Loading...
HomeMy WebLinkAbout11/10/2026 14.B. Wiley City Sewer Study Report r 'V „i .i. r y/I i ...,.. ./ ,,,, ,N.I.r....,,, t,"gin.;Rn`,,_1a`` ____ BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No. 14.B. For Meeting of: November 10, 2026 ITEM TITLE: Wiley City Sewer Study Report SUBMITTED BY: *Trevor Martin, Planning Manager Bill Preston, Community Development Director SUMMARY EXPLANATION: The City Council authorized the Planning Division to apply for a SIED Grant to conduct a sewer study in the Wiley City Area. The report will be delivered to the Ahtanum Irrigation District and any other party wishing to see a copy after it is delivered to the City Council. The City and County have agreed that this report does not guarantee or obligate the City of Yakima for any associated wastewater projects that might be identified by the study. The report identified four options for wastewater service in the Wiley City area. It provides a cost analysis of each alternative. The report also identifies the Ahtanum Irrigation District as the lead entity on the project. ITEM BUDGETED: Yes STRATEGIC PRIORITY 24-25: A Safe and Healthy Yakima RECOMMENDATION: No action necessary. ATTACHMENTS: Wiley City Final Sewer Study Report 124 CITY OF YAKIMA WILEY CITY SEWER SERVICES EVALUATION REPORT irI� r ,, r �' s • PROJECT NO. 25160E * \H LA 125 CITY OF YAKIMA WILEY CITY SEWER SERVICES EVALUATION REPORT P. Sifr �� / Digital) sig - by Dean P.Smith Q �' DN:`C=k S, E •smith@hlacivil.com, /r- 4 4 O="HLA Engi -ering and Land `, Surveyi ., In.. ,CN=Dean P.Smith Date:2' 4.1 i '7 16:08:50-07'00' .44) 30111 OISTE. NAL Prepared by: 0,, HLA HLA PROJECT NO. 25160E October 2026 126 TABLE OF CONTENTS INTRODUCTION AND EXECUTIVE SUMMARY EXECUTIVE SUMMARY INTRODUCTION OBJECTIVE ii CHAPTER 1 —CONNECTION TO EXISTING YAKIMA SEWER SYSTEM 1-1 Task 1: Assessment of Connecting to the Existing City of Yakima Sewer System 1-1 Alternative A: Gravity Sewer through the Former Trolley Corridor 1-1 Alternative B: Force Main through the Former Trolley Corridor 1-1 Alternative C: Force Main along South Wiley Road and Ahtanum Road 1-1 Alternative D: Pumping to Equalization Storage with Gravity Conveyance through the Former Trolley Corridor 1-1 Yakima Improvements 1-2 Alternative Comparison 1-2 CHAPTER 2— EVALUATION OF A LOCAL WASTEWATER TREATMENT PLANT 2-1 Task 2: Evaluation of a Local Wastewater Treatment Plant 2-1 Regulatory Compliance 2-1 Treatment Processes 2-1 Land Application 2-4 Infiltration Basins 2-4 Subsurface Infiltration Galleries 2-4 Constructed Treatment Wetlands 2-4 Groundwater Quality Requirements 2-5 Surface-Water Discharge 2-5 Phased Implementation 2-5 Preliminary Conclusions 2-6 CHAPTER 3—COST ANALYSIS 3-1 Capital Cost Comparison for Connection to Yakima 3-1 Operating Cost Comparison for Connection to Yakima 3-1 Local Treatment Alternative 3-2 Operating Cost Comparison for Local MBR Treatment Plant 3-2 Capital Cost Comparison for Local Conventional Activated Sludge Treatment Plant 3-3 Operating Cost Comparison for Local Conventional Activated Sludge Treatment Plant 3-3 Wiley City Local Improvements 3-4 Monthly Cost Summary Table 3-5 CHAPTER 4—STAKEHOLDER AND PUBLIC ENGAGEMENT 4-1 Public Outreach Open House 4-1 Survey Results Summary. 4-1 Public Input and Implications for Project Development 4-2 CHAPTER 5— FUNDING OPPORTUNITIES AND GRANT ANALYSIS 5-1 Washington State Department of Ecology 5-1 USDA Rural Development 5-1 Community Development Block Grant 5-1 Washington State Public Works Board 5-2 Bureau of Reclamation WaterSMART 5-2 EPA Closing America's Wastewater Access Gap Initiative 5-3 Funding Strategy and Implementation 5-3 Agency Coordination and Project Leadership 5-4 Feasibility Findings and Future Work 5-4 41HLA 127 LIST OF TABLES TABLE 2-1 POTENTIAL SITE SIZE REQUIREMENTS 2-3 TABLE 3-1 PROJECT COST SUMMARY 3-1 TABLE 3-2 CAPITAL COST COMPARISON FOR LOCAL MBR TREATMENT PLANT 3-2 TABLE 3-3 ESTIMATED OPERATING COSTS FOR LOCAL MBR TREATMENT PLANT 3-2 TABLE 3-4 PRELIMINARY CAPITAL COST ESTIMATE 3-3 TABLE 3-5 PRELIMINARY OPERATING COSTS 3-3 TABLE 3-6 PROJECT COST SUMMARY 3-4 TABLE 3-7 MONTHLY COST SUMMARY 3-5 APPENDIX TABLE OF CONTENTS APPENDIX A-VICINITY MAP APPENDIX B-COST ESTIMATES APPENDIX C- PUBLIC OUTREACH 4Z1HLA 128 EXECUTIVE SUMMARY INTRODUCTION AND OBJECTIVE till, ter ; • ! r ` • r . r Val • * • ,A: OH HLAI2. t WILEY CITY SEWER SERVICES EVALUATION REPORT EXECUTIVE SUMMARY This study evaluates the feasibility of providing sanitary sewer service to Wiley City and the surrounding Wiley City/Ahtanum area in response to concerns about aging septic systems and reported failures. Using the Akel Wiley City Capacity Analysis as the planning basis, it compares connection to Yakima's existing sewer system with development of a local wastewater treatment and disposal facility. Four Yakima connection alternatives were evaluated. Alternatives A, B, and C have estimated project costs of approximately$9.33 million to $10.18 million, plus downstream collection system improvements estimated to be $11.74 million. Alternative D, which incorporates equalization and controlled discharge, has an estimated cost of$13.37 million. However, the $11.74 million downstream improvements are expected to be avoided, subject to establishing an acceptable discharge rate and storage volume with Yakima. Local treatment alternatives include conventional activated sludge and membrane bioreactor facilities, with estimated project costs of$32.47 million and $39.59 million, respectively. Their feasibility depends on identifying suitable land and reliable year-round effluent management. Soil and groundwater conditions, seasonal storage needs, and receiving-water impairments will constrain disposal options. All estimates include the local collection system and the estimated cost of land acquisition for each alternative, but exclude private property connection expenses, and applicable City connection charges. Household costs would depend on financing, grant assistance, customer participation, and operating requirements. Public outreach identified concerns among participants about affordability and replacing existing septic service. Potential funding sources are identified, but eligibility and awards remain unconfirmed. The Ahtanum Irrigation District (AID) intends to take the lead in advancing the project and, as of October 2026, is pursuing formation of a utility district. The City of Yakima and Yakima County will continue to support AID as the project moves forward. The study indicates that sanitary sewer service to Wiley City is potentially feasible through either connection to Yakima or development of a local treatment facility.Alternative D offers the lowest estimated capital cost, contingent on confirming that equalization and controlled discharge can avoid downstream Yakima improvements. Local treatment remains a potential alternative where suitable land and reliable effluent disposal can be secured. Advancing the project will require confirmation of these conditions and a funding strategy that addresses customer affordability. The next phase should refine facility requirements, capital and operating costs, and ownership responsibilities to support selection of a preferred alternative and development of an implementation plan. INTRODUCTION The City of Yakima (COY) is evaluating the feasibility of extending sanitary sewer service to Wiley City's Limited Area of More Intensive Rural Development (LAMIRD) and the surrounding Wiley City/Ahtanum area. Concerns regarding aging septic systems and reported failures have prompted consideration of long-term wastewater service alternatives to address potential public health and environmental impacts. This study evaluates connection to Yakima's existing sewer system and development of a local wastewater treatment and disposal facility. The evaluation considers conceptual conveyance alternatives, treatment technologies, effluent disposal options, preliminary capital and operating costs, regulatory and ownership considerations, community input, and potential funding sources. The Akel Wiley City Capacity Analysis provides the planning basis for the service area, wastewater flow, and downstream collection system assumptions used in this study. Additional assumptions specific to the alternatives and financial evaluation are identified in the applicable sections. In general, the community currently has about 150 residential services, about 10 commercial type services, 1 industrial facility, and 1 COLA 130 t WILEY CITY SEWER SERVICES EVALUATION REPORT elementary school included in a total of 363-acres. The estimated flow from these facilities is 30,000 gpd from the residential and commercial connections, 50,000 gpd from the industry, and 20,000 gpd from the school. The industry is operational 24 hours per day and discharges a consistent flow rate, while the other services have a higher diurnal variation throughout the day. For planning and financial evaluation, the initial customer base is represented by 600 equivalent residential units (ERUs), including residential customers and the equivalent wastewater contributions from commercial users, the industrial facility, and the school. The ERU total represents equivalent wastewater demand rather than the number of individual service connections. At an assumed flow of 190 gpd per ERU, these 600 ERUs represent an initial planning flow of approximately 114,000 gpd. The financial evaluation uses 600 contributing ERUs to allocate estimated operating costs and debt repayment. Future buildout and infill development are projected to at least double existing wastewater flows and could ultimately increase flows to approximately 2,100 ERUs (400,000 gpd) based on the Akel report calculations using an estimated flow per acre. These future growth projections are considered separately from the initial customer base when evaluating long-term capacity and storage requirements. Additional assumptions specific to individual alternatives and the financial evaluation are identified in the applicable sections. The study was prepared under the following tasks: • Task 1: Assessment of Connecting to the Existing City of Yakima Sewer System. • Task 2: Evaluation of a Local Wastewater Treatment System. • Task 3: Stakeholder Engagement and Public Outreach. OBJECTIVE The objective of this study is to determine whether the identified wastewater service alternatives are reasonably feasible, compare their advantages, constraints, and preliminary costs, and identify the next steps needed to advance the project. The evaluation uses available information, conceptual layouts, and planning-level assumptions appropriate for a feasibility study. Its findings are intended to guide selection of alternatives for further evaluation and support future planning and funding decisions. Remaining uncertainties that could materially affect implementation are identified for resolution during subsequent phases. OHLA 131 CHAPTER 1 CONNECTION TO EXISTING YAKIMA SEWER SYSTEM Llk tk till, ter ; • ! r • soirn r . r .0 OHLA 132 t WILEY CITY SEWER SERVICES EVALUATION REPORT CHAPTER 1 —CONNECTION TO EXISTING YAKIMA SEWER SYSTEM Task 1: Assessment of Connecting to the Existing City of Yakima Sewer System Four conceptual conveyance alternatives were evaluated for connecting Wiley City to the existing City of Yakima sewer system. The alternatives consider gravity conveyance, pumped conveyance, and equalization to manage the timing and rate of discharge. The Akel Wiley City Capacity Analysis provides the basis for the wastewater flow and downstream collection system assumptions used in this evaluation. The alternatives include: • Alternative A: Gravity Sewer through the Former Trolley Corridor. • Alternative B: Force Main through the Former Trolley Corridor. • Alternative C: Force Main along South Wiley Road and Ahtanum Road. • Alternative