HomeMy WebLinkAboutR-2017-075 2018-2023 Six-Year Transportation Improvement Program; YUACP Capital Facilities ElementA RESOLUTION
RESOLUTION NO. R-2017-075
to amend the Yakima Urban Area Comprehensive Plan Capital Facilities
Element to incorporate the Six-year Transportation Improvement
Program (TIP) for the period of 2018 through 2023
WHEREAS, the City of Yakima annually prepares, reviews and adopts a Six — Year
Transportation Improvement Program for the construction of streets and arterial streets in the
City of Yakima for the ensuing six year period, all as contemplated and required by State RCW
35 77 010 and applicable Federal law; and
WHEREAS, the City of Yakima desires to amend the Yakima Urban Area
Comprehensive Pian Capital Facilities Element to reflect the adoption of the Six-year TIP, as
contemplated and required by RCW 36 70A.070(6) to ensure compliance with the Growth
Management Act and consistency of the Comprehensive Plan and the Six-year TIP; and
WHEREAS, this amendment is limited to incorporation of the projects listed in the Six-
year Transportation Improvement Plan for the period of 2018 to 2023 to the Capital Facilities
Element of the Yakima Urban Area Comprehensive Plan, which is contemplated and provided
under RCW 36 70A.130(2B) and RCW 35 77 010; and
WHEREAS, public hearings were held by the Yakima City Council on the Six-year TIP
on June 6, 2017 and June 20, 2017, with proper public notice as required by RCW 35 77.010,
and
WHEREAS, amending the Yakima Area Comprehensive Plan Capital Facilities
Element is in the best interest of the City and its residents; now, therefore
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA:
The adopted Six -Year Transportation Improvement Program for the period of 2018
through 2023 for the City of Yakima shall be incorporated as an amendment to the Capital
facilities Element of the Yakima Urban Area Comprehensive Plan
ADOPTED BY THE CITY COUNCIL this 20th day of June, 2017
ATTEST
Sonya Cl r Tee, City Clerk
* �►
as '.,5 -;-
BUSINESS OF THE CITY COUNCIL
YAKIMA, WASHINGTON
AGENDA STATEMENT
1
Item No. 9.
For Meeting of: June 20, 2017
ITEM TITLE: Public Hearing and resolutions to consider: A) Adoption of the Six-
year Transportation Improvement Program for the years 2018 to
2023, and to amend the Metropolitan Transportation Plan; and B)
Amend the Yakima Urban Area Comprehensive Plan Capital
Facilities Element
SUBMITTED BY: Brett Sheffield, Chief Engineer, 576-6797
Scott Schafer, Director of Public Works
SUMMARY EXPLANATION:
A) Each year the City is required by RCW 35.77.010 and RCW 36.81.121 to update its Six-year
Transportation Improvement Program (TIP) for submittal to the Washington State Department of
Transportation. This Plan must include all transportation projects for which state gas tax
revenue and federal revenue will be used.
The proposed 2018-2023 Transportation Improvement Plan includes fourteen projects that have
funding. The funded projects are:
#1 — North 1st Street Revitalization, 'N' Street to SR 12
#4 — Powerhouse Road Sidewalk
#5 — Garfield Elementary Safety Improvements
#6 — Yakima Valley Transportation Company Preservation
#7 — Spring Creek Road Reconstruction
#8 — South 36th Avenue Reconstruction
#9 — Sorenson Road Reconstruction
#10 — Bravo Company Boulevard
#12 — Northside Alley Pavers
#14 — Cowiche Canyon Trail
#15 — N.34th Avenue/Fruitvale Boulevard & N. 34th Avenue/River Road Roundabouts
#16 — Complete Street Projects
#18 — S. 80th Avenue (Wide Hollow Creek) Bridge
#19 — Wide Hollow Road (Wide Hollow Creek) Bridge
A summary of the proposed changes to last year's TI P are listed below:
2
Add projects:
#15 N. 34th Avenue/Fruitvale Blvd & N. 34th Avenue/River Road Roundabouts
#16 Complete Street Projects
#20 West River Road Improvements
Divide the North 1st Street Revitalization project into two phases:
#2 North 1st Street Revitalization, Phase 2 — 'N' Street to 'H' Street, and
#3 North 1st Street Revitalization, Phase 3 — 'H' Street to MLK
Remove project #4 — Adams Elementary/Washington M.S. sidewalk improvements since the
construction funds are in the process of being obligated.
Funding for the remainder of the projects included in the 2018-2023 TIP will continue to be
sought.
In order to use federal funds, such as those administered by the Federal Highway Administration
(FHWA) and the Federal Transit Authority (FTA), projects must be included in the Statewide
Transportation Improvement Program (STIP). The STIP is a prioritized program of
transportation projects, complied from local and regional plans, along with the Washington
Transportation System Plan (WTP), which provides a backbone for developing projects for the
intermodal transportation network in the State of Washington.
The STIP contains federally funded projects plus state and local projects that are regionally
significant. These projects have been identified through the planning process as the highest
priority for the available funding to the state's Transportation Program. Planning activities of state
and local governments are essential parts of integrated regional planning processes. Long range
transportation planning is a part of the comprehensive land use planning carried out by local
governments. Citizen participation is an integral part of the planning process at all levels. Local
agencies are required to develop and adopt a Six-year Transportation Program; holding at least
one public hearing during its development.
B) The City needs to amend the Yakima Urban Area Comprehensive Plan Capital Facilities
Element to incorporate the adopted Six-year TIP for 2018 to 2023. This will ensure that we are
in compliance with the Growth Management Act and that we are consistent with the
Comprehensive Plan as required. The amendment is limited to incorporate only those projects
that are adopted in the STI P and is not subject to the "once a year" change required under
the regulations of the Growth Management Act.
ITEM BUDGETED:
NA
STRATEGIC PRIORITY: Public Trust and Accountability
APPROVED FOR
SUBMITTAL:
City Manager
STAFF RECOMMENDATION:
Adopt resolutions.
