HomeMy WebLinkAboutR-2017-075 2018-2023 Six-Year Transportation Improvement Program; YUACP Capital Facilities ElementA RESOLUTION RESOLUTION NO. R-2017-075 to amend the Yakima Urban Area Comprehensive Plan Capital Facilities Element to incorporate the Six-year Transportation Improvement Program (TIP) for the period of 2018 through 2023 WHEREAS, the City of Yakima annually prepares, reviews and adopts a Six — Year Transportation Improvement Program for the construction of streets and arterial streets in the City of Yakima for the ensuing six year period, all as contemplated and required by State RCW 35 77 010 and applicable Federal law; and WHEREAS, the City of Yakima desires to amend the Yakima Urban Area Comprehensive Pian Capital Facilities Element to reflect the adoption of the Six-year TIP, as contemplated and required by RCW 36 70A.070(6) to ensure compliance with the Growth Management Act and consistency of the Comprehensive Plan and the Six-year TIP; and WHEREAS, this amendment is limited to incorporation of the projects listed in the Six- year Transportation Improvement Plan for the period of 2018 to 2023 to the Capital Facilities Element of the Yakima Urban Area Comprehensive Plan, which is contemplated and provided under RCW 36 70A.130(2B) and RCW 35 77 010; and WHEREAS, public hearings were held by the Yakima City Council on the Six-year TIP on June 6, 2017 and June 20, 2017, with proper public notice as required by RCW 35 77.010, and WHEREAS, amending the Yakima Area Comprehensive Plan Capital Facilities Element is in the best interest of the City and its residents; now, therefore BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The adopted Six -Year Transportation Improvement Program for the period of 2018 through 2023 for the City of Yakima shall be incorporated as an amendment to the Capital facilities Element of the Yakima Urban Area Comprehensive Plan ADOPTED BY THE CITY COUNCIL this 20th day of June, 2017 ATTEST Sonya Cl r Tee, City Clerk * �► as '.,5 -;- BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT 1 Item No. 9. For Meeting of: June 20, 2017 ITEM TITLE: Public Hearing and resolutions to consider: A) Adoption of the Six- year Transportation Improvement Program for the years 2018 to 2023, and to amend the Metropolitan Transportation Plan; and B) Amend the Yakima Urban Area Comprehensive Plan Capital Facilities Element SUBMITTED BY: Brett Sheffield, Chief Engineer, 576-6797 Scott Schafer, Director of Public Works SUMMARY EXPLANATION: A) Each year the City is required by RCW 35.77.010 and RCW 36.81.121 to update its Six-year Transportation Improvement Program (TIP) for submittal to the Washington State Department of Transportation. This Plan must include all transportation projects for which state gas tax revenue and federal revenue will be used. The proposed 2018-2023 Transportation Improvement Plan includes fourteen projects that have funding. The funded projects are: #1 — North 1st Street Revitalization, 'N' Street to SR 12 #4 — Powerhouse Road Sidewalk #5 — Garfield Elementary Safety Improvements #6 — Yakima Valley Transportation Company Preservation #7 — Spring Creek Road Reconstruction #8 — South 36th Avenue Reconstruction #9 — Sorenson Road Reconstruction #10 — Bravo Company Boulevard #12 — Northside Alley Pavers #14 — Cowiche Canyon Trail #15 — N.34th Avenue/Fruitvale Boulevard & N. 34th Avenue/River Road Roundabouts #16 — Complete Street Projects #18 — S. 80th Avenue (Wide Hollow Creek) Bridge #19 — Wide Hollow Road (Wide Hollow Creek) Bridge A summary of the proposed changes to last year's TI P are listed below: 2 Add projects: #15 N. 34th Avenue/Fruitvale Blvd & N. 34th Avenue/River Road Roundabouts #16 Complete Street Projects #20 West River Road Improvements Divide the North 1st Street Revitalization project into two phases: #2 North 1st Street Revitalization, Phase 2 — 'N' Street to 'H' Street, and #3 North 1st Street Revitalization, Phase 3 — 'H' Street to MLK Remove project #4 — Adams Elementary/Washington M.S. sidewalk improvements since the construction funds are in the process of being obligated. Funding for the remainder of the projects included in the 2018-2023 TIP will continue to be sought. In order to use federal funds, such as those administered by the Federal Highway Administration (FHWA) and the Federal Transit Authority (FTA), projects must be included in the Statewide Transportation Improvement Program (STIP). The STIP is a prioritized program of transportation projects, complied from local and regional plans, along with the Washington Transportation System Plan (WTP), which provides a backbone for developing projects for the intermodal transportation network in the State of Washington. The STIP contains federally