D: Pumping to Equalization Storage with Gravity Conveyance through the Former Trolley Corridor. These alternatives are shown on the Wiley City Site Map included in this report. Alternative A: Gravity Sewer through the Former Trolley Corridor Alternative A would convey wastewater by gravity through the former trolley corridor to Yakima's existing sewer system near Ahtanum Road. A spot survey was completed to evaluate elevations along the proposed alignment. The surveyed elevations indicate that the terrain provides sufficient grade for gravity conveyance at a conceptual level. Pipe slopes, burial depths, and connection elevations would be refined during subsequent design. The corridor is identified in this study as existing Yakima County right-of-way and is currently farmed as agricultural ground. Access through the corridor would likely need to be reestablished to allow City personnel and equipment to inspect, maintain, and repair the sewer facilities. The necessary access improvements and property rights would be confirmed during subsequent project development. Alternative B: Force Main through the Former Trolley Corridor Alternative B would include a centralized lift station and force main to convey wastewater from Wiley City to Yakima's existing sewer system. The force main would generally follow the same corridor as Alternative A. Pumped conveyance would provide flexibility in pipeline elevations but would require ongoing power, equipment maintenance, and periodic replacement of pumping components. Alternative C: Force Main along South Wiley Road and Ahtanum Road Alternative C would include a centralized lift station and force main extending north along South Wiley Road and east along Ahtanum Road, connecting to Yakima's existing sewer system at the manhole on the south side of Ahtanum Road near South 86th Avenue. This alignment would follow the roadway corridor and require coordination with existing utilities, roadway restoration, and maintenance of traffic and property access during construction. Alternative D: Pumping to Equalization Storage with Gravity Conveyance through the Former Trolley Corridor Alternative D would include a lift station that pumps wastewater into equalization storage, followed by controlled discharge through a gravity sewer generally following the Alternative A corridor. Equalization would temporarily store wastewater and regulate its release to reduce the flow contributed to Yakima's collection system during peak periods. The potential effect on downstream improvement requirements is discussed below. OHLA 133 t WILEY CITY SEWER SERVICES EVALUATION REPORT Yakima Improvements Based on the adopted Akel planning analysis, additional downstream collection system improvements are needed to accommodate Wiley City wastewater flows under Alternatives A, B, and C. A planning-level allowance of approximately$12 million is included for these improvements in the cost comparison. Alternative D would use aerated equalization storage to hold wastewater during peak periods and release it at a controlled rate when capacity is available in Yakima's collection system. For this feasibility evaluation, Alternative D assumes that controlled discharge would avoid the downstream improvements included in the other alternatives to serve the current needs. Confirmation of an acceptable discharge rate and corresponding storage volume would be necessary before advancing this alternative. The estimated cost savings are therefore conditional on the ability to operate within those limits. A significant increase in ERU's within the service area or a change in City of Yakima's ability to accept this flow could impact this approach. This approach could, at a minimum, delay City of Yakima collection system improvements or be viable until a local treatment solution is constructed and commissioned. Alternative Comparison The former trolley corridor appears to be the most economical conveyance alignment based on the preliminary cost estimates. Compared with the South Wiley Road and Ahtanum Road alignment, it would generally reduce roadway construction, pavement restoration, and conflicts with existing utilities. Both gravity and pumped conveyance remain feasible options, subject to confirmation of property rights and the improvements needed to establish maintenance access. Alternative D has the lowest estimated capital cost of the alternatives evaluated, assuming equalization and controlled discharge would avoid the downstream Yakima improvements. Its overall economic feasibility depends on confirmation of this assumption and consideration of land acquisition, maintenance access, and ongoing pumping and equalization costs. Chapter 3 presents the preliminary cost comparison. To prevent odors from the equalization tanks, a system consisting of blower and aerators is anticipated to be needed. Likewise, a H2S control system may be necessary to prevent corrosion and odor issues at the discharge into the City of Yakima collection system depending upon flow rate and duration in the conveyance pipe if a force main is used to convey the wastewater from the community. However, if a gravity convenance pipe is used a H2S control system is not anticipated to be needed. OHLA 1-2 134 CHAPTER 2 EVALUATION OF A LOCAL WASTEWATER TREAMTMENT PLANT Llk t_" ' N'T tilI, f, .r ; ' 0r ` • r . r r. lik r. !' fI; �'..•..•-• ' , i \,,,'� FJI,�,r.,A: L.i7 4 135 WILEY CITY SEWER SERVICES EVALUATION REPORT CHAPTER 2— EVALUATION OF A LOCAL WASTEWATER TREATMENT PLANT Task 2: Evaluation of a Local Wastewater Treatment Plant Regulatory Compliance The feasibility of a local wastewater treatment facility depends on identifying a suitable treatment site and a reliable method of managing treated effluent throughout the year. The selected discharge or reuse approach will establish the applicable treatment requirements and influence facility size, operating complexity, land requirements, and cost. Local waterways have limited seasonal flows, which will constrain their ability to receive treated wastewater. Surface-water discharge could require stringent effluent limits, particularly during periods of low streamflow and elevated temperature. Groundwater infiltration and land application provide potential alternatives but depend on suitable soils, groundwater conditions, available land, and protection of water quality. This study considers these constraints at a feasibility level. Site-specific investigations and coordination with the Washington State Department of Ecology would be needed during subsequent planning to establish applicable discharge requirements and confirm the suitability of the selected approach. Treatment Processes Two treatment technologies were evaluated for a local wastewater treatment facility rated for 200,000 gpd: • Treatment Alternative 1: Conventional Activated Sludge. • Treatment Alternative 2: Membrane Bioreactor(MBR). Both technologies use biological treatment to remove wastewater constituents. Conventional activated sludge typically uses secondary clarification to separate solids from treated wastewater, while MBR uses membrane filtration. Either process may require additional treatment features to meet the requirements of the selected discharge or reuse approach. The following sections compare the technologies and identify potential effluent management methods. Final process selection would depend on the treatment requirements, site constraints, capital and operating costs, and operational capabilities of the future utility. Treatment Alternative 1 —Conventional Activated Sludge A conventional activated sludge facility would use biological treatment followed by secondary clarification to separate solids from treated wastewater. Depending on the selected discharge or reuse approach, the facility may also require nutrient removal, filtration, and disinfection. Limited seasonal streamflow may result in discharge requirements that a conventional secondary treatment process alone cannot meet. However, these constraints do not independently eliminate conventional activated sludge as a feasible alternative. Additional treatment could be incorporated where necessary, with associated increases in capital cost and operating requirements. Conventional activated sludge remains a potential local treatment alternative. Its feasibility and cost would depend on the complete treatment process needed to support the selected effluent management approach. OHLA 2-1 136 t WILEY CITY SEWER SERVICES EVALUATION REPORT Treatment Alternative 2—Membrane Bioreactor An MBR facility would combine biological treatment with membrane filtration to separate solids from treated wastewater. This process can produce effluent with low suspended solids concentrations and may offer advantages where available land is limited, or a higher level of effluent quality is needed for discharge or reuse. Although MBR treatment can produce high-quality effluent, it does not inherently reduce effluent temperature sufficiently to satisfy surface-water discharge requirements. Limited streamflow and elevated receiving-water temperatures will constrain discharge during warmer months. Potential approaches include groundwater infiltration, seasonal land application, or storage during periods when surface-water discharge is restricted. The feasibility of these approaches would depend on site conditions, available land, seasonal capacity, and applicable permitting requirements. Nutrient removal, disinfection, and membrane maintenance and replacement would also need to be addressed in evaluating the complete treatment system. MBR remains a potential local treatment alternative, particularly where effluent quality or site constraints favor membrane filtration. Its benefits should be evaluated against the capital and operating costs of a conventional activated sludge facility configured to meet the same treatment requirements. Effluent Management Alternatives A local wastewater treatment facility would require a reliable approach for managing treated effluent throughout the year. Potential methods include evaporation, groundwater infiltration, land application, and surface-water discharge. A combination of methods may be necessary to accommodate seasonal conditions. The following is based on the value of an Equivalent Residential Unit (ERU) generating 190 gallons of wastewater per day, and a service area with a total of 600 ERUs (114,000 gpd). 1. Evaporation Ponds Treated effluent could be retained in ponds for disposal through evaporation. The preliminary estimate identifies approximately 40 acres for the May through October period. Evaporation alone would not establish a year-round disposal solution; a storage basin with a capacity of 20-million gallons or another disposal method would be needed during periods when evaporation is insufficient during winter months. A winter storage lagoon has a high risk of generating odors during spring and will need to include adequate mixing to mitigate. 2. Groundwater Infiltration Treated effluent could be discharged through infiltration basins or subsurface galleries where soil and groundwater conditions are suitable. Feasibility would depend on infiltration capacity, seasonal groundwater elevations, available area, and groundwater protection requirements. Any cooling benefit would require site-specific evaluation. 3. Land Application Treated effluent could be applied to suitable agricultural land during periods when soil conditions and crop needs allow. Preliminary land requirements are approximately 20 to 40 acres, depending on the crop and allowable application rate. Storage or another disposal method would be necessary when land application is unavailable. 