BUSINESS OF THE CITY COUNCIL
YAKIMA, WASHINGTON
AGENDA STATEMENT
Item No. 14.B.
For Meeting of: November 10, 2026
ITEM TITLE: Wiley City Sewer Study Report
SUBMITTED BY: *Trevor Martin, Planning Manager
Bill Preston, Community Development Director
SUMMARY EXPLANATION:
The City Council authorized the Planning Division to apply for a SIED Grant to conduct a sewer study in
the Wiley City Area. The report will be delivered to the Ahtanum Irrigation District and any other party
wishing to see a copy after it is delivered to the City Council. The City and County have agreed that this
report does not guarantee or obligate the City of Yakima for any associated wastewater projects that
might be identified by the study.
The report identified four options for wastewater service in the Wiley City area. It provides a cost analysis
of each alternative. The report also identifies the Ahtanum Irrigation District as the lead entity on the
project.
ITEM BUDGETED: Yes
STRATEGIC PRIORITY 24-25: A Safe and Healthy Yakima
RECOMMENDATION: No action necessary.
ATTACHMENTS:
Wiley City Final Sewer Study Report
124
CITY OF YAKIMA
WILEY CITY SEWER
SERVICES EVALUATION
REPORT
irI�
r
,,
r �'
s
•
PROJECT NO. 25160E * \H LA
125
CITY OF YAKIMA
WILEY CITY SEWER
SERVICES EVALUATION
REPORT
P. Sifr
�� / Digital) sig - by Dean P.Smith
Q �' DN:`C=k S, E •smith@hlacivil.com,
/r- 4 4 O="HLA Engi -ering and Land
`, Surveyi ., In.. ,CN=Dean P.Smith
Date:2' 4.1 i '7 16:08:50-07'00'
.44) 30111
OISTE.
NAL
Prepared by:
0,, HLA
HLA PROJECT NO. 25160E
October 2026
126
TABLE OF CONTENTS
INTRODUCTION AND EXECUTIVE SUMMARY
EXECUTIVE SUMMARY
INTRODUCTION
OBJECTIVE ii
CHAPTER 1 —CONNECTION TO EXISTING YAKIMA SEWER SYSTEM 1-1
Task 1: Assessment of Connecting to the Existing City of Yakima Sewer System 1-1
Alternative A: Gravity Sewer through the Former Trolley Corridor 1-1
Alternative B: Force Main through the Former Trolley Corridor 1-1
Alternative C: Force Main along South Wiley Road and Ahtanum Road 1-1
Alternative D: Pumping to Equalization Storage with Gravity Conveyance through the Former Trolley
Corridor 1-1
Yakima Improvements 1-2
Alternative Comparison 1-2
CHAPTER 2— EVALUATION OF A LOCAL WASTEWATER TREATMENT PLANT 2-1
Task 2: Evaluation of a Local Wastewater Treatment Plant 2-1
Regulatory Compliance 2-1
Treatment Processes 2-1
Land Application 2-4
Infiltration Basins 2-4
Subsurface Infiltration Galleries 2-4
Constructed Treatment Wetlands 2-4
Groundwater Quality Requirements 2-5
Surface-Water Discharge 2-5
Phased Implementation 2-5
Preliminary Conclusions 2-6
CHAPTER 3—COST ANALYSIS 3-1
Capital Cost Comparison for Connection to Yakima 3-1
Operating Cost Comparison for Connection to Yakima 3-1
Local Treatment Alternative 3-2
Operating Cost Comparison for Local MBR Treatment Plant 3-2
Capital Cost Comparison for Local Conventional Activated Sludge Treatment Plant 3-3
Operating Cost Comparison for Local Conventional Activated Sludge Treatment Plant 3-3
Wiley City Local Improvements 3-4
Monthly Cost Summary Table 3-5
CHAPTER 4—STAKEHOLDER AND PUBLIC ENGAGEMENT 4-1
Public Outreach Open House 4-1
Survey Results Summary. 4-1
Public Input and Implications for Project Development 4-2
CHAPTER 5— FUNDING OPPORTUNITIES AND GRANT ANALYSIS 5-1
Washington State Department of Ecology 5-1
USDA Rural Development 5-1
Community Development Block Grant 5-1
Washington State Public Works Board 5-2
Bureau of Reclamation WaterSMART 5-2
EPA Closing America's Wastewater Access Gap Initiative 5-3
Funding Strategy and Implementation 5-3
Agency Coordination and Project Leadership 5-4
Feasibility Findings and Future Work 5-4
41HLA
127
LIST OF TABLES
TABLE 2-1 POTENTIAL SITE SIZE REQUIREMENTS 2-3
TABLE 3-1 PROJECT COST SUMMARY 3-1
TABLE 3-2 CAPITAL COST COMPARISON FOR LOCAL MBR TREATMENT PLANT 3-2
TABLE 3-3 ESTIMATED OPERATING COSTS FOR LOCAL MBR TREATMENT PLANT 3-2
TABLE 3-4 PRELIMINARY CAPITAL COST ESTIMATE 3-3
TABLE 3-5 PRELIMINARY OPERATING COSTS 3-3
TABLE 3-6 PROJECT COST SUMMARY 3-4
TABLE 3-7 MONTHLY COST SUMMARY 3-5
APPENDIX TABLE OF CONTENTS
APPENDIX A-VICINITY MAP
APPENDIX B-COST ESTIMATES
APPENDIX C- PUBLIC OUTREACH
4Z1HLA
128
EXECUTIVE
SUMMARY
INTRODUCTION
AND OBJECTIVE
till,
ter ; • !
r ` • r
. r
Val • *
•
,A:
OH
HLAI2.
t WILEY CITY SEWER SERVICES EVALUATION REPORT
EXECUTIVE SUMMARY
This study evaluates the feasibility of providing sanitary sewer service to Wiley City and the surrounding
Wiley City/Ahtanum area in response to concerns about aging septic systems and reported failures.
Using the Akel Wiley City Capacity Analysis as the planning basis, it compares connection to Yakima's
existing sewer system with development of a local wastewater treatment and disposal facility.
Four Yakima connection alternatives were evaluated. Alternatives A, B, and C have estimated project
costs of approximately$9.33 million to $10.18 million, plus downstream collection system improvements
estimated to be $11.74 million. Alternative D, which incorporates equalization and controlled discharge,
has an estimated cost of$13.37 million. However, the $11.74 million downstream improvements are
expected to be avoided, subject to establishing an acceptable discharge rate and storage volume with
Yakima.
Local treatment alternatives include conventional activated sludge and membrane bioreactor facilities,
with estimated project costs of$32.47 million and $39.59 million, respectively. Their feasibility depends
on identifying suitable land and reliable year-round effluent management. Soil and groundwater
conditions, seasonal storage needs, and receiving-water impairments will constrain disposal options.
All estimates include the local collection system and the estimated cost of land acquisition for each
alternative, but exclude private property connection expenses, and applicable City connection charges.
Household costs would depend on financing, grant assistance, customer participation, and operating
requirements. Public outreach identified concerns among participants about affordability and replacing
existing septic service. Potential funding sources are identified, but eligibility and awards remain
unconfirmed.
The Ahtanum Irrigation District (AID) intends to take the lead in advancing the project and, as of October
2026, is pursuing formation of a utility district. The City of Yakima and Yakima County will continue to
support AID as the project moves forward.
The study indicates that sanitary sewer service to Wiley City is potentially feasible through either
connection to Yakima or development of a local treatment facility.Alternative D offers the lowest
estimated capital cost, contingent on confirming that equalization and controlled discharge can avoid
downstream Yakima improvements. Local treatment remains a potential alternative where suitable land
and reliable effluent disposal can be secured. Advancing the project will require confirmation of these
conditions and a funding strategy that addresses customer affordability. The next phase should refine
facility requirements, capital and operating costs, and ownership responsibilities to support selection of a
preferred alternative and development of an implementation plan.
INTRODUCTION
The City of Yakima (COY) is evaluating the feasibility of extending sanitary sewer service to Wiley City's
Limited Area of More Intensive Rural Development (LAMIRD) and the surrounding Wiley City/Ahtanum
area. Concerns regarding aging septic systems and reported failures have prompted consideration of
long-term wastewater service alternatives to address potential public health and environmental impacts.
This study evaluates connection to Yakima's existing sewer system and development of a local
wastewater treatment and disposal facility. The evaluation considers conceptual conveyance alternatives,
treatment technologies, effluent disposal options, preliminary capital and operating costs, regulatory and
ownership considerations, community input, and potential funding sources.
The Akel Wiley City Capacity Analysis provides the planning basis for the service area, wastewater flow,
and downstream collection system assumptions used in this study. Additional assumptions specific to the
alternatives and financial evaluation are identified in the applicable sections. In general, the community
currently has about 150 residential services, about 10 commercial type services, 1 industrial facility, and 1
COLA
130
t WILEY CITY SEWER SERVICES EVALUATION REPORT
elementary school included in a total of 363-acres. The estimated flow from these facilities is 30,000 gpd
from the residential and commercial connections, 50,000 gpd from the industry, and 20,000 gpd from the
school. The industry is operational 24 hours per day and discharges a consistent flow rate, while the
other services have a higher diurnal variation throughout the day.
For planning and financial evaluation, the initial customer base is represented by 600 equivalent
residential units (ERUs), including residential customers and the equivalent wastewater contributions from
commercial users, the industrial facility, and the school. The ERU total represents equivalent wastewater
demand rather than the number of individual service connections. At an assumed flow of 190 gpd per
ERU, these 600 ERUs represent an initial planning flow of approximately 114,000 gpd. The financial
evaluation uses 600 contributing ERUs to allocate estimated operating costs and debt repayment.
Future buildout and infill development are projected to at least double existing wastewater flows and
could ultimately increase flows to approximately 2,100 ERUs (400,000 gpd) based on the Akel report
calculations using an estimated flow per acre. These future growth projections are considered separately
from the initial customer base when evaluating long-term capacity and storage requirements. Additional
assumptions specific to individual alternatives and the financial evaluation are identified in the applicable
sections.
The study was prepared under the following tasks:
• Task 1: Assessment of Connecting to the Existing City of Yakima Sewer System.
• Task 2: Evaluation of a Local Wastewater Treatment System.
• Task 3: Stakeholder Engagement and Public Outreach.
OBJECTIVE
The objective of this study is to determine whether the identified wastewater service alternatives are
reasonably feasible, compare their advantages, constraints, and preliminary costs, and identify the next
steps needed to advance the project.
The evaluation uses available information, conceptual layouts, and planning-level assumptions
appropriate for a feasibility study. Its findings are intended to guide selection of alternatives for further
evaluation and support future planning and funding decisions. Remaining uncertainties that could
materially affect implementation are identified for resolution during subsequent phases.
OHLA
131
CHAPTER 1
CONNECTION TO
EXISTING YAKIMA
SEWER SYSTEM
Llk
tk
till,
ter ; • !
r • soirn
r
. r
.0
OHLA
132
t WILEY CITY SEWER SERVICES EVALUATION REPORT
CHAPTER 1 —CONNECTION TO EXISTING YAKIMA SEWER SYSTEM
Task 1: Assessment of Connecting to the Existing City of Yakima Sewer System
Four conceptual conveyance alternatives were evaluated for connecting Wiley City to the existing City of
Yakima sewer system. The alternatives consider gravity conveyance, pumped conveyance, and
equalization to manage the timing and rate of discharge. The Akel Wiley City Capacity Analysis provides
the basis for the wastewater flow and downstream collection system assumptions used in this evaluation.
The alternatives include:
• Alternative A: Gravity Sewer through the Former Trolley Corridor.
• Alternative B: Force Main through the Former Trolley Corridor.