funded projects plus state and local projects that are regionally significant. These projects have been identified through the planning process as the highest priority for the available funding to the state's Transportation Program. Planning activities of state and local governments are essential parts of integrated regional planning processes. Long range transportation planning is a part of the comprehensive land use planning carried out by local governments. Citizen participation is an integral part of the planning process at all levels. Local agencies are required to develop and adopt a Six-year Transportation Program; holding at least one public hearing during its development. B) The City needs to amend the Yakima Urban Area Comprehensive Plan Capital Facilities Element to incorporate the adopted Six-year TIP for 2018 to 2023. This will ensure that we are in compliance with the Growth Management Act and that we are consistent with the Comprehensive Plan as required. The amendment is limited to incorporate only those projects that are adopted in the STI P and is not subject to the "once a year" change required under the regulations of the Growth Management Act. ITEM BUDGETED: NA STRATEGIC PRIORITY: Public Trust and Accountability APPROVED FOR SUBMITTAL: City Manager STAFF RECOMMENDATION: Adopt resolutions. BOARD/COMMITTEE RECOMMENDATION: ATTACHMENTS: Description Upload Date D Resolutions 5/23/2017 D 2018 - 2023 5/23/2017 Type Cover Memo Cor Memo 3 Agency: Yakima Co. No.: City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2018 to 2023 Hearing Date: 6/6/17 & 6/20/17 Amend Date: Adoption Date: 6/20/2017 Resolution No.: i -s 7.., .o ,___ o ..L. Priority Number Project Identification A, PIN/Federal Aid No, B. Bridge No, L. Project Title D. Street/Road Name or Number - E. Beginning MP or Road Ending MP or Road F. Describe Work to Be Done Improvement Type(s) Total Length .— i' v., 7 Project Costs in Thousands of Dollars,Federal Expendture Schedule (Local Agency) y Funded Projects Only Project Phase Phase Start Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type R/W Required Date (MM/YY) Federal Fund Cc:de Federal Cost by Phase lst. 2nd 3rd 4th 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 1 North 1st Street Revitalization North ast Street from: 'N' Street to: SR 12 Improve North 1.st Street by rehabilitating the pavement and lane markings, removing on -street parking, enhancing street and pedestrian lighting, constructing median islands and installing various pedestrian and decorative elements. 3 06 S 0.42 P 0 C W S 08 Totals 1/1/2018 STP(U) 2,718 424 3,142 3,142 CE No 2,718 424 3,142 3,142 14 2 North 1st Street Revitalization, Phase 2 N. 1st Street from: 'H' Street to: 'N'Street Improve North ast Street by rehabilitating the pavement and lane markings, removing on -street parking, enhancing street and pedestrian lighting, constructing median islands and installing various pedestrian and decorative elements. 06 12 5 0.50 P G C W 5 0 CN 1/1/2018 FASTLANE 4,250 TIB 750 0 5,000 5,000 CE Yes 12/31/2017 Totals 4,250 5,000 5,000 0 14 3 North 1st Street Revitalization, Phase 2 N. 1st Street from: 'H' Street to: 'N'Street Improve North 1.st Street by rehabilitating the pavement and lane markings, removing on -street parking, enhancing street and pedestrian lighting, constructing median islands and installing various pedestrian and decorative elements. 06 12 5 0.48 P r G C W 5 0 CN 1/1/2018 FAS -DANE 4,250 TIB 750 0 5,000 5,000 CE Yes 12/31/2018 Totals 4,250 5,000 5,000 0 17 4 Powerhouse Road Sidewalk Powerhouse Road from: Cowiche Canyon Rd to: Mobile Home Park Widen westbound lane to provide a 14 -foot wide shared bike lane and construct curb, gutter and sidewalk on the north side of the road. 05 12 5 0.6 0 C T CN Totals /112018 TAP 245 245 245 I CE No 245 245 245 0) Agency: Yakima Co. No.: City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2018 to 2023 Hearing Date: 6/6/17 & 6/20/17 Amend Date: Adoption Date: 6/20/2017 Resolution No.: .;". 0 57,,0 1.3 c 5 , Priority Number Project Identification A. PIN/Federal Aid No, B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to Be Done Improvement Type(s) Total Length '0' -ra L., a ..f. 577. Project Costs in Thousands of Dollars,Federal Expendture Schedule (Local Agency) y Funded Projects Only Project Phase Phase Start Fund Source Information Federl Funding State Fund Code State Funds Local Funds Total Funds Envir, Type R/W Required Date (MM/YY) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 19 5 Garfield Elementary Safety Improvements Various Streets from: to: This project will make various pedestrian safety improvements in the vicinity of Garfield Elementary School, such as, constructing sidewalk, improving roadway crossings, installing flashers. 