BOARD/COMMITTEE RECOMMENDATION:
ATTACHMENTS:
Description Upload Date
D Resolutions 5/23/2017
D 2018 - 2023 5/23/2017
Type
Cover Memo
Cor Memo
3
Agency: Yakima
Co. No.:
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2018 to 2023
Hearing Date: 6/6/17 & 6/20/17
Amend Date:
Adoption Date: 6/20/2017
Resolution No.:
i -s
7..,
.o
,___
o
..L.
Priority Number
Project Identification
A, PIN/Federal Aid No, B. Bridge No,
L. Project Title
D. Street/Road Name or Number
-
E. Beginning MP or Road Ending MP or Road
F. Describe Work to Be Done
Improvement
Type(s)
Total Length
.— i'
v.,
7
Project Costs in Thousands of Dollars,Federal
Expendture Schedule
(Local Agency)
y Funded
Projects Only
Project Phase
Phase
Start
Fund Source Information
Federal Funding
State
Fund Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/W
Required
Date
(MM/YY)
Federal Fund
Cc:de
Federal
Cost by
Phase
lst.
2nd
3rd
4th
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
14
1
North 1st Street Revitalization
North ast Street
from: 'N' Street to: SR 12
Improve North 1.st Street by rehabilitating the pavement
and lane markings, removing on -street parking,
enhancing street and pedestrian lighting, constructing
median islands and installing various pedestrian and
decorative elements.
3
06
S
0.42
P
0
C
W
S
08
Totals
1/1/2018
STP(U)
2,718
424
3,142
3,142
CE
No
2,718
424 3,142 3,142
14
2
North 1st Street Revitalization, Phase 2
N. 1st Street
from: 'H' Street to: 'N'Street
Improve North ast Street by rehabilitating the pavement
and lane markings, removing on -street parking,
enhancing street and pedestrian lighting, constructing
median islands and installing various pedestrian and
decorative elements.
06
12
5
0.50
P
G
C
W
5
0
CN
1/1/2018
FASTLANE
4,250
TIB
750
0
5,000
5,000
CE
Yes
12/31/2017
Totals 4,250
5,000 5,000 0
14
3
North 1st Street Revitalization, Phase 2
N. 1st Street
from: 'H' Street to: 'N'Street
Improve North 1.st Street by rehabilitating the pavement
and lane markings, removing on -street parking,
enhancing street and pedestrian lighting, constructing
median islands and installing various pedestrian and
decorative elements.
06
12
5
0.48
P
r
G
C
W
5
0
CN
1/1/2018
FAS -DANE
4,250
TIB
750
0
5,000
5,000
CE
Yes
12/31/2018
Totals 4,250
5,000 5,000 0
17
4
Powerhouse Road Sidewalk
Powerhouse Road
from: Cowiche Canyon Rd to: Mobile Home Park
Widen westbound lane to provide a 14 -foot wide
shared bike lane and construct curb, gutter and
sidewalk on the north side of the road.
05
12
5
0.6
0
C
T
CN
Totals
/112018
TAP
245
245
245
I
CE
No
245
245 245
0)
Agency: Yakima
Co. No.:
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2018 to 2023
Hearing Date: 6/6/17 & 6/20/17
Amend Date:
Adoption Date: 6/20/2017
Resolution No.:
.;".
0
57,,0
1.3 c
5 ,
Priority Number
Project Identification
A. PIN/Federal Aid No, B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to Be Done
Improvement
Type(s)
Total Length
'0'
-ra
L.,
a
..f.
577.
Project Costs in Thousands of Dollars,Federal
Expendture Schedule
(Local Agency)
y Funded
Projects Only
Project Phase
Phase
Start
Fund Source Information
Federl Funding
State
Fund Code
State
Funds
Local
Funds
Total
Funds
Envir,
Type
R/W
Required
Date
(MM/YY)
Federal Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
19
5
Garfield Elementary Safety Improvements
Various Streets
from: to:
This project will make various pedestrian safety
improvements in the vicinity of Garfield Elementary
School, such as, constructing sidewalk, improving
roadway crossings, installing flashers.
12
5
N/A
P
T
0
CN
5/1/2018
SRTS
141
141
141
CE
Yes
1/1/2017
Totals 141 141 141
14
6
Yakima Va Hey Transportation Company Preservation
Yakima Avenue
from: Yakima Avenue to: 6th Avenue
This project will remove and replace a portion of the
existing trolley rail in the vicinity of the intersection
of 6th Avenue and Yakima Avenue,
03
5
0.02
0
CN
1/1/2018
STP(E)
52
52
52
CE
No
Totals 52 52 52
17
7
Spring Creek Road Reconstruction
Spring Creek Road
from: Washington Ave. to: 36th Avenue
Widen roadway to three lanes, install curb, gutter,
sidewalk and street lights.
03
5
0.85
S
W
CN
1/1/2018
SIED
1,100
820
1,920
1,920
SEPA
Yes
3/1/2017
1,100 820 1920, 1,920
17
8
5. 36th Avenue Reconstruction
36th Avenue
from: Spring Creek Rd. to: Sorenson Rct
Widen roadway to three lanes, install curb, gutter,
sidewalk and street lights.
03
0.40
S
W
CN
1/1/2018
SIED
520
385
905
905
SEPA
Yes
3/1/2017
520 385 905 905
Agency: Yakima
Co. No.:
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2018 to 2023
Hearing Date: 6/6/17 & 6/20/17 Adoption Date: 6/20/2017
Amend Date:
Resolution No.:
Functional Class
Priority Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to Be Done
Improvement
Type(s)
Srtatus
Total Length
UtiIity Codes
Project Costs in Thousands of DolIarS
Expenditure Schedule
(Local Agency)
Federal y Funded
Projects Only
Project Phase
Phast.