• Alternative C: Force Main along South Wiley Road and Ahtanum Road.
• Alternative D: Pumping to Equalization Storage with Gravity Conveyance through the Former
Trolley Corridor.
These alternatives are shown on the Wiley City Site Map included in this report.
Alternative A: Gravity Sewer through the Former Trolley Corridor
Alternative A would convey wastewater by gravity through the former trolley corridor to Yakima's existing
sewer system near Ahtanum Road. A spot survey was completed to evaluate elevations along the
proposed alignment. The surveyed elevations indicate that the terrain provides sufficient grade for gravity
conveyance at a conceptual level. Pipe slopes, burial depths, and connection elevations would be refined
during subsequent design.
The corridor is identified in this study as existing Yakima County right-of-way and is currently farmed as
agricultural ground. Access through the corridor would likely need to be reestablished to allow City
personnel and equipment to inspect, maintain, and repair the sewer facilities. The necessary access
improvements and property rights would be confirmed during subsequent project development.
Alternative B: Force Main through the Former Trolley Corridor
Alternative B would include a centralized lift station and force main to convey wastewater from Wiley City
to Yakima's existing sewer system. The force main would generally follow the same corridor as
Alternative A. Pumped conveyance would provide flexibility in pipeline elevations but would require
ongoing power, equipment maintenance, and periodic replacement of pumping components.
Alternative C: Force Main along South Wiley Road and Ahtanum Road
Alternative C would include a centralized lift station and force main extending north along South Wiley
Road and east along Ahtanum Road, connecting to Yakima's existing sewer system at the manhole on
the south side of Ahtanum Road near South 86th Avenue. This alignment would follow the roadway
corridor and require coordination with existing utilities, roadway restoration, and maintenance of traffic
and property access during construction.
Alternative D: Pumping to Equalization Storage with Gravity Conveyance through the Former
Trolley Corridor
Alternative D would include a lift station that pumps wastewater into equalization storage, followed by
controlled discharge through a gravity sewer generally following the Alternative A corridor. Equalization
would temporarily store wastewater and regulate its release to reduce the flow contributed to Yakima's
collection system during peak periods. The potential effect on downstream improvement requirements is
discussed below.
OHLA
133
t WILEY CITY SEWER SERVICES EVALUATION REPORT
Yakima Improvements
Based on the adopted Akel planning analysis, additional downstream collection system improvements are
needed to accommodate Wiley City wastewater flows under Alternatives A, B, and C. A planning-level
allowance of approximately$12 million is included for these improvements in the cost comparison.
Alternative D would use aerated equalization storage to hold wastewater during peak periods and release
it at a controlled rate when capacity is available in Yakima's collection system. For this feasibility
evaluation, Alternative D assumes that controlled discharge would avoid the downstream improvements
included in the other alternatives to serve the current needs. Confirmation of an acceptable discharge rate
and corresponding storage volume would be necessary before advancing this alternative. The estimated
cost savings are therefore conditional on the ability to operate within those limits. A significant increase in
ERU's within the service area or a change in City of Yakima's ability to accept this flow could impact this
approach. This approach could, at a minimum, delay City of Yakima collection system improvements or
be viable until a local treatment solution is constructed and commissioned.
Alternative Comparison
The former trolley corridor appears to be the most economical conveyance alignment based on the
preliminary cost estimates. Compared with the South Wiley Road and Ahtanum Road alignment, it would
generally reduce roadway construction, pavement restoration, and conflicts with existing utilities. Both
gravity and pumped conveyance remain feasible options, subject to confirmation of property rights and
the improvements needed to establish maintenance access.
Alternative D has the lowest estimated capital cost of the alternatives evaluated, assuming equalization
and controlled discharge would avoid the downstream Yakima improvements. Its overall economic
feasibility depends on confirmation of this assumption and consideration of land acquisition, maintenance
access, and ongoing pumping and equalization costs. Chapter 3 presents the preliminary cost
comparison.
To prevent odors from the equalization tanks, a system consisting of blower and aerators is anticipated to
be needed. Likewise, a H2S control system may be necessary to prevent corrosion and odor issues at
the discharge into the City of Yakima collection system depending upon flow rate and duration in the
conveyance pipe if a force main is used to convey the wastewater from the community. However, if a
gravity convenance pipe is used a H2S control system is not anticipated to be needed.
OHLA 1-2
134
CHAPTER 2
EVALUATION OF
A LOCAL
WASTEWATER
TREAMTMENT
PLANT
Llk
t_" ' N'T tilI,
f, .r ; '
0r ` • r
. r
r.
lik
r.
!' fI; �'..•..•-• ' , i
\,,,'� FJI,�,r.,A: L.i7 4
135
WILEY CITY SEWER SERVICES EVALUATION REPORT
CHAPTER 2— EVALUATION OF A LOCAL WASTEWATER TREATMENT PLANT
Task 2: Evaluation of a Local Wastewater Treatment Plant
Regulatory Compliance
The feasibility of a local wastewater treatment facility depends on identifying a suitable treatment site and
a reliable method of managing treated effluent throughout the year. The selected discharge or reuse
approach will establish the applicable treatment requirements and influence facility size, operating
complexity, land requirements, and cost.
Local waterways have limited seasonal flows, which will constrain their ability to receive treated
wastewater. Surface-water discharge could require stringent effluent limits, particularly during periods of
low streamflow and elevated temperature. Groundwater infiltration and land application provide potential
alternatives but depend on suitable soils, groundwater conditions, available land, and protection of water
quality.
This study considers these constraints at a feasibility level. Site-specific investigations and coordination
with the Washington State Department of Ecology would be needed during subsequent planning to
establish applicable discharge requirements and confirm the suitability of the selected approach.
Treatment Processes
Two treatment technologies were evaluated for a local wastewater treatment facility rated for 200,000
gpd:
• Treatment Alternative 1: Conventional Activated Sludge.
• Treatment Alternative 2: Membrane Bioreactor(MBR).
Both technologies use biological treatment to remove wastewater constituents. Conventional activated
sludge typically uses secondary clarification to separate solids from treated wastewater, while MBR uses
membrane filtration. Either process may require additional treatment features to meet the requirements of
the selected discharge or reuse approach.
The following sections compare the technologies and identify potential effluent management methods.
Final process selection would depend on the treatment requirements, site constraints, capital and
operating costs, and operational capabilities of the future utility.
Treatment Alternative 1 —Conventional Activated Sludge
A conventional activated sludge facility would use biological treatment followed by secondary clarification
to separate solids from treated wastewater. Depending on the selected discharge or reuse approach, the
facility may also require nutrient removal, filtration, and disinfection.
Limited seasonal streamflow may result in discharge requirements that a conventional secondary
treatment process alone cannot meet. However, these constraints do not independently eliminate
conventional activated sludge as a feasible alternative. Additional treatment could be incorporated where
necessary, with associated increases in capital cost and operating requirements.
Conventional activated sludge remains a potential local treatment alternative. Its feasibility and cost would
depend on the complete treatment process needed to support the selected effluent management
approach.
OHLA 2-1
136
t WILEY CITY SEWER SERVICES EVALUATION REPORT
Treatment Alternative 2—Membrane Bioreactor
An MBR facility would combine biological treatment with membrane filtration to separate solids from
treated wastewater. This process can produce effluent with low suspended solids concentrations and may
offer advantages where available land is limited, or a higher level of effluent quality is needed for
discharge or reuse.
Although MBR treatment can produce high-quality effluent, it does not inherently reduce effluent
temperature sufficiently to satisfy surface-water discharge requirements. Limited streamflow and elevated
receiving-water temperatures will constrain discharge during warmer months. Potential approaches
include groundwater infiltration, seasonal land application, or storage during periods when surface-water
discharge is restricted. The feasibility of these approaches would depend on site conditions, available
land, seasonal capacity, and applicable permitting requirements. Nutrient removal, disinfection, and
membrane maintenance and replacement would also need to be addressed in evaluating the complete
treatment system.
MBR remains a potential local treatment alternative, particularly where effluent quality or site constraints
favor membrane filtration. Its benefits should be evaluated against the capital and operating costs of a
conventional activated sludge facility configured to meet the same treatment requirements.
Effluent Management Alternatives
A local wastewater treatment facility would require a reliable approach for managing treated effluent
throughout the year. Potential methods include evaporation, groundwater infiltration, land application, and
surface-water discharge. A combination of methods may be necessary to accommodate seasonal
conditions. The following is based on the value of an Equivalent Residential Unit (ERU) generating 190
gallons of wastewater per day, and a service area with a total of 600 ERUs (114,000 gpd).
1. Evaporation Ponds
Treated effluent could be retained in ponds for disposal through evaporation. The preliminary
estimate identifies approximately 40 acres for the May through October period. Evaporation alone
would not establish a year-round disposal solution; a storage basin with a capacity of 20-million
gallons or another disposal method would be needed during periods when evaporation is
insufficient during winter months. A winter storage lagoon has a high risk of generating odors
during spring and will need to include adequate mixing to mitigate.
2. Groundwater Infiltration
Treated effluent could be discharged through infiltration basins or subsurface galleries where soil
and groundwater conditions are suitable. Feasibility would depend on infiltration capacity,
seasonal groundwater elevations, available area, and groundwater protection requirements. Any
cooling benefit would require site-specific evaluation.
3. Land Application
Treated effluent could be applied to suitable agricultural land during periods when soil conditions
and crop needs allow. Preliminary land requirements are approximately 20 to 40 acres,
depending on the crop and allowable application rate. Storage or another disposal method would
be necessary when land application is unavailable.
4. Surface-Water Discharge
Treated effluent could potentially be discharged to a local waterway, subject to applicable
discharge requirements. Limited seasonal streamflow and temperature constraints will restrict this
approach during warmer months. Surface-water discharge could remain a supplemental or
seasonal option if an acceptable discharge location and operating period can be established.
5. Potential Site Size Requirements
Preliminary land requirements for the treatment facilities and effluent management alternatives
are summarized below. These estimates provide a basis for screening potential sites and
comparing alternatives:
OHLA 2-2
137
t WILEY CITY SEWER SERVICES EVALUATION REPORT
TABLE 2-1 POTENTIAL SITE SIZE REQUIREMENTS
Alternative Preliminary Site Requirement
Conventional Activated Sludge Facility 10 acres
MBR Treatment Facility 5 acres
Evaporation Ponds 40+ acres (May—October) +winter storage or
discharge alternative
Subsurface Infiltration Gallery 5+ acres initially (depending upon infiltration rate)
Land Application 20-40 acres, depending on crop
Surface-Water Discharge Not applicable
The total site area would include land for both treatment and the selected effluent management method,
with additional space as needed for seasonal storage, access, setbacks, buffers, and future expansion.
These planning estimates would be refined during subsequent site evaluation based on wastewater flows,
facility layout, soil conditions, seasonal groundwater elevations, and applicable discharge requirements.
The evaporation pond estimate addresses only the identified seasonal period and does not include the
additional facilities needed to provide year-round effluent management.
Regulatory Requirements for Alternatives
Permitting requirements for a local wastewater treatment facility would depend on the selected effluent
management method and receiving environment. Applicable land treatment systems would be evaluated
using the Washington State Department of Ecology's Land Treatment System Engineering and Design
Guidance, Publication 25-10-021 (the "Green Book"). The principal permitting pathways include:
Groundwater discharge. Land application and infiltration systems that discharge wastewater to
groundwater generally require a State Waste Discharge Permit. Subsurface infiltration galleries may also
be subject to Underground Injection Control requirements, including registration and protection of
groundwater quality.
Surface-water discharge. Direct discharge of treated wastewater to a local stream would require a
National Pollutant Discharge Elimination System (NPDES) permit. Treatment requirements would reflect
the receiving water's conditions and applicable water-quality standards.
