Loading...
HomeMy WebLinkAbout10/06/2026 07.L. Resolution - accept $3million Bureau Reclamation grant_Nelson Ph2 pipeline conveyance proj IC2010 ' e+ i'i i 1�•• r y/I • • i t, gin.;:::: __-`` " BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No. 7.L. For Meeting of: October 6, 2026 ITEM TITLE: Resolution accepting a Bureau of Reclamation grant for the Nelson Phase 2 Pipeline Conveyance Improvements Project IC2010 (Grant Funding) SUBMITTED BY: Scott Schafer, Director of Public Works * Daniel Tiliano, Water/Irrigation Manager SUMMARY EXPLANATION: The City of Yakima (City) is moving forward with the construction of the Nelson Phase 2 Pipeline Conveyance Improvements Project IC2010. This agreement sets forth the terms and conditions for the City to utilize the $3,000,000.00 in funding that was made available from the Burau of Reclamation. The funds will be used to construct a portion of the overall pipeline as well as any other tasks for Phase 2. There is no additional match requirement as part of the grant funding agreement. Grant Agreement No. R26AP00146-00 has been attached for City Council review. ITEM BUDGETED: Yes STRATEGIC PRIORITY 24-25: A Resilient Yakima RECOMMENDATION: Adopt Resolution. ATTACHMENTS: Resolution_Bureau Reclamation $3million grant_Nelson Ph2 pipeline proj Notice of Award R26AP00164 Yakima Nelson Dam.pdf 154 RESOLUTION NO. R-2026- A RESOLUTION authorizing an agreement with the Bureau of Reclamation for a grant of $3,000,000.00 for the Nelson Phase 2 Pipeline Conveyance Improvements Project (IC2010). WHEREAS, a Financial Assistance Agreement ("Agreement") is entered into between the Bureau of Reclamation ("Reclamation") and the City of Yakima ("City"), pursuant to Fish and Wildlife Coordination Act of 1934, Public Law 95-624, 16 U.S.C. 661 et seq., as amended, and Section 7(a) of the Fish and Wildlife Coordination Act (FWCA) (70 Stat 1122; 16 U.S.C. 742f(a)); and WHEREAS, the City owns the Nelson Diversion at West Powerhouse Road and South Naches Road in accordance with applicable Federal, State and Local regulations; and WHEREAS, the City, along with its consultant HDR Engineering, Inc., has designed an irrigation pipeline conveyance system from the Nelson Diversion east to the Hwy 12/North 40th Avenue interchange to replace the existing Fruitvale Canal and the Old Union Canal irrigation diversions; and WHEREAS, Reclamation will provide a $3,000,000.00 grant to install a portion of the overall irrigation pipeline conveyance system; and WHEREAS, the City indicates their acceptance of this award, including all award terms and conditions, by starting work, drawing down funds, or accepting the award via electronic means; and WHEREAS, the City Council finds and determines that approval of said Grant Agreement is in the best interests of the residents of the City of Yakima; now therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The City Council hereby approves the Nelson Phase 2 Pipeline Conveyance and Water Delivery Agreement and authorizes the City Manager to enter into Grant Agreement No. R26AP00164- 00. The City is not required to sign the Notice of Award. The City Manager is hereby authorized to execute the attached and incorporated agreement with Reclamation. ADOPTED BY THE CITY COUNCIL this 6th day of October, 2026. Matt Brown, Mayor ATT EST: Rosalinda Ibarra, CMC, City Clerk 155 1.DATE ISSUED MM/DDM'YY 1a.SUPERSEDES AWARD NOTICE dated 09/16/2026 except that any additions or restrictions previously imposed NOTICE OF AWARD remain in effect unless spedfically resdnded 2.ASSISTANCE LISTING NUMBER -(SENT OF TA, 15.517-Fish and Wildlife Coordination Act �QP� AVA,. �is �, 'j# A 3.ASSISTANCE TYPE Project Grant O 4.GRANT NO.R26AP00164-00 5. TYPE OF AWARD ` - Originating MCA# Other `" - 4a.FAIN R26AP00164 5a.ACTION TYPE New 6. PROJECT PERIOD MM/DD/YYYY MM/DD/YYYY From 05/01/2026 Through 09/30/2029 AUTHORIZATION(Legislation/Regulations) 7.BUDGET PERIOD MM/DD/YYYY MM/DD/YYYY Fish and Wildlife Coordination Act of 1934,Public Law 85-624,as From 05/01/2026 Through 09/30/2029 amended;as limited and delegated by the Secretary of the Interior 6.TITLE OF PROJECT(OR PROGRAM) Nelson Phase 2 Pipeline Conveyance and Water Delivery 9a.GRANTEE NAME AND ADDRESS 9b.GRANTEE PROJECT DIRECTOR CITY OF YAKIMA Mr.Daniel Tiliano 129 N 2nd St 2301 Fruitvale Blvd. Yakima,WA,98901-2613 YAKIMA,WA,98902 Phone:509-576-6480 10a.GRANTEE AUTHORIZING OFFICIAL 10b.FEDERAL PROJECT OFFICER Ms.Vicki Baker Mr.Nathan Moeller 129 North 2nd Street Bureau of Redamation CPN Region Yakima,WA,98901-2613 1150 N.Curtis Rd Phone:509-575-6272 Boise,ID,83706-1000 Phone:208-378-5211 ALL AMOUNTS ARE SHOWN IN USD 11.APPROVED BUDGET(Excludes Direct Assistance) 12.AWARD COMPUTATION I Financial Assistance from the Federal Awarding Agency Only a.Amount of Federal Financial Assistance(from item 11m) $ 3,000,000.00 II Total project costs including grant funds and all other financial participation (( b.Less Unobligated Balance From Prior Budget Periods $ 0.00 a. Salaries and Wages c.Less Cumulative Prior Award(s)This Budget Period $ 0.00 $ 0.00 d.AMOUNT OF FINANCIAL ASSISTANCE THIS ACTION $ 3,000,000.00 b. Fringe Benefits $ 0.00 13.Total Federal Funds Awarded to Date for Project Period $ 3,000,000.00 c. Total Personnel Costs $ 0.00 14.RECOMMENDED FUTURE SUPPORT d. Equipment $ 0.00 (Subject to the availability of funds and satisfactory progress of the project): e. Supplies $ 0.00 YEAR TOTAL DIRECT COSTS YEAR TOTAL DIRECT COSTS a.2 $ d. 5 $ f. Travel $ 0.00 b. 3 $ e. 6 $ 9- Construction $ 3,000,000.00 c. 4 $ f. 7 $ h. Other $ 0.00 15.PROGRAM INCOME SHALL BE USED IN ACCORD WITH ONE OF THE FOLLOWING ALTERNATIVES: i. Contractual $ 0.00 a. DEDUCTION b b. ADDITIONAL COSTS c. MATCHING j. TOTAL DIRECT COSTS $ 3,000,000.00 d. OTHER RESEARCH(Add/Deduct Option) e. OTHER(See REMARKS) k. INDIRECT COSTS $ 0.00 16.THIS AWARD IS BASED ON AN APPLICATION SUBMITTED TO,AND AS APPROVED