4. Surface-Water Discharge Treated effluent could potentially be discharged to a local waterway, subject to applicable discharge requirements. Limited seasonal streamflow and temperature constraints will restrict this approach during warmer months. Surface-water discharge could remain a supplemental or seasonal option if an acceptable discharge location and operating period can be established. 5. Potential Site Size Requirements Preliminary land requirements for the treatment facilities and effluent management alternatives are summarized below. These estimates provide a basis for screening potential sites and comparing alternatives: OHLA 2-2 137 t WILEY CITY SEWER SERVICES EVALUATION REPORT TABLE 2-1 POTENTIAL SITE SIZE REQUIREMENTS Alternative Preliminary Site Requirement Conventional Activated Sludge Facility 10 acres MBR Treatment Facility 5 acres Evaporation Ponds 40+ acres (May—October) +winter storage or discharge alternative Subsurface Infiltration Gallery 5+ acres initially (depending upon infiltration rate) Land Application 20-40 acres, depending on crop Surface-Water Discharge Not applicable The total site area would include land for both treatment and the selected effluent management method, with additional space as needed for seasonal storage, access, setbacks, buffers, and future expansion. These planning estimates would be refined during subsequent site evaluation based on wastewater flows, facility layout, soil conditions, seasonal groundwater elevations, and applicable discharge requirements. The evaporation pond estimate addresses only the identified seasonal period and does not include the additional facilities needed to provide year-round effluent management. Regulatory Requirements for Alternatives Permitting requirements for a local wastewater treatment facility would depend on the selected effluent management method and receiving environment. Applicable land treatment systems would be evaluated using the Washington State Department of Ecology's Land Treatment System Engineering and Design Guidance, Publication 25-10-021 (the "Green Book"). The principal permitting pathways include: Groundwater discharge. Land application and infiltration systems that discharge wastewater to groundwater generally require a State Waste Discharge Permit. Subsurface infiltration galleries may also be subject to Underground Injection Control requirements, including registration and protection of groundwater quality. Surface-water discharge. Direct discharge of treated wastewater to a local stream would require a National Pollutant Discharge Elimination System (NPDES) permit. Treatment requirements would reflect the receiving water's conditions and applicable water-quality standards. Reclaimed-water use. Production and distribution of reclaimed water for beneficial use would require evaluation under Washington's reclaimed-water requirements. The proposed use would determine the applicable treatment and management provisions, with review by Ecology and the Department of Health. Ecology's Land Treatment System Engineering and Design Guidance, Publication 25-10-021 (January 2026), provides guidance for land application and infiltration lagoon systems. Separate guidance and requirements would apply to subsurface infiltration galleries and reclaimed-water uses. Constructed treatment wetlands may provide treatment or polishing, but their permitting pathway would depend on the system configuration and ultimate discharge location. A constructed treatment wetland should be distinguished from a discharge to an existing natural wetland. Coordination with Ecology during subsequent planning would establish the applicable permitting pathway and preliminary treatment requirements for the selected concept. This feasibility study identifies potential approaches; it does not establish final effluent limits or discharge authorization. OHLA 2-3 138 } , l•1�.. t WILEY CITY SEWER SERVICES EVALUATION REPORT Land Application Land application requires sufficient suitable acreage to accommodate treated effluent at rates consistent with crop needs, soil conditions, and groundwater protection. Seasonal limitations would require storage or another permitted disposal method when irrigation is unsuitable. Based on preliminary wastewater flow calculations for buildout of the study area, approximately 30-million gallons of storage would be required during mid-October through mid-March. The associated land requirements and construction costs would be substantial. The required storage period could extend beyond these months depending on weather, soil conditions, and the selected crop. Additionally, storing treated wastewater during the winter months for future irrigation will require storage basins, or lagoons. These storage basins/lagoons have an inherent odor risk, even if they are equipped with mixing to help mitigate against potential odor issues and risks. A storage pond with a volume of 30- million gallons will require approximately 20-acres, assuming a depth of 8-feet. Land application may therefore be more practical as a seasonal component of a broader effluent management approach than as the sole disposal method. Further evaluation would establish the available application season, suitable acreage, and storage or alternate disposal needs. Infiltration Basins Infiltration basins are shallow, unlined impoundments that receive treated wastewater and allow it to percolate through the underlying soil. Their suitability depends on soil permeability, seasonal groundwater elevations, available land, and the ability to protect groundwater quality. Infiltration basins could provide a year-round effluent management option at a suitable site. Preliminary evaluation would need to consider seasonal capacity and sufficient area to allow individual basins to be maintained. The required level of treatment before discharge would depend on site conditions and applicable groundwater protection requirements. Subsurface Infiltration Galleries Infiltration galleries distribute treated wastewater below ground through perforated piping, similar to the dispersal component of an onsite septic system. Their feasibility depends on soil permeability, seasonal groundwater elevations, adequate separation from groundwater, and sufficient area to accommodate the proposed flow. For this study, infiltration galleries remain a potential effluent disposal method, subject to site-specific evaluation. Shallow groundwater will constrain their location and capacity. Further evaluation would be needed to determine whether subsurface infiltration would provide sufficient cooling to address applicable temperature requirements. The permitting approach would be coordinated with Ecology and would address applicable State Waste Discharge Permit and Underground Injection Control requirements. Site-specific investigation and confirmation of allowable loading rates would occur during subsequent planning. Constructed Treatment Wetlands Constructed treatment wetlands use vegetation, soils, and biological processes to provide additional treatment of wastewater. Depending on the configuration, treated effluent may subsequently infiltrate into the ground or discharge to surface water. A constructed wetland could form part of a local treatment and effluent management system. Its feasibility would depend on available land, seasonal treatment performance, soil and groundwater conditions, and the requirements of the ultimate discharge location. Further evaluation would be needed to determine the OHLA 2-4 139 } , l•1�.. t WILEY CITY SEWER SERVICES EVALUATION REPORT treatment benefit and whether the system could provide sufficient cooling to address applicable temperature requirements. Groundwater Quality Requirements Washington's groundwater quality standards are established under Chapter 173-200 WAC. Criteria relevant to the preliminary evaluation of wastewater disposal include: • Nitrate (as N): 10 mg/L • Total coliform bacteria: 1/100 mL • Total dissolved solids: 500 mg/L • pH: 6.5-8.5 standard units These values are groundwater quality criteria, rather than established effluent limits for the proposed facility. Applicable discharge limits and treatment requirements would be determined through Ecology's permitting process based on existing groundwater quality, site conditions, and the proposed disposal method. Washington's groundwater antidegradation requirements also protect existing groundwater quality. Accordingly, meeting the listed numeric criteria alone may not establish an acceptable discharge. Subsequent evaluation would determine the treatment and monitoring necessary to protect groundwater and any connected surface waters. Surface-Water Discharge Discharge of treated wastewater to a local waterway would require an NPDES permit issued by Ecology. Applicable effluent limits would depend on receiving-water conditions, water-quality standards, and any relevant total maximum daily load (TMDL) requirements. Bachelor Creek has multiple identified water-quality impairments, including temperature. These impairments, combined with limited seasonal streamflow and little available capacity for dilution, will constrain the timing, volume, and quality of treated effluent that could be discharged. Temperature requirements would be a particular consideration during warmer months. Surface-water discharge remains a potential seasonal or supplemental effluent management option. Further evaluation would identify a suitable discharge location and determine whether the anticipated effluent quality and temperature could meet applicable requirements. Storage or another disposal method would be needed during periods when surface-water discharge is unavailable. Phased Implementation Equalization storage could be constructed as an initial phase to support connection of the Wiley City collection system to Yakima's sewer system. The facility would include mixing and aeration to limit solids settling and septic conditions, with controlled discharge at a rate acceptable to the City. This approach could allow sewer service to begin before a local treatment facility is constructed and spread capital expenditures over multiple phases. A local treatment facility could subsequently be developed as funding becomes available, and a suitable treatment site and effluent disposal approach are established. Further evaluation would determine whether the initial equalization and conveyance facilities could be incorporated into the long-term system and whether the phased approach offers an overall cost and schedule advantage. The timing of service would depend on funding, property acquisition, permitting, and City acceptance of the proposed discharge. Refer to cost estimates for alternatives in Chapter 3 and appendix. OHLA 2-5 140 } , l•1�.. t WILEY CITY SEWER SERVICES EVALUATION REPORT Preliminary Conclusions A local wastewater treatment facility remains a potential alternative for serving Wiley City. Its feasibility will depend on identifying a suitable site and a reliable year-round effluent management approach. Groundwater infiltration warrants further evaluation, with seasonal land application and surface-water discharge retained as potential supplemental options. Available well logs indicate groundwater may occur as shallow as approximately 8 feet below ground surface. Site-specific evaluation would be needed to determine whether suitable soils, groundwater separation, and infiltration capacity are available. Further evaluation would also determine whether subsurface infiltration could provide sufficient cooling to address applicable temperature requirements. Both conventional activated sludge and MBR treatment remain viable technologies for further consideration. MBR may offer advantages where higher effluent quality or a smaller treatment footprint is needed. The selected disposal method and associated treatment requirements will determine whether those advantages justify its additional capital and operating costs. The next phase should focus on potential treatment sites, the capacity and seasonal availability of the proposed disposal methods, and preliminary coordination with Ecology. That information would support refinement of the treatment alternatives and a comparison of complete treatment and disposal costs. OHLA 2-6 141 CHAPTER 3 COST ANALYSIS t_" ' till, .11 di r + r '. 