Reclaimed-water use. Production and distribution of reclaimed water for beneficial use would require
evaluation under Washington's reclaimed-water requirements. The proposed use would determine the
applicable treatment and management provisions, with review by Ecology and the Department of Health.
Ecology's Land Treatment System Engineering and Design Guidance, Publication 25-10-021 (January
2026), provides guidance for land application and infiltration lagoon systems. Separate guidance and
requirements would apply to subsurface infiltration galleries and reclaimed-water uses.
Constructed treatment wetlands may provide treatment or polishing, but their permitting pathway would
depend on the system configuration and ultimate discharge location. A constructed treatment wetland
should be distinguished from a discharge to an existing natural wetland.
Coordination with Ecology during subsequent planning would establish the applicable permitting pathway
and preliminary treatment requirements for the selected concept. This feasibility study identifies potential
approaches; it does not establish final effluent limits or discharge authorization.
OHLA 2-3
138
} , l•1�..
t WILEY CITY SEWER SERVICES EVALUATION REPORT
Land Application
Land application requires sufficient suitable acreage to accommodate treated effluent at rates consistent
with crop needs, soil conditions, and groundwater protection. Seasonal limitations would require storage
or another permitted disposal method when irrigation is unsuitable.
Based on preliminary wastewater flow calculations for buildout of the study area, approximately 30-million
gallons of storage would be required during mid-October through mid-March. The associated land
requirements and construction costs would be substantial. The required storage period could extend
beyond these months depending on weather, soil conditions, and the selected crop.
Additionally, storing treated wastewater during the winter months for future irrigation will require storage
basins, or lagoons. These storage basins/lagoons have an inherent odor risk, even if they are equipped
with mixing to help mitigate against potential odor issues and risks. A storage pond with a volume of 30-
million gallons will require approximately 20-acres, assuming a depth of 8-feet.
Land application may therefore be more practical as a seasonal component of a broader effluent
management approach than as the sole disposal method. Further evaluation would establish the
available application season, suitable acreage, and storage or alternate disposal needs.
Infiltration Basins
Infiltration basins are shallow, unlined impoundments that receive treated wastewater and allow it to
percolate through the underlying soil. Their suitability depends on soil permeability, seasonal groundwater
elevations, available land, and the ability to protect groundwater quality.
Infiltration basins could provide a year-round effluent management option at a suitable site. Preliminary
evaluation would need to consider seasonal capacity and sufficient area to allow individual basins to be
maintained. The required level of treatment before discharge would depend on site conditions and
applicable groundwater protection requirements.
Subsurface Infiltration Galleries
Infiltration galleries distribute treated wastewater below ground through perforated piping, similar to the
dispersal component of an onsite septic system. Their feasibility depends on soil permeability, seasonal
groundwater elevations, adequate separation from groundwater, and sufficient area to accommodate the
proposed flow.
For this study, infiltration galleries remain a potential effluent disposal method, subject to site-specific
evaluation. Shallow groundwater will constrain their location and capacity. Further evaluation would be
needed to determine whether subsurface infiltration would provide sufficient cooling to address applicable
temperature requirements.
The permitting approach would be coordinated with Ecology and would address applicable State Waste
Discharge Permit and Underground Injection Control requirements. Site-specific investigation and
confirmation of allowable loading rates would occur during subsequent planning.
Constructed Treatment Wetlands
Constructed treatment wetlands use vegetation, soils, and biological processes to provide additional
treatment of wastewater. Depending on the configuration, treated effluent may subsequently infiltrate into
the ground or discharge to surface water.
A constructed wetland could form part of a local treatment and effluent management system. Its feasibility
would depend on available land, seasonal treatment performance, soil and groundwater conditions, and
the requirements of the ultimate discharge location. Further evaluation would be needed to determine the
OHLA 2-4
139
} , l•1�..
t WILEY CITY SEWER SERVICES EVALUATION REPORT
treatment benefit and whether the system could provide sufficient cooling to address applicable
temperature requirements.
Groundwater Quality Requirements
Washington's groundwater quality standards are established under Chapter 173-200 WAC. Criteria
relevant to the preliminary evaluation of wastewater disposal include:
• Nitrate (as N): 10 mg/L
• Total coliform bacteria: 1/100 mL
• Total dissolved solids: 500 mg/L
• pH: 6.5-8.5 standard units
These values are groundwater quality criteria, rather than established effluent limits for the proposed
facility. Applicable discharge limits and treatment requirements would be determined through Ecology's
permitting process based on existing groundwater quality, site conditions, and the proposed disposal
method.
Washington's groundwater antidegradation requirements also protect existing groundwater quality.
Accordingly, meeting the listed numeric criteria alone may not establish an acceptable discharge.
Subsequent evaluation would determine the treatment and monitoring necessary to protect groundwater
and any connected surface waters.
Surface-Water Discharge
Discharge of treated wastewater to a local waterway would require an NPDES permit issued by Ecology.
Applicable effluent limits would depend on receiving-water conditions, water-quality standards, and any
relevant total maximum daily load (TMDL) requirements.
Bachelor Creek has multiple identified water-quality impairments, including temperature. These
impairments, combined with limited seasonal streamflow and little available capacity for dilution, will
constrain the timing, volume, and quality of treated effluent that could be discharged. Temperature
requirements would be a particular consideration during warmer months.
Surface-water discharge remains a potential seasonal or supplemental effluent management option.
Further evaluation would identify a suitable discharge location and determine whether the anticipated
effluent quality and temperature could meet applicable requirements. Storage or another disposal method
would be needed during periods when surface-water discharge is unavailable.
Phased Implementation
Equalization storage could be constructed as an initial phase to support connection of the Wiley City
collection system to Yakima's sewer system. The facility would include mixing and aeration to limit solids
settling and septic conditions, with controlled discharge at a rate acceptable to the City.
This approach could allow sewer service to begin before a local treatment facility is constructed and
spread capital expenditures over multiple phases. A local treatment facility could subsequently be
developed as funding becomes available, and a suitable treatment site and effluent disposal approach
are established.
Further evaluation would determine whether the initial equalization and conveyance facilities could be
incorporated into the long-term system and whether the phased approach offers an overall cost and
schedule advantage. The timing of service would depend on funding, property acquisition, permitting, and
City acceptance of the proposed discharge. Refer to cost estimates for alternatives in Chapter 3 and
appendix.
OHLA 2-5
140
} , l•1�..
t WILEY CITY SEWER SERVICES EVALUATION REPORT
Preliminary Conclusions
A local wastewater treatment facility remains a potential alternative for serving Wiley City. Its feasibility
will depend on identifying a suitable site and a reliable year-round effluent management approach.
Groundwater infiltration warrants further evaluation, with seasonal land application and surface-water
discharge retained as potential supplemental options.
Available well logs indicate groundwater may occur as shallow as approximately 8 feet below ground
surface. Site-specific evaluation would be needed to determine whether suitable soils, groundwater
separation, and infiltration capacity are available. Further evaluation would also determine whether
subsurface infiltration could provide sufficient cooling to address applicable temperature requirements.
Both conventional activated sludge and MBR treatment remain viable technologies for further
consideration. MBR may offer advantages where higher effluent quality or a smaller treatment footprint is
needed. The selected disposal method and associated treatment requirements will determine whether
those advantages justify its additional capital and operating costs.
The next phase should focus on potential treatment sites, the capacity and seasonal availability of the
proposed disposal methods, and preliminary coordination with Ecology. That information would support
refinement of the treatment alternatives and a comparison of complete treatment and disposal costs.
OHLA 2-6
141
CHAPTER 3
COST ANALYSIS
t_" ' till,
.11 di
r +
r '. 000 +l
j I
ter ; • !
0 r ` : r
. r
A.
°100. + Nillilir•
NI fl
l r Ff ''rJR:kl 1.il .r
HLAI4.
t WILEY CITY SEWER SERVICES EVALUATION REPORT
CHAPTER 3—COST ANALYSIS
The estimated construction cost includes physical construction, a 20% contingency, and applicable sales
tax. The total estimated project cost also includes engineering, funding administration, and construction
engineering.
Capital Cost Comparison for Connection to Yakima
The estimated capital costs for connecting Wiley City to Yakima's sewer system are summarized below.
Construction costs represent the proposed conveyance improvements, while total project costs include
engineering, funding administration, and construction engineering.
All alternatives also require a local collection system within Wiley City, estimated at$7.3 million. This
common cost is presented separately under Wiley City Local Improvements and included in the Project
Cost Summary.
Alternatives A, B, and C include an additional $11.74 million allowance for downstream improvements to
Yakima's collection system that are identified in the Akel report. Alternative D assumes equalization and
controlled discharge would avoid those improvements, subject to the conditions described in Chapter 1.
These downstream costs are presented separately in the Project Cost Summary.
TABLE 3-1 PROJECT COST SUMMARY
Wiley City Connection City of Yakima Total
Alternative Local to City of Improvement Estimated
Improvements Yakima Costs Cost
A- Gravity sewer through the $7,290,000 $2,040,000 $11,740,000 $21,070,000
former trolley corridor
B- Force main through the $7,290,000 $2,310,000 $11,740,000 $21,340,000
former trolley corridor
C- Force main along South
Wiley Road and Ahtanum $7,290,000 $2,890,000 $11,740,000 $21,920,000
Road
D— Lift station, equalization
storage, and gravity sewer $7,290,000 $6,080,000 $0 $13,370,000
through the former trolley
corridor
Alternative cost estimates are included in the report appendix.
Operating Cost Comparison for Connection to Yakima
For this feasibility evaluation, the estimated Yakima sewer service charge is approximately $82 per month
per equivalent residential unit (ERU). This estimate uses the rate assumptions below, including the 1.5
multiplier for service outside city limits:
• Base charge: $26.12 per month.
• Assumed flow charge based on 7.5 CCF: $3.81/CCF x 7.5 CCF= $28.58 per month.
• Outside-city service charge: ($26.12 + 28.58) x 1.5 = $82.05 per month.
The estimated one-time City connection charge is approximately$4,320 per ERU, calculated as ($2,827
+ $53.05) x 1.5. This charge is separate from the cost of private service piping, septic system
decommissioning, and other work necessary to connect individual properties.
OHLA 3-1
143
} , l•1�..
WILEY CITY SEWER SERVICES EVALUATION REPORT
Total monthly household costs would include the sewer service charge, repayment of financed project
costs, and any additional charges needed to operate and maintain the local collection, pumping, and
equalization facilities. Debt repayment would depend on the selected alternative, grant assistance,
financing terms, and number of contributing ERUs. These costs are compared in the Monthly Cost
Summary.
The rate assumptions used in this evaluation would be confirmed with the City during subsequent project
development.
Local Treatment Alternative
A local treatment alternative includes the construction of a collection system within the community service
area, a treatment facility, and effluent discharge system. The collection system alternatives were
presented previously. The two treatment system alternatives considered for this feasibility study include a
Membrane Bioreactor estimated to require a 5-acre site, and a conventional activated sludge facility using
aeration basins and secondary clarifiers estimated to require a 10-acre site. For this study, the estimated
costs to construct a 5-acre infiltration gallery on a 10-acre site are included as the basis for the total
project cost estimated to be $4,500,000.
TABLE 3-2 CAPITAL COST COMPARISON FOR LOCAL MBR TREATMENT PLANT
Facility Treatment Facility with Collection Estimated Project
Effluent Discharge System Cost
Membrane Bioreactor $32,300,000 $7,290,000 $39,590,000
Treatment Plant
The estimated construction cost represents the anticipated contractor cost to build the facility. The total
estimated project cost includes construction plus allowances for land development.