BY,THE FEDERAL AWARDING AGENCY ON THE ABOVE TITLED PROJECT AND IS SUBJECT TO THE TERMS AND CONDITIONS INCORPORATED EITHER DIRECTLY I. TOTAL APPROVED BUDGET $ 3,000,000.00 OR BY REFERENCE IN THE FOLLOWING: a. The grant program legislation b. The grant program regulations. c. This award notice including terms and conditions,if any,noted below under REMARKS. m. Federal Share $ 3,000,000.00 d. Federal administrative requirements,cost principles and audit requirements applicable to this grant. In the event there are conflicting or otherwise inconsistent policies applicable to the grant,the above order of precedence shall n. Non-Federal Share $ 0.00 prevail.Acceptance of the grant terms and conditions is acknowledged by the grantee when funds are drawn or otherwise obtained from the grant payment system. REMARKS (Other Terms and Conditions Attached- O Yes O No) See next page GRANTS MANAGEMENT OFFICIAL: Nathan Moeller,Grants Management Specialist Bureau of Redamation CPN Region 1150 N.Curtis Rd Boise,ID,83706-1000 Phone:208-378-5211 17. VENDOR CODE 0071340010 18a.UEI FJNNX1XFJ9K3 18b.DUNS 19. CONG.DIST. 04 LINE# FINANCIAL ACCT AMT OF FIN ASST START DATE END DATE TAS ACCT PO LINE DESCRIPTION 1 0054015253-00010 $3,000,000.00 05/01/2026 09/30/2029 0680 FA Nelson 156 PAGE 2 of 3 DATE ISSUED NOTICE OF AWARD (Continuation Sheet) 09/16/2026 GRANT NO. R26AP00164-00 REMARKS: Recipients are NOT required to sign the Notice of Award or any other award document. Recipients indicate their acceptance of an award,including award terms and conditions,by starting work,drawing down funds,or accepting the award via electronic means. Recipient acceptance of an award carries with it the responsibility to be aware of and comply with all terms and conditions applicable to the award. Recipients are responsible for ensuring that their subrecipients and contractors are aware of and comply with applicable award statutes,regulations,and terms and conditions. Recipient failure to comply with award terms and conditions can result in Reclamation taking one or more of the remedies and actions described in 2 CFR 200.339.343 Costs outlined in the budget table under Section 11.of this Notice of Award are not reflective of the amount that was approved for total project costs over the five years of this award.The amount listed in this table only reflects the amount that is to be obligated on this award under this action.To view total project cost approval, please look at the Budget in the Agreement Terms and Conditions. 2 157 PAGE 3 of 3 DATE ISSUED NOTICE OF AWARD (Continuation Sheet) 09/16/2026 GRANT NO. R26AP00164-00 Federal Financial Report Cycle Reporting Period Start Date Reporting Period End Date Reporting Type Reporting Period Due Date 05/01/2026 09/30/2026 Semi-Annual 10/30/2026 10/01/2026 03/31/2027 Semi-Annual 04/30/2027 04/01/2027 09/30/2027 Semi-Annual 10/30/2027 10/01/2027 03/31/2028 Semi-Annual 04/30/2028 04/01/2028 09/30/2028 Semi-Annual 10/30/2028 10/01/2028 03/31/2029 Semi-Annual 04/30/2029 05/01/2026 09/30/2029 Project Final 01/28/2030 Performance Progress Report Cycle Reporting Period Start Date Reporting Period End Date Reporting Type Reporting Period Due Date 05/01/2026 09/30/2026 Semi-Annual 10/30/2026 10/01/2026 03/31/2027 Semi-Annual 04/30/2027 04/01/2027 09/30/2027 Semi-Annual 10/30/2027 10/01/2027 03/31/2028 Semi-Annual 04/30/2028 04/01/2028 09/30/2028 Semi-Annual 10/30/2028 10/01/2028 03/31/2029 Semi-Annual 04/30/2029 05/01/2026 09/30/2029 Project Final 01/28/2030 3 158 AWARD ATTACHMENTS CITY OF YAKIMA R26AP00164-00 1.Agreement template 159 �1 0 — BUREAU OF — RECLAMATION Federal Financial Assistance Terms and Conditions of Award Table of Contents I. Award Administration and Overview 2 1. Authority 2 2. Public Purpose of Support 2 3. Background and Objectives 3 4. Financial Assistance Administrative Regulations 3 5. Regulatory Compliance 3 6. Acceptance 4 7. Amendments 4 II. Project Performance 4 1. Project Narrative and Milestones 4 2. Recipient Responsibilities 6 3. Reclamation Responsibilities 6 III. Financial Assistance 6 1. Available Funding 6 2. Approved Budget 7 3. Cost Sharing Requirement 8 4. Pre-Award Incurrence of Costs 8 5. Indirect Costs 8 IV. Payment Information 9 1. Payment Method 9 2. Payment 9 3. Return of Funds, Excess Cash, and Interest 9 3.1 Return of Funds or Excess Cash 9 3.2 Return of Interest 10 V. Reporting Requirements 10 1. Reclamation Required Reports and Submission 10 1.1 Financial Reporting Requirements 10 FY26 Version 01, published February 10, 2026 160 1.2 Performance Progress Reporting Requirements 11 2. Federal-wide Reports and Disclosures 11 2.1 System for Award Management 12 2.2 Subawards and Executive Compensation 12 2.3 Reporting Recipient Integrity and Performance 12 2.4 Conflicts of Interest 12 2.5 Trafficking Victims Protection 14 3. Remedies for Noncompliance 14 VI. Program or Project Specific Terms and Conditions 14 1. Buy America Preference for Infrastructure Projects 14 1. Liability 18 VII. Reclamation Contacts 18 1. Grants Officer 18 2. Grants Management Specialist 18 3. Grants Officer's Technical Representative 19 VIII. Department of Interior Standard Terms and Conditions 19 I. Award Administration and Overview 1. Authority This Financial Assistance Agreement (Agreement) is entered into between the Bureau of Reclamation (Reclamation) and the City of Yakima (Recipient), pursuant to Fish and Wildlife Coordination Act of 1934, Public Law 85-624, 16 U.S.C. 661 et seq., as amended, and Section 7(a) of the Fish and Wildlife Coordination Act (FWCA) (70 Stat 1122; 16 U.S.C. 742f(a)) 2. Public Purpose of Support The public purpose of this agreement is to improve fish passage for threatened and endangered aquatic species at the Nelson Dam site, improve flood control in the Yakima River and improve the water deliveries for irrigation in the area. Page 2 of 19 161 3. Background and Objectives The Nelson