000 +l j I ter ; • ! 0 r ` : r . r A. °100. + Nillilir• NI fl l r Ff ''rJR:kl 1.il .r HLAI4. t WILEY CITY SEWER SERVICES EVALUATION REPORT CHAPTER 3—COST ANALYSIS The estimated construction cost includes physical construction, a 20% contingency, and applicable sales tax. The total estimated project cost also includes engineering, funding administration, and construction engineering. Capital Cost Comparison for Connection to Yakima The estimated capital costs for connecting Wiley City to Yakima's sewer system are summarized below. Construction costs represent the proposed conveyance improvements, while total project costs include engineering, funding administration, and construction engineering. All alternatives also require a local collection system within Wiley City, estimated at$7.3 million. This common cost is presented separately under Wiley City Local Improvements and included in the Project Cost Summary. Alternatives A, B, and C include an additional $11.74 million allowance for downstream improvements to Yakima's collection system that are identified in the Akel report. Alternative D assumes equalization and controlled discharge would avoid those improvements, subject to the conditions described in Chapter 1. These downstream costs are presented separately in the Project Cost Summary. TABLE 3-1 PROJECT COST SUMMARY Wiley City Connection City of Yakima Total Alternative Local to City of Improvement Estimated Improvements Yakima Costs Cost A- Gravity sewer through the $7,290,000 $2,040,000 $11,740,000 $21,070,000 former trolley corridor B- Force main through the $7,290,000 $2,310,000 $11,740,000 $21,340,000 former trolley corridor C- Force main along South Wiley Road and Ahtanum $7,290,000 $2,890,000 $11,740,000 $21,920,000 Road D— Lift station, equalization storage, and gravity sewer $7,290,000 $6,080,000 $0 $13,370,000 through the former trolley corridor Alternative cost estimates are included in the report appendix. Operating Cost Comparison for Connection to Yakima For this feasibility evaluation, the estimated Yakima sewer service charge is approximately $82 per month per equivalent residential unit (ERU). This estimate uses the rate assumptions below, including the 1.5 multiplier for service outside city limits: • Base charge: $26.12 per month. • Assumed flow charge based on 7.5 CCF: $3.81/CCF x 7.5 CCF= $28.58 per month. • Outside-city service charge: ($26.12 + 28.58) x 1.5 = $82.05 per month. The estimated one-time City connection charge is approximately$4,320 per ERU, calculated as ($2,827 + $53.05) x 1.5. This charge is separate from the cost of private service piping, septic system decommissioning, and other work necessary to connect individual properties. OHLA 3-1 143 } , l•1�.. WILEY CITY SEWER SERVICES EVALUATION REPORT Total monthly household costs would include the sewer service charge, repayment of financed project costs, and any additional charges needed to operate and maintain the local collection, pumping, and equalization facilities. Debt repayment would depend on the selected alternative, grant assistance, financing terms, and number of contributing ERUs. These costs are compared in the Monthly Cost Summary. The rate assumptions used in this evaluation would be confirmed with the City during subsequent project development. Local Treatment Alternative A local treatment alternative includes the construction of a collection system within the community service area, a treatment facility, and effluent discharge system. The collection system alternatives were presented previously. The two treatment system alternatives considered for this feasibility study include a Membrane Bioreactor estimated to require a 5-acre site, and a conventional activated sludge facility using aeration basins and secondary clarifiers estimated to require a 10-acre site. For this study, the estimated costs to construct a 5-acre infiltration gallery on a 10-acre site are included as the basis for the total project cost estimated to be $4,500,000. TABLE 3-2 CAPITAL COST COMPARISON FOR LOCAL MBR TREATMENT PLANT Facility Treatment Facility with Collection Estimated Project Effluent Discharge System Cost Membrane Bioreactor $32,300,000 $7,290,000 $39,590,000 Treatment Plant The estimated construction cost represents the anticipated contractor cost to build the facility. The total estimated project cost includes construction plus allowances for land development. The estimate will be refined as the treatment site, process requirements, and effluent management approach are established during preliminary design efforts. Operating Cost Comparison for Local MBR Treatment Plant Preliminary operating costs for a local MBR treatment facility are estimated below, assuming 600 contributing ERUs. TABLE 3-3 ESTIMATED OPERATING COSTS FOR LOCAL MBR TREATMENT PLANT Cost Component Planning Assumption Monthly Cost per ERU Power 110,000 kWh per month at$0.06/kWh $11.00 Chemicals $300 per month $0.50 Equipment maintenance Annual allowance of 8% of$2 million in $22.25 equipment costs Labor 1.5 full-time equivalent positions at a $31.25 burdened annual cost of$150,000 ea. Total $65.00 The estimated treatment facility operating cost is approximately $65 per month per ERU, excluding repayment of capital costs. Actual operating costs would depend on the selected equipment, staffing approach, treatment requirements, and effluent management method. Debt repayment is presented separately in the Monthly Cost Summary. c -ILA 3-2 144 t WILEY CITY SEWER SERVICES EVALUATION REPORT Capital Cost Comparison for Local Conventional Activated Sludge Treatment Plant The preliminary capital cost estimate for a local conventional activated sludge treatment facility is summarized below. TABLE 3-4 PRELIMINARY CAPITAL COST ESTIMATE Treatment Facility Estimated Project Facility with Effluent Collection System Cost Discharge Conventional Activated $25,180,000 $7,290,000 $32,470,000 Sludge Treatment Plant The estimated construction cost includes physical construction, a 20% contingency, and applicable sales tax. The total estimated project cost also includes engineering, funding administration, and construction engineering. The estimate would be refined as the treatment site, process requirements, and effluent management approach are established. Operating Cost Comparison for Local Conventional Activated Sludge Treatment Plant Preliminary operating costs for a local conventional activated sludge treatment facility are estimated below, assuming 600 contributing ERUs: TABLE 3-5 PRELIMINARY OPERATING COSTS Cost Component Planning Assumption Monthly Cost per ERU Power 72,000 kWh per month at$0.06/kWh $7.20 Chemicals $300 per month $0.50 Equipment maintenance Annual allowance of 8% of$1.5 million in $16.67 equipment costs Labor 1.5 full-time equivalent positions at a $31.25 burdened annual cost of$150,000 ea. Total $55.62 The estimated treatment facility operating cost is approximately $56 per month per ERU, excluding repayment of capital costs. Actual operating costs would depend on the selected equipment, staffing approach, treatment requirements, and effluent management method. Debt repayment is presented separately in the Monthly Cost Summary. OHLA 3-3 145 t WILEY CITY SEWER SERVICES EVALUATION REPORT Wiley City Local Improvements All alternatives require a local sewer collection system to convey wastewater from properties within the study area to the selected conveyance or treatment facilities. Improvements would include gravity sewer mains, manholes, and associated roadway and surface restoration. TABLE 3-6 PROJECT COST SUMMARY Total Monthly Monthly charges Total Monthly Loan Infrastructure Operating Costs paid to Yakima Payment for Improvement per ERU per ERU3 Infrastructure Costs Improvements4 Yakima Connection $21,070,000 $11 $82 $117.00 Alternative A Yakima Connection $21,340,000 $21 $82 $119.00 Alternative B Yakima Connection $21,920,000 $21 $82 $122.00 Alternative C Yakima Connection $82 while Alternative D' $13,370,000 $21 discharging to $75.00 Yakima Local Conventional Activated Sludge $32,470,000 $67 $0 $180.00 Treatment Plante Local MBR Treatment $39,590,000 $76 $0 $220.00 Plante Alternative D assumes equalization and controlled discharge would avoid downstream Yakima improvements,subject to the conditions described in Chapter 1. 2 Effluent discharge alternative to City of Yakima is not included in the estimated project cost. 3 Lower rates may be able to be negotiated with City of Yakima if local collection system is owned or maintained by AID. °Loan payment based on 100%of capital costs financed at 1.2%interest for 30 years and 600 ERUs 5Includes improvements in City of Yakima collection system estimated to be$11.74 million. Private property connection expenses and applicable City connection charges are separate from the project costs shown above. The following monthly cost comparison illustrates how grant assistance and financing could affect the cost per ERU for the alternatives evaluated. OHLA 3-4 146 t WILEY CITY SEWER SERVICES EVALUATION REPORT Monthly Cost Summary Table The following table compares estimated monthly costs per ERU under illustrative grant funding scenarios. Calculations assume 600 contributing ERUs, a 1.20% annual interest rate, and a 30-year repayment period with monthly payments. Grant assistance is applied to the total estimated project cost, with the remaining balance financed. TABLE 3-7 MONTHLY COST SUMMARY Operating Cost Percentage of Loan Repayment Total Monthly Alternative per Month Project Covered Amount per Cost by Grant Month 0% $117.00 $210.00 Yakima Connection $93 25% $87.75 $180.75 Alternative A 50% $58.50 $151.50 75% $29.25 $122.25 0% $119.00 $222.00 Yakima Connection $103 25% $89.25 $192.25 Alternative B 50% $59.50 $162.50 75% $29.75 $132.75 0% $122.00 $225.00 Yakima Connection $103 25% $91.50 $194.50 Alternative C 50% $61.00 $164.00 75% $30.50 $133.50 0% $75.00 $178.00 Yakima Connection $103 (potential 25% $56.25 $159.25 Alternative D to negotiate lower w/COY) 50% $37.50 $140.50 75% $18.75 $121.75 Local Conventional 0% $180.00 $247.00 Activated Sludge $67.00 250% $135.00 $202.00 Treatment Plant 50/° $90.00 $157.00 75% $45.00 $112.00 0% $220.00 $296.00 Local MBR 25% $165.00 $241.00 Treatment Plant $76.00 50% $110.00 $186.00 75% $55.00 $131.00 'Includes monthly operating costs per ERU and monthly charges paid to Yakima per ERU,as shown in Table 3-6. The Yakima Alternative D assumes that equalization and controlled discharge would avoid downstream Yakima improvements. These scenarios illustrate the effect of grant assistance and do not represent confirmed funding availability or proposed sewer rates. Actual household costs would depend on funding awards, financing terms, customer participation, and the final operating budget. Private property connection expenses, and applicable City connection charges are excluded. 