Start
Fund Source Information
Federal Funding
State
Fund Code
State
Funds
Local
Funds
Total
Funds
Envir,
Type
R
Required
Date
Federal Fund
Code
Federal
Cost by
Phase(MM/YY)
1st
2nd
3rd
4th
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
17
9
Sorenson Road Reconstruction
Sorenson Road
from: 36th Avenue to: 38th Avenue
Widen roadway, install curb, gutter, sidewalk and
street lights.
03
014
5
CN
1/1/2018
S ED
180
140
320
320
Yes
3/1/2017
To a Is 180 140 320 320
16
10
Bravo Company Boulevard
North 10th Street
from: 'H' Street to: Lincoln Ave.
Construct new roadway including water, sewer, curb,
gutter, sidewalk, street lighting and storm drainage
system.
01
06
5
..65
P
T
RW
CN
1/1/2018
1/1/2018
UFT
LIFT
800
4,480
200
1,120
1,000
5,600
1,000
5„600
01
Yes
1/:L/2018
Totals
5280 1,320 6,600 1,000 5„600
16
1.
E. 'H' Street Extension, Ph. 1
E. 'H' Street
from: 1..st Street to: 10th Street
Construct new roadway including water, sewer, curb,
gutter, sidewalk, street lighting and storm drainage
system.
01
08
P
L10
0
T
W
RW
CN
1/1/20:18500
2019
TIB
1,500
3,100
500
4,600
500
4,600
CE
Yes
121112018
To a s 3,600 5,100 500 4,600
00
12
Northside Alley Paver
Alleys between Folsom Ave. and Fruitvale Blvd.
from: 16th Avenue to: 6th Avenue
Pave the east/west gravel alleys between Folsom
Avenue and Fruitvale Boulevard from 16th Avenue to
6th Avenue
07
5
33
0
T
C
CN
1/1/2018CMA
:133
57
410
410
01
No
Totals 353 57 410 410
03
Agency: Yakima
Co. No.:
City No.: :1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2018 to 2023
Hearing Date: 6/6/17 & 6/20/17 Adoption Date: 6/20/2017
Amend Date:
Resolution No.:
L /
Priority Number
Project Identification
A. PIN/Federal Aid NA B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to Be Done
Improvement
Type(s)
Status
Total Length
U
-'
Project Costs in Thousands of Do rsFederal
Expenditure Schedule
(Local Agency)
y Funded
Projects Only
Project Phase
Phase
Start
Fund Source Information
Federal Funding
State
Fund Code
State
Funds
focal
Funds
Total
Funds
Envir.
Type
R
Required
Date
YY
Federal Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
2
3
4
5
6
7
8
9
:10
11
12
:13
14
'
:.6
17
18
:19
20
21
16
13
E. 'H' Street Extension, Ph. 2
01
0.55
P
R;
1/1/2019
STP(U)
432
68
500
500
CE
Yes
E. 'H' Street
08
T
CN
2021
STP(U)
2462
338
2,500
2,500
from: 10th Street to: 1-82
W
1/1/2015
Construct new roadway including water, sewer, curb,
gutter, sidewalk, street lighting and storm drainage
system.
5
Totals 2,594 406 3,000 500 2,500
00
14
Cowiche Canyon Trail
28
2.00
RW
7/1/2019CWA
105
105
105
Cowiche Canyon
CN
2020
CWA
1,695
1,695
1,695
from: Powerhouse Road to: Trailhead
/1/2020
Construct a 10 -foot wide pathway, including two
bridges over Cowiche Creek.
Totals 1,800 105 1,695
N. 34th Ave./Fruit-vale Blvd. & N. 34th Ave/River
14
15
Rood Roundabouts
03
5
N/A
9
PE
6/1/2017
HSIP
1.1.7
13
130
130
CE
Yes
34th Avenue
12
T
RW
7/1/2017
HSIP
9
1
10
10
from: Fruitvale Blvd. to: River Road
0
CN
1/2018
HSIP
788
88
876
876
1/1/2018
Improve the intersections of N. 34th Avenue &
5
Fruitvale Boulevard and N. 34th Avenue & River Road
by installing roundabouts
Totals 914 102 ,0:.6
19
16
Complete Streets Projects
32
5
N/A
P
PE
6/1/20:17
TIB
35
35
35
Yes
Various Streets
T
RW
7/1/2017
TIB
100
100
100
from: N/A to: N/A
C
CN
:1/1/2018
TIB
365
365
365
1/1/2018
Construct sidewalk on the south side of Swan Avenue from McGuiness
Park. to Campbell Lane, on Rai., St. between 815 St and Nadlel, Ave.,
south side of Prasch Ate. born 2.01h in 1615, sou15 hide or Viola from loin
AVE. to 4111 Ave. and on Powerhouse road from Robertson Elementary to
Englewood.
500
Agency: Yakima
Co. No.:
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2018 to 2023
Hearing Date: 6/6/17 & 6/20/17
Amend Date:
Adoption Date: 6/20/2017
Resolution No.:
0
Priority Number
Project Identification
A. PIN/Federal Aid No, B. Bridge No,
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to Be Done
Improvement
Type(s)
Total Length
Ja
18
Project Costs in Thousands of Dollars,Federally
Expendture Schedule
(Local Agency)
Funded
Projects Only
Project Phase
Phase
Start
Fund Source Information
Federal Funding
State
Fund Code
State
Funds
Local
Funds
Total
Funds
Envir,
Type
R
Required
Date
(MM/YY)
Federal Fund
Code
Federal
Cost by
Phase
1st:
2nd
3rd
4th
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
14
17
E. Nob Hill Blvd. & Fair Ave. 1/5 Improvements
Nob Hill Boulevard
from: E. Nob Hill Blvd. to: Fair Ave.
Widen Nob Hill Boulevard through the intersection,
construct left -turn lane, curb, gutter, sidewalk, street
lighting and drainage. Upgrade signal by installing mast
arm structures.