The estimate will be refined as the treatment site, process requirements, and effluent management
approach are established during preliminary design efforts.
Operating Cost Comparison for Local MBR Treatment Plant
Preliminary operating costs for a local MBR treatment facility are estimated below, assuming 600
contributing ERUs.
TABLE 3-3 ESTIMATED OPERATING COSTS FOR LOCAL MBR TREATMENT PLANT
Cost Component Planning Assumption Monthly Cost per ERU
Power 110,000 kWh per month at$0.06/kWh $11.00
Chemicals $300 per month $0.50
Equipment maintenance Annual allowance of 8% of$2 million in $22.25
equipment costs
Labor 1.5 full-time equivalent positions at a $31.25
burdened annual cost of$150,000 ea.
Total $65.00
The estimated treatment facility operating cost is approximately $65 per month per ERU, excluding
repayment of capital costs. Actual operating costs would depend on the selected equipment, staffing
approach, treatment requirements, and effluent management method. Debt repayment is presented
separately in the Monthly Cost Summary.
c -ILA 3-2
144
t WILEY CITY SEWER SERVICES EVALUATION REPORT
Capital Cost Comparison for Local Conventional Activated Sludge Treatment Plant
The preliminary capital cost estimate for a local conventional activated sludge treatment facility is
summarized below.
TABLE 3-4 PRELIMINARY CAPITAL COST ESTIMATE
Treatment Facility Estimated Project
Facility with Effluent Collection System Cost
Discharge
Conventional Activated $25,180,000 $7,290,000 $32,470,000
Sludge Treatment Plant
The estimated construction cost includes physical construction, a 20% contingency, and applicable sales
tax. The total estimated project cost also includes engineering, funding administration, and construction
engineering.
The estimate would be refined as the treatment site, process requirements, and effluent management
approach are established.
Operating Cost Comparison for Local Conventional Activated Sludge Treatment Plant
Preliminary operating costs for a local conventional activated sludge treatment facility are estimated
below, assuming 600 contributing ERUs:
TABLE 3-5 PRELIMINARY OPERATING COSTS
Cost Component Planning Assumption Monthly Cost per ERU
Power 72,000 kWh per month at$0.06/kWh $7.20
Chemicals $300 per month $0.50
Equipment maintenance Annual allowance of 8% of$1.5 million in $16.67
equipment costs
Labor 1.5 full-time equivalent positions at a $31.25
burdened annual cost of$150,000 ea.
Total $55.62
The estimated treatment facility operating cost is approximately $56 per month per ERU, excluding
repayment of capital costs. Actual operating costs would depend on the selected equipment, staffing
approach, treatment requirements, and effluent management method. Debt repayment is presented
separately in the Monthly Cost Summary.
OHLA 3-3
145
t WILEY CITY SEWER SERVICES EVALUATION REPORT
Wiley City Local Improvements
All alternatives require a local sewer collection system to convey wastewater from properties within the
study area to the selected conveyance or treatment facilities. Improvements would include gravity sewer
mains, manholes, and associated roadway and surface restoration.
TABLE 3-6 PROJECT COST SUMMARY
Total Monthly Monthly charges Total Monthly Loan
Infrastructure Operating Costs paid to Yakima Payment for
Improvement per ERU per ERU3 Infrastructure
Costs Improvements4
Yakima Connection $21,070,000 $11 $82 $117.00
Alternative A
Yakima Connection $21,340,000 $21 $82 $119.00
Alternative B
Yakima Connection $21,920,000 $21 $82 $122.00
Alternative C
Yakima Connection $82 while
Alternative D' $13,370,000 $21 discharging to $75.00
Yakima
Local Conventional
Activated Sludge $32,470,000 $67 $0 $180.00
Treatment Plante
Local MBR Treatment $39,590,000 $76 $0 $220.00
Plante
Alternative D assumes equalization and controlled discharge would avoid downstream Yakima improvements,subject to the
conditions described in Chapter 1.
2 Effluent discharge alternative to City of Yakima is not included in the estimated project cost.
3 Lower rates may be able to be negotiated with City of Yakima if local collection system is owned or maintained by AID.
°Loan payment based on 100%of capital costs financed at 1.2%interest for 30 years and 600 ERUs
5Includes improvements in City of Yakima collection system estimated to be$11.74 million.
Private property connection expenses and applicable City connection charges are separate from the
project costs shown above. The following monthly cost comparison illustrates how grant assistance and
financing could affect the cost per ERU for the alternatives evaluated.
OHLA 3-4
146
t WILEY CITY SEWER SERVICES EVALUATION REPORT
Monthly Cost Summary Table
The following table compares estimated monthly costs per ERU under illustrative grant funding scenarios.
Calculations assume 600 contributing ERUs, a 1.20% annual interest rate, and a 30-year repayment
period with monthly payments. Grant assistance is applied to the total estimated project cost, with the
remaining balance financed.
TABLE 3-7 MONTHLY COST SUMMARY
Operating Cost Percentage of Loan Repayment Total Monthly
Alternative per Month Project Covered Amount per Cost
by Grant Month
0% $117.00 $210.00
Yakima Connection $93 25% $87.75 $180.75
Alternative A 50% $58.50 $151.50
75% $29.25 $122.25
0% $119.00 $222.00
Yakima Connection $103 25% $89.25 $192.25
Alternative B 50% $59.50 $162.50
75% $29.75 $132.75
0% $122.00 $225.00
Yakima Connection $103 25% $91.50 $194.50
Alternative C 50% $61.00 $164.00
75% $30.50 $133.50
0% $75.00 $178.00
Yakima Connection $103 (potential 25% $56.25 $159.25
Alternative D to negotiate
lower w/COY) 50% $37.50 $140.50
75% $18.75 $121.75
Local Conventional 0% $180.00 $247.00
Activated Sludge $67.00 250% $135.00 $202.00
Treatment Plant 50/° $90.00 $157.00
75% $45.00 $112.00
0% $220.00 $296.00
Local MBR 25% $165.00 $241.00
Treatment Plant $76.00 50% $110.00 $186.00
75% $55.00 $131.00
'Includes monthly operating costs per ERU and monthly charges paid to Yakima per ERU,as shown in Table 3-6.
The Yakima Alternative D assumes that equalization and controlled discharge would avoid downstream
Yakima improvements.
These scenarios illustrate the effect of grant assistance and do not represent confirmed funding
availability or proposed sewer rates. Actual household costs would depend on funding awards, financing
terms, customer participation, and the final operating budget. Private property connection expenses, and
applicable City connection charges are excluded.
4iHLA 3-5
147
CHAPTER 4
STAKEHOLDER
AND PUBLIC
ENGAGEMENT
till,
ter ; • !
r ` • r
. r
Val • *
•
,A:
OH LA
148
AII6k WILEY CITY SEWER SERVICES EVALUATION REPORT
(73
CHAPTER 4—STAKEHOLDER AND PUBLIC ENGAGEMENT
Public Outreach Open House
An open house for the Wiley City Sewer Services Evaluation was held on June 18, 2026, from 4:00 to
7:00 p.m. at the West Valley Fair in Wiley City. The event introduced the study, presented potential sewer
service alternatives, and gathered input from residents and affected property owners.
Display boards included a study-area map, potential benefits of sewer service, and preliminary alternative
costs. English and Spanish flyers were distributed through Ahtanum Valley Elementary School, and
informational mailers were sent to properties within the study area. Public outreach display boards and
mailers are included in the report appendix.
The open house used an informal discussion format, allowing attendees to speak directly with project
team members, ask questions, and discuss their concerns. Participants were also invited to complete a
survey about existing wastewater service, preferences, connection costs, and monthly charges.
Fourteen voluntary survey responses were received, including one in Spanish. The results summarize the
views of participating respondents and are not statistically representative of the broader community. They
provide useful information about public concerns but do not establish service-area household income or
funding eligibility.
Survey Results Summary:
A total of 14 survey responses were received during the public outreach process and are included in the
report appendix.
Question 1 — Do you prefer on-site septic or sanitary sewer service?
Response Number of Respondents
On-site septic 8
Sanitary sewer 5
No response 1
Of the 13 respondents who answered this question, approximately 62% preferred on-site septic systems
and 38% preferred sanitary sewer service. These responses reflect differing preferences among
participants and support continued discussion of existing septic conditions, potential sewer service
benefits, and household costs.
Question 2—What is the maximum payment you could pay for a one-time connection fee to sewer?
Response Number of Respondents
None 5
$1,500 3
$2,500 2
$3,500 1
$4,500 2
$5,000 or more 1
OHLA 4-1
149
} , l•1�..
WILEY CITY SEWER SERVICES EVALUATION REPORT
Five respondents, approximately 36%, indicated they could not pay a one-time connection fee. Three
respondents identified amounts at or above the estimated $4,320 City connection charge. That charge
does not include private service piping, septic system decommissioning, or other property-specific
connection expenses.
The responses indicate that initial connection costs are a concern among participants. Further project
development should consider assistance or financing options for household connection expenses in
addition to funding for the public sewer improvements.
Question 3—What is the maximum payment you would be willing to pay for sewer service?
Response Number of Respondents
None 5
$75 per month 5
$125 per month 2
$175 per month 1
$225 per month 0
$275 per month 1
Five respondents indicated they would not be willing to pay a monthly sewer charge, and five identified
$75 per month as their maximum. Together, these responses represent approximately 71% of
participants. Four respondents selected amounts greater than $75 per month.
These responses reflect willingness to pay rather than a verified measure of household financial capacity.
They indicate that monthly charges would be an important consideration for participating residents and
support continued evaluation of grant assistance, financing terms, and opportunities to reduce project and
operating costs.
Public Input and Implications for Project Development
Survey comments identified concerns about both initial connection expenses and ongoing monthly sewer
charges. Some respondents expressed satisfaction with their existing septic systems and questioned the
need to connect to a public sewer system. Others described concerns about accommodating additional
costs within their household budgets.
These comments support continued evaluation of funding approaches that address both public
infrastructure costs and individual household connection expenses. Future outreach should explain the
basis for the project need, anticipated household costs, potential connection requirements, and available
financial assistance as those details become established.
Both conventional activated sludge and MBR treatment should remain under consideration as local
treatment alternatives. Further evaluation should compare complete treatment and disposal systems with
connection to Yakima, considering capital costs, long-term operating requirements, and projected
household charges. Community input should inform that evaluation alongside technical feasibility and
environmental considerations.
OHLA 4-2
150
CHAPTER 5
FUN
OPPORTDING
UNITIES
AND GRANT
ANALYSIS
-
Llk
t_
too
ter ; • !
•
r
N'})
OHLA
151
t WILEY CITY SEWER SERVICES EVALUATION REPORT
CHAPTER 5— FUNDING OPPORTUNITIES AND GRANT ANALYSIS
State and federal funding programs may support the planning, design, and construction of sewer
improvements for Wiley City. Potential sources include the Washington State Department of Ecology,
USDA Rural Development, the Community Development Block Grant program, and the Washington State
Public Works Board. Funding availability and eligibility will depend on the selected alternative, ownership
and operating structure, service-area population and income, project costs, and projected household
sewer charges. Applicant eligibility identified below refers to eligibility to apply. Project eligibility, legal
authority, financial qualifications, and funding availability remain subject to agency review.
Washington State Department of Ecology
Ecology's Water Quality Combined Funding Program is a potential primary funding source for the project.
Through a single application, eligible public entities may request assistance from several programs,
including the Clean Water State Revolving Fund and Centennial Clean Water Program. Eligible activities
include planning, design, and construction of wastewater collection, conveyance, treatment, and
reclaimed-water facilities. Assistance may include low-interest loans, grants, and forgivable principal,
depending on project eligibility, financial hardship criteria, and available funding.