4iHLA 3-5 147 CHAPTER 4 STAKEHOLDER AND PUBLIC ENGAGEMENT till, ter ; • ! r ` • r . r Val • * • ,A: OH LA 148 AII6k WILEY CITY SEWER SERVICES EVALUATION REPORT (73 CHAPTER 4—STAKEHOLDER AND PUBLIC ENGAGEMENT Public Outreach Open House An open house for the Wiley City Sewer Services Evaluation was held on June 18, 2026, from 4:00 to 7:00 p.m. at the West Valley Fair in Wiley City. The event introduced the study, presented potential sewer service alternatives, and gathered input from residents and affected property owners. Display boards included a study-area map, potential benefits of sewer service, and preliminary alternative costs. English and Spanish flyers were distributed through Ahtanum Valley Elementary School, and informational mailers were sent to properties within the study area. Public outreach display boards and mailers are included in the report appendix. The open house used an informal discussion format, allowing attendees to speak directly with project team members, ask questions, and discuss their concerns. Participants were also invited to complete a survey about existing wastewater service, preferences, connection costs, and monthly charges. Fourteen voluntary survey responses were received, including one in Spanish. The results summarize the views of participating respondents and are not statistically representative of the broader community. They provide useful information about public concerns but do not establish service-area household income or funding eligibility. Survey Results Summary: A total of 14 survey responses were received during the public outreach process and are included in the report appendix. Question 1 — Do you prefer on-site septic or sanitary sewer service? Response Number of Respondents On-site septic 8 Sanitary sewer 5 No response 1 Of the 13 respondents who answered this question, approximately 62% preferred on-site septic systems and 38% preferred sanitary sewer service. These responses reflect differing preferences among participants and support continued discussion of existing septic conditions, potential sewer service benefits, and household costs. Question 2—What is the maximum payment you could pay for a one-time connection fee to sewer? Response Number of Respondents None 5 $1,500 3 $2,500 2 $3,500 1 $4,500 2 $5,000 or more 1 OHLA 4-1 149 } , l•1�.. WILEY CITY SEWER SERVICES EVALUATION REPORT Five respondents, approximately 36%, indicated they could not pay a one-time connection fee. Three respondents identified amounts at or above the estimated $4,320 City connection charge. That charge does not include private service piping, septic system decommissioning, or other property-specific connection expenses. The responses indicate that initial connection costs are a concern among participants. Further project development should consider assistance or financing options for household connection expenses in addition to funding for the public sewer improvements. Question 3—What is the maximum payment you would be willing to pay for sewer service? Response Number of Respondents None 5 $75 per month 5 $125 per month 2 $175 per month 1 $225 per month 0 $275 per month 1 Five respondents indicated they would not be willing to pay a monthly sewer charge, and five identified $75 per month as their maximum. Together, these responses represent approximately 71% of participants. Four respondents selected amounts greater than $75 per month. These responses reflect willingness to pay rather than a verified measure of household financial capacity. They indicate that monthly charges would be an important consideration for participating residents and support continued evaluation of grant assistance, financing terms, and opportunities to reduce project and operating costs. Public Input and Implications for Project Development Survey comments identified concerns about both initial connection expenses and ongoing monthly sewer charges. Some respondents expressed satisfaction with their existing septic systems and questioned the need to connect to a public sewer system. Others described concerns about accommodating additional costs within their household budgets. These comments support continued evaluation of funding approaches that address both public infrastructure costs and individual household connection expenses. Future outreach should explain the basis for the project need, anticipated household costs, potential connection requirements, and available financial assistance as those details become established. Both conventional activated sludge and MBR treatment should remain under consideration as local treatment alternatives. Further evaluation should compare complete treatment and disposal systems with connection to Yakima, considering capital costs, long-term operating requirements, and projected household charges. Community input should inform that evaluation alongside technical feasibility and environmental considerations. OHLA 4-2 150 CHAPTER 5 FUN OPPORTDING UNITIES AND GRANT ANALYSIS - Llk t_ too ter ; • ! • r N'}) OHLA 151 t WILEY CITY SEWER SERVICES EVALUATION REPORT CHAPTER 5— FUNDING OPPORTUNITIES AND GRANT ANALYSIS State and federal funding programs may support the planning, design, and construction of sewer improvements for Wiley City. Potential sources include the Washington State Department of Ecology, USDA Rural Development, the Community Development Block Grant program, and the Washington State Public Works Board. Funding availability and eligibility will depend on the selected alternative, ownership and operating structure, service-area population and income, project costs, and projected household sewer charges. Applicant eligibility identified below refers to eligibility to apply. Project eligibility, legal authority, financial qualifications, and funding availability remain subject to agency review. Washington State Department of Ecology Ecology's Water Quality Combined Funding Program is a potential primary funding source for the project. Through a single application, eligible public entities may request assistance from several programs, including the Clean Water State Revolving Fund and Centennial Clean Water Program. Eligible activities include planning, design, and construction of wastewater collection, conveyance, treatment, and reclaimed-water facilities. Assistance may include low-interest loans, grants, and forgivable principal, depending on project eligibility, financial hardship criteria, and available funding. Coordination with Ecology will be necessary to establish the applicable service area and evaluate financial hardship eligibility under each ownership and treatment alternative. This determination is particularly important for alternatives involving connection to the City of Yakima or incorporation into a larger utility system. Potential grant assistance and financing terms should be confirmed before they are incorporated into projected household sewer charges. Applicant eligibility: • Ahtanum Irrigation District:Yes, subject to confirmation of authority to undertake the proposed wastewater project. • City of Yakima: Yes. • Yakima County: Yes. USDA Rural Development USDA's Water and Waste Disposal Loan and Grant Program is another potential primary funding source. The program supports wastewater collection, conveyance, treatment, and disposal facilities serving eligible rural areas with populations of 10,000 or fewer. Assistance generally consists of long-term loans, with grants available in certain circumstances to maintain reasonable user costs. Loan repayment periods may extend to 40 years, depending on the useful life of the financed facilities. USDA will need to confirm applicant and service-area eligibility, including the eligibility of improvements within Yakima's existing system. The potential grant and loan combination will depend on USDA's evaluation of project need, household income, repayment capacity, and long-term financial sustainability. USDA planning assistance programs should also be evaluated to support the next phase of project development. Applicant eligibility: • Ahtanum Irrigation District:Yes, subject to confirmation of the necessary wastewater and financing authority. • City of Yakima: Yes, for improvements serving an eligible rural area. • Yakima County: Yes, for improvements serving an eligible rural area. Community Development Block Grant The Washington State Department of Commerce administers the Community Development Block Grant program, which provides potential supplemental funding for public infrastructure benefiting low- and moderate-income residents. General Purpose grants are currently available for up to $2 million, OHLA 5-1 152 } , l•1�.. t WILEY CITY SEWER SERVICES EVALUATION REPORT depending on project type and available funding. Yakima County should be evaluated as a potential applicant for improvements serving unincorporated Wiley City. Special purpose districts cannot apply directly to the state program but may participate through an eligible city or county. Eligibility will require an accepted service-area determination and documentation of the income characteristics of the benefiting population. Coordination with Commerce should establish whether existing income data is sufficient or if an income survey is necessary. The public outreach completed for this study provides information regarding community concerns and willingness to pay but does not establish income eligibility for grant funding. Applicant eligibility: • Ahtanum Irrigation District: No direct application. May participate as a subrecipient through an eligible city, town, or county. • City of Yakima: No, for the state program. The City receives CDBG entitlement funding directly from HUD. • Yakima County: Yes, subject to project and service-area income eligibility. Washington State Public Works Board The Public Works Board provides assistance for infrastructure planning, preconstruction, and construction. Funding generally consists of loans, with grants available to qualifying distressed communities. Eligible preconstruction activities include engineering, environmental review, permitting, and other work necessary to prepare the project for construction. Public Works Board funding should be evaluated for the next phase of planning and for capital costs remaining after other funding sources are identified. Applicable award limits, repayment terms, grant eligibility, and funding cycles will need to be confirmed based on the proposed applicant and project scope. Applicant eligibility: • Ahtanum Irrigation District:Yes, subject to confirmation of authority to undertake the proposed wastewater project. • City of Yakima: Yes. • Yakima County: Yes. Bureau of Reclamation WaterSMART WaterSMART funding may be applicable if the selected alternative includes a defined water-reclamation or reuse component. The Title XVI Water Reclamation and Reuse Program provides competitive, cost- shared assistance for qualifying water recycling projects. Potential applicability to Wiley City could include supplying reclaimed water to identified irrigation users and demonstrating measurable water-supply benefits. Eligibility should not be assumed for wastewater collection and treatment facilities or land application intended solely for effluent disposal. Further evaluation would be necessary to identify potential users, quantify reuse demand and benefits, and establish the feasibility of the proposed reclaimed-water system. Reclamation's eligibility, cost-share, and application requirements would need to be confirmed before this funding source is incorporated into the project financing plan. Applicant eligibility: • Ahtanum Irrigation District:Yes, for a qualifying water-reclamation and reuse project. • City of Yakima: Yes, fora qualifying water-reclamation and reuse project. • Yakima County: Conditional, subject to Reclamation confirming the County's eligibility in its proposed project-sponsor role. OHLA 5-2 153 AII6k WILEY CITY SEWER SERVICES EVALUATION REPORT (73 EPA Closing America's Wastewater Access Gap Initiative This initiative provides no-cost technical assistance to communities with failing septic systems or inadequate wastewater infrastructure. Assistance includes evaluating wastewater needs and feasible solutions, assessing affordability, identifying funding sources, and preparing preliminary engineering and application materials necessary to pursue funding. The initiative supports access to the Clean Water State Revolving Fund and other funding programs but does not constitute a direct construction funding