Phase 2 Project builds on the successful completion of the Nelson Dam Removal and Diversion Project (Phase 1), which was finalized in 2023. Phase 1 removed the aging Nelson Dam on the Naches River, restored fish passage, improved river processes, reduced flood risks, and established a new irrigation diversion and fish screening facility. With this critical infrastructure in place, Phase 2 shifts the focus to modernizing the region's irrigation conveyance system.The project includes installing new 24- to 42-inch irrigation pipelines extending from the new Nelson diversion east along Highway 12 to the existing Fruitvale irrigation canal near North 40th Avenue. This work represents the next step in a decade-long, multi-agency effort supported through the Yakima Basin Integrated Plan to improve both water infrastructure and ecosystem health. The primary objective of Phase 2 is to improve the reliability and efficiency of irrigation water delivery for the City of Yakima's General and Fruitvale irrigation systems, as well as the Old Union Canal system. By consolidating water diversions at the new Nelson facility, the project will eliminate the need for the existing Fruitvale and Old Union diversion structures, enabling Yakima County to undertake floodplain restoration at the confluence of Cowiche Creek and the Naches River. In addition to enhancing long-term water supply reliability,the project supports habitat restoration, improves fish passage, reduces maintenance needs, and strengthens regional resilience through coordinated investments funded by state and federal grants. Construction is scheduled for completion in spring 2026. 4. Financial Assistance Administrative Regulations All recipients are required to follow the applicable federal, Department of Interior, and Reclamation financial assistance regulations.The provisions of the "Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Financial Assistance" located at Title 2 CFR Part 200 at https://www.ecfr.gov/current/title-2/part-200,the Department of the Interior Federal Agency Regulations for Grants and Agreements at Title 2 CFR Subtitle B, Part 1400 1499 at https://www.ecfr.gov/current/title-2/part-1400, and the Financial Assistance Interior Regulations (or FAIR) at Title 2 CFR Subtitle B, Parts 1402-1402.499 at https://www.ecfr.gov/current/title-2/part-1402, are hereby incorporated by reference as though set forth in full text. 5. Regulatory Compliance All recipients must comply, or assist Reclamation,with all regulatory compliance requirements and all applicable state, federal, and local environmental, cultural, and paleontological resource protection laws and regulations, as applicable to this Agreement. These may include, but are not limited to, the National Environmental Policy Act (NEPA), Department of the Interior regulations implementing NEPA, the Clean Water Act, the Endangered Species Act, consultation with potentially affected Tribes, and consultation with the State Historic Preservation Office. If the Recipient begins project activities that require environmental or other regulatory compliance approval, prior to written notice from the GO that all such clearances have been obtained, Page 3 of 19 162 Reclamation reserves the right to initiate remedies for non-compliance as defined by 2 CFR 200.339-340 at https://www.ecfr.gov/current/title-2/section-200.339, including termination of this Agreement. 6. Acceptance Recipients of Reclamation financial assistance awards must comply with the applicable terms and conditions incorporated, either directly or by reference, in their Notice of Funding Opportunity, program announcements, and this Notice of Award.These terms and conditions are in addition to the assurances and certifications made as part of the award application process through submission of the Standard Forms SF-424B Assurances for Non-Construction Programs, SF-424D Assurances for Construction Programs, and Certifications Regarding Lobbying (see https://www.grants.gov/forms/forms-repository/sf-424-family), or through acceptance of certifications and representations in the System for Award Management (https://sam.gov/content/home). Acceptance of a financial assistance award, including any amendments, from Reclamation carries with it the responsibility to be aware of and comply with all terms and conditions applicable to the award. Acceptance means starting work, drawing down or requesting funds, or accepting the award via electronic means. Accepting the award constitutes a consent to fulfill and comply with all terms and conditions by the recipient. 7. Amendments Any changes to this Agreement shall be made in writing by the Grants Officer (GO), unless determined by Reclamation to be administrative corrections which do not impact the terms and conditions of the Agreement. No statement made by any person, or in writing, other than the GO shall be allowed to amend, modify, or otherwise affect the Agreement. All recipient requests for amendment of the Agreement, including prior approval requirements set forth in 2 CFR 200.308 at https://www.ecfr.gov/current/title-2/section-200.308, such as no- cost extensions and changes to key personnel, or the addition of previously agreed upon funding, are addressed to the GO and submitted in writing (including via email) and will include a full description of the reason for the request. Amendment requests can be submitted to the Grants Management Specialist (GMS) or to the GO identified on the NOA page. II. Project Performance 1. Project Narrative and Milestones The Recipients approved project proposal dated 5/1/2026 is incorporated by reference to this Agreement. Page 4 of 19 163 Under this Agreement, the Recipient shall: Complete the Nelson Dam project by installing new irrigation main pipelines along US 12 from the new diversion structure to two existing irrigation delivery systems for the City of Yakima: the "General" and