Coordination with Ecology will be necessary to establish the applicable service area and evaluate
financial hardship eligibility under each ownership and treatment alternative. This determination is
particularly important for alternatives involving connection to the City of Yakima or incorporation into a
larger utility system. Potential grant assistance and financing terms should be confirmed before they are
incorporated into projected household sewer charges.
Applicant eligibility:
• Ahtanum Irrigation District:Yes, subject to confirmation of authority to undertake the proposed
wastewater project.
• City of Yakima: Yes.
• Yakima County: Yes.
USDA Rural Development
USDA's Water and Waste Disposal Loan and Grant Program is another potential primary funding source.
The program supports wastewater collection, conveyance, treatment, and disposal facilities serving
eligible rural areas with populations of 10,000 or fewer. Assistance generally consists of long-term loans,
with grants available in certain circumstances to maintain reasonable user costs. Loan repayment periods
may extend to 40 years, depending on the useful life of the financed facilities.
USDA will need to confirm applicant and service-area eligibility, including the eligibility of improvements
within Yakima's existing system. The potential grant and loan combination will depend on USDA's
evaluation of project need, household income, repayment capacity, and long-term financial sustainability.
USDA planning assistance programs should also be evaluated to support the next phase of project
development.
Applicant eligibility:
• Ahtanum Irrigation District:Yes, subject to confirmation of the necessary wastewater and
financing authority.
• City of Yakima: Yes, for improvements serving an eligible rural area.
• Yakima County: Yes, for improvements serving an eligible rural area.
Community Development Block Grant
The Washington State Department of Commerce administers the Community Development Block Grant
program, which provides potential supplemental funding for public infrastructure benefiting low- and
moderate-income residents. General Purpose grants are currently available for up to $2 million,
OHLA 5-1
152
} , l•1�..
t WILEY CITY SEWER SERVICES EVALUATION REPORT
depending on project type and available funding. Yakima County should be evaluated as a potential
applicant for improvements serving unincorporated Wiley City. Special purpose districts cannot apply
directly to the state program but may participate through an eligible city or county.
Eligibility will require an accepted service-area determination and documentation of the income
characteristics of the benefiting population. Coordination with Commerce should establish whether
existing income data is sufficient or if an income survey is necessary. The public outreach completed for
this study provides information regarding community concerns and willingness to pay but does not
establish income eligibility for grant funding.
Applicant eligibility:
• Ahtanum Irrigation District: No direct application. May participate as a subrecipient through an
eligible city, town, or county.
• City of Yakima: No, for the state program. The City receives CDBG entitlement funding directly
from HUD.
• Yakima County: Yes, subject to project and service-area income eligibility.
Washington State Public Works Board
The Public Works Board provides assistance for infrastructure planning, preconstruction, and
construction. Funding generally consists of loans, with grants available to qualifying distressed
communities. Eligible preconstruction activities include engineering, environmental review, permitting, and
other work necessary to prepare the project for construction.
Public Works Board funding should be evaluated for the next phase of planning and for capital costs
remaining after other funding sources are identified. Applicable award limits, repayment terms, grant
eligibility, and funding cycles will need to be confirmed based on the proposed applicant and project
scope.
Applicant eligibility:
• Ahtanum Irrigation District:Yes, subject to confirmation of authority to undertake the proposed
wastewater project.
• City of Yakima: Yes.
• Yakima County: Yes.
Bureau of Reclamation WaterSMART
WaterSMART funding may be applicable if the selected alternative includes a defined water-reclamation
or reuse component. The Title XVI Water Reclamation and Reuse Program provides competitive, cost-
shared assistance for qualifying water recycling projects. Potential applicability to Wiley City could include
supplying reclaimed water to identified irrigation users and demonstrating measurable water-supply
benefits.
Eligibility should not be assumed for wastewater collection and treatment facilities or land application
intended solely for effluent disposal. Further evaluation would be necessary to identify potential users,
quantify reuse demand and benefits, and establish the feasibility of the proposed reclaimed-water system.
Reclamation's eligibility, cost-share, and application requirements would need to be confirmed before this
funding source is incorporated into the project financing plan.
Applicant eligibility:
• Ahtanum Irrigation District:Yes, for a qualifying water-reclamation and reuse project.
• City of Yakima: Yes, fora qualifying water-reclamation and reuse project.
• Yakima County: Conditional, subject to Reclamation confirming the County's eligibility in its
proposed project-sponsor role.
OHLA 5-2
153
AII6k WILEY CITY SEWER SERVICES EVALUATION REPORT
(73
EPA Closing America's Wastewater Access Gap Initiative
This initiative provides no-cost technical assistance to communities with failing septic systems or
inadequate wastewater infrastructure. Assistance includes evaluating wastewater needs and feasible
solutions, assessing affordability, identifying funding sources, and preparing preliminary engineering and
application materials necessary to pursue funding. The initiative supports access to the Clean Water
State Revolving Fund and other funding programs but does not constitute a direct construction funding
commitment.
Participation should be evaluated for Wiley City based on documented septic system conditions and the
community's wastewater infrastructure needs. Assistance could support the ongoing planning effort by
addressing financial feasibility and funding application requirements. Any proposed assistance should be
coordinated with the existing engineering work to address remaining needs and avoid duplication.
Eligibility to request technical assistance:
• Ahtanum Irrigation District:Yes, on behalf of the community.
• City of Yakima: Yes, on behalf of the community.
• Yakima County: Yes, on behalf of the community.
Funding Strategy and Implementation
Development of a funding strategy will require identification of the responsible owner, operator, and
applicant; confirmation of the service boundary and initial customer base; and evaluation of household
income and projected sewer costs. The next phase should also establish the scope and budget for
additional planning and coordinate potential funding sources, application schedules, and project
readiness requirements.
The financial evaluation would consider both grant-assisted and loan-financed scenarios. Projected
household costs must account for debt service, operation and maintenance, reserves, and applicable
connection costs. Potential grant assistance must remain an identified funding opportunity until eligibility
is confirmed and an award is secured.
OHLA 5-3
154
t WILEY CITY SEWER SERVICES EVALUATION REPORT
Agency Coordination and Project Leadership
The Ahtanum Irrigation District (AID) intends to take the lead in advancing sanitary sewer service for
VViley City and the surrounding Ahtanum area. AID is currently pursuing formation of a utility district to
establish the organizational structure and authority for project development and future sewer service.
The City of Yakima and Yakima County will continue to support AID and the development of the project
through ongoing coordination as planning and district formation proceed.
Continued coordination will define responsibilities for funding applications, facility ownership, and long-
term operations. These efforts will support AID's leadership and establish the agreements and service
arrangements needed to advance the project.
Feasibility Findings and Future Work
This study identifies potential approaches for providing sanitary sewer service to Wiley City through
connection to Yakima's existing system or development of a local wastewater treatment and disposal
facility. Both approaches remain feasible, subject to the technical, financial, and organizational conditions
described in this report.
The former trolley corridor appears to provide the most economical conveyance alignment based on the
preliminary estimates. Spot survey elevations support the conceptual feasibility of gravity conveyance,
although maintenance access would need to be reestablished through the currently farmed corridor.
Alternative D has the lowest estimated capital cost, contingent on equalization and controlled discharge
avoiding downstream Yakima improvements. Its overall economic feasibility depends on acceptable
discharge conditions, required storage, property needs, and ongoing operating costs.
Local treatment remains dependent on identifying a suitable site and reliable year-round effluent
management. Conventional activated sludge and MBR treatment are potential technologies, with
selection dependent on discharge requirements, site constraints, and complete treatment and disposal
costs.
Advancing the project would require:
• Establishing the responsible entity for project development, funding applications, ownership, and
operations, including continued coordination regarding the Ahtanum Irrigation District's utility
district formation.
• Confirming acceptable discharge rates and equalization requirements with Yakima.
• Clarifying property rights and maintenance access along the conveyance corridors.
• Further evaluating potential treatment sites and disposal capacity, including seasonal limitations
and applicable permitting requirements.
• Refining capital and operating costs, customer participation assumptions, and household
connection expenses.
• Coordinating funding eligibility and continuing public outreach as project costs and service
arrangements become better defined.
OHLA 5-4
155
APPENDIX A
VICINITY MAP
-
Ll
r jI
•
f, ter • • 0
r‘, Nuoir` : r
r
HLAI..
N
CONNECTION TO CITY OF
YAKI0t,
MA SEWER MAINLINE `/i
71 - „__
____:.__
.......,_
,., , ,
_ ,
---- _,_____ . . _
___ _ . • .
_ . :
AHTANUM RD
. .
__
p
. _
L.
_....,,
4, f � •• r�, — NEW GRAVITY
s- + - - s-s :11.111'
. \, (EWER 7,200 LF) ., ,-`\ ALTERNATIVE A,
_ -- z
:711
J , P ,� �, Q
. - -- SERVICE AREA ~o
BOUNDARY ►� ;' �', co
II Rp �_�_ HAOKETT e �
`Y '' .tee 1 : i /` :
*11111111111.116-
*_; WILEY CITY R ,- , .�,,.,• .�
. .:,,_.,..,,,. .., ___,_._ >- NEW SEWER FORCE . .+•I a I.
-
i ROCKSTROM RD �_
MAIN 7,200 LF •`�i.�=1.'i� i
-� f? -,:, 11 I r (ALTERNATI\_:
,,,,,,� ` . ., Eii,ms-f -. �, E igi
ill'- - - --- -� _1' .` �- v R' i ' tr t f ! ;i HUGHES RI1'
01' I \ S3 NG\4-
1- -1--, � , • �' , ISM i I
r—
1"1ii I I I i I AHTANUM L_J NEW TREATMENT
,, � , " ELEMENTARY NEW TREATMENT
"ti ,`7, SCHOOL PLANT OR EQ
ti gpCHELOR CREEK L`'f ,, . PLANT AND EQ
,,, _ip I TANK SITE OPTION
t: %..%; ZONING: R1 TANK SITE OPTION
,, : _.4,,,, ;I cR • -.-,-� { a, ZONING: R1
'
i__I MCCULLOUGH RD . '-----
— — . ILI
NEW TREATMENT
PROPOSED SEWER
PLANT SITE OPTION COLLECTION , ;yiy I
ZONING: SR SYSTEM o - -b s
J —, Obi • -:ECG', ,' �P` � —I
AN _
rini
i co
HATTON CREEK
MEADOWBROOKRD `'• I •.. �I y.
..ill , 7-• r... ., j vi..":0 f•-•IV .
,j'
RUTHERFORD RD -4:'. I
I
' . WILEY CITY SITE MAP
• 2803 River Road
( l ..�y o zoo 40o eoo ILA Yakima,WA98902
r,..;-.K �:� (509) 966-7000
\ tAIlir; ,yl www.hlacivil.com
".� 157
APPENDIX B
COST
ESTIMATES
r jI
vot
ter ; • !
polo
r
. r
• �
FJI,�, ,A:
0>FILA
HLAI..