03
04
31
N/A
P
T
W
C
RW
CN
1/1/2018STE
6/1/2019
U
STP(U)
187
1,457
29
227
216
1,684
216
1,684
CE
Yes
1/1/2019
Totals 1,644 256 1,900 215 1,684
17
18
5. 80th Avenue Bridge
S. 80th Avenue
from: Wide Hollow Rd. to: Plain Ave.
Replace existing two-lane bridge over Wide Hollow
Creek with three -lane bridge. The City's involvement
is only to pass through of an Ecology grant: in
conjunction with the County's flood plain
management project.
09
5
0,05
P
T
PE
CN
1/1/2017
1/1/2018
DOE
DOE
25
75
0
0
25
75
25
75
CE
No
Totals 100 75
17
19
Wide Hollow Rood Bridge
Wide Hollow Road
from: 89th Avenue to: 88th Avenue
Replace existing two-lane bridge over Wide Hollow
Creek with three -lane bridge. The City's involvement
is only to pass through of an Ecology grant in
conjunction with the County's flood plain
management project.
09
0.05
P
T
PE
CN
1/1/2017
1/1/2018
DOE
DOE
25
75
25
75
25
75
CE
No
Totals 100 100 25 75
19
20
West River Road Improvements
River Road
from: 40th Avenue to: 34th Avenue
Reconstruct and widen roadway to three lanes, install
curb, gutter, sidewalk, street lights and drainage.
03
04
0.36
P
T
G
S
C
PE
RW
CN
1/1/2018
6/1/2018
1/1/2019
SIED
SIED
SIED
55
100
550
55
100
550
110
200
1,100
110
200
1,100
CE
Yes
2019
705 705 1,410 110 200 1,100
0
Agency: Yakima
Co. No.:
City No.: 1.485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2018 to 2023
Hearing Date: 6/6/17 & 6/20/17 Adoption Date: 6/20/2017
Amend Date:
Resolution No.:
Functional Class
Priority Number
Project Identification
A, PIN/Federal Aid No, B. Bridge No,
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to Be Done
Improvement
Type(s)
Total Length
o
-
Project Cotts in Thousands of Dol arsFederally
Expenditure Schedule
(Local Agency)
Funded
Projects Only
Project Phase
Phase
Start
Fund Source Information
Federal Funding
State
Fund Code
State
Funds
Local
Funds
Total
Funds
Envir,
Type
R
Required
Date
-
Federal Fund
Code
Federal
Cost by
Phase(MM/YY)
1st
2nd
3rd
4th
2
3
4
5
6
7
8
9
10
11
12
:13
14
'
i.6
17
18
:19
20
21
14
21,
1605 Ave. & Tieton Dr. Intersection Improvements
5
8
040
8
PE
1/1/2019
STP(U)40
300
300
CE
Yes
16th Avenue
7
T
RW
1/1/2020
STP(U)
3,460
540
4,000
3,460
from: 1.6th Ave. to: Tieton Dr,
G
0
CN
4/1/2021,
STP(U)
1,300
200
1,500
1,500
4/:L/2021
Reconstruct and widen 16th Avenue and Tieton Drive
by adding left -turn lanes tor all movements at the
intersection. Upgrade the traffic signal.
C 5
59
Totals 5020 780 5,800 300 3,460 1,500
14
22
lSth Street Underpass
12
P
0.02
P
PE
1/1/2019
BRAC
240
60
ii 00
300
CE
No
Yakima Avenue
from: Yakima Ave. to: 18th Street
T
0
CN
2020
BRAC
2,288
572
2,860
2,860
S
Replace the bridge on E. Yakima Avenue that crosses
over 18th Street.
Totals 2,528 532 3,160 300 2,860
17
23
64th Ave. & Ahtanum Intersection Improvements
12
5
N/A
P
PE
1/1/2018
CMAQ56
9
65
65
CE
Yes
64th Avenue
T
RW
1/1/2019
CMAQ
43
7
50
50
from: 64th Ave. to: Ahtanum Rd.
C
CN
1/1/2020
CMAQ
433
67
500
500
500
/1/2070
0
Improve the 64th Avenue and Ahtanum Road
intersection by constructing a westbound right -turn
lane on Ahtanum and installing a traffic signal.
Totals 532 83 615 65 550
14
24
South th Avenue Sidewalks
12
P
088
P
PE
1/1/2018
PBP
54
6
60
60
CE
Yes
1.6th Avenue
T
RW
6/1/2018
PBP
234
26
260
260
from: Washington Ave. to: Nob Hill Blvd.
0
CN
6/1/2019
PBP
369
41
410
410
6/1/2019
0
Install 7 -foot sidewalk on the west side of 16th
Avenue.
Totals 657 73 730 320 41.0
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2018 to 2023
Hearing Date: 6/6/17 & 6/20/17 Adoption Date: 6/20/2017
Amend Date:
Resolution No.:
‘7.)
z
Project Identification
A. PIN/Federal Aid No, B. Bridge No,
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to Be Done
Improvement
Type(s)
IO
Utility Codes
Project Costs in Thousands of Dofllars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
Fund Source Information
Federal Funding
State
Fund Code
State
Funds
Local
Funds
Total
Funds
Envir,
Type
R/W
Required
Date
MM ' ''
Federal Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
2
3
4
5
6
7
8
9
..0
11
12
i.3
i.4
i.5
i.6
17
:18
....
20
21
19
25
McClure Elementary School Safety Improvements
Various locations
from: to:
This project will make various pedestrian safety
improvements in the vicinity of McClure Elementary
School, such as, constructing sidewalk, ADA ramps
and improving crosswalks.
12
P
N/A
P
T
C
0
PE
CN
1/112018RTS
1/1/2019
SRTS
46
380
30
240
3D
240
CE
No
Totals 426 270
30 240
19
26
,,IcKinley Elementary School So ety Improvements
Various locations
from: to:
This project will make various padestrian safety
improvements in the vicinity of McKinley Elementary
School, such as, replacing delapitated sidewalk,
constructing ADA ramps, and installing a HAWK
pedestrian crossing system.