12 5 N/A P T 0 CN 5/1/2018 SRTS 141 141 141 CE Yes 1/1/2017 Totals 141 141 141 14 6 Yakima Va Hey Transportation Company Preservation Yakima Avenue from: Yakima Avenue to: 6th Avenue This project will remove and replace a portion of the existing trolley rail in the vicinity of the intersection of 6th Avenue and Yakima Avenue, 03 5 0.02 0 CN 1/1/2018 STP(E) 52 52 52 CE No Totals 52 52 52 17 7 Spring Creek Road Reconstruction Spring Creek Road from: Washington Ave. to: 36th Avenue Widen roadway to three lanes, install curb, gutter, sidewalk and street lights. 03 5 0.85 S W CN 1/1/2018 SIED 1,100 820 1,920 1,920 SEPA Yes 3/1/2017 1,100 820 1920, 1,920 17 8 5. 36th Avenue Reconstruction 36th Avenue from: Spring Creek Rd. to: Sorenson Rct Widen roadway to three lanes, install curb, gutter, sidewalk and street lights. 03 0.40 S W CN 1/1/2018 SIED 520 385 905 905 SEPA Yes 3/1/2017 520 385 905 905 Agency: Yakima Co. No.: City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2018 to 2023 Hearing Date: 6/6/17 & 6/20/17 Adoption Date: 6/20/2017 Amend Date: Resolution No.: Functional Class Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to Be Done Improvement Type(s) Srtatus Total Length UtiIity Codes Project Costs in Thousands of DolIarS Expenditure Schedule (Local Agency) Federal y Funded Projects Only Project Phase Phast. Start Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir, Type R Required Date Federal Fund Code Federal Cost by Phase(MM/YY) 1st 2nd 3rd 4th 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 17 9 Sorenson Road Reconstruction Sorenson Road from: 36th Avenue to: 38th Avenue Widen roadway, install curb, gutter, sidewalk and street lights. 03 014 5 CN 1/1/2018 S ED 180 140 320 320 Yes 3/1/2017 To a Is 180 140 320 320 16 10 Bravo Company Boulevard North 10th Street from: 'H' Street to: Lincoln Ave. Construct new roadway including water, sewer, curb, gutter, sidewalk, street lighting and storm drainage system. 01 06 5 ..65 P T RW CN 1/1/2018 1/1/2018 UFT LIFT 800 4,480 200 1,120 1,000 5,600 1,000 5„600 01 Yes 1/:L/2018 Totals 5280 1,320 6,600 1,000 5„600 16 1. E. 'H' Street Extension, Ph. 1 E. 'H' Street from: 1..st Street to: 10th Street Construct new roadway including water, sewer, curb, gutter, sidewalk, street lighting and storm drainage system. 01 08 P L10 0 T W RW CN 1/1/20:18500 2019 TIB 1,500 3,100 500 4,600 500 4,600 CE Yes 121112018 To a s 3,600 5,100 500 4,600 00 12 Northside Alley Paver Alleys between Folsom Ave. and Fruitvale Blvd. from: 16th Avenue to: 6th Avenue Pave the east/west gravel alleys between Folsom Avenue and Fruitvale Boulevard from 16th Avenue to 6th Avenue 07 5 33 0 T C CN 1/1/2018CMA :133 57 410 410 01 No Totals 353 57 410 410 03 Agency: Yakima Co. No.: City No.: :1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2018 to 2023 Hearing Date: 6/6/17 & 6/20/17 Adoption Date: 6/20/2017 Amend Date: Resolution No.: L / Priority Number Project Identification A. PIN/Federal Aid NA B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to Be Done Improvement Type(s) Status Total Length U -' Project Costs in Thousands of Do rsFederal Expenditure Schedule (Local Agency) y Funded Projects Only Project Phase Phase Start Fund Source Information Federal Funding State Fund Code State Funds focal Funds Total Funds Envir. Type R Required Date YY Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 2 3 4 5 6 7 8 9 :10 11 12 :13 14 ' :.6 17 18 :19 20 21 16 13 E. 'H' Street Extension, Ph. 2 01 0.55 P R; 1/1/2019 STP(U) 432 68 500 500 CE Yes E. 'H' Street 08 T CN 2021 STP(U) 2462 338 2,500 2,500 from: 10th Street to: 1-82 W 1/1/2015 Construct new roadway including water, sewer, curb, gutter, sidewalk, street lighting and storm drainage system. 5 Totals 2,594 406 3,000 500 2,500 00 14 Cowiche Canyon Trail 28 2.00 RW 7/1/2019CWA 105 105 105 Cowiche Canyon CN 2020 CWA 1,695 1,695 1,695 from: Powerhouse Road to: Trailhead /1/2020 Construct a 10 -foot wide pathway, including two bridges over Cowiche Creek. Totals 1,800 105 1,695 N. 34th Ave./Fruit-vale Blvd. & N. 34th Ave/River 14 15 Rood Roundabouts 03 5 N/A 9 PE 6/1/2017 HSIP 1.1.7 13 130 130 CE Yes 34th Avenue 12 T RW 7/1/2017 HSIP 9 1 10 10 from: Fruitvale Blvd. to: River Road 0 CN 1/2018 HSIP 788 88 876 876 1/1/2018 Improve the intersections of N. 34th Avenue & 5 Fruitvale Boulevard and N. 34th Avenue & River Road by installing roundabouts Totals 914 102 ,0:.6 19 16 Complete Streets Projects 32 5 N/A P PE 6/1/20:17 TIB 35 35 35 Yes Various Streets T RW 7/1/2017 TIB 100 100 100 from: N/A to: N/A C CN :1/1/2018 TIB 365 365 365 1/1/2018 Construct sidewalk on the south side of Swan Avenue from McGuiness Park. to Campbell Lane, on Rai., St. between 815 St and Nadlel, Ave., south side of Prasch Ate. born 2.01h in 1615, sou15 hide or Viola from loin AVE. to 4111 Ave. and on Powerhouse road from Robertson Elementary to Englewood. 