CITY OF YAKIMA
Wiley City Sewer Services Evaluation 10/27/2026
Engineer's Opinion of Construction Cost PRELIMINARY
25160E
Item Payment Overall
No. Description Specification Unit Unit Cost Quantity Overall Cost
ALTERNATIVE A-Gravity Sewer Main Via Trolley Line Easement
1 Minor Change 1-04.4(1) FA $25,000.00 1 $25,000.00
2 Mobilization 2-01.5 LS $87,000.00 1 $87,000.00
3 Project Temporary Traffic Control 2-04.5(1) LS $4,000.00 1 $4,000.00
4 Clearing and Grubbing 3-01.5 LS $40,000.00 1 $40,000.00
5 Removal of Structures and Obstructions 3-02.5 LS $5,000.00 1 $5,000.00
6 Crushed Surfacing Base Course 4-05.5 TON $100.00 2 $200.00
7 HMA Cl. 1/2-Inch PG 64H-28 5-04.5 TON $500.00 1 $500.00
8 Manhole 48 In. Diam. Type 1 7-05.5 EA $7,000.00 18 $126,000.00
9 Shoring or Extra Excavation 7-08.5 LF $2.00 7,200 $14,400.00
10 Select Backfill, as Directed 7-08.5 CY $100.00 21 $2,100.00
11 PVC Sanitary Sewer Pipe 12 In. Diam. 7-17.5 LF $120.00 7,200 $864,000.00
12 Erosion Control and Water Pollution Prevention 8-01.5 LS $4,000.00 1 $4,000.00
13 Pavement Markings 8-22.5 LS $1,500.00 1 $1,500.00
Subtotal $1,173,700.00
Sales Tax 8.6% $100,938.20
Assumptions: Contingency 20% $254,900.00
1. 3'wide trench, 5'wide resurfacing area Total Estimated Construction Cost $1,529,538.20
2. Resurfacing section in roadway(0.25' HMA, 0.5' CSBC)
3. 1% slope for gravity sewer Design Engineering 14% $214,140.00
4. Area in field to be backfilled with native including surface repair Environmental and Cultural Resources $7,500.00
5. Manholes every 400 feet Funding Agency Review Fees $5,000.00
Funding Administration 2.5% $38,240.00
Construction Engineering 16% $244,730.00
Total Estimated Project Cost $2,039,148.20
159
CITY OF YAKIMA
Wiley City Sewer Services Evaluation 10/27/2026
Engineer's Opinion of Construction Cost PRELIMINARY
25160E
Item Payment Overall
No. Description Specification Unit Unit Cost Quantity Overall Cost
ALTERNATIVE B -New Lift Station and Force Main Via Trolley Line Easement
1 Minor Change 1-04.4(1) FA $25,000.00 1 $25,000.00
2 SPCC Plan 1-07.15(1) LS $2,500.00 1 $2,500.00
3 Mobilization 2-01.5 LS $99,000.00 1 $99,000.00
4 Project Temporary Traffic Control 2-04.5(1) LS $10,000.00 1 $10,000.00
5 Clearing and Grubbing 3-01.5 LS $40,000.00 1 $40,000.00
6 Removal of Structures and Obstructions 3-02.5 LS $5,000.00 1 $5,000.00
7 Crushed Surfacing Base Course 4-05.5 TON $100.00 2 $200.00
8 HMA Cl. 1/2-Inch PG 64H-28 5-04.5 TON $500.00 1 $500.00
9 Wetwell Manhole, In Place 7-05.5 EA $50,000.00 1 $50,000.00
10 Precast Concrete Vault 7-05.5 EA $15,000.00 1 $15,000.00
11 Shoring or Extra Excavation 7-08.5 LF $2.00 7,200 $14,400.00
12 Select Backfill, as Directed 7-08.5 CY $100.00 40 $4,000.00
13 Submersible Sewer Pumps 7-22.5 LS $300,000.00 1 $300,000.00
14 Sewer Force Main and Fittings,X In. Diam. 7-25.5 LF $70.00 7,200 $504,000.00
15 Erosion Control and Water Pollution Prevention 8-01.5 LS $4,000.00 1 $4,000.00
16 Electrical and Control System Improvements, Complete 8-20.5 LS $250,000.00 1 $250,000.00
17 Pavement Markings 8-22.5 LS $2,000.00 1 $2,000.00
Subtotal $1,325,600.00
Sales Tax 8.6% $114,001.60
Assumptions: Contingency 20% $287,900.00
1. 3'wide trench, 5'wide resurfacing area Total Estimated Construction Cost $1,727,501.60
2. Resurfacing section in roadway(0.25' HMA, 0.5' CSBC)
3. Area in field to be backfilled with native including surface repair Design Engineering 14% $241,850.00
4. Lift station structures to be backfilled with select backfill Environmental and Cultural Resources $7,500.00
Funding Agency Review Fees $5,000.00
Funding Administration 2.5% $43,190.00
Construction Engineering 16% $276,400.00
Total Estimated Project Cost $2,301,441.60
160
CITY OF YAKIMA
Wiley City Sewer Services Evaluation 10/27/2026
Engineer's Opinion of Construction Cost PRELIMINARY
25160E
Item Payment Overall
No. Description Specification Unit Unit Cost Quantity Overall Cost
ALTERNATIVE C -New Lift Station and Force Main Via S Wiley Rd and Ahtanum Rd
1 Minor Change 1-04.4(1) FA $25,000.00 1 $25,000.00
2 SPCC Plan 1-07.15(1) LS $2,500.00 1 $2,500.00
3 Mobilization 2-01.5 LS $124,000.00 1 $124,000.00
4 Project Temporary Traffic Control 2-04.5(1) LS $50,000.00 1 $50,000.00
5 Clearing and Grubbing 3-01.5 LS $10,000.00 1 $10,000.00
6 Removal of Structures and Obstructions 3-02.5 LS $5,000.00 1 $5,000.00
7 Unclassified Excavation Incl. Haul 3-03.5 CY $50.00 530 $26,500.00
8 Crushed Surfacing Base Course 4-05.5 TON $50.00 1,770 $88,500.00
9 HMA Cl. 1/2-Inch PG 64H-28 5-04.5 TON $150.00 1,800 $270,000.00
10 Wetwell Manhole, In Place 7-05.5 EA $50,000.00 1 $50,000.00
11 Precast Concrete Vault 7-05.5 EA $17,000.00 1 $17,000.00
12 Shoring or Extra Excavation 7-08.5 LF $2.00 8,130 $16,260.00
13 Select Backfill, as Directed 7-08.5 CY $100.00 40 $4,000.00
14 Submersible Sewer Pumps 7-22.5 LS $200,000.00 1 $200,000.00
15 Sewer Force Main and Fittings,X In. Diam. 7-25.5 LF $70.00 8,130 $569,100.00
16 Erosion Control and Water Pollution Prevention 8-01.5 LS $4,000.00 1 $4,000.00
17 Electrical and Control System Improvements, Complete 8-20.5 LS $175,000.00 1 $175,000.00
18 Pavement Markings 8-22.5 LS $25,000.00 1 $25,000.00
Subtotal $1,661,860.00
Sales Tax 8.6% $142,919.96
Assumptions: Contingency 20% $361,000.00
1. 3'wide trench, 5'wide trench patch, full lane 12' repair Total Estimated Construction Cost $2,165,779.96
2. Resurfacing section (0.35' HMA 1' CSBC over trench, 0.15' grind &overlay 12'wide)
3. Lift station structures to be backfilled with select backfill Design Engineering 14% $303,210.00
Environmental and Cultural Resources $7,500.00
Funding Agency Review Fees $5,000.00
Funding Administration 2.5% $54,140.00
Construction Engineering 16% $346,520.00
Total Estimated Project Cost $2,882,149.96
161
Alternative D-Equalization Tanks and Gravity Sewer Via Trolley Line Easement
Item Qty Unit Unit Price Total
Mobilization 1 LS $500,000 $500,000
Paving/Site work 1 LS $200,000 $200,000
EQ Tank with mixers 200,000 Gallons $3 $600,000
Influent Screen 2 EA $250,000 $500,000
Electrical controls for phased discharge 1 EA $250,000 $250,000
Subtotal $2,050,000
Contingency 20% $410,000
Total construction estimate wo tax $2,460,000
Taxes 8.6% $211,560
$2,671,560
Engineering 14% $374,018
Funding Administration 3% $66,789
Construction Assistance 16% $427,450
$3,539,817
Plus connection to City via gravity line costs
Gravity Mainline via Existing Trolley Right-of-way $2,040,000
Land Purchase Cost(5 acres at$100,000 per acre $500,000
Sub total $6,079,817
Wiley City Collection System $7,290,000
Total $13,369,817
162
CITY OF YAKIMA
Wiley City Sewer Services Evaluation 10/27/2026
Engineer's Opinion of Construction Cost PRELIMINARY
25160E
Item Payment Overall
No. Description Specification Unit Unit Cost Quantity Overall Cost
Sewer Main Throughout Wiley City -To Connect to Central Area
1 Minor Change 1-04.4(1) FA $25,000.00 1 $25,000.00
2 Mobilization 2-01.5 LS $313,000.00 1 $313,000.00
3 Project Temporary Traffic Control 2-04.5(1) LS $150,000.00 1 $150,000.00
4 Removal of Structures and Obstructions 3-02.5 LS $25,000.00 1 $25,000.00
5 Unclassified Excavation Incl. Haul 3-03.5 CY $22.00 1,470 $32,340.00
6 Crushed Surfacing Base Course 4-05.5 TON $50.00 4,900 $245,000.00
7 HMA Cl. 1/2-Inch PG 64H-28 5-04.5 TON $120.00 4,900 $588,000.00
8 Manhole 48 In. Diam. Type 1 7-05.5 EA $6,000.00 58 $348,000.00
9 Shoring or Extra Excavation 7-08.5 LF $2.00 22,610 $45,220.00
10 Select Backfill, as Directed 7-08.5 CY $100.00 220 $22,000.00
11 PVC Sanitary Sewer Pipe 8 In. Diam. 7-17.5 LF $100.00 22,610 $2,261,000.00
12 Erosion Control and Water Pollution Prevention 8-01.5 LS $10,000.00 1 $10,000.00
13 Pavement Markings 8-22.5 LS $150,000.00 1 $150,000.00
Subtotal $4,214,560.00
Sales Tax 8.6% $362,452.16
Assumptions: Contingency 20% $915,400.00
1. 3'wide trench, 5'wide trench patch, full lane 12' repair Total Estimated Construction Cost $5,492,412.16
2. Resurfacing section (0.35' HMA 1' CSBC over trench, 0.15' grind &overlay 12'wide)
3. 1% slope for gravity sewer Design Engineering 14% $768,940.00
4. Manholes every 400 feet Environmental and Cultural Resources $7,500.00
Funding Agency Review Fees $5,000.00
Funding Administration 2.5% $137,310.00
Construction Engineering 16% $878,790.00
Total Estimated Project Cost $7,289,952.16
163
Wiley City Conventional WWTP Cost Estimate
Item Qty Unit Unit price Total
Mobilization 1 LS $1,000,000 $1,000,000
Paving/Site work 1 LS $200,000 $200,000
EQ Tank with mixers 200,000 Gallons $3 $600,000
Influent Screen 2 EA $250,000 $500,000
Building 2,000 SF $500 $1,000,000
Office/Lab area 1 LS $200,000 $200,000
Aeration Basin 1 LS $2,500,000 $2,500,000
Electrical 1 LS $2,000,000 $2,000,000
Infiltration Gallery 1 LS $4,500,000 $4,500,000
Influent Channel 1 LS $100,000 $100,000
Screw Press/Thickener 1 LS $500,000 $500,000
Sludge Storage Tank 1 LS $200,000 $200,000
Digester 1 LS $300,000 $300,000
Digester Blower/piping and diffusers 1 LS $200,000 $200,000
Drying Beds 1 LS $200,000 $200,000
Subtotal $14,000,000
Contingency 20% $2,800,000
Total construction estimate wo tax $16,800,000
Taxes 8.6% $1,444,800
$18,244,800
Engineering 14% $2,554,272
Funding Administration 2.5% $456,120
Construction assistance 16% $2,919,168
$24,174,360
Land Purchase Cost- 10 acres $1,000,000
Wiley City Collection System $7,290,000
Total $32,464,360
164
Wiley City MBR WWTP Cost Estimate
Item Qty Unit Unit price Total
Mobilization 1 LS $1,000,000 $1,000,000
Paving/Site work 1 LS $200,000 $200,000
EQ Tank with mixers 200,000 Gallons $3 $600,000
Influent Screen 2 EA $250,000 $500,000
Office/Lab area 1 LS $200,000 $200,000
MBR Tanks 60,400 Gallons $30 $1,812,000
MBR Equipment 1 LS $1,700,000 $1,700,000
MBR Building and Equipment Installation 1 LS $4,500,000 $4,500,000
Electrical 1 LS $2,000,000 $2,000,000
Infiltration gallery 1 LS $4,500,000 $4,500,000
Screw Press/Thickener 1 LS $500,000 $500,000
Sludge Storage Tank 1 LS $200,000 $200,000
Digester 1 LS $300,000 $300,000
Digester Blower/piping and diffusers 1 LS $200,000 $200,000
Drying Beds 1 LS $200,000 $200,000
Subtotal $18,412,000
Contingency 20% $3,682,400
Total construction estimate wo tax $22,094,400
Taxes 8.6% $1,900,118
$23,994,518
Engineering 14% $3,359,233
Funding Administration 2.5% $599,863
Construction Assistance 16% $3,839,123
$31,792,737
Land Purchase Cost- 5 acres $500,000
Wiley City Collection System $7,290,000
Total $39,582,737
165
APPENDIX C
PUBLIC
OUTREACH
r jI
vot
ter ; • !
r
. r
• �
,A:
0>FILA
HLAI..