commitment. Participation should be evaluated for Wiley City based on documented septic system conditions and the community's wastewater infrastructure needs. Assistance could support the ongoing planning effort by addressing financial feasibility and funding application requirements. Any proposed assistance should be coordinated with the existing engineering work to address remaining needs and avoid duplication. Eligibility to request technical assistance: • Ahtanum Irrigation District:Yes, on behalf of the community. • City of Yakima: Yes, on behalf of the community. • Yakima County: Yes, on behalf of the community. Funding Strategy and Implementation Development of a funding strategy will require identification of the responsible owner, operator, and applicant; confirmation of the service boundary and initial customer base; and evaluation of household income and projected sewer costs. The next phase should also establish the scope and budget for additional planning and coordinate potential funding sources, application schedules, and project readiness requirements. The financial evaluation would consider both grant-assisted and loan-financed scenarios. Projected household costs must account for debt service, operation and maintenance, reserves, and applicable connection costs. Potential grant assistance must remain an identified funding opportunity until eligibility is confirmed and an award is secured. OHLA 5-3 154 t WILEY CITY SEWER SERVICES EVALUATION REPORT Agency Coordination and Project Leadership The Ahtanum Irrigation District (AID) intends to take the lead in advancing sanitary sewer service for VViley City and the surrounding Ahtanum area. AID is currently pursuing formation of a utility district to establish the organizational structure and authority for project development and future sewer service. The City of Yakima and Yakima County will continue to support AID and the development of the project through ongoing coordination as planning and district formation proceed. Continued coordination will define responsibilities for funding applications, facility ownership, and long- term operations. These efforts will support AID's leadership and establish the agreements and service arrangements needed to advance the project. Feasibility Findings and Future Work This study identifies potential approaches for providing sanitary sewer service to Wiley City through connection to Yakima's existing system or development of a local wastewater treatment and disposal facility. Both approaches remain feasible, subject to the technical, financial, and organizational conditions described in this report. The former trolley corridor appears to provide the most economical conveyance alignment based on the preliminary estimates. Spot survey elevations support the conceptual feasibility of gravity conveyance, although maintenance access would need to be reestablished through the currently farmed corridor. Alternative D has the lowest estimated capital cost, contingent on equalization and controlled discharge avoiding downstream Yakima improvements. Its overall economic feasibility depends on acceptable discharge conditions, required storage, property needs, and ongoing operating costs. Local treatment remains dependent on identifying a suitable site and reliable year-round effluent management. Conventional activated sludge and MBR treatment are potential technologies, with selection dependent on discharge requirements, site constraints, and complete treatment and disposal costs. Advancing the project would require: • Establishing the responsible entity for project development, funding applications, ownership, and operations, including continued coordination regarding the Ahtanum Irrigation District's utility district formation. • Confirming acceptable discharge rates and equalization requirements with Yakima. • Clarifying property rights and maintenance access along the conveyance corridors. • Further evaluating potential treatment sites and disposal capacity, including seasonal limitations and applicable permitting requirements. • Refining capital and operating costs, customer participation assumptions, and household connection expenses. • Coordinating funding eligibility and continuing public outreach as project costs and service arrangements become better defined. OHLA 5-4 155 APPENDIX A VICINITY MAP - Ll r jI • f, ter • • 0 r‘, Nuoir` : r r HLAI.. N CONNECTION TO CITY OF YAKI0t, MA SEWER MAINLINE `/i 71 - „__ ____:.__ .......,_ ,., , , _ , ---- _,_____ . . _ ___ _ . • . _ . : AHTANUM RD . . __ p . _ L. _....,, 4, f � •• r�, — NEW GRAVITY s- + - - s-s :11.111' . \, (EWER 7,200 LF) ., ,-`\ ALTERNATIVE A, _ -- z :711 J , P ,� �, Q . - -- SERVICE AREA ~o BOUNDARY ►� ;' �', co II Rp �_�_ HAOKETT e � `Y '' .tee 1 : i /` : *11111111111.116- *_; WILEY CITY R ,- , .�,,.,• .� . .:,,_.,..,,,. .., ___,_._ >- NEW SEWER FORCE . .+•I a I. - i ROCKSTROM RD �_ MAIN 7,200 LF •`�i.�=1.'i� i -� f? -,:, 11 I r (ALTERNATI\_: ,,,,,,� ` . ., Eii,ms-f -. �, E igi ill'- - - --- -� _1' .` �- v R' i ' tr t f ! ;i HUGHES RI1' 01' I \ S3 NG\4- 1- -1--, � , • �' , ISM i I r— 1"1ii I I I i I AHTANUM L_J NEW TREATMENT ,, � , " ELEMENTARY NEW TREATMENT "ti ,`7, SCHOOL PLANT OR EQ ti gpCHELOR CREEK L`'f ,, . PLANT AND EQ ,,, _ip I TANK SITE OPTION t: %..%; ZONING: R1 TANK SITE OPTION ,, : _.4,,,, ;I cR • -.-,-� { a, ZONING: R1 ' i__I MCCULLOUGH RD . '----- — — . ILI NEW TREATMENT PROPOSED SEWER PLANT SITE OPTION COLLECTION , ;yiy I ZONING: SR SYSTEM o - -b s J —, Obi • -:ECG', ,' �P` � —I AN _ rini i co HATTON CREEK MEADOWBROOKRD `'• I •.. �I y. ..ill , 7-• r... ., j vi..":0 f•-•IV . ,j' RUTHERFORD RD -4:'. I I ' . WILEY CITY SITE MAP • 2803 River Road ( l ..�y o zoo 40o eoo ILA Yakima,WA98902 r,..;-.K �:� (509) 966-7000 \ tAIlir; ,yl www.hlacivil.com ".� 157 APPENDIX B COST ESTIMATES r jI vot ter ; • ! polo r . r • � FJI,�, ,A: 0>FILA HLAI.. CITY OF YAKIMA Wiley City Sewer Services Evaluation 10/27/2026 Engineer's Opinion of Construction Cost PRELIMINARY 25160E Item Payment Overall No. Description Specification Unit Unit Cost Quantity Overall Cost ALTERNATIVE A-Gravity Sewer Main Via Trolley Line Easement 1 Minor Change 1-04.4(1) FA $25,000.00 1 $25,000.00 2 Mobilization 2-01.5 LS $87,000.00 1 $87,000.00 3 Project Temporary Traffic Control 2-04.5(1) LS $4,000.00 1 $4,000.00 4 Clearing and Grubbing 3-01.5 LS $40,000.00 1 $40,000.00 5 Removal of Structures and Obstructions 3-02.5 LS $5,000.00 1 $5,000.00 6 Crushed Surfacing Base Course 4-05.5 TON $100.00 2 $200.00 7 HMA Cl. 1/2-Inch PG 64H-28 5-04.5 TON $500.00 1 $500.00 8 Manhole 48 In. Diam. Type 1 7-05.5 EA $7,000.00 18 $126,000.00 9 Shoring or Extra Excavation 7-08.5 LF $2.00 7,200 $14,400.00 10 Select Backfill, as Directed 7-08.5 CY $100.00 21 $2,100.00 11 PVC Sanitary Sewer Pipe 12 In. Diam. 7-17.5 LF $120.00 7,200 $864,000.00 12 Erosion Control and Water Pollution Prevention 8-01.5 LS $4,000.00 1 $4,000.00 13 Pavement Markings 8-22.5 LS $1,500.00 1 $1,500.00 Subtotal $1,173,700.00 Sales Tax 8.6% $100,938.20 Assumptions: Contingency 20% $254,900.00 1. 3'wide trench, 5'wide resurfacing area Total Estimated Construction Cost $1,529,538.20 2. Resurfacing section in roadway(0.25' HMA, 0.5' CSBC) 3. 1% slope for gravity sewer Design Engineering 14% $214,140.00 4. Area in field to be backfilled with native including surface repair Environmental and Cultural Resources $7,500.00 5. Manholes every 400 feet Funding Agency Review Fees $5,000.00 Funding Administration 2.5% $38,240.00 Construction Engineering 16% $244,730.00 Total Estimated Project Cost $2,039,148.20 159 CITY OF YAKIMA Wiley City Sewer Services Evaluation 10/27/2026 Engineer's Opinion of Construction Cost PRELIMINARY 25160E Item Payment Overall No. Description Specification Unit Unit Cost Quantity Overall Cost ALTERNATIVE B -New Lift Station and Force Main Via Trolley Line Easement 1 Minor Change 1-04.4(1) FA $25,000.00 1 $25,000.00 2 SPCC Plan 1-07.15(1) LS $2,500.00 1 $2,500.00 3 Mobilization 2-01.5 LS $99,000.00 1 $99,000.00 4 Project Temporary Traffic Control 2-04.5(1) LS $10,000.00 1 $10,000.00 5 Clearing and Grubbing 3-01.5 LS $40,000.00 1 $40,000.00 6 Removal of Structures and Obstructions 3-02.5 LS $5,000.00 1 $5,000.00 7 Crushed Surfacing Base Course 4-05.5 TON $100.00 2 $200.00 8 HMA Cl. 1/2-Inch PG 64H-28 5-04.5 TON $500.00 1 $500.00 9 Wetwell Manhole, In Place 7-05.5 EA $50,000.00 1 $50,000.00 10 Precast Concrete Vault 7-05.5 EA $15,000.00 1 $15,000.00 11 Shoring or Extra Excavation 7-08.5 LF $2.00 7,200 $14,400.00 12 Select Backfill, as Directed 7-08.5 CY $100.00 40 $4,000.00 13 Submersible Sewer Pumps 7-22.5 LS $300,000.00 1 $300,000.00 14 Sewer Force Main and Fittings,X In. Diam. 7-25.5 LF $70.00 7,200 $504,000.00 15 Erosion Control and Water Pollution Prevention 8-01.5 LS $4,000.00 1 $4,000.00 16 Electrical and Control System Improvements, Complete 8-20.5 LS $250,000.00 1 $250,000.00 17 Pavement Markings 8-22.5 LS $2,000.00 1 $2,000.00 Subtotal $1,325,600.00 Sales Tax 8.6% $114,001.60 Assumptions: Contingency 20% $287,900.00 1. 3'wide trench, 5'wide resurfacing area Total Estimated Construction Cost $1,727,501.60 2. Resurfacing section in roadway(0.25' HMA, 0.5' CSBC) 3. Area in field to be backfilled with native including surface repair Design Engineering 14% $241,850.00 4. Lift station structures to be backfilled with select backfill Environmental and Cultural Resources $7,500.00 Funding Agency Review Fees $5,000.00 Funding Administration 2.5% $43,190.00 Construction Engineering 16% $276,400.00 Total Estimated Project Cost $2,301,441.60 160 CITY OF YAKIMA Wiley City Sewer Services Evaluation 10/27/2026 Engineer's Opinion of Construction Cost PRELIMINARY 25160E Item Payment Overall No. Description Specification Unit Unit Cost Quantity Overall Cost ALTERNATIVE C -New Lift Station and Force Main Via S Wiley Rd and Ahtanum Rd 1 Minor Change 1-04.4(1) FA $25,000.00 1 $25,000.00 2 SPCC Plan 1-07.15(1) LS $2,500.00 1 $2,500.00 3 Mobilization 2-01.5 LS $124,000.00 1 $124,000.00 4 Project Temporary Traffic Control 2-04.5(1) LS $50,000.00 1 $50,000.00 5 Clearing and Grubbing 3-01.5 LS $10,000.00 1 $10,000.00 6 Removal of Structures and Obstructions 3-02.5 LS $5,000.00 1 $5,000.00 7 Unclassified Excavation Incl. Haul 3-03.5 CY $50.00 530 $26,500.00 8 Crushed Surfacing Base Course 4-05.5 TON $50.00 1,770 $88,500.00 9 HMA Cl. 1/2-Inch PG 64H-28 5-04.5 TON $150.00 1,800 $270,000.00 10 Wetwell Manhole, In Place 7-05.5 EA $50,000.00 1 $50,000.00 11 Precast Concrete Vault 7-05.5 EA $17,000.00 1 $17,000.00 12 Shoring or Extra Excavation 7-08.5 LF $2.00 8,130 $16,260.00 13 Select Backfill, as Directed 7-08.5 CY $100.00 40 $4,000.00 14 Submersible Sewer Pumps 7-22.5 LS $200,000.00 1 $200,000.00 15 Sewer Force Main and Fittings,X In. Diam. 7-25.5 LF $70.00 8,130 $569,100.00 16 Erosion Control and Water Pollution Prevention 8-01.5 LS $4,000.00 1 $4,000.00 17 Electrical and Control System Improvements, Complete 8-20.5 LS $175,000.00 1 $175,000.00 18 Pavement Markings 8-22.5 LS $25,000.00 1 $25,000.00 Subtotal $1,661,860.00 Sales Tax 8.6% $142,919.96 Assumptions: Contingency 20% $361,000.00 1. 