the "Fruitvale" irrigation systems; and one for the Naches Cowiche Canal Association:the "Old Union" irrigation system. Completion of the new pipelines from the new Nelson diversion open the door for Yakima County to complete a long-planned project (Cowiche Confluence Complex) to restore Cowiche Creek and surrounding floodplain areas along the confluence with the Naches River. With the Nelson diversion and completed pipelines in place, removal of the existing Fruitvale and Old Union Diversions can be completed, improving spawning habitat and fish passage in Cowiche Creek for coho salmon and steelhead. The pipeline improvements include: • Install a 36-inch high density polyethylene (HDPE) pipeline from the new intake to the existing Naches Cowiche Canal. About 700 feet of pipeline will end at the canal and be discharged via a concrete outlet structure.Water will then be conveyed down the canal similar to existing conditions. • Install a 42-inch HDPE "Consolidated" pipeline from the intake which will distribute water to the Fruitvale and Old Union canal systems. The pipeline will extend from the intake for a distance of approximately 7,000 feet along the eastbound Highway 12 right-of-way and terminate near the existing Fruitvale Canal. At this point, flow will be bifurcated using two valves and metered branches: one discharging into the existing Fruitvale Canal and the other extending north easterly and discharging into the existing Old Union Canal. • Install a 32-inch HDPE pipeline from the new intake to the City's "General" pipeline system 3,000 feet to just downstream of its existing sedimentation pond, eliminating that which lies adjacent to US 12. Here,the new pipe will connect directly to the existing HDPE pipe at that location. The milestones*for completing the Project are: Planned Planned Milestone/Task/Activity Start Date Completion Date Complete environmental and cultural compliance February 2020 April 2026 Installation of 3,300 lineal feet of new 42' May 2026 August 2028 irrigation pipe Construction of Access and CARV vaults May 2026 April 2029 Installation of 1,550 lineal feet of new 42" October 2027 April 2029 irrigation pipe. Page 5 of 19 164 Installation of approximately 975 lineal feet of October 2027 April 2029 new 24" irrigation piping Construction of Access and CARV Vaults, turnout October 2027 April 2029 Vaults, and Meter and Valve Vault Installation of Electrical Instrumentation & Control October 2027 April 2029 components for valves and meters Miscellaneous metal construction October 2027 April 2029 *Please note that milestone activities and planned dates may change. 2. Recipient Responsibilities The Recipient shall carry out the approved project in accordance with the terms and conditions stated herein, 2 CFR Part 200 (including procurement requirements in 200.320 at https://www.ecfr.gov/current/title-2/section-200.320), adherence to Federal, state, and local laws, regulations, and codes, as applicable, and shall obtain all required approvals and permits. If the approved project contains construction activities,the Recipient is responsible for construction inspection, oversight, and acceptance. If applicable,the Recipient shall also coordinate and obtain approvals from site owners and operators. 3. Reclamation Responsibilities Reclamation monitoring and oversight of this award includes review and acceptance of financial and performance reports, and other deliverables identified as part of the project scope. Additional monitoring activities may include drawdown approvals, site visits, conference calls, and other on-site and off-site monitoring activities such as inspections or evaluation on Recipient and subrecipient premises. At the Recipient's request, Reclamation may also provide technical support to the Recipient for the approved project and objectives of this Agreement. III. Financial Assistance 1. Available Funding The total estimated project cost for this Agreement is $7,950,000.00 The amount of federal funds issued with this action is $3,000,000.00, as indicated by"Amount of Financial Assistance This Action"within block 12 of the NOA. Subject to the availability of Congressional appropriations, subsequent funds may be made available for payment through written amendments to this Agreement by a Reclamation GO. No legal liability on the part of the Government for any payment may arise until funds are made available, in writing, to the Recipient by a Reclamation GO. Page 6 of 19 165 The Recipient shall not incur costs or obligate funds for any purpose pertaining to operation of the program or activities beyond the period of performance end date. The only costs which are authorized for a period of up to 120 days following the period of performance are those strictly associated with closeout activities for preparation of the final reports. 2. Approved Budget The total approved budget summarizes the financial aspects of the project. It is detailed by category in block 11 of the NOA page and below. Final costs incurred within budget categories listed may be either higher or lower than the estimated costs.All costs incurred by the Recipient under this Agreement must be in accordance with budget documentation dated 5/1/2026, and any pre-award clarifications conducted between the Recipient and Reclamation. The Recipient is responsible for ensuring federal funds are managed in a manner consistent with 2 CFR Part 200 Subpart E at https://www.ecfr.gov/current/title-2/part-200/subpart-E, the approved budget, approved project activities, and terms and conditions of award. Recipients are Page 7 of 19 166 encouraged to direct questions regarding allowability, allocability or reasonableness of costs to the GO for review prior to incurrence of the costs in question. Summary of Budgeted Costs Category Total Cost a.Personnel $0.00 b.Fringe Benefits $0.00 c.Travel $0.00 d.Equipment $0.00 e.Supplies $0.00 Federal Estimated Amount Non-Federal Estimated Amount f.Contractual $0.00 g.Construction $7,950,000.00 h.Other Direct Costs $0.00 i.Total Direct Costs $7,950,000.00 j.Indirect Charges $0.00 Total Costs $7,950,000.00 $7,950,000.00 $0.00 Cost Share Percentage 100% 0% 3. Cost Sharing Requirement Non-federal cost-share is not required for this Agreement 4. Pre-Award Incurrence of Costs The Recipient shall be entitled to reimbursement for costs incurred on or after May 1, 2026 which if had been incurred after the start date of the period of performance,would have been allowable, allocable, and reasonable under the terms and conditions of this Agreement. 