500 Agency: Yakima Co. No.: City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2018 to 2023 Hearing Date: 6/6/17 & 6/20/17 Amend Date: Adoption Date: 6/20/2017 Resolution No.: 0 Priority Number Project Identification A. PIN/Federal Aid No, B. Bridge No, C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to Be Done Improvement Type(s) Total Length Ja 18 Project Costs in Thousands of Dollars,Federally Expendture Schedule (Local Agency) Funded Projects Only Project Phase Phase Start Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir, Type R Required Date (MM/YY) Federal Fund Code Federal Cost by Phase 1st: 2nd 3rd 4th 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 17 E. Nob Hill Blvd. & Fair Ave. 1/5 Improvements Nob Hill Boulevard from: E. Nob Hill Blvd. to: Fair Ave. Widen Nob Hill Boulevard through the intersection, construct left -turn lane, curb, gutter, sidewalk, street lighting and drainage. Upgrade signal by installing mast arm structures. 03 04 31 N/A P T W C RW CN 1/1/2018STE 6/1/2019 U STP(U) 187 1,457 29 227 216 1,684 216 1,684 CE Yes 1/1/2019 Totals 1,644 256 1,900 215 1,684 17 18 5. 80th Avenue Bridge S. 80th Avenue from: Wide Hollow Rd. to: Plain Ave. Replace existing two-lane bridge over Wide Hollow Creek with three -lane bridge. The City's involvement is only to pass through of an Ecology grant: in conjunction with the County's flood plain management project. 09 5 0,05 P T PE CN 1/1/2017 1/1/2018 DOE DOE 25 75 0 0 25 75 25 75 CE No Totals 100 75 17 19 Wide Hollow Rood Bridge Wide Hollow Road from: 89th Avenue to: 88th Avenue Replace existing two-lane bridge over Wide Hollow Creek with three -lane bridge. The City's involvement is only to pass through of an Ecology grant in conjunction with the County's flood plain management project. 09 0.05 P T PE CN 1/1/2017 1/1/2018 DOE DOE 25 75 25 75 25 75 CE No Totals 100 100 25 75 19 20 West River Road Improvements River Road from: 40th Avenue to: 34th Avenue Reconstruct and widen roadway to three lanes, install curb, gutter, sidewalk, street lights and drainage. 03 04 0.36 P T G S C PE RW CN 1/1/2018 6/1/2018 1/1/2019 SIED SIED SIED 55 100 550 55 100 550 110 200 1,100 110 200 1,100 CE Yes 2019 705 705 1,410 110 200 1,100 0 Agency: Yakima Co. No.: City No.: 1.485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2018 to 2023 Hearing Date: 6/6/17 & 6/20/17 Adoption Date: 6/20/2017 Amend Date: Resolution No.: Functional Class Priority Number Project Identification A, PIN/Federal Aid No, B. Bridge No, C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to Be Done Improvement Type(s) Total Length o - Project Cotts in Thousands of Dol arsFederally Expenditure Schedule (Local Agency) Funded Projects Only Project Phase Phase Start Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir, Type R Required Date - Federal Fund Code Federal Cost by Phase(MM/YY) 1st 2nd 3rd 4th 2 3 4 5 6 7 8 9 10 11 12 :13 14 ' i.6 17 18 :19 20 21 14 21, 1605 Ave. & Tieton Dr. Intersection Improvements 5 8 040 8 PE 1/1/2019 STP(U)40 300 300 CE Yes 16th Avenue 7 T RW 1/1/2020 STP(U) 3,460 540 4,000 3,460 from: 1.6th Ave. to: Tieton Dr, G 0 CN 4/1/2021, STP(U) 1,300 200 1,500 1,500 4/:L/2021 Reconstruct and widen 16th Avenue and Tieton Drive by adding left -turn lanes tor all movements at the intersection. Upgrade the traffic signal. C 5 59 Totals 5020 780 5,800 300 3,460 1,500 14 22 lSth Street Underpass 12 P 0.02 P PE 1/1/2019 BRAC 240 60 ii 00 300 CE No Yakima Avenue from: Yakima Ave. to: 18th Street T 0 CN 2020 BRAC 2,288 572 2,860 2,860 S Replace the bridge on E. Yakima Avenue that crosses over 18th Street. Totals 2,528 532 3,160 300 2,860 17 23 64th Ave. & Ahtanum Intersection Improvements 12 5 N/A P PE 1/1/2018 CMAQ56 9 65 65 CE Yes 64th Avenue T RW 1/1/2019 CMAQ 43 7 50 50 from: 64th Ave. to: Ahtanum Rd. C CN 1/1/2020 CMAQ 433 67 500 500 500 /1/2070 0 Improve the 64th Avenue and Ahtanum Road intersection by constructing a westbound right -turn lane on Ahtanum and installing a traffic signal. Totals 532 83 615 65 550 14 24 South th Avenue Sidewalks 12 P 088 P PE 1/1/2018 PBP 54 6 60 60 CE Yes 1.6th Avenue T RW 6/1/2018 PBP 234 26 260 260 from: Washington Ave. to: Nob Hill Blvd. 0 CN 6/1/2019 PBP 369 41 410 410 6/1/2019 0 Install 7 -foot sidewalk on the west side of 16th Avenue. Totals 657 73 730 320 41.0 Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2018 to 2023 Hearing Date: 6/6/17 & 6/20/17 Adoption Date: 6/20/2017 Amend Date: Resolution No.: ‘7.) z Project Identification A. PIN/Federal Aid No, B. Bridge No, C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to Be Done Improvement Type(s) IO Utility Codes Project Costs in Thousands of Dofllars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir, Type R/W Required Date MM ' '' Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th 2 3 4 5 6 7 8 9 ..0 11 12 i.3 i.4 i.5 i.6 17 :18 .... 