12
P
N/A
P
T
C
0
PE
CN
1/1/2018
2019
SRTS
SRTS
50
430
50
430
50
430
CE
No
Totals 480 0 480
50 430
19
27
618 Avenue Roodway Improvements
6th Avenue
from: Walnut Street to: River Road
Reconstruct the existing trolley rail and impacted
roadway, grind and overlay the remaining width of
6th Avenue.
03
07
P
PE
CN
2020
2021
OTHER
OTHER
200
2,000
200
2,000
400
4,000
400
4,000
CE
No
Totals 0 2,200 4,400
0 400 4,000
12
28
SR 12 & 16th Avenue interchange
Westbound ramps of SR 12
from: 1.6th Avneue to: 58 12
Construct a roundabout where the westbound ramps
intersect. with N. 16th Avenue.
03
06
P
N/A
0
PE
CN
/1/20191 TF(U)
1/1/2020 STP(U)
86
779
14
121
100
900
100
900
CE
No
Totals 865 135 1,000
100 900
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2018 to 2023
Hearing Date: 6/6/17 & 6/20/17 Adoption Date: 6/20/2017
Amend Date:
Resolution No.:
‘7.)
z
Project Identification
A. PIN/Federal Aid No, B. Bridge No,
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to Be Done
Improvement
Type(s)
IO
Utility Codes
Project Costs in Thousands of Dofllar5
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
Fund Source Information
Federal Ei. riding
State
Fund Code
State
Funds
Local
Funds
Total
Funds
Envir,
Type
R/W
Required
Date
MM ' ''
Federal Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
2
3
4
5
6
7
8
9
..0
11
12
1
i.4
15
16
17
:18
....
20
21
14
29
S. 1st . & E. Washington Ave. 1/5 Improvements
03
P
N/A
8
PE
201.
STP(U)
260
40
300
300
CE
Yes
South 1st Street
06
W
RW
2020
STP(U)
260
40
300
300
from: S. 1st Street to: E. Washington Ave.
S
CN
1/1/2021
STP(U)
1,2.11
189
1,400
1,400
/1/2020
Realign intersection, widen E. Washington Avenue to
accommodate an additional lane, replace curb, gutter
and sidewalk, and install a new traffic signalization
system.
T
Totals :1731 269 2,000 300 300 1400
14
30
Washington Ave. & Long iber Rd. Intersection
03
N/A
C
PE
1/1/2019
STP(U)100
14
114
114
CE
Yes
Washington Avenue
05
T
RW
1/1/2020
STP(U)
100
14
114
114
from: Washington Ave. to: Longfiber Rd.
06
W
CN
1/1/2021
STP(U)
688
107
795
795
1/1/2020
5
Improve the Washington Avenue and Longfiber Road
intersection by constructing an eastboung left -turn
lane on Washington and a northbound ieft-turn lane
on Longfiber, install or replace curb, gutter, sidewalk,
street lighting, storm drainage and safety flashing
signal
Totals 888 135 1,023 114 114 795
14
3:1
E. Nob Hill Boulevard Reconstruction
03
P
0.85C
PE
1/1/2019STP(U)
545
.
630
630
CE
Yes
E. Nob Hill Boulevard
04
T
RW
1/1/2020
STP(U)
1,090
170
1760
1,260
from: S. 6th Street to: 5.1.8th Street
06
W
CN
/1/2021
STP(U)
6,532
1,020
7,552
7552
1/1/2025
Reconstruct and widen roadway to 5 lanes with
intersection improvements, curb, gutter, sidewalk,
street lighting and drainage system
0
P
G
Totals 1167 1775 9,442 630 1760 7,552
14
32
N. 40 h Ave. & Summitview Ave. Intersection
12
8
N/A
P
PE
1/1/2019
STP(U)26
17
143
4
CE
Yes
N. 40th Avenue
T
RW
1/1/2020
STP(U)
130
20
150
150
from: N. 40th Ave. to: Summitview Dr.
W
CN
1/1/2021
STP(U)
692
108
800
800
1/1/2020
Improve the intersection by constructing larger
corner radii, lengthening the turn lanes, and
upgrading the traffic signal system.
5
Totals 948 45 1,05.3 143 150 800
Agency: Yakima
Co. No.: 1—.)
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2018 to 2023
Hearing Date: 6/6/17 & 6/20/17 Adoption Date: 6/20/2017
Amend Date:
Resolution No.:
Priority Nu mber
Project Identification
A. PIN/Federal Aid No, B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to Be Done
Improvement
Type(s)
Total Length
as
Project Costs in Thousands of Dol arsFederal
Expenditure Schedule
(Local Agency)
y Funded
Projects Only
Project Phase
Phase
Start
Fund Source Information
Federal Funding
State
Fund Code
State
Funds
Local
Funds
Total
Funds
Envir,
Type
R/W
Required
Date
IMM '' ''
Federal Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
14
33
AL 1Gth Avenue & Fruitvole Blvd.
12
P
N/A
P
PE
1/1/2019STP(U(
.
44
144
CE
Yes
N. 16th Avenue
T
RW
1/1/2020
STP(U)
173
27
200
200
from: N. 16th Ave. to: Fruitvale Blvd,
Improve the intersection by constructing larger curb
radii, installing ADA ramps, and upgrading the traffic
signal syste.m.
0
W
CN
1/1/2021
STP(U)
400
62
462
462
/1/702o
Totals 699 07 806 144 200 462
16
34
E. MnodAvenue Reconstruction
03
0.76
P
PE
1/1/2020
STP(S)
122
TPP
23
7
152
152
CE
No
E. Mead Avenue
from: Rudkin Rd. to: Fair Ave.
06
T
5
CN
1/1/2021
STP(5)
1,730
TPP
206
70
2,006
2,006
Partner with Union Gap to reconstruct E. Mead
C
Avenue, install curb, gutter, sidewalk and storm
drainage system.