WILEY CITY
SEWER
IMPROVEMENTS
BENEFITS OF CONNECTIN • ' =
• Pi
l'il RPOk ATLD 18
IMPROVED SANITATION & PUBLIC HEALTH: City sewer service
eases concern about septic system failures, leaks, or
contamination.
SUPPORT COMMUNITY GROWTH AND FUTURE
DEVELOPMENT: Sewer infrastructure can accommodate future
homes, businesses, and community improvements.
PEACE OF MIND: Ongoing City maintenance offers long term
reliability. For you, that means no surprise costs for septic
repairs or replacements.
INCREASE PROPERTY VALUE AND MARKETABILITY: Access to
public sewer service is often viewed as a desirable feature by
homebuyers and lenders. Pumping a septic tank before selling
is no longer needed.
PROVIDE A CENTRALIZED, PROFESSIONALLY MANAGED
WASTEWATER SYSTEM: System operation, maintenance, and
regulatory compliance are handled by qualified utility
personnel.
CREATE A SUSTAINABLE WASTEWATER SOLUTION FOR
FUTURE GENERATIONS: Investing in modern infrastructure
helps ensure reliable service and environmental protection for
years to come.
L/ 67
WILEY CITY
SEWER IMPROVEMENTS
WE WANT TO HEAR FROM YOU! Sewer Service Is Potentially
Coming To Your Area!
; Y i`1k', Open House,
p • Review and discuss alternatives for
, 40).,'', West Valley Fair
q . : ' Thursday,June 18th a local wastewater treatment plant
ui ;•�% Anytime betweenor connection to the City of Yakima:
%q 4pm-7pm
�0,,, ,i ••••••• se ' 3120 S.Wiley Rd,Yakima, Would you connect?
',`,:‘,": ,: „ - WA 98903
Project Background
Many septic tanks in the Wiley City/Ahtanum area are aging and experiencing failures. The City of Yakima is
performing a study to examine the feasibility of expanding sanitary sewer services within Wiley City and
evaluating alternatives to establish a comprehensive wastewater management system.
West Valley School District#208 does not sponsor this event and assumes no responsibility for it.In consideration of the privilege to distribute materials,the West Valley School District shall
be held harmless from any cause of action filed in any court or administrative tribunal arising out of the distribution of these materials,including costs,attorney's fees and judgments or
awards.
Questions? For more information please contact Tanner Cline at(509)966-7000 or tcline@hlacivil.com 168
WILEY CITY
MEJORAS AL SISTEMA
DE DRENAJE SANITARIO ;El servicio de drenaje
iQUERFMOS ESCUCHAR SU sanitario podria llegar a su
OPINION! area!
I-
,-----,-,--risq‘,,„,,. jCasa Abierta! Revisar y discutir alternativas para
•' '••1r"f, Feria de West Valley una planta local de tratamiento de
, % Jueves,18 de Junio aguas residuales o una conexion al
Visitenos entre las sistema de la Ciudad de Yakima:
%,u''• '••••�i 4pm-7pm
3120 S.Wiley Rd,Yakima
�+ '� a9`^ Se conectar�a al sistema de
``° .,,>aATh1> '_ WA 98903
drenaje sanitario?
Antecedentes del proyecto
Muchos sistemas septicos en el area de Wiley City/Ahtanum estan envejeciendo y presentando fallas. La
Ciudad de Yakima esta realizando un estudio para evaluar la viabilidad de expandir los servicios de drenaje
sanitario dentro de Wiley City y analizar alternativas para establecer un sistema integral de adminstracion de
aguas residuales.
El Distrito Escolar de West Valley#208 no patrocina este evento y no asume responsabilidad alguna por este.En consideracidn al privilegio de distribuir materiales,el Distrito Escolar
de West Valley no puede asumir responsabilidad por alguna accidn que Ileve a corte o un tribunal administrativo que surja de la distribucidn de estos materiales,incluyendo costos,
cuotas de abogados y juicios o premios.
169
zPregunatas? Para obtener mas informaci6n,por favor comuniquese con:Marla Meza(509)966-7000 o mmeza@hlacivil.com
----)
-- Noir C
., Survey
Wiley City Sewer Improvements
We Want to Hear From You and Value Your Input!
1. Do you prefer on-site septic or sanitary sewer service?
Cl Septic
❑ Sewer
Why? — & ,' /hna a-; ' J
2.What is the maximum payment you could pay for a one-time connection fee to sewer?
El None
.-' $1,500
El$2,500
❑ $3,500
❑$4,500
❑$5,000+
For reference, the typical City of Yakima Connection outside City limits Fee: $4,320
3. What is the maximum monthly payment you would be willing to pay for sewer service?
El $75
❑$125
❑$175
❑$225
El $275
For reference, the typical rate outside City limits of Yakima is $63 per month
Cost to pump a septic tank: $500 every 3 years
Cost to replace a septic system: $10,000 to $15,000, if standard system meets County standards, up to
$30,000 - $40,000 if a non-standard system is required
4. Property address: 03 S. Cti1 /e
5. Name of property owner: 1�,,,j `,,% '{`r_ o sr r�
6. Additional comments or questions:
Survey Return
Answer the questions above and return to one of the open house hosts! <tom
LA
170
......ri
,jl survey
Wiley City Sewer Improvements
We Want to Hear From You and Value Your Input!
1. Do you prefer on-site septic or sanitary sewer service?
'� . Septic
❑ Sewer
Why? c..*‘'oA oU���\,\
2. What is the maximum payment you could pay for a one-time connection fee to sewer?
None ,r^"\ V.,r,.,vij".t11 ‘NC:oovi. 1S Ltsg hear
❑$1,500 -5 k. o.s-.Arc+.,�
❑ $2,500
❑$3,500
❑$4,500
❑$5,000+
For reference, the typical City of Yakima Connection outside City limits Fee: $4,320
3. What is the maximum monthly payment you would be willing to pay for sewer service?
❑ $75
❑ $125
❑ $175
❑ $225
❑ $275
For reference, the typical rate outside City limits of Yakima is $63 per month
Cost to pump a septic tank: $500 every 3 years
Cost to replace a septic system: $10,000 to $15,000, if standard system meets County standards, up to
$30,000 - $40,000 if a non-standard system is required
4. Property address: t\go\ G‘\54xN e\
5. Name of property owner: ,6 ctAV• iktAr4\-,I\ G +r e
6. Additional comments or questions: A•p ce.cAsc 1.-_ -\ - a \cr,cr\5 bv.\ 1 05
,LL u -NONS0 (t.F"\e Coc )44"\)\ ‘N cows-it, . = ay .. C L\-.3.i. Q.. V IN 171S A17)%t '1 ,
Survey Return
Answer the questions above and return to one of the open house hosts! 0 IILA
171
:,--.: . � Survey. 17.1
Wiley City Sewer Improvements
We Want to Hear From You and Value Your Input!
1. Do you prefer on-site septic or sanitary sewer service?
4 Septic
Sewer , ' r�I _ �f t}� a n p
Why? 4 V t ' 0[/ l'� 5 11" l"T !� ..� , /LIPA/4 %
2. What is the maximum payment you could pay for a one-time connection fee to sewer?
❑ None
❑$1,500
❑$2,500
M$3,500
❑$4,500
❑ $5,000+
For reference, the typical City of Yakima Connection outside City limits Fee: $4,320
3.What is the maximum monthly payment you would be willing to pay for sewer service?
❑$75
WI$125
❑$175
❑ $225
❑$275
For reference, the typical rate outside City limits of Yakima is$63 per month
Cost to pump a septic tank: $500 every 3 years
Cost to replace a septic system: $10,000 to $15,000, if standard system meets County standards, up to
$30,000- $40,000 if a non-standard system is required
4. Property address: 14 U a It r$ A eti
5. Name of property owner: ��"�,-� ,L,
6. Additional comments or questions:
Survey Return
Answer the questions above and return to one of the open house hosts! 0
ILA
172
(.._,
�- Survey
Wiley City Sewer Improvements
We Want to Hear From You and Value Your Input!
1. Do you prefer on-site septic or sanitary sewer service?
i ,Septic
❑Sewer 1�
Why?. L CC L1 ._ 11 . Q n 2 n M 0.-� r '\" OC\ 0 k,f O kA n
A9460050064404
2. What is the maximum payment you could pay for a one-time connection fee to sewer?
None
❑ $1,500
❑ $2,500
❑$3,500
❑$4,500
❑$5,000+
For reference, the typical City of Yakima Connection outside City limits Fee: $4,320
3. What is the maximum monthly payment you would be willing to pay for sewer service?
CI$5 0(02. dt- ' im +i '�l `� t-g
❑$125
❑$175
❑$225
❑$275
For reference, the typical rate outside City limits of Yakima is$63 per month
Cost to pump a septic tank: $500 every 3 years
Cost to replace a septic system: $10,000 to $15,000, if standard system meets County standards, up to
$30,000-$40,000 if a non-standard system is required
4. Property address: \l r @�\be.44- 3-6.
5. Name of property owner: �� ,,2'ti(7-1-h
6. Additional comments or questions:
UW� l� r4-C o( - ,,1
.�� 1r�d ~'era Co`rC _ \ � -� C�Va mf� -
- 6 n 00�+ r'1 Mcn 'r� 1- ? c
Survey Return
Answer the questions above and return to one of the open house hosts!
< /1ILI .
173
Survey
Wiley City Sewer Improvements
We Want to Hear From You and Value Your Input!
1. Do you prefer on-site septic or sanitary sewer service?
❑Septic
❑Sewer
Why?
2. What is the maximum payment you could pay for a one-time connection fee to sewer?
Ed None
❑$1,500
❑$2,500
❑$3,500
❑ $4,500
❑ $5,000+
For reference, the typical City of Yakima Connection outside City limits Fee: $4,320
3. What is the maximum monthly payment you would be willing to pay for sewer service?
❑ $75
❑$125
❑$175
❑$225
❑$275
For reference, the typical rate outside City limits of Yakima is $63 per month
Cost to pump a septic tank: $500 every 3 years
Cost to replace a septic system: $10,000 to $15,000, if standard system meets County standards, up to
$30,000- $40,000 if a non-standard system is required
4. Property address:
5. Name of property owner:
6. Additional comments or questions:
Survey Return
Answer the questions above and return to one of the open house hosts! HLA
174
(----
Nor 7 Survey
Wiley City Sewer Improvements
We Want to Hear From You and Value Your Input!