20 21 19 25 McClure Elementary School Safety Improvements Various locations from: to: This project will make various pedestrian safety improvements in the vicinity of McClure Elementary School, such as, constructing sidewalk, ADA ramps and improving crosswalks. 12 P N/A P T C 0 PE CN 1/112018RTS 1/1/2019 SRTS 46 380 30 240 3D 240 CE No Totals 426 270 30 240 19 26 ,,IcKinley Elementary School So ety Improvements Various locations from: to: This project will make various padestrian safety improvements in the vicinity of McKinley Elementary School, such as, replacing delapitated sidewalk, constructing ADA ramps, and installing a HAWK pedestrian crossing system. 12 P N/A P T C 0 PE CN 1/1/2018 2019 SRTS SRTS 50 430 50 430 50 430 CE No Totals 480 0 480 50 430 19 27 618 Avenue Roodway Improvements 6th Avenue from: Walnut Street to: River Road Reconstruct the existing trolley rail and impacted roadway, grind and overlay the remaining width of 6th Avenue. 03 07 P PE CN 2020 2021 OTHER OTHER 200 2,000 200 2,000 400 4,000 400 4,000 CE No Totals 0 2,200 4,400 0 400 4,000 12 28 SR 12 & 16th Avenue interchange Westbound ramps of SR 12 from: 1.6th Avneue to: 58 12 Construct a roundabout where the westbound ramps intersect. with N. 16th Avenue. 03 06 P N/A 0 PE CN /1/20191 TF(U) 1/1/2020 STP(U) 86 779 14 121 100 900 100 900 CE No Totals 865 135 1,000 100 900 Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2018 to 2023 Hearing Date: 6/6/17 & 6/20/17 Adoption Date: 6/20/2017 Amend Date: Resolution No.: ‘7.) z Project Identification A. PIN/Federal Aid No, B. Bridge No, C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to Be Done Improvement Type(s) IO Utility Codes Project Costs in Thousands of Dofllar5 Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start Fund Source Information Federal Ei. riding State Fund Code State Funds Local Funds Total Funds Envir, Type R/W Required Date MM ' '' Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th 2 3 4 5 6 7 8 9 ..0 11 12 1 i.4 15 16 17 :18 .... 20 21 14 29 S. 1st . & E. Washington Ave. 1/5 Improvements 03 P N/A 8 PE 201. STP(U) 260 40 300 300 CE Yes South 1st Street 06 W RW 2020 STP(U) 260 40 300 300 from: S. 1st Street to: E. Washington Ave. S CN 1/1/2021 STP(U) 1,2.11 189 1,400 1,400 /1/2020 Realign intersection, widen E. Washington Avenue to accommodate an additional lane, replace curb, gutter and sidewalk, and install a new traffic signalization system. T Totals :1731 269 2,000 300 300 1400 14 30 Washington Ave. & Long iber Rd. Intersection 03 N/A C PE 1/1/2019 STP(U)100 14 114 114 CE Yes Washington Avenue 05 T RW 1/1/2020 STP(U) 100 14 114 114 from: Washington Ave. to: Longfiber Rd. 06 W CN 1/1/2021 STP(U) 688 107 795 795 1/1/2020 5 Improve the Washington Avenue and Longfiber Road intersection by constructing an eastboung left -turn lane on Washington and a northbound ieft-turn lane on Longfiber, install or replace curb, gutter, sidewalk, street lighting, storm drainage and safety flashing signal Totals 888 135 1,023 114 114 795 14 3:1 E. Nob Hill Boulevard Reconstruction 03 P 0.85C PE 1/1/2019STP(U) 545 . 630 630 CE Yes E. Nob Hill Boulevard 04 T RW 1/1/2020 STP(U) 1,090 170 1760 1,260 from: S. 6th Street to: 5.1.8th Street 06 W CN /1/2021 STP(U) 6,532 1,020 7,552 7552 1/1/2025 Reconstruct and widen roadway to 5 lanes with intersection improvements, curb, gutter, sidewalk, street lighting and drainage system 0 P G Totals 1167 1775 9,442 630 1760 7,552 14 32 N. 40 h Ave. & Summitview Ave. Intersection 12 8 N/A P PE 1/1/2019 STP(U)26 17 143 4 CE Yes N. 40th Avenue T RW 1/1/2020 STP(U) 130 20 150 150 from: N. 40th Ave. to: Summitview Dr. W CN 1/1/2021 STP(U) 692 108 800 800 1/1/2020 Improve the intersection by constructing larger corner radii, lengthening the turn lanes, and upgrading the traffic signal system. 5 Totals 948 45 1,05.3 143 150 800 Agency: Yakima Co. No.: 1—.) City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2018 to 2023 Hearing Date: 6/6/17 & 6/20/17 Adoption Date: 6/20/2017 Amend Date: Resolution No.: Priority Nu mber Project Identification A. PIN/Federal Aid No, B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to Be Done Improvement Type(s) Total Length as Project Costs in Thousands of Dol arsFederal Expenditure Schedule (Local Agency) y Funded Projects Only Project Phase Phase Start Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir, Type R/W Required Date IMM '' '' Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 33 AL 1Gth Avenue & Fruitvole Blvd. 12 P N/A P PE 1/1/2019STP(U( . 