5. Indirect Costs Indirect costs are not approved for this Agreement. Page 8 of 19 167 IV. Payment Information 1. Payment Method Recipients must utilize the Department of Treasury Automated Standard Application for Payments (ASAP) payment system to request payments. ASAP is a Recipient-initiated payment and information system designed to provide a single point of contact for the request and delivery of federal funds.ASAP is the only allowable method for request and receipt of payment. Recipient procedures must minimize the time elapsing between the drawdown of federal funds and the disbursement for Agreement purposes. 2. Payment Financial assistance recipients are paid in advance by electronic drawdown, provided they maintain written procedures that minimize the time elapse between transfer of funds from ASAP accounts and disbursements, and they have financial management systems that meet standards for fund control and accountability. Advance payments are limited to the immediate cash requirements to carry out the purpose of the approved program or project. 3. Return of Funds, Excess Cash, and Interest 3.1 Return of Funds or Excess Cash Funds, principal, and excess cash returns may be made to Reclamation through the following means. Payment Method ASAP The Recipient must direct returns of funds not spent, excess cash on hand, and award funds and principal owed to the federal government to the ASAP system. Returns should include: - The agency to credit the funding (i.e. Reclamation) - The relevant ASAP account numbers - The reason for the return Payment Method Electronic Transfer If the Recipient is unable to return funds owed to the federal government through ASAP, the following electronic transfer information should be utilized: ACH Returns: ABA Routing Number: 051036706 Account number: 312018 Bank Name and Location: Credit Gateway, Federal Reserve Bank, Richmond,VA Agreement Number: Reclamation Grant or Cooperative Agreement Number Fedwire Returns: ABA Routing Number: 021030004 Page 9 of 19 168 ABA Short Name:TREAS NYC Account number: 14060905 Beneficiary Name: Bureau of Reclamation Bank Name and Location: Federal Reserve Bank, 33 Liberty Street, Federal Reserve Post Office Station, New York, NY 10045 Agreement Number: Reclamation Grant or Cooperative Agreement Number Pay.gov: Accepted payment methods on Pay.gov include ACH, PayPal, Venmo, and debit or credit card.Visit BOR Online Bill Pay at https://www.pay.gov/public/form/start/596136970 Bill Number: Recipient Vendor Code (See Notice of Award Page 1, Section 17) Customer Number: 9999999999 (default for all BOR recipients) Amount: $X.XX Memo to Agency: To properly document return of funds,you must include the Grant or Cooperative Agreement Number and reason for return to BOR. If known,the ASAP ID and Grant Officer Name should also be included. 3.2 Return of Interest Interest earned on Federal funds in excess of$500 per year must be returned annually to the Department of Health and Human Services Payment Management System (PMS). Recipients and subrecipients can find further information and a link to directions at 2 CFR 200.305(b)(12) at https://www.ecfr.gov/current/title-2/part-200/subpart-D#p-200.305(b)(12). V. Reporting Requirements 1. Reclamation Required Reports and Submission Reports can be submitted to the GMS via bor-pnr-postaward@usbr.cov or GrantSolutions. 1.1 Financial Reporting Requirements The interim Federal Financial Report (SF-425) shall be submitted semi-annually, according to the Report Frequency and Submission schedule noted under the Federal Financial Report Cycle, following the Notice of Award page and in the table at the end of this section. All financial reports shall be signed by an Authorized Certifying Official for the Recipient's organization. Per 2 CFR Part 200.344 at https://www.ecfr.gov/current/title-2/section-200.344, the Final Federal Financial Report (SF-425) shall be submitted within 120 days of the period of performance end date. The recipient shall not incur costs or obligate funds for any purpose pertaining to the operation of the program or activities beyond the period of performance end date and must liquidate all financial obligations incurred under the award. The only costs authorized for 120 days following the period of performance end date are those strictly associated with closeout activities in preparation of final reports. All sections of the Final SF-425 must be complete. Page 10 of 19 169 Federal Financial Report Submission Schedule Report Type Format Reporting Period Due Date Interim SF-425 Semi-Annual: October 1-March 31 30 days after the end and April 1 thru September 30 of reporting period Final SF-425 Entire period of performance 120 days after the end of period of performance 1.2 Performance Progress Reporting Requirements Reclamation requires Performance Reports to be submitted semi-annually, according to the Report Frequency and Submission schedule noted under the Performance Progress Report Cycle, following the Notice of Award page. Reclamation may utilize standard, OMB-approved forms for the collection of performance information, or no specific format, as identified in the NOFO or program announcement. For Construction and non-construction,the minimum information to include in Performance