G
0
Totals :l852 77 2,158„ 2,006
17
35
5. 48th Avenue Reconstruction
03
.00
P
PE
1/1/2019
STP(U)
223
5
258
258
CE
Yes
South 48th Avenue
05
T
RW
1/1/2020
STP(U)
51.9
81
600
600
from: Summitview Ave. to: Nob Hill Blvd.
W
CN
1/1/2021
STP(U)
1,485
232
1,717
1,717
2020
Reconstruct and widen 48th Avenue, install curb,
gutter, sidewalk, street lighting and drainage system.
Totals 2,227 3482,575 258 600 1,717
17
36
Powerhouse Rd. & Englewood Ave. 1/5
12
P
N/A
P
PE
'2019
STP(S)
43
7
50
50
CE
Yes
Powerhouse Rd.
T
RW
1/1/2020
STP(5)
87
1.3
100
100
from: Powerhouse Rd. to: Englewood Ave.
C
CN
1/1/2021
STP(S)
500
78
578
578
1/1/2021
Realign intersection, install curb, gutter, sidewalk and
safety flashing signal. Possibly construct a
roundabout:.
5
0
W
Totals 630 98 728 100 578
Agency: Yakima
Co. No.:
City No.: 1.485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2018 to 2023
Hearing Date: 6/6/17 & 6/20/1.7 Adoption Date: 6/20/2017
Amend Date:
Resolution No.:
Ci
Priority Number
Project Identification
A. PIN/Federal Aid NA B. Bridge No.
C. Project Title
D. Street/Road Name or Number
-
E. Beginning MP or Road Ending MP or Road
F. Describe Work to Be Done
Improvement
Type(s)
Status
Total Length
o
U
-'
Project Costs in Thousands of Do rsFederal
Expenditure Schedule
Agency)
y Funded
Projects Only
Project Phase
Phase
Start
Fund Source Information
Federal(Local
Funding
State
Fund Code
State
Funds
Local
Funds
Total
Funds
Envir,
Type
R
Required
Date
YY
Federal Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
2
3
4
5
6
7
8
9
10
11
12
:13
14
'
i.6
17
18
:19
20
21
14
37
W Lincoln Aee & MLKBIed, Realign en
01
0.50
'
PE
1/1/2019
STP(E)
424
67
491
491
CE
Yes
V. Lincoln Avenue
12
T
RW
1/1/2020
STP(E)
1,047
163
1,210
1,21.0
,from: N. 5th Ave. to: Custer St.
W
5
CN
1/2021,
STP(E)
1,801
281
2,082.
2,082
1/1/2020
0
Realign W. Lincoln Avenue, install curb, gutter.
sidewalks, street lighting, drainage.
P
Totals 3,272 511 3,783
491 .2 0 2,082
16
38
Tieton Dr. & S. 5th Ave. _ Improvements
12
P
N/A
P
PE
'2019
STP(U)
69
0
80
CE
Yes
Tieton Drive
W
RW
:1/1/2020
STP(U)
104
16
120
120
from: Tieton Dr, to: S. 5th Ave.
5
CN
1/1/2021
STP(U)
865
135
1,000
1,000
1/1/2021
Remove existing traffic signal and construct a
roundabout, remove and replace curb, gutter,
sidewalk, street lighting and drainage
T
Totals :1,038 152 1,200 80 120 1,000
17
39
Yakima Downtown Future imbatives, Phase 5
06
8
N/A
P
PE
1/1/2019
OTHER
500
500
500
CE
No
from: 1st Street to: 9th Street
12
T
C
CN
4/1/2020
OTHER
5,500
5,500
5,500
Install historic lighting, sidewalk modifications and
other improvements. Exact improvement area(s) to
be determined
.5
Totals 6,000 6,000 500 5,500
14
40
E. Nob Hill Blvd. & S. 18th Street 1/S Improvements
01
0.10
C
PE
1/1/2019
STP(U)
511
8
58
58
CE
Yes
1_ Nob Hill Boulevard
04
T
RW
/1/2020
STP(U)
50
8
58
58
from: E. Nob Hill Blvd. to: S. 18th Street
W
CN
1/1/2021
STP(U)
346
54
400
400
1/1/2021
Widen south leg for double left turn from westbound
Nob Hill, install curb, gutter, sidewalk, upgrade traffic
signal system
Totals 446 70 516 5858 400
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2018 to 2023
Hearing Date: 6/6/17 & 6/20/17 Adoption Date: 6/20/2017
Amend Date:
Resolution No.:
Functional Class
Priority Nu other
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to Be Done
Improvement
Type(s)
Total Length
Utility Codes
Project Costs in Thousands of Dollar5Federally
Expenditure Schedule
(Local Agency)
Funded
Projects Only
Project Phase
Phase
Start
Fund Source Information
Federal Ei. riding
State
Fund Code
State
Funds
Local
Funds
Total
Funds
Envir,
Type
R/W
Required
Date
(MM/YY)
Federal Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6 h
2
3
4
5
6
7
8
9
..0
11
12
:.
i.4
:.5
:.6
17
:18
....
20
21
14
4:1
S. 48th Ave. & 5ummitview Ave. Signalization
12
P
N/A
8
PE
1/1/2020
STP(S)
25
4
29
29
CE
Yes
Summitview Avenue
T
RW
6/1/2020
STP(S)
25
4
29
29
from: Summitview Ave. to: S. 48th Ave.
CN
:1/1/2021
STP(5)
554
81.
635
635
1/1/2021
Install traffic signal at the intersection of Summitview
Avenue and 48th Avenue.
Totals 604 89 693 58 635
14
42
S. 72nd Ave. & W. Washington Ave. VS
12
P
N/A
P
PE
1/1/2019
STP(C)
91
4
105
105
CE
Yes
S. 72nd Avenue
06
T
RW
1/1/2020
STP(C)
91
14
105
105
from: s. 72nd Ave. to: W. Washington Ave.
0
CN
1/1/2021
STP(C)
544
86
630
630
1/1/2021
Improve intersection by installing a traffic: signal
system or roundabout.