44 144 CE Yes N. 16th Avenue T RW 1/1/2020 STP(U) 173 27 200 200 from: N. 16th Ave. to: Fruitvale Blvd, Improve the intersection by constructing larger curb radii, installing ADA ramps, and upgrading the traffic signal syste.m. 0 W CN 1/1/2021 STP(U) 400 62 462 462 /1/702o Totals 699 07 806 144 200 462 16 34 E. MnodAvenue Reconstruction 03 0.76 P PE 1/1/2020 STP(S) 122 TPP 23 7 152 152 CE No E. Mead Avenue from: Rudkin Rd. to: Fair Ave. 06 T 5 CN 1/1/2021 STP(5) 1,730 TPP 206 70 2,006 2,006 Partner with Union Gap to reconstruct E. Mead C Avenue, install curb, gutter, sidewalk and storm drainage system. G 0 Totals :l852 77 2,158„ 2,006 17 35 5. 48th Avenue Reconstruction 03 .00 P PE 1/1/2019 STP(U) 223 5 258 258 CE Yes South 48th Avenue 05 T RW 1/1/2020 STP(U) 51.9 81 600 600 from: Summitview Ave. to: Nob Hill Blvd. W CN 1/1/2021 STP(U) 1,485 232 1,717 1,717 2020 Reconstruct and widen 48th Avenue, install curb, gutter, sidewalk, street lighting and drainage system. Totals 2,227 3482,575 258 600 1,717 17 36 Powerhouse Rd. & Englewood Ave. 1/5 12 P N/A P PE '2019 STP(S) 43 7 50 50 CE Yes Powerhouse Rd. T RW 1/1/2020 STP(5) 87 1.3 100 100 from: Powerhouse Rd. to: Englewood Ave. C CN 1/1/2021 STP(S) 500 78 578 578 1/1/2021 Realign intersection, install curb, gutter, sidewalk and safety flashing signal. Possibly construct a roundabout:. 5 0 W Totals 630 98 728 100 578 Agency: Yakima Co. No.: City No.: 1.485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2018 to 2023 Hearing Date: 6/6/17 & 6/20/1.7 Adoption Date: 6/20/2017 Amend Date: Resolution No.: Ci Priority Number Project Identification A. PIN/Federal Aid NA B. Bridge No. C. Project Title D. Street/Road Name or Number - E. Beginning MP or Road Ending MP or Road F. Describe Work to Be Done Improvement Type(s) Status Total Length o U -' Project Costs in Thousands of Do rsFederal Expenditure Schedule Agency) y Funded Projects Only Project Phase Phase Start Fund Source Information Federal(Local Funding State Fund Code State Funds Local Funds Total Funds Envir, Type R Required Date YY Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 2 3 4 5 6 7 8 9 10 11 12 :13 14 ' i.6 17 18 :19 20 21 14 37 W Lincoln Aee & MLKBIed, Realign en 01 0.50 ' PE 1/1/2019 STP(E) 424 67 491 491 CE Yes V. Lincoln Avenue 12 T RW 1/1/2020 STP(E) 1,047 163 1,210 1,21.0 ,from: N. 5th Ave. to: Custer St. W 5 CN 1/2021, STP(E) 1,801 281 2,082. 2,082 1/1/2020 0 Realign W. Lincoln Avenue, install curb, gutter. sidewalks, street lighting, drainage. P Totals 3,272 511 3,783 491 .2 0 2,082 16 38 Tieton Dr. & S. 5th Ave. _ Improvements 12 P N/A P PE '2019 STP(U) 69 0 80 CE Yes Tieton Drive W RW :1/1/2020 STP(U) 104 16 120 120 from: Tieton Dr, to: S. 5th Ave. 5 CN 1/1/2021 STP(U) 865 135 1,000 1,000 1/1/2021 Remove existing traffic signal and construct a roundabout, remove and replace curb, gutter, sidewalk, street lighting and drainage T Totals :1,038 152 1,200 80 120 1,000 17 39 Yakima Downtown Future imbatives, Phase 5 06 8 N/A P PE 1/1/2019 OTHER 500 500 500 CE No from: 1st Street to: 9th Street 12 T C CN 4/1/2020 OTHER 5,500 5,500 5,500 Install historic lighting, sidewalk modifications and other improvements. Exact improvement area(s) to be determined .5 Totals 6,000 6,000 500 5,500 14 40 E. Nob Hill Blvd. & S. 18th Street 1/S Improvements 01 0.10 C PE 1/1/2019 STP(U) 511 8 58 58 CE Yes 1_ Nob Hill Boulevard 04 T RW /1/2020 STP(U) 50 8 58 58 from: E. Nob Hill Blvd. to: S. 18th Street W CN 1/1/2021 STP(U) 346 54 400 400 1/1/2021 Widen south leg for double left turn from westbound Nob Hill, install curb, gutter, sidewalk, upgrade traffic signal system Totals 446 70 516 5858 400 Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2018 to 2023 Hearing Date: 6/6/17 & 6/20/17 Adoption Date: 6/20/2017 Amend Date: Resolution No.: Functional Class Priority Nu other Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to Be Done Improvement Type(s) Total Length Utility Codes Project Costs in Thousands of Dollar5Federally Expenditure Schedule (Local Agency) Funded Projects Only Project Phase Phase Start Fund Source Information Federal Ei. riding State Fund Code State Funds Local Funds Total Funds Envir, Type R/W Required Date (MM/YY) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6 h 2 3 4 5 6 7 8 9 ..0 11 12 :. i.4 :.5 :.6 17 :18 .... 20 21 14 4:1 S. 48th Ave. & 5ummitview Ave. Signalization 12 P N/A 8 PE 1/1/2020 STP(S) 25 4 29 29 CE Yes Summitview Avenue T RW 6/1/2020 STP(S) 25 4 29 29 from: Summitview Ave. to: S. 48th Ave. CN :1/1/2021 STP(5) 554 81. 