted hours authorized. Construction observation reports from site visits to be provided to the City in PDF. • Electronic copies of materials testing reports at the completion of construction, • Review and recommendation of contractor requests for payment in PDF. • Punchlist following final inspection in PDF and hard copy. • Letter recommending substantial completion and project acceptance in PDF and hard copy. ® Record drawings in PDF. M 6/20/17 3:32 PM Z:1Bothell\Data\YAK\715-114\Contract\PSA_Amend_No. 1_SOW_Beech Street LS and FM-SDC.docx ORIGINAL 1 PAIGE NO 7 0F_J2_PACES_ 11 City of Yakima Exhibit A —Scope of Work Beech Street Lift Station and Force Main, Phase 4 — SDC Amendment No. -I of the project within four hundred (400) calendar days. UTZ_ CC 1, L CC: I U L M I e2t MeM maintenance of the system. Provide training for City staff. Approach: Su task 3.1: Develop PLC Software 11.1 Coordinate a software development meeting with City staff. Review facility data point standards, control standards, and 01 graphical object standards. 3.1.2 Based on the control panel design and City data point standards, develop the PLC data point names, descriptions, and addresses for the control panel, 3.1.3 Develop software for the control panel using RSLogix 5000 for CompactLogix PLCs. 3.2.1 Coordinate with City staff to develop 01 screen designs and layouts based on selected 01 standard City staff will have final approval of Of screen designs. I • overall system process display that identifies major system information in one (1) overall screen; • System real time, and historical alarms and events displays. Historical displays will filter alarms and events by specific time and date; • System historical trending of analog data. This screen will be configurable to display twenty-four (24) hours of data; and • Summary of displays showing totals, averages, minimums, and maximums. This information will be displayed for daily, monthly, and yearly periods of time. Subtask 3.3: Perform Factory Testing 3.3.1 Perform a factory test at the contractor's panel shop that will include the following: • Compare the final fabricated products against the original design criteria. • Test the power systems. • Test the PLC controller and 01. • Test the discrete and analog inputs and outputs through simulation equipment. 7 6/20/17 3:32 PM Z:\Bothell\Data\YAK\715-114\Contract\P$A—Amend_N4. 1_SOW—Beech Street LS and FM-SDC.docx ORIGINAL 1 PAGE SIL'? SI 0F_j2- PAGES 12 City of Yakima Exhibit A — Scope of Work Beech Street Lift Station and Force Main, Phase 4 — SDC Amendment No. 1 • Load the latest software in the PLC and 01 software. • Test the PLC analog scaling code. • Test the PLC system alarms code. • Test the PLC totalizing and system summary code. • Test the PLC control loops code, • Test the 01 code during PLC code testing. law- I IN T071 ME I N I �Ill 51111ill dfLer MbLill is Urrillplete, dill Ill Life UpFlur LUlIIll d JITbL ieTel Ul Cralli an Me use o the field control equipment. Ill!I1111:1lE I III I 4 11 1 Its glu jl�iljiw� IIIIII!II, 15.1 Coordinate with the contractor to prepare O&M documentation identified in the prole specifications. Supply control system documentation and software to the contractor for inclusion final is documents. I the O&M manual as a training aid. • Completed PLC information. • Completed Of and HMI screen designs. • Factory testing reports. • Final startup and commissioning reports, • One (1) electronic copy of PLC and 01 software. P-3 6/20/17 3:32 IRM Z:\Bothel]\Data\YAK\715-114\Contract\P5A-Amend_No. 1 -SOW -Beech Street LS and FM-SDC,docx OPKINAL i PAGE NOF. I 2 --PAGES City of Yakima Exhibit A — Scope of Work Beech Street Lift Station and Force Main, Phase 4 — SDC Amendment No. I One (1) electronic copy of the following items: • Project spreadsheet file that includes information about the software configuration, addressing, data point names, alarms, control loops, and operations documentation; and o O&M material from the contractor as specified in the contract documents. Task 4 — Lift Station SCADA Additions Objective: Assist the City with implementing changes to the SCADA system for the Beech Street sewer system, Approach: Subtask 4.1: Develop SCADA Screens forte Beech Street Sewer System Subtask 4.2: Configure Radio Communications 4.2.1 Modify the master telemetry radio and establish communications to Beech Street radio. 4.2.2 Modify master polling routine to add Beech Street remote terminal unit (RTU), Su task 4.3: Perform Testing and Configuration 4.3.1 Provide testing procedures before final testing and commissioning to the City. 4.3.2 Assist the City with testing the data points and control capabilities between the facility controllers and the SCADA computer system. Subtask 4.4: Prepare O&M Documentation and Provide to City Staff for Review and.Approval. 4.4.1 Material(s) will consist of the following items: • Data point spreadsheet list. • HMI screens and screen layout. in advance of such additional hours needed, and additional hours shall be mutually negotiated Conley Engineering,, Inc. will provide all access needed to reprogram the SCADA and radio systems, City staff will provide virtual private network (VPN) access for remote testing and programming of the SCADA during the testing phase. RH2 Dellverables: • Completed SCADA system deployment design (to be included in O&M documentation). • SCADA data point spreadsheet. • HMI computer screen example designs for approval by the City. • Configured HMI computer screens. • Configured remote access components. Testing and commissioning test procedures for City approval, 9 15/20/17 3:32 PM Z:\Bothell\Data\YAK\715-114\Contract\PSA Amend No. I—SQW_Beech Street LS and FM-SDC.docx ORIGINAL PAGE NO if F_j?- PAGES EXHIBIT B City of Yakima Beech Street Lift Station and Force Main Amendment 1 Phase 4 - SDC fee Estimate IJEF_Dllc S—B IM FM -SDC 2DIM12A. 6P2fP.1 -2 PM ORIGINAL- PAGE NO 12- OF PAGES - T5 . ... .... . .. ... ... .................. �T EXHIBIT B RH2 ENGINEERING, INC. 2017 SCHEDULE OF RATES AND CHARGES Professional I Professional 11 Professional III Professional IV 'Professional VI 'Professional VII Professional VIII X 11111111 !Professional Ix ITechnician I Technician II Technician III Technician Administrative I Administrative 11 dmin'strative III JAdministrative IV 'Administrative V II I CAD Plots - Half Size jCAD PlotsSize !CAD Plots - Large ,Copies (bw) 8.5" X 11" Copies (bw) 8.5 X 14" Copies (bw) Copies (color) 8.51, X !V, price per copy jCopies (color) 8.51' X 14" iCopies (color) 11" X 17" ,Technology Charge Subconsultants �Outslde Services .... .. . ..... . .. . .... . .... . .. . ............ . Rates Ifsted are adjusted annually.