W
Totals 726 14 840 105 105 630
14
43
N. 40th Ave. & Englewood Ave. Intersection
12
8
N/A
P
PE
/1/2020
STP(U)
43
7
50
50
CE
No
N. 40th Avenue
T
CN
6/1/2020
STP(U)
260
40
300
300
,from: N. 40th Ave. to: Englewood
Replace traffic signal poles and upgrade controller.
To a Is 303 47 350 350
14
44
Nob Hill Boulevard Sidewalk Improvements
12
P
2.50
P
PE
1/1/2020
STP(S)
55
63
63
CE
Yes
Nob Hill Boulevard
T
RW
2021
STP(S)
107
19
126
126
from: S. 16th Ave. to: S. 6th Street
5
CN
2022
STP(S)
327
51
378
378
1/1/2022
Construct sidewalk in locations where it doesn't exist
on the south side of Nob Hill
VV
Totals 489 78 567 504
Agency: Yakima
Co. No.: 1—.)
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2018 to 2023
Hearing Date: 6/6/17 & 6/20/17 Adoption Date: 6/20/2017
Amend Date:
Resolution No.:
Priority Nu mber
Project Identification
A. PIN/Federal Aid No, B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to Be Done
Improvement
Type(s)
Total Length
as
F
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federal y Funded
Projects Only
Project Phase
Phase
Start
Fund Source Information
Federal Funding
State
Fund Code
State
Funds
Local
Funds
Total
Funds
Envir,
Type
R/W
Required
Date
MM ' ' ''
Federal Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
14
45
E. Yakima Ave. & Fair Ave..Signalization
12
P
N/A
P
PE
1/1/2020
STP(U)
6
14
100
100
CE
No
Yakima Avenue
from: E. Yakima Ave. to: Fair Ave.
T
CN
6/1/2021.
STP(U)
519
81
600
600
Install traffic signal at the intersection of Yakima
Avenue and Fair Avenue.
0
Totals 605 95 700 100 600
16
46
S. 3rd Avenue & W. Washington Ave. Signal
12
P
N/A
P
PE
4/1/2019
20
20
20
CE
No
S. 3rd Avenue
from: S. 3rd Ave, to: W. Washington Ave.
T
CN
9/1/2019
210
210
210
Upgrade the traffic signalization system
230 230 230
Totals 230 230 230
19
47
75th Avenue Improvements
01
0.50
P
PE
'2020
STP(U)
87
13
100
100
CE
Yes
75th Avenue
08
RW
1/1/2021
STP(U)
173
27
200
200
from: Mead Ave. to: Nob Hill Blvd.
S
CN
:1/1/2022
STP(U)
1,038
162
1,200
1,200
1/1/2022
T
Construct a new two-lane roadway and widen
portions of existing roadway, install curb, gutter,
sidewalk, street lighting and storm drainage system.
To a Is 1,298 202 1,500 100 1,400
17
48
5. 6618 Avenue provements
03
P
..76
P
PE
/1/2019
STP(U)
86
14
100
100
CE
Yes
66th Avenue
04
T
RW
/1/2020
STP(U)
173
27
200
200
from: Summitview Ave. to: Scenic Dr.
W
CN
1/1/2021
STP(U)
1,096
164
1,260
1,260
1/1/2021
Reconstruct and widen roadway to three lanes, install
curb, gutter, sidewalk, storm drainage system and
utilities.
Totals
1,355 205 1,560 100 200 1,260
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2018 to 2023
Hearing Date: 6/6/17 & 6/20/17 Adoption Date: 6/20/2017
Amend Date:
Resolution No.:
‘7.)
z
Project Identification
A. PIN/Federal Aid No, B. Bridge No,
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to Be Done
Improvement
Type(s)
IO
Utility Codes
Project Costs in Thousands of Dofllar5Federally
Expenditure Schedule
(Local Agency)
Funded
Projects Only
Project Phase
Phase
Start
Fund Source Information
Federal FL riding
State
Fund Code
State
Funds
Local
Funds
Total
Funds
Envir,
Type
VW
Required
Date
N1N1 ' ''
Federal Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6 h
2
3
4
5
6
7
8
9
..0
11
12
i.3
i.4
i.5
i.6
17
:18
....
20
21
17
49
Rudkin Rood Reconstruction
03
P
0.76
P
PE
201
STP(C)
109
27
136
136
CE
No
Rudkin Road
from: E. Viola Ave. to: Rainier Pl.
06
T
CN
1/9/2020
STP(C)
945
TPP
945
106
1,996
1,996
Reconstruct roadway, install curl, gutter, sidewalk
and storm drainage. Partner with Union Gap to
install additional sewer force main.
Totals 1,054 945 133 2,132 136 1,996
17
50
Englewood Avenue Improvements
05
P
100
P
PE
1/1/2021
STP(C)
272
43
5
315
CE
Yes
Englewood Avenue
06
T
RW
1/1/2022
STP(C)
349
55
404
404
from: N. 40th Ave. to: IV. 56th Ave.
W
CN
1/1/2023
STP(C)
2,329
363
2,692
2,692
1/1/2023
5
Widen roadway to three lanes, install curb, gutter,
sidewalk, street lighting and storm drainage system.
0
C
Totals
2,950 461 ,411 3,411
17
51
Englewood Avenue Improvements
05
P
0.50
P
PE
'202
STP(U)
136
21
157
157
CE
Yes
Englewood Avenue
06
T
RW
:1/1/2022
STP(U)
173
27
200
200
from: N. 16th Ave. to: N. 24th Ave.
W
CN
:1/1/2023
STP(U)
1,164
182
1,346
1,346
2023
Widen roadway to three lanes, install curb, gutter,
sidewalk, street lighting and storm drainage system,
water and sewer lines.
Totals :1,473 230 1,703 1,703
17
52
5. 80th Avenue Improvements
04
P
1.30
P
PE
1/1/2021
TIB
131
20
151
151
CE
Yes
S. 80th Avenue
T
RW
1/1/2022
TIB
382
59
441
441
from: Tieton Drive to: Zier Road
0
CN
1/1/2023
TIB
1,667
260
1,927
1,927
1/1/2023
5
Widen roadway to three lanes, install curb, gutter,
sidewalk, street lighting and storm drainage system.