3'wide trench, 5'wide trench patch, full lane 12' repair Total Estimated Construction Cost $2,165,779.96 2. Resurfacing section (0.35' HMA 1' CSBC over trench, 0.15' grind &overlay 12'wide) 3. Lift station structures to be backfilled with select backfill Design Engineering 14% $303,210.00 Environmental and Cultural Resources $7,500.00 Funding Agency Review Fees $5,000.00 Funding Administration 2.5% $54,140.00 Construction Engineering 16% $346,520.00 Total Estimated Project Cost $2,882,149.96 161 Alternative D-Equalization Tanks and Gravity Sewer Via Trolley Line Easement Item Qty Unit Unit Price Total Mobilization 1 LS $500,000 $500,000 Paving/Site work 1 LS $200,000 $200,000 EQ Tank with mixers 200,000 Gallons $3 $600,000 Influent Screen 2 EA $250,000 $500,000 Electrical controls for phased discharge 1 EA $250,000 $250,000 Subtotal $2,050,000 Contingency 20% $410,000 Total construction estimate wo tax $2,460,000 Taxes 8.6% $211,560 $2,671,560 Engineering 14% $374,018 Funding Administration 3% $66,789 Construction Assistance 16% $427,450 $3,539,817 Plus connection to City via gravity line costs Gravity Mainline via Existing Trolley Right-of-way $2,040,000 Land Purchase Cost(5 acres at$100,000 per acre $500,000 Sub total $6,079,817 Wiley City Collection System $7,290,000 Total $13,369,817 162 CITY OF YAKIMA Wiley City Sewer Services Evaluation 10/27/2026 Engineer's Opinion of Construction Cost PRELIMINARY 25160E Item Payment Overall No. Description Specification Unit Unit Cost Quantity Overall Cost Sewer Main Throughout Wiley City -To Connect to Central Area 1 Minor Change 1-04.4(1) FA $25,000.00 1 $25,000.00 2 Mobilization 2-01.5 LS $313,000.00 1 $313,000.00 3 Project Temporary Traffic Control 2-04.5(1) LS $150,000.00 1 $150,000.00 4 Removal of Structures and Obstructions 3-02.5 LS $25,000.00 1 $25,000.00 5 Unclassified Excavation Incl. Haul 3-03.5 CY $22.00 1,470 $32,340.00 6 Crushed Surfacing Base Course 4-05.5 TON $50.00 4,900 $245,000.00 7 HMA Cl. 1/2-Inch PG 64H-28 5-04.5 TON $120.00 4,900 $588,000.00 8 Manhole 48 In. Diam. Type 1 7-05.5 EA $6,000.00 58 $348,000.00 9 Shoring or Extra Excavation 7-08.5 LF $2.00 22,610 $45,220.00 10 Select Backfill, as Directed 7-08.5 CY $100.00 220 $22,000.00 11 PVC Sanitary Sewer Pipe 8 In. Diam. 7-17.5 LF $100.00 22,610 $2,261,000.00 12 Erosion Control and Water Pollution Prevention 8-01.5 LS $10,000.00 1 $10,000.00 13 Pavement Markings 8-22.5 LS $150,000.00 1 $150,000.00 Subtotal $4,214,560.00 Sales Tax 8.6% $362,452.16 Assumptions: Contingency 20% $915,400.00 1. 3'wide trench, 5'wide trench patch, full lane 12' repair Total Estimated Construction Cost $5,492,412.16 2. Resurfacing section (0.35' HMA 1' CSBC over trench, 0.15' grind &overlay 12'wide) 3. 1% slope for gravity sewer Design Engineering 14% $768,940.00 4. Manholes every 400 feet Environmental and Cultural Resources $7,500.00 Funding Agency Review Fees $5,000.00 Funding Administration 2.5% $137,310.00 Construction Engineering 16% $878,790.00 Total Estimated Project Cost $7,289,952.16 163 Wiley City Conventional WWTP Cost Estimate Item Qty Unit Unit price Total Mobilization 1 LS $1,000,000 $1,000,000 Paving/Site work 1 LS $200,000 $200,000 EQ Tank with mixers 200,000 Gallons $3 $600,000 Influent Screen 2 EA $250,000 $500,000 Building 2,000 SF $500 $1,000,000 Office/Lab area 1 LS $200,000 $200,000 Aeration Basin 1 LS $2,500,000 $2,500,000 Electrical 1 LS $2,000,000 $2,000,000 Infiltration Gallery 1 LS $4,500,000 $4,500,000 Influent Channel 1 LS $100,000 $100,000 Screw Press/Thickener 1 LS $500,000 $500,000 Sludge Storage Tank 1 LS $200,000 $200,000 Digester 1 LS $300,000 $300,000 Digester Blower/piping and diffusers 1 LS $200,000 $200,000 Drying Beds 1 LS $200,000 $200,000 Subtotal $14,000,000 Contingency 20% $2,800,000 Total construction estimate wo tax $16,800,000 Taxes 8.6% $1,444,800 $18,244,800 Engineering 14% $2,554,272 Funding Administration 2.5% $456,120 Construction assistance 16% $2,919,168 $24,174,360 Land Purchase Cost- 10 acres $1,000,000 Wiley City Collection System $7,290,000 Total $32,464,360 164 Wiley City MBR WWTP Cost Estimate Item Qty Unit Unit price Total Mobilization 1 LS $1,000,000 $1,000,000 Paving/Site work 1 LS $200,000 $200,000 EQ Tank with mixers 200,000 Gallons $3 $600,000 Influent Screen 2 EA $250,000 $500,000 Office/Lab area 1 LS $200,000 $200,000 MBR Tanks 60,400 Gallons $30 $1,812,000 MBR Equipment 1 LS $1,700,000 $1,700,000 MBR Building and Equipment Installation 1 LS $4,500,000 $4,500,000 Electrical 1 LS $2,000,000 $2,000,000 Infiltration gallery 1 LS $4,500,000 $4,500,000 Screw Press/Thickener 1 LS $500,000 $500,000 Sludge Storage Tank 1 LS $200,000 $200,000 Digester 1 LS $300,000 $300,000 Digester Blower/piping and diffusers 1 LS $200,000 $200,000 Drying Beds 1 LS $200,000 $200,000 Subtotal $18,412,000 Contingency 20% $3,682,400 Total construction estimate wo tax $22,094,400 Taxes 8.6% $1,900,118 $23,994,518 Engineering 14% $3,359,233 Funding Administration 2.5% $599,863 Construction Assistance 16% $3,839,123 $31,792,737 Land Purchase Cost- 5 acres $500,000 Wiley City Collection System $7,290,000 Total $39,582,737 165 APPENDIX C PUBLIC OUTREACH r jI vot ter ; • ! r . r • � ,A: 0>FILA HLAI.. WILEY CITY SEWER IMPROVEMENTS BENEFITS OF CONNECTIN • ' = • Pi l'il RPOk ATLD 18 IMPROVED SANITATION & PUBLIC HEALTH: City sewer service eases concern about septic system failures, leaks, or contamination. SUPPORT COMMUNITY GROWTH AND FUTURE DEVELOPMENT: Sewer infrastructure can accommodate future homes, businesses, and community improvements. PEACE OF MIND: Ongoing City maintenance offers long term reliability. For you, that means no surprise costs for septic repairs or replacements. INCREASE PROPERTY VALUE AND MARKETABILITY: Access to public sewer service is often viewed as a desirable feature by homebuyers and lenders. Pumping a septic tank before selling is no longer needed. PROVIDE A CENTRALIZED, PROFESSIONALLY MANAGED WASTEWATER SYSTEM: System operation, maintenance, and regulatory compliance are handled by qualified utility personnel. CREATE A SUSTAINABLE WASTEWATER SOLUTION FOR FUTURE GENERATIONS: Investing in modern infrastructure helps ensure reliable service and environmental protection for years to come. L/ 67 WILEY CITY SEWER IMPROVEMENTS WE WANT TO HEAR FROM YOU! Sewer Service Is Potentially Coming To Your Area! ; Y i`1k', Open House, p • Review and discuss alternatives for , 40).,'', West Valley Fair q . : ' Thursday,June 18th a local wastewater treatment plant ui ;•�% Anytime betweenor connection to the City of Yakima: %q 4pm-7pm �0,,, ,i ••••••• se ' 3120 S.Wiley Rd,Yakima, Would you connect? ',`,:‘,": ,: „ - WA 98903 Project Background Many septic tanks in the Wiley City/Ahtanum area are aging and experiencing failures. The City of Yakima is performing a study to examine the feasibility of expanding sanitary sewer services within Wiley City and evaluating alternatives to establish a comprehensive wastewater management system. West Valley School District#208 does not sponsor this event and assumes no responsibility for it.In consideration of the privilege to distribute materials,the West Valley School District shall be held harmless from any cause of action filed in any court or administrative tribunal arising out of the distribution of these materials,including costs,attorney's fees and judgments or awards. Questions? For more information please contact Tanner Cline at(509)966-7000 or tcline@hlacivil.com 168 WILEY CITY MEJORAS AL SISTEMA DE DRENAJE SANITARIO ;El servicio de drenaje iQUERFMOS ESCUCHAR SU sanitario podria llegar a su OPINION! area! I- ,-----,-,--risq‘,,„,,. jCasa Abierta! Revisar y discutir alternativas para •' '••1r"f, Feria de West Valley una planta local de tratamiento de , % Jueves,18 de Junio aguas residuales o una conexion al Visitenos entre las sistema de la Ciudad de Yakima: %,u''• '••••�i 4pm-7pm 3120 S.Wiley Rd,Yakima �+ '� a9`^ Se conectar�a al sistema de ``° .,,>aATh1> '_ WA 98903 drenaje sanitario? Antecedentes del proyecto Muchos sistemas septicos en el area de Wiley City/Ahtanum estan envejeciendo y presentando fallas. La Ciudad de Yakima esta realizando un estudio para evaluar la viabilidad de expandir los servicios de drenaje sanitario dentro de Wiley City y analizar alternativas para establecer un sistema integral de adminstracion de aguas residuales. El Distrito Escolar de West Valley#208 no patrocina este evento y no asume responsabilidad alguna por este.En consideracidn al privilegio de distribuir materiales,el Distrito Escolar de West Valley no puede asumir responsabilidad por alguna accidn que Ileve a corte o un tribunal administrativo que surja de la distribucidn de estos materiales,incluyendo costos, cuotas de abogados y juicios o premios. 169 zPregunatas? Para obtener mas informaci6n,por favor comuniquese con:Marla Meza(509)966-7000 o mmeza@hlacivil.com ----) -- Noir C ., Survey Wiley City Sewer Improvements We Want to Hear From You and Value Your Input! 1. Do you prefer on-site septic or sanitary sewer service? Cl Septic ❑ Sewer Why? — & ,' /hna a-; ' J 2.What is the maximum payment you could pay for a one-time connection fee to sewer? El None .-' $1,500 El$2,500 ❑ $3,500 ❑$4,500 ❑$5,000+ For reference, the typical City of Yakima Connection outside City limits Fee: $4,320 3. What is the maximum monthly payment you would be willing to pay for sewer service? El $75 ❑$125 ❑$175 ❑$225 El $275 For reference, the typical rate outside City limits of Yakima is $63 per month Cost to pump a septic tank: $500 every 3 years Cost to replace a septic system: $10,000 to $15,000, if standard system meets County standards, up to $30,000 - $40,000 if a non-standard system is required 4. Property address: 03 S. Cti1 /e 5. Name of property owner: 1�,,,j `,,% '{`r_ o sr r� 6. Additional comments or questions: Survey Return Answer the questions above and return to one of the open house hosts! <tom LA 170 ......ri ,jl survey Wiley City Sewer Improvements We Want to Hear From You and Value Your Input! 1. Do you prefer on-site septic or sanitary sewer service? '� . Septic ❑ Sewer Why? c..*‘'oA oU���\,\ 2. What is the maximum payment you could pay for a one-time connection fee to sewer? None ,r^"\ V.,r,.,vij".t11 ‘NC:oovi. 1S Ltsg hear ❑$1,500 -5 k. o.s-.Arc+.,� ❑ $2,500 ❑$3,500 ❑$4,500 ❑$5,000+ For reference, the typical City of Yakima Connection outside City limits Fee: $4,320 3. What is the maximum monthly payment you would be willing to pay for sewer service? ❑ $75 ❑ $125 ❑ $175 ❑ $225 ❑ $275 For reference, the typical rate outside City limits of Yakima is $63 per month Cost to pump a septic tank: $500 every 3 years Cost to replace a septic system: $10,000 to $15,000, if standard system meets County standards, up to $30,000 - $40,000 if a non-standard system is required 4. Property address: t\go\ G‘\54xN e\ 5. Name of property owner: ,6 ctAV• iktAr4\-,I\ G +r e 6. Additional comments or questions: A•p ce.cAsc 1.-_ -\ - a \cr,cr\5 bv.\ 1 05 ,LL u -NONS0 (t.F"\e Coc )44"\)\ ‘N cows-it, . = ay .. C L\-.3.i. Q.. V IN 171S A17)%t '1 , Survey Return Answer the questions above and return to one of the open house hosts! 0 IILA 171 :,--.: . � Survey. 17.1 Wiley City Sewer Improvements We Want to Hear From You and Value Your Input! 1. Do you prefer on-site septic or sanitary sewer service? 4 Septic Sewer , ' r�I _ �f t}� a n p Why? 4 V t ' 0[/ l'� 5 11" l"T !� ..� , /LIPA/4 % 2. What is the maximum payment you could pay for a one-time connection fee to sewer? ❑ None ❑$1,500 ❑$2,500 M$3,500 ❑$4,500 ❑ $5,000+ For reference, the typical City of Yakima Connection outside City limits Fee: $4,320 3.What is the maximum monthly payment you would be willing to pay for sewer service? ❑$75 WI$125 ❑$175 ❑ $225 ❑$275 For reference, the typical rate outside City limits of Yakima is$63 per month Cost to pump a septic tank: $500 every 3 years Cost to replace a septic system: $10,000 to $15,000, if standard system meets County standards, up to $30,000- $40,000 if a non-standard system is required 4. Property address: 14 U a It r$ A eti 5. Name of property owner: ��"�,-� ,L, 6. Additional comments or questions: Survey Return Answer the questions above and return to one of the open house hosts! 0 ILA 172 (.._, �- Survey Wiley City Sewer Improvements We Want to Hear From You and Value Your Input! 1. Do you prefer on-site septic or sanitary sewer service? i ,Septic ❑Sewer 1� Why?. L CC L1 ._ 11 . Q n 2 n M 0.