Reports are: • Report identification; recipient name, agreement number, project title, and period of performance start and end dates • A comparison of actual accomplishments to the objectives of the federal award for the reporting period • Where accomplishments can be quantified, or performance data and analysis informative to Reclamation, if applicable • A reason(s) why any established goals/objectives were not met, if applicable • Pertinent information on overall activity such as cost overruns, or high unit costs • Significant developments such as problems, delays, or adverse conditions, if applicable • Favorable developments such as objectives ahead of schedule, or less cost than anticipated, if applicable Per 2 CFR Part 200.344 at https://www.ecfr.gov/current/title-2/section-200.344,the Final Performance Progress Report shall be submitted within 120 days of the period of performance end date.The Final Performance Report shall include a summary of all activities completed during the entire period of performance with the minimum information stated above, and any Program Specific or Data Collection report requirements as stated within the NOFO and this Agreement. 2. Federal-wide Reports and Disclosures Page 11 of 19 170 2.1 System for Award Management Unless exempted by 2 CFR 25.110 at https://www.ecfr.gov/current/title-2/section-25.110, recipients must maintain current information in the System for Award Management (SAM) until the final financial report required under the Award is submitted, or the final payment is received, whichever is later, per Appendix A to Part 25, Title 2 at https://www.ecfr.gov/current/title-2/part- 25/appendix-Appendix%20A%20to%20Part%2025.This requires recipients to review and update information at least annually after the initial registration, or more frequently if required by changes in your information. See https://sam.gov/content/home. If a recipient allows their SAM registration to lapse,they will be prevented from submitting applications for funding opportunities in Grants.gov, and ASAP accounts are suspended, among other federal financial assistance restrictions. 2.2 Subawards and Executive Compensation Unless exempted by 2 CFR Part 170.105 at https://www.ecfr.gov/current/title-2/section-170.105, Recipients are required to report information on subawards and executive total compensation to meet the requirements of the federal Funding Accountability and Transparency Act of 2006. Recipients can review Appendix A to Part 170, Title 2 at, for information on what,where, and when to report. 2.3 Reporting Recipient Integrity and Performance Recipients that have active financial assistance and procurement contracts from federal agencies exceeding $10,000,000 for any period of time during the period of performance of this Agreement must maintain current information in SAM about civil, criminal, or administrative proceedings as outlined in Appendix XII to Part 200 at https://www.ecfr.gov/current/title- 2/subtitle-A/chapter-I I/part-200/subpart-F/subject-group-ECFR4424206eaecf751/appendix- Ap p e n d ix%20X I I%20to%20 Pa rt%20200. 2.4 Conflicts of Interest The Recipient must establish safeguards to prohibit its employees and Subrecipients from using their positions for purposes that constitute or present the appearance of a personal or organizational conflict of interest.The Recipient is responsible for notifying the Grants Officer in writing of any actual or potential conflicts of interest that may arise during the life of this award. Conflicts of interest include any relationship or matter which might place the Recipient or its employees in a position of conflict, real or apparent, between their responsibilities under the agreement and any other outside interests. Conflicts of interest may also include, but are not limited to, direct or indirect financial interests, close personal relationships, positions of trust in outside organizations, consideration of future employment arrangements with a different organization, or decision-making affecting the award that would cause a reasonable person with knowledge of the relevant facts to question the impartiality of the Recipient and/or Recipient's employees and Subrecipients in the matter. The Grants Officer and the servicing Ethics Counselor will determine if a conflict of interest exists. If a conflict of interest exists, the Grants Officer will determine whether a mitigation Page 12 of 19 171 plan is feasible. Mitigation plans must be approved by the Grants Officer, in writing. Failure to resolve conflicts of interest in a manner that satisfies the government may be cause for termination of the award. Definitions: This section incorporates by reference https://www.ecfr.gov/current/title-2/part-200/subpart-A including, but not limited to the following additional terms: A. Conflict of Interest is defined as any relationship or matter which might place the Recipient, its employees, and/or its Subrecipients in a position of conflict, real or apparent, between their responsibilities under the agreement and any other outside interests. Conflicts of interest may also include, but are not limited to, direct or indirect financial interests, close personal relationships, positions of trust in outside organizations, consideration of future employment arrangements with a different organization, or decision-making affecting the award that would cause a reasonable person with knowledge of the relevant facts to question the impartiality of the Recipient and/or Recipient's employees and Subrecipients in the matter. B. Close Personal Relationship means a federal award program employee's childhood or other friend, sibling, or other family relations that may compromise or impair the fairness and impartiality of the Proposal Evaluator and Advisor and Grants Officer in the review, selection, award, and management of a financial assistance award. C. Discretionary Federal