C
Totals 2,180 339 2,519 2,519
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2018 to 2023
Hearing Date: 6/6/17 & 6/20/17 Adoption Date: 6/20/2017
Amend Date:
Resolution No.:
‘7.)
z
Project Identification
A. PIN/Federal Aid No, B. Bridge No,
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to Be Done
Improvement
Type(s)
IO
Utility Codes
Project Costs in Thousands of Dofllar5Federally
Expenditure Schedule
(Local Agency)
Funded
Projects Only
Project Phase
Phase
Start
Fund Source Information
Federal Ft riding
State
Fund Code
State
Funds
Local
Funds
Total
Funds
Envir,
Type
R/W
Required
Date
NIM ' ''
Federal Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6 h
2
3
4
5
6
7
8
9
..0
11
12
i.3
i.4
i.5
i.6
17
:18
....
20
21
17
53
Englewood Avenue Improvements
03
P
1.00
P
PE
2021.
STP(U)
2..
34
252
252
CE
YeS
Englewood Avenue
05
T
RW
2022
STP(U)
327
51
378
378
from: N. 24th Ave. to: N. 40th Ave.
06
W
CN
1/1/2023
STP(U)
2,789
435
3,224
3,2.24
1/1/2023
Reconstruct and widen roadway to three lanes, install
curb, gutter, sidewalk, street lighting and storm
drainage system. Install sewer and water lines.
Totals
3,334 520 3,854 3,854
17
54
88th Avenue Improvements
06
0
048
P
PE
1/1/2020
STP(U)43
7
50
50
CE
Yes
88th Avenue
12
T
RW
1/1/2021
STP(U)
52
8
60
60
from: Tieton Dr. to: Summitview Ave.
C
CN
6/1/2021
STP(U)
285
45
330
330
6/1/2021
Construct curb, gutter, sidewalk and storm drainage
system on the east side of 88th Avenue.
Totals 380 60 440 50 390
17
55
64 h Avenue Improvements
03
P
1.00
P
PE
1/1/2020
STP(U)
200
32
232
232
CE
No
64th Avenue
04
T
CN
2021
STP(U)
1,600
249
1,849
1,849
from: Washington Ave. to: Nob Hill Blvd,
06
C
8
Widen roadway to three lanes, install curb, gutter,
sidewalk, street lighting and storm drainage system.
o
:1, 800 281 2,08:1 232 1,849
16
56
1-82 & Lincoln Avenue Interchange
01
N/A
0
PE
1/1/2019
STP(U)
260
40
300
300
CE
Yes
Lincoln Avenue
P
RW
1/1/2020
STP(U)
173
27
200
200
from: E. '8' Street to: 1-82
Reconstruct/extend off -ramp from existing 1-82 off -
ramp for Lincoln Avenue to E. '6' Street.
G
CN
6/1/2021,
STP(U)
1,730
270
2,000
2,000
6/1/2021
337 2,500 300 200 2,000
Agency: Yakima
Co. No.: a.
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2018 to 2023
Hearing Date: 6/6/17 & 6/20/17 Adoption Date: 6/20/2017
Amend Date:
Resolution No.:
C.,
Priority Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to Be Done
Improvement
Type(s)
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
Fund Source Information
Federal Funding
State
Fund Code
State
Funds
Local
Funds
Total
Funds
Envir,
Type
R/W
Required
Date
NIM ' ''
Federal Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6 h
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
14
57
lSth Avenue Corridor Improvemen
16th Avenue
from: SR 12 to: Washington Ave.
Study to determine strategies for improving the 16th
Avenue corridor
04
P
350
P
T
C
0
0
5
PE
1/1/2020
STP(U)
120
17
137
137
17 137 137
14
58
4Oth Avenue Corridrlmprvemnts
40th Avenue
from: SR 12 to: Washington Ave.
Study to determine strategies for improving the 40th
Avenue corridor.
04
8
320
8
T
C
8
0
5
PE
1/1/2020
STP(U)120
17
137
137
Totals 120 17 137 137
14
59
Nob Hill Boulevard Corridor Improvements
Nob Hill Boulevard
from: 1-82 to: 16th Ave.
Study to determine strategies for improving the Nob
Hill Boulevard corridor.
03
04
7.70
P
T
0
5
C
8
PE
'2020
STP(U)
120
17
137
137
120 17 137 137
14
60
North/South Connector to West Valley
Unknown Road
from: Ahtanum Rd. to: Summitview Ext.
Corridor study to determine the best location for a
north/south limited access route in West Valley. City
and County joint project.
01.
04
06
P
6.00
P
T
5
C
0
PE
10020
STP(LJ)
432
58
500
500
CE
Yes
432 68 500 500
Agency: Yakima
Co. No.:
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2018 to 2023
Hearing Date: 6/6/17 & 6/20/17 Adoption Date: 6/20/2017
Amend Date:
Resolution No.:
Functional Class
Priority Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to Be Done
Improvement
Type(s)
Sttus
Total Length
UtiIity Codes
Project Costs in Thousands of DolIar5
Schedule
(Local Agency)
Federal y Funded
Projects Only
Project Phase
Phasic.
Start
Fund Source InformationExpenditure
Federal Funding
State
Fund Code
State
Funds
Local
Funds
Total
Funds
Envir,
Type
R/W
Required
Date
Federal Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6 h(MM/YY)
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
14
61
5. Ist treet/Main Street Corridor mprovements
S. ilst Street/Main Street
from: Nob Hill Blvd. to: Barker Mill Bridge
Joint project with Union Gap. Stucy to determine
strategies for improving the 1st Street/Main Street
corridor.
01
2.00
P
T
0
5
C
0
PE
'2020
STP(U)
120
17
137
137
No
120 17 137 137