-� r '\" OC\ 0 k,f O kA n A9460050064404 2. What is the maximum payment you could pay for a one-time connection fee to sewer? None ❑ $1,500 ❑ $2,500 ❑$3,500 ❑$4,500 ❑$5,000+ For reference, the typical City of Yakima Connection outside City limits Fee: $4,320 3. What is the maximum monthly payment you would be willing to pay for sewer service? CI$5 0(02. dt- ' im +i '�l `� t-g ❑$125 ❑$175 ❑$225 ❑$275 For reference, the typical rate outside City limits of Yakima is$63 per month Cost to pump a septic tank: $500 every 3 years Cost to replace a septic system: $10,000 to $15,000, if standard system meets County standards, up to $30,000-$40,000 if a non-standard system is required 4. Property address: \l r @�\be.44- 3-6. 5. Name of property owner: �� ,,2'ti(7-1-h 6. Additional comments or questions: UW� l� r4-C o( - ,,1 .�� 1r�d ~'era Co`rC _ \ � -� C�Va mf� - - 6 n 00�+ r'1 Mcn 'r� 1- ? c Survey Return Answer the questions above and return to one of the open house hosts! < /1ILI . 173 Survey Wiley City Sewer Improvements We Want to Hear From You and Value Your Input! 1. Do you prefer on-site septic or sanitary sewer service? ❑Septic ❑Sewer Why? 2. What is the maximum payment you could pay for a one-time connection fee to sewer? Ed None ❑$1,500 ❑$2,500 ❑$3,500 ❑ $4,500 ❑ $5,000+ For reference, the typical City of Yakima Connection outside City limits Fee: $4,320 3. What is the maximum monthly payment you would be willing to pay for sewer service? ❑ $75 ❑$125 ❑$175 ❑$225 ❑$275 For reference, the typical rate outside City limits of Yakima is $63 per month Cost to pump a septic tank: $500 every 3 years Cost to replace a septic system: $10,000 to $15,000, if standard system meets County standards, up to $30,000- $40,000 if a non-standard system is required 4. Property address: 5. Name of property owner: 6. Additional comments or questions: Survey Return Answer the questions above and return to one of the open house hosts! HLA 174 (---- Nor 7 Survey Wiley City Sewer Improvements We Want to Hear From You and Value Your Input! 1. Do you prefer on-site septic or sanitary sewer service? r.; Septic ❑ Sewer ,_' Why? 4ps41,/ h Live O - / "PI 5 to 1i`4/� w 2. What is the maximum payment you�c -pay for a one-time connection fee to sewer? ❑ None ve-t(a° ❑$1,500 ❑$2,500 ❑$3,500 � 4,500 ❑$5,000+ For reference, the typical City of Yakima Connection outside City limits Fee: $4,320 3. What is the maximum monthly payment you would be willing to pay for sewer service? ❑$125 ❑$175 ❑$225 ❑$275 For reference, the typical rate outside City limits of Yakima is$63 per month Cost to pump a septic tank: $500 every 3 years Cost to replace a septic system: $10,000 to $15,000, if standard system meets County standards, up to $30,000 - $40,000 if a non-standard system is required 4. Property address: fi'M PrkiliCtill 5. Name of property owner: J ok,\ c7 JA4Q 6. Additional comments or questions: Survey Return Answer the questions above and return to one of the open house hosts! 0- -ILA 175 t I ` : r.�' Survey Wiley City Sewer Improvements We Want to Hear From You and Value Your Input! 1. Do you prefer on-site septic or sanitary sewer service? E Septic ❑ Sewer Why? J zi ru, pc p 4 (2,0c.Pe_) 2. What is the maximum payment you could pay for a one-time connection fee to sewer? ❑ None ix $1,500 ❑ $2,500 ❑ $3,500 ❑ $4,500 ❑$5,000+ For reference, the typical City of Yakima Connection outside City limits Fee: $4,320 3.What is the maximum monthly payment you would be willing to pay for sewer service? ❑$75 On! W,ffi PCarSu-tr7e c 7-4 ml 0-111,v--1-6,,,, oxr-- 1 tLe- , ❑$125 7 ' .'E"lf,b I S /vwra "til-_— ` ter- r rF tJiTt,:r j e `,. ❑$175 ❑$225 ❑$275 For reference, the typical rate outside City limits of Yakima is $63 per month Cost to pump a septic tank: $500 every 3 years Cost to replace a septic system: $10,000 to $15,000, if standard system meets County standards, up to $30,000- $40,000 if a non-standard system is required 4. Property address: /(7.3v,3 inec-cletol2d4 / JJ 5. Name of property owner: ,/ r rkr -(-14A-447 34444.104, 6. Additional comments or questions: ^''c'd a..�rr+an '“-/6. 5 %f ccm--- Survey Return Answer the questions above and return to one of the open house hosts! w �� ���;;;••• 176 rvi.0 ki-ict-e, Pipe_+''- S :, 5 0n C5 lS Y ....,,,:air 4 ,) _ 15 7- -k , ,: Surve y Wiley City Sewer Improvements We Want to Hear From You and Value Your Input! 1. Do you prefer on-site septic or sanitary sewer service? ❑S= 'tic '►'.Sewer • Why? 5 PTIC, 640C)W410 2. What is the maximum payment you could pay for a one-time connection fee to sewer? ❑ None ❑$1,500 1 52,500 ❑$3,500 ❑ $4,500 ❑ $5,000+ For reference, the typical City of Yakima Connection outside City limits Fee: $4,320 3. What is the maximum monthly payment you would be willing to pay for sewer service? ❑ $75 ❑ $125 g$175 ❑$225 ❑$275 For reference, the typical rate outside City limits of Yakima is$63 per month Cost to pump a septic tank: $500 every 3 years , Cost to replace a septic system: $10,000 to $15,000, if standard system meets County standards, up to $30,000- $40,000 if a non-standard system is required 4. Property address: a Jam' 5. Name of property owner: 1?LIC E - rieGC-tP-SnA) 6.Additional comments or questions: Survey Return Answer the questions above and return to one of the open house hosts! 0 HLA 177 '� Q,. Survey Wiley City Sewer Improvements We Want to Hear From You and Value Your Input! 1. Do you prefer on-site septic or sanitary sewer service? ❑Septic Sewer 1 t [ Why? 1 2. What is the maximum payment you could pay for a one-time connection fee to sewer? ❑ None ❑$1,500 ❑$2,500 ❑$3,500 El$4 500 `GL$5 000+ Fgr reference, the typical City of Yakima Connection outside City limits Fee: $4,320 3. What is the maximum monthly payment you would be willing to pay for sewer service? ❑$75 ❑ $125 El$175 E$225 For reference, the typical rate outside City limits of Yakima is $63 per month Cost to pump a septic tank: $500 every 3 years Cost to replace a septic system: $10,000 to $15,000, if standard system meets County standards, up to $30,000 - $40,000 if a non-standard system is required /1/4S---- 4. Property addres : q (r��( - 5. Name of property owner: Crt : 0eelif\---( ! 6. Additional comments or questions: . 11--T2 -t '$f C`_ 1 Survey Return Answer the questions above and return to one of the open house hosts! 0)11LA 178 Sid 5 ocv- d, i ►.v � ( '.tir'llit---;:..i I. �. W .1. Survey Wiley City Sewer Improvements We Want to Hear From You and Value Your Input! 1. Do you prefer on-site septic or sanitary sewer service? Septic ❑Sewer Why? 2. What ti�is''the maximum payment you could pay for a one-time connection fee to sewer? fn one ❑$1,500 ❑$2,500 ❑$3,500 ❑$4,500 ❑$5,000+ For reference, the typical City of Yakima Connection outside City limits Fee: $4,320 3. What ithe maximum monthly payment you would be willing to pay for sewer service? ❑-�1at5 ❑ $125 ❑ $175 ❑ $225 ❑$275 For reference, the typical rate outside City limits of Yakima is $63 per month Cost to pump a septic tank: $500 every 3 years Cost to replace a septic system: $10,000 to $15,000, if standard system meets County standards, up to $30,000 - $40,000 if a non-standard system is required wpi 4. Property address: 1 CAo(% -V\\ Oke 'S r4 qoY'''''' 5. Name of property owner: / �' r stions: ' th()1. 1�' M' .(01, 6 Additional comments o que V Survey Return Answer the questions above and return to one of the open house hosts! oi LA 179 rr Survey Wiley City Sewer Improvements We Want to Hear From You and Value Your Input! ' Q (Li 1. Do you prefer on-site septic or sanitary sewer service? ❑ Septic ASewer Why? 17'- ((it -eil'il— f `J 2. What is the maximum payment you could pay for a one-time connection fee to sewer? E None ❑ $1,500 N$2,500 ❑ $3,500 ❑ $4,500 ❑ $5,000+ For reference, the typical City of Yakima Connection outside City limits Fee: $4,320 3. What is the maximum monthly payment you would be willing to pay for sewer service? ❑ $75 It:$125 ❑ $175 ❑$225 ❑$275 For reference, the typical rate outside City limits of Yakima is $63 per month Cost to pump a septic tank: $500 every 3 years Cost to replace a septic system: $10,000 to $15,000, if standard system meets Coun standards, up to $30,000- $40,000 if a non-standard system is required ,`).M// yylf ) Y 1 L7-0 yet A pt. (I/JGJ a66 - ' qq - 4. Property address: 307 O "'. q 4-v-e 5. Name of property owner: 72/Gr 4- 72ty4/' ix/` f 6. Additional comments or questions: 15 T h4f- at Ti 41 E- F,cr mz 1—z— i, lff ,0'1-6 1dl-e®'l Survey Return Answer the questions above and return to one of the open house hosts! LA QM 180 � �'C .f, Survey -.--._ Wiley City Sewer Improvements We Want to Hear From You and Value Your Input! 1. Do you prefer on-site septic or sanitary sewer service? Septic ❑ Sewer Why? — 2. What is the maximum payment you could pay for a one-time connection fee to sewer? ▪ None ❑$1,500 ❑$2,500 ❑ $3,500 ❑ $4,500 ❑ $5,000+ For reference, the typical City of Yakima Connection outside City limits Fee: $4,320 3. What is the maximum monthly payment you would be willing to pay for sewer service? LI $75 ❑$125 ❑ $175 ❑ $225 ❑$275 Pe" For reference, the typical rate outside City limits of Yakima is$63 per month X 12, = 75C� y Cost to pump a septic tank: $500 every 3 years 6,c.--4-Al- 6c''5 ' Ie-SS-' e (/Ov ; g6 // o; _44, Cost to replace a septic system: $10,000 to $15,000, if standard system meets County standards, up to $30,000 - $40,000 if a non-standard system is required 4. Property address: _ _ . 19L44-1 4 1- 5. Name of property owner: f"e Q-.-Lfi 1 6`J r"G( 6. Additional comments or questions: 0 ° LL ci��-T 4- :c Survey Return Answer the questions above and return to one of the open house hosts! *1-ILA 181 ` y > Survey Wiley City Sewer Improvements We Want to Hear From You and Value Your Input! 1. Do you prefer on-site septic or sanitary sewer service? ❑ Septic .Sewer Why? �1 �4t� -Pa'r✓t LiP ' 2. What is the maximum payment you could pay for a one-time connection fee to sewer? ❑ None X$1,500 ❑ $2,500 ❑$3,500 ❑$4,500 ❑$5,000+ For reference, the typical City of Yakima Connection outside City limits Fee: $4,320 3. What is the maximum monthly payment you would be willing to pay for sewer service? t.$75 ❑$125 ❑$175 ❑$225 ❑$275 For reference, the typical rate outside City limits of Yakima is$63 per month Cost to pump a septic tank: $500 every 3 years Cost to replace a septic system: $10,000 to $15,000, if standard system meets County standards, up to $30,000- $40,000 if a non-standard system is required 4. Property address: 1 IT 491 5. Name of property owner: 44.6., tit kitir 6. Additional comments or questions: Survey Return Answer the questions above and return to one of the open house hosts! OimILA 182 ' _yt C, Encuesta Wiley City Mejoras Drenaje Sanitario iQueremos escucharle y valoramos su opinion! 1. e:,Prefiere mantener su sistema septico o conectarse al sistema de drenaje sanitario? D Septico 16 Drenaje Sanitario Po fo-hr c fv r Ci. cii, � -1 2 a ( e 1 c/(n Q C'OS("P C<0IA VII OS ccvayf 0 s 2. 1,Cual es el monto maximo que podria pagar por una tarifa Unica de conexion al drenaje sanitario? ❑ Ninguno ❑ $1,500 ❑$2,500 ❑ $3,500 k $4,500 ❑ $5,000+ Como referencia, la tarifa tipica de conexiOn al alcantarillado de la Ciudad de Yakima para propiedades ubicadas fuera de los limites de la ciudad es de $4,320. 3. ,Cual es el pago mensual maximo que estaria dispuesto(a) a pagar por el servicio de drenaje sanitario? $75 ❑$125 ❑$175 ❑$225 ❑ $275 Como referencia, la tarifa mensual tipica fuera de los limites de la Ciudad de Yakima es de $63. Costo de vaciar un tanque septico: aproximadamente $500 cada 3 anos Costo de reemplazo de un sistema septico: $10,000 a $15,000 si un sistema estandar cumple con los requisitos del condado; hasta $30,000 a $40,000 si se requiere un sistema no estandar. 4. Direccion de la propiedad: 5. Nombre del propietario:, -y Jr ca k1 J p a c!,"et+ e 16 6. Comentarios o preguntas adicionales: n oc i3 2 if 9.moil '' coo., *MLA Devolucion de la Encuesta Responda las preguntas anteriores y devuelva la encuesta a uno de los anfitriones de la reunion 183