Financial Assistance means Federal awards including grants and agreements that are awarded at the discretion of the agency. D. Employment means: 1. In any capacity, even if otherwise permissible, by any applicant or potential applicant for a Federal financial assistance award; 2. Employment within the last 12 months with a different organization applying for some portion of the award's approved project activities and funding to complete them OR expected to apply for and to receive some portion of the award; and/or 3. Employment with a different organization of any member of the organization employee's household or a relative with whom the organization's employee has a close personal relationship who is applying for some portion of the award's approved project activities and funding to complete them OR expected to apply for and to receive some portion of the award. E. Non-federal entity means a State, local government, Indian tribe, institution of higher education, or nonprofit organization that carries out a Federal award as a Recipient or Subrecipient. F. Recipient means a non-federal entity that receives a federal award directly from a federal awarding agency to carry out an activity under a federal program.The term Recipient does not include Subrecipients. G. Subrecipient means a non-federal entity that receives a subaward from a pass-through entity to carry out part of a federal program, but does not include an individual who is a beneficiary of such program. A Subrecipient may also be a recipient of other federal awards directly from a federal awarding agency. Page 13 of 19 172 2.5 Trafficking Victims Protection The Recipient, its employees, and its subrecipients under this award may not engage in human trafficking, procuring commercial sex acts, or using forced labor during the performance of the award, or any subawards. Recipients must inform Reclamation immediately of any allegation of such activity. Reclamation may unilaterally terminate this award, without penalty, in addition to other remedies for noncompliance, if a violation of the Trafficking Victims Protection Act of 2000 (TVPA), codified at 2 CFR Part 175.15 at https://www.ecfr.gov/on/2024-09-30/title-2/section- 175.15, for financial assistance awards, is determined. Recipients will ensure this provision is included in any agreements entered into for award activities. 3. Remedies for Noncompliance Failure to comply with the recipient reporting, disclosure, and notice requirements contained in this Agreement, terms and conditions, or federal financial assistance regulations, may be considered a material noncompliance with the terms and conditions of the award. Noncompliance may result in withholding of payments, denying both the use of federal funds and recipient cost-share for all or part of a cost, activity or action not in compliance, whole or partial suspension or termination of the Agreement, recovery of funds paid under the Agreement,withholding of future awards, or other legal remedies in accordance with 2 CFR 200.339-340 at https://www.ecfr.gov/current/title-2/section-200.339. VI. Program or Project Specific Terms and Conditions 1. Buy America Preference for Infrastructure Projects Recipients of an award of Federal financial assistance from a program for infrastructure are hereby notified that none of the funds provided under this award may be used for an infrastructure project unless: (1) All iron and steel used in the project are produced in the United States—this means all manufacturing processes, from the initial melting stage through the application of coatings, occurred in the United States; (2) All manufactured products used in the project are produced in the United States— this means the manufactured product was manufactured in the United States; and the cost of the components of the manufactured product that are mined, produced, or manufactured in the United States is greater than 55 percent of the total cost of all components of the manufactured product, unless another standard that meets or exceeds this standard has been established under applicable law or regulation for determining the minimum amount of domestic content of the manufactured product; and (3) All construction materials are manufactured in the United States—this means that all manufacturing processes for the construction material occurred in the United States. The construction material standards are listed below. Page 14 of 19 173 Incorporation into an infrastructure project.The Buy America Preference only applies to articles, materials, and supplies that are consumed in, incorporated into, or affixed to an infrastructure project.As such, it does not apply to tools, equipment, and supplies, such as temporary scaffolding, brought to the construction site and removed at or before the completion of the infrastructure project. Nor does a Buy America Preference apply to equipment and furnishings, such as movable chairs, desks, and portable computer equipment, that are used at or within the finished infrastructure project but are not an integral part of the structure or permanently affixed to the infrastructure project. Categorization of articles, materials, and supplies. An article, material, or supply should only be classified into one of the following categories: (i) Iron or steel products; (ii) 15 Manufactured products; (iii) Construction materials; or (iv) Section 70917(c) materials.An article, material, or supply should not be considered to fall into multiple categories. In some cases, an article, material, or supply may not fall under any of the categories listed in this paragraph. The classification of an article, material, or supply as falling into one of the categories listed in this paragraph must be made based on its status at the time it is brought to the work site for incorporation into an infrastructure project. In general, the work site is the location of the infrastructure