635 635 1/1/2021 Install traffic signal at the intersection of Summitview Avenue and 48th Avenue. Totals 604 89 693 58 635 14 42 S. 72nd Ave. & W. Washington Ave. VS 12 P N/A P PE 1/1/2019 STP(C) 91 4 105 105 CE Yes S. 72nd Avenue 06 T RW 1/1/2020 STP(C) 91 14 105 105 from: s. 72nd Ave. to: W. Washington Ave. 0 CN 1/1/2021 STP(C) 544 86 630 630 1/1/2021 Improve intersection by installing a traffic: signal system or roundabout. W Totals 726 14 840 105 105 630 14 43 N. 40th Ave. & Englewood Ave. Intersection 12 8 N/A P PE /1/2020 STP(U) 43 7 50 50 CE No N. 40th Avenue T CN 6/1/2020 STP(U) 260 40 300 300 ,from: N. 40th Ave. to: Englewood Replace traffic signal poles and upgrade controller. To a Is 303 47 350 350 14 44 Nob Hill Boulevard Sidewalk Improvements 12 P 2.50 P PE 1/1/2020 STP(S) 55 63 63 CE Yes Nob Hill Boulevard T RW 2021 STP(S) 107 19 126 126 from: S. 16th Ave. to: S. 6th Street 5 CN 2022 STP(S) 327 51 378 378 1/1/2022 Construct sidewalk in locations where it doesn't exist on the south side of Nob Hill VV Totals 489 78 567 504 Agency: Yakima Co. No.: 1—.) City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2018 to 2023 Hearing Date: 6/6/17 & 6/20/17 Adoption Date: 6/20/2017 Amend Date: Resolution No.: Priority Nu mber Project Identification A. PIN/Federal Aid No, B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to Be Done Improvement Type(s) Total Length as F Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federal y Funded Projects Only Project Phase Phase Start Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir, Type R/W Required Date MM ' ' '' Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 45 E. Yakima Ave. & Fair Ave..Signalization 12 P N/A P PE 1/1/2020 STP(U) 6 14 100 100 CE No Yakima Avenue from: E. Yakima Ave. to: Fair Ave. T CN 6/1/2021. STP(U) 519 81 600 600 Install traffic signal at the intersection of Yakima Avenue and Fair Avenue. 0 Totals 605 95 700 100 600 16 46 S. 3rd Avenue & W. Washington Ave. Signal 12 P N/A P PE 4/1/2019 20 20 20 CE No S. 3rd Avenue from: S. 3rd Ave, to: W. Washington Ave. T CN 9/1/2019 210 210 210 Upgrade the traffic signalization system 230 230 230 Totals 230 230 230 19 47 75th Avenue Improvements 01 0.50 P PE '2020 STP(U) 87 13 100 100 CE Yes 75th Avenue 08 RW 1/1/2021 STP(U) 173 27 200 200 from: Mead Ave. to: Nob Hill Blvd. S CN :1/1/2022 STP(U) 1,038 162 1,200 1,200 1/1/2022 T Construct a new two-lane roadway and widen portions of existing roadway, install curb, gutter, sidewalk, street lighting and storm drainage system. To a Is 1,298 202 1,500 100 1,400 17 48 5. 6618 Avenue provements 03 P ..76 P PE /1/2019 STP(U) 86 14 100 100 CE Yes 66th Avenue 04 T RW /1/2020 STP(U) 173 27 200 200 from: Summitview Ave. to: Scenic Dr. W CN 1/1/2021 STP(U) 1,096 164 1,260 1,260 1/1/2021 Reconstruct and widen roadway to three lanes, install curb, gutter, sidewalk, storm drainage system and utilities. Totals 1,355 205 1,560 100 200 1,260 Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2018 to 2023 Hearing Date: 6/6/17 & 6/20/17 Adoption Date: 6/20/2017 Amend Date: Resolution No.: ‘7.) z Project Identification A. PIN/Federal Aid No, B. Bridge No, C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to Be Done Improvement Type(s) IO Utility Codes Project Costs in Thousands of Dofllar5Federally Expenditure Schedule (Local Agency) Funded Projects Only Project Phase Phase Start Fund Source Information Federal FL riding State Fund Code State Funds Local Funds Total Funds Envir, Type VW Required Date N1N1 ' '' Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6 h 2 3 4 5 6 7 8 9 ..0 11 12 i.3 i.4 i.5 i.6 17 :18 .... 20 21 17 49 Rudkin Rood Reconstruction 03 P 0.76 P PE 201 STP(C) 109 27 136 136 CE No Rudkin Road from: E. Viola Ave. to: Rainier Pl. 06 T CN 1/9/2020 STP(C) 945 TPP 945 106 1,996 1,996 Reconstruct roadway, install curl, gutter, sidewalk and storm drainage. Partner with Union Gap to install additional sewer force main. Totals 1,054 945 133 2,132 136 1,996 17 50 Englewood Avenue Improvements 05 P 100 P PE 1/1/2021 STP(C) 272 43 5 315 CE Yes Englewood Avenue 06 T RW 1/1/2022 STP(C) 349 55 404 404 from: N. 40th Ave. to: IV. 56th Ave. W CN 1/1/2023 STP(C) 2,329 363 2,692 2,692 1/1/2023 5 Widen roadway to three lanes, install curb, gutter, sidewalk, street lighting and storm drainage system. 0 C Totals 2,950 461 ,411 3,411 17 51 Englewood Avenue Improvements 05 P 0.50 P PE '202 STP(U) 136 21 157 157 CE Yes Englewood Avenue 06 T RW :1/1/2022 STP(U) 173 27 200 200 from: N. 16th Ave. to: N. 24th Ave. W CN :1/1/2023 STP(U) 1,164 182 1,346 1,346 2023 Widen roadway to three lanes, install curb, gutter, sidewalk, street lighting and storm drainage system, water and sewer lines. Totals :1,473 230 1,703 1,703 17 52 5. 