1. Do you prefer on-site septic or sanitary sewer service?
r.; Septic
❑ Sewer ,_'
Why? 4ps41,/ h Live O - / "PI 5 to 1i`4/� w
2. What is the maximum payment you�c -pay for a one-time connection fee to sewer?
❑ None ve-t(a°
❑$1,500
❑$2,500
❑$3,500
� 4,500
❑$5,000+
For reference, the typical City of Yakima Connection outside City limits Fee: $4,320
3. What is the maximum monthly payment you would be willing to pay for sewer service?
❑$125
❑$175
❑$225
❑$275
For reference, the typical rate outside City limits of Yakima is$63 per month
Cost to pump a septic tank: $500 every 3 years
Cost to replace a septic system: $10,000 to $15,000, if standard system meets County standards, up to
$30,000 - $40,000 if a non-standard system is required
4. Property address: fi'M PrkiliCtill
5. Name of property owner: J ok,\ c7 JA4Q
6. Additional comments or questions:
Survey Return
Answer the questions above and return to one of the open house hosts!
0- -ILA
175
t
I ` :
r.�' Survey
Wiley City Sewer Improvements
We Want to Hear From You and Value Your Input!
1. Do you prefer on-site septic or sanitary sewer service?
E Septic
❑ Sewer
Why? J zi ru, pc p 4 (2,0c.Pe_)
2. What is the maximum payment you could pay for a one-time connection fee to sewer?
❑ None
ix $1,500
❑ $2,500
❑ $3,500
❑ $4,500
❑$5,000+
For reference, the typical City of Yakima Connection outside City limits Fee: $4,320
3.What is the maximum monthly payment you would be willing to pay for sewer service?
❑$75 On! W,ffi PCarSu-tr7e c 7-4 ml 0-111,v--1-6,,,, oxr-- 1 tLe- ,
❑$125 7 ' .'E"lf,b I S /vwra "til-_— ` ter- r rF tJiTt,:r j e `,.
❑$175
❑$225
❑$275
For reference, the typical rate outside City limits of Yakima is $63 per month
Cost to pump a septic tank: $500 every 3 years
Cost to replace a septic system: $10,000 to $15,000, if standard system meets County standards, up to
$30,000- $40,000 if a non-standard system is required
4. Property address: /(7.3v,3 inec-cletol2d4 / JJ
5. Name of property owner: ,/ r rkr -(-14A-447 34444.104,
6. Additional comments or questions: ^''c'd a..�rr+an '“-/6.
5 %f ccm---
Survey Return
Answer the questions above and return to one of the open house hosts! w ��
���;;;••• 176
rvi.0 ki-ict-e, Pipe_+''- S
:, 5 0n C5 lS
Y
....,,,:air 4 ,)
_ 15 7-
-k , ,: Surve
y
Wiley City Sewer Improvements
We Want to Hear From You and Value Your Input!
1. Do you prefer on-site septic or sanitary sewer service?
❑S= 'tic
'►'.Sewer
• Why? 5 PTIC, 640C)W410
2. What is the maximum payment you could pay for a one-time connection fee to sewer?
❑ None
❑$1,500
1 52,500
❑$3,500
❑ $4,500
❑ $5,000+
For reference, the typical City of Yakima Connection outside City limits Fee: $4,320
3. What is the maximum monthly payment you would be willing to pay for sewer service?
❑ $75
❑ $125
g$175
❑$225
❑$275
For reference, the typical rate outside City limits of Yakima is$63 per month
Cost to pump a septic tank: $500 every 3 years ,
Cost to replace a septic system: $10,000 to $15,000, if standard system meets County standards, up to
$30,000- $40,000 if a non-standard system is required
4. Property address: a Jam'
5. Name of property owner: 1?LIC E - rieGC-tP-SnA)
6.Additional comments or questions:
Survey Return
Answer the questions above and return to one of the open house hosts! 0
HLA
177
'�
Q,.
Survey
Wiley City Sewer Improvements
We Want to Hear From You and Value Your Input!
1. Do you prefer on-site septic or sanitary sewer service?
❑Septic
Sewer 1 t
[ Why? 1
2. What is the maximum payment you could pay for a one-time connection fee to sewer?
❑ None
❑$1,500
❑$2,500
❑$3,500
El$4 500
`GL$5 000+
Fgr reference, the typical City of Yakima Connection outside City limits Fee: $4,320
3. What is the maximum monthly payment you would be willing to pay for sewer service?
❑$75
❑ $125
El$175
E$225
For reference, the typical rate outside City limits of Yakima is $63 per month
Cost to pump a septic tank: $500 every 3 years
Cost to replace a septic system: $10,000 to $15,000, if standard system meets County standards, up to
$30,000 - $40,000 if a non-standard system is required
/1/4S----
4. Property addres : q (r��( -
5. Name of property owner: Crt : 0eelif\---(
!
6. Additional comments or questions: . 11--T2 -t '$f C`_ 1
Survey Return
Answer the questions above and return to one of the open house hosts!
0)11LA
178
Sid 5 ocv- d, i ►.v �
( '.tir'llit---;:..i
I.
�. W .1. Survey
Wiley City Sewer Improvements
We Want to Hear From You and Value Your Input!
1. Do you prefer on-site septic or sanitary sewer service?
Septic
❑Sewer
Why?
2. What
ti�is''the maximum payment you could pay for a one-time connection fee to sewer?
fn one
❑$1,500
❑$2,500
❑$3,500
❑$4,500
❑$5,000+
For reference, the typical City of Yakima Connection outside City limits Fee: $4,320
3. What ithe maximum monthly payment you would be willing to pay for sewer service?
❑-�1at5
❑ $125
❑ $175
❑ $225
❑$275
For reference, the typical rate outside City limits of Yakima is $63 per month
Cost to pump a septic tank: $500 every 3 years
Cost to replace a septic system: $10,000 to $15,000, if standard system meets County standards, up to
$30,000 - $40,000 if a non-standard system is required
wpi
4. Property address: 1 CAo(% -V\\ Oke 'S r4 qoY''''''
5. Name of property owner: / �'
r stions: ' th()1. 1�' M' .(01,
6 Additional comments o que V
Survey Return
Answer the questions above and return to one of the open house hosts! oi
LA
179
rr Survey
Wiley City Sewer Improvements
We Want to Hear From You and Value Your Input!
' Q (Li
1. Do you prefer on-site septic or sanitary sewer service?
❑ Septic
ASewer Why? 17'- ((it -eil'il— f `J
2. What is the maximum payment you could pay for a one-time connection fee to sewer?
E None
❑ $1,500
N$2,500
❑ $3,500
❑ $4,500
❑ $5,000+
For reference, the typical City of Yakima Connection outside City limits Fee: $4,320
3. What is the maximum monthly payment you would be willing to pay for sewer service?
❑ $75
It:$125
❑ $175
❑$225
❑$275
For reference, the typical rate outside City limits of Yakima is $63 per month
Cost to pump a septic tank: $500 every 3 years
Cost to replace a septic system: $10,000 to $15,000, if standard system meets Coun standards, up to
$30,000- $40,000 if a non-standard system is required ,`).M// yylf ) Y 1 L7-0 yet A pt. (I/JGJ
a66 - ' qq -
4. Property address: 307 O "'. q 4-v-e
5. Name of property owner: 72/Gr 4- 72ty4/' ix/`
f
6. Additional comments or questions: 15 T h4f- at Ti 41 E- F,cr mz 1—z—
i, lff ,0'1-6 1dl-e®'l
Survey Return
Answer the questions above and return to one of the open house hosts! LA
QM
180
�
�'C .f,
Survey
-.--._
Wiley City Sewer Improvements
We Want to Hear From You and Value Your Input!
1. Do you prefer on-site septic or sanitary sewer service?
Septic
❑ Sewer
Why? —
2. What is the maximum payment you could pay for a one-time connection fee to sewer?
▪ None
❑$1,500
❑$2,500
❑ $3,500
❑ $4,500
❑ $5,000+
For reference, the typical City of Yakima Connection outside City limits Fee: $4,320
3. What is the maximum monthly payment you would be willing to pay for sewer service?
LI $75
❑$125
❑ $175
❑ $225
❑$275 Pe"
For reference, the typical rate outside City limits of Yakima is$63 per month X 12, = 75C� y
Cost to pump a septic tank: $500 every 3 years 6,c.--4-Al- 6c''5 ' Ie-SS-' e (/Ov ; g6 // o; _44,
Cost to replace a septic system: $10,000 to $15,000, if standard system meets County standards, up to
$30,000 - $40,000 if a non-standard system is required
4. Property address: _ _ . 19L44-1 4 1-
5. Name of property owner: f"e Q-.-Lfi 1 6`J r"G(
6. Additional comments or questions: 0 ° LL ci��-T 4- :c
Survey Return
Answer the questions above and return to one of the open house hosts!
*1-ILA
181
` y > Survey
Wiley City Sewer Improvements
We Want to Hear From You and Value Your Input!
1. Do you prefer on-site septic or sanitary sewer service?
❑ Septic
.Sewer
Why? �1 �4t� -Pa'r✓t LiP '
2. What is the maximum payment you could pay for a one-time connection fee to sewer?
❑ None
X$1,500
❑ $2,500
❑$3,500
❑$4,500
❑$5,000+
For reference, the typical City of Yakima Connection outside City limits Fee: $4,320
3. What is the maximum monthly payment you would be willing to pay for sewer service?
t.$75
❑$125
❑$175
❑$225
❑$275
For reference, the typical rate outside City limits of Yakima is$63 per month
Cost to pump a septic tank: $500 every 3 years
Cost to replace a septic system: $10,000 to $15,000, if standard system meets County standards, up to
$30,000- $40,000 if a non-standard system is required
4. Property address: 1 IT 491
5. Name of property owner: 44.6., tit kitir
6. Additional comments or questions:
Survey Return
Answer the questions above and return to one of the open house hosts!
OimILA
182
' _yt
C,
Encuesta
Wiley City Mejoras Drenaje Sanitario
iQueremos escucharle y valoramos su opinion!
1. e:,Prefiere mantener su sistema septico o conectarse al sistema de drenaje sanitario?
D Septico
16 Drenaje Sanitario
Po fo-hr c fv r Ci. cii,
� -1 2 a ( e 1 c/(n Q C'OS("P C<0IA VII OS ccvayf
0
s
2. 1,Cual es el monto maximo que podria pagar por una tarifa Unica de conexion al drenaje sanitario?
❑ Ninguno
❑ $1,500
❑$2,500
❑ $3,500
k $4,500
❑ $5,000+
Como referencia, la tarifa tipica de conexiOn al alcantarillado de la Ciudad de Yakima para propiedades
ubicadas fuera de los limites de la ciudad es de $4,320.
3. ,Cual es el pago mensual maximo que estaria dispuesto(a) a pagar por el servicio de drenaje
sanitario?
$75
❑$125
❑$175
❑$225
❑ $275
Como referencia, la tarifa mensual tipica fuera de los limites de la Ciudad de Yakima es de $63.
Costo de vaciar un tanque septico: aproximadamente $500 cada 3 anos
Costo de reemplazo de un sistema septico: $10,000 a $15,000 si un sistema estandar cumple con los
requisitos del condado; hasta $30,000 a $40,000 si se requiere un sistema no estandar.
4. Direccion de la propiedad:
5. Nombre del propietario:, -y Jr
ca k1 J p a c!,"et+ e 16