80th Avenue Improvements 04 P 1.30 P PE 1/1/2021 TIB 131 20 151 151 CE Yes S. 80th Avenue T RW 1/1/2022 TIB 382 59 441 441 from: Tieton Drive to: Zier Road 0 CN 1/1/2023 TIB 1,667 260 1,927 1,927 1/1/2023 5 Widen roadway to three lanes, install curb, gutter, sidewalk, street lighting and storm drainage system. C Totals 2,180 339 2,519 2,519 Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2018 to 2023 Hearing Date: 6/6/17 & 6/20/17 Adoption Date: 6/20/2017 Amend Date: Resolution No.: ‘7.) z Project Identification A. PIN/Federal Aid No, B. Bridge No, C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to Be Done Improvement Type(s) IO Utility Codes Project Costs in Thousands of Dofllar5Federally Expenditure Schedule (Local Agency) Funded Projects Only Project Phase Phase Start Fund Source Information Federal Ft riding State Fund Code State Funds Local Funds Total Funds Envir, Type R/W Required Date NIM ' '' Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6 h 2 3 4 5 6 7 8 9 ..0 11 12 i.3 i.4 i.5 i.6 17 :18 .... 20 21 17 53 Englewood Avenue Improvements 03 P 1.00 P PE 2021. STP(U) 2.. 34 252 252 CE YeS Englewood Avenue 05 T RW 2022 STP(U) 327 51 378 378 from: N. 24th Ave. to: N. 40th Ave. 06 W CN 1/1/2023 STP(U) 2,789 435 3,224 3,2.24 1/1/2023 Reconstruct and widen roadway to three lanes, install curb, gutter, sidewalk, street lighting and storm drainage system. Install sewer and water lines. Totals 3,334 520 3,854 3,854 17 54 88th Avenue Improvements 06 0 048 P PE 1/1/2020 STP(U)43 7 50 50 CE Yes 88th Avenue 12 T RW 1/1/2021 STP(U) 52 8 60 60 from: Tieton Dr. to: Summitview Ave. C CN 6/1/2021 STP(U) 285 45 330 330 6/1/2021 Construct curb, gutter, sidewalk and storm drainage system on the east side of 88th Avenue. Totals 380 60 440 50 390 17 55 64 h Avenue Improvements 03 P 1.00 P PE 1/1/2020 STP(U) 200 32 232 232 CE No 64th Avenue 04 T CN 2021 STP(U) 1,600 249 1,849 1,849 from: Washington Ave. to: Nob Hill Blvd, 06 C 8 Widen roadway to three lanes, install curb, gutter, sidewalk, street lighting and storm drainage system. o :1, 800 281 2,08:1 232 1,849 16 56 1-82 & Lincoln Avenue Interchange 01 N/A 0 PE 1/1/2019 STP(U) 260 40 300 300 CE Yes Lincoln Avenue P RW 1/1/2020 STP(U) 173 27 200 200 from: E. '8' Street to: 1-82 Reconstruct/extend off -ramp from existing 1-82 off - ramp for Lincoln Avenue to E. '6' Street. G CN 6/1/2021, STP(U) 1,730 270 2,000 2,000 6/1/2021 337 2,500 300 200 2,000 Agency: Yakima Co. No.: a. City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2018 to 2023 Hearing Date: 6/6/17 & 6/20/17 Adoption Date: 6/20/2017 Amend Date: Resolution No.: C., Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to Be Done Improvement Type(s) Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir, Type R/W Required Date NIM ' '' Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6 h 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 57 lSth Avenue Corridor Improvemen 16th Avenue from: SR 12 to: Washington Ave. Study to determine strategies for improving the 16th Avenue corridor 04 P 350 P T C 0 0 5 PE 1/1/2020 STP(U) 120 17 137 137 17 137 137 14 58 4Oth Avenue Corridrlmprvemnts 40th Avenue from: SR 12 to: Washington Ave. Study to determine strategies for improving the 40th Avenue corridor. 04 8 320 8 T C 8 0 5 PE 1/1/2020 STP(U)120 17 137 137 Totals 120 17 137 137 14 59 Nob Hill Boulevard Corridor Improvements Nob Hill Boulevard from: 1-82 to: 16th Ave. Study to determine strategies for improving the Nob Hill Boulevard corridor. 03 04 7.70 P T 0 5 C 8 PE '2020 STP(U) 120 17 137 137 120 17 137 137 14 60 North/South Connector to West Valley Unknown Road from: Ahtanum Rd. to: Summitview Ext. Corridor study to determine the best location for a north/south limited access route in West Valley. City and County joint project. 01. 04 06 P 6.00 P T 5 C 0 PE 10020 STP(LJ) 432 58 500 500 CE Yes 432 68 500 500 Agency: Yakima Co. No.: City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2018 to 2023 Hearing Date: 6/6/17 & 6/20/17 Adoption Date: 6/20/2017 Amend Date: Resolution No.: Functional Class Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to Be Done Improvement Type(s) Sttus Total Length UtiIity Codes Project Costs in Thousands of DolIar5 Schedule (Local Agency) Federal y Funded Projects Only Project Phase Phasic. Start Fund Source InformationExpenditure Federal Funding State Fund Code State Funds Local Funds Total Funds Envir, Type R/W Required Date Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6 h(MM/YY) 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 61 5. Ist treet/Main Street Corridor mprovements S. ilst Street/Main Street from: Nob Hill Blvd. to: Barker Mill Bridge Joint project with Union Gap. Stucy to determine strategies for improving the 1st Street/Main Street corridor. 01 2.00 P T 0 5 C 0 PE '2020 STP(U) 120 17 137 137 No 120 17 137 137