project at which the iron, steel, manufactured products, and construction materials will be incorporated. Application of the Buy America Preference by category. An article, material, or supply incorporated into an infrastructure project must meet the Buy America Preference for only the single category in which it is classified. Determining the cost of components for manufactured products. In determining whether the cost of components for manufactured products is greater than 55 percent of the total cost of all components, use the following instructions: (a) For components purchased by the manufacturer,the acquisition cost, including transportation costs to the place of incorporation into the manufactured product (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or (b) For components manufactured by the manufacturer, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (a), plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the manufactured product. Construction material standards. The Buy America Preference applies to the following construction materials incorporated into infrastructure projects. Each construction material is followed by a standard for the material to be considered "produced in the United States." Except as specifically provided, only a single standard should be applied to a single construction material. (1) Non-ferrous metals.All manufacturing processes, from initial smelting or melting through final shaping, coating, and assembly, occurred in the United States. (2) Plastic and polymer-based products. All manufacturing processes, from initial Page 15 of 19 174 combination of constituent plastic or polymer-based inputs, or, where applicable, constituent composite materials, until the item is in its final form, occurred in the United States. (3) Glass. All manufacturing processes, from initial batching and melting of raw materials through annealing, cooling, and cutting, occurred in the United States. (4) Fiber optic cable (including drop cable). All manufacturing processes, from the initial ribboning (if applicable), through buffering, fiber stranding and jacketing, occurred in the United States.All manufacturing processes also include the standards for glass and optical fiber, but not for non-ferrous metals, plastic and polymer-based products, or any others. (5) Optical fiber. All manufacturing processes, from the initial preform fabrication stage through the completion of the draw, occurred in the United States. (6) Lumber. All manufacturing processes, from initial debarking through treatment and planing, occurred in the United States. (7) Drywall. All manufacturing processes, from initial blending of mined or synthetic gypsum plaster and additives through cutting and drying of sandwiched panels, occurred in the United States. (8) Engineered wood. All manufacturing processes from the initial combination of constituent materials until the wood product is in its final form, occurred in the United States. Waivers. When necessary, recipients may apply for, and the agency may grant, a waiver from these requirements. Information on the process for requesting a waiver from these requirements can be found at https://www.doi.gov/grants/buyamerica. When DOI has determined that one of the following exceptions applies, the awarding official may waive the application of the Buy America Preference in any case in which the agency determines that: (1) applying the Buy America Preference would be inconsistent with the public interest; (2) the types of iron, steel, manufactured products, or construction materials are not produced in the United States in sufficient and reasonably available quantities or of a satisfactory quality; or (3) the inclusion of iron, steel, manufactured products, or construction materials produced in the United States will increase the cost of the overall project by more than 25 percent. A request to waive the application of the Buy America Preference must be in writing.The agency will provide instructions on the format, contents, and supporting materials required for any waiver request. Waiver requests are subject to public comment periods of no less than 15 days and must be reviewed by the Office of Management and Budget (OMB) Made in America Office. There may be instances where an award qualifies, in whole or in part, for an existing waiver described at the Approved DOI General Applicability Waivers website located at https://www.doi.gov/grants/BuyAmerica/GeneralApplicabi lityWaivers. Page 16 of 19 175 Definitions "Buy America Preference" means the "domestic content procurement preference" set forth in section 70914 of the Build America, Buy America Act, which requires the head of each Federal agency to ensure that none of the funds made available for a Federal award for an infrastructure project may be obligated unless all of the iron, steel, manufactured products, and construction materials incorporated into the project are produced in the United States. "Construction materials" means articles, materials, or supplies that consist of only one of the items listed in paragraph (1) of this definition, except as provided in paragraph (2) of this definition. To the extent one of the items listed in paragraph (1) contains as inputs other items listed in paragraph (1), it is nonetheless a construction material. (1) The listed items are: (i) Non-ferrous metals; (ii) Plastic and polymer-based products (including polyvinylchloride, composite building materials, and polymers used in fiber optic cables); (iii) Glass (including optic glass); (iv) Fiber optic cable (including drop cable); (v) Optical fiber; (vi) Lumber; (vii) Engineered wood; and (viii) Drywall. (2) Minor additions of articles, materials, supplies, or binding agents to a construction material do not change the categorization of the construction material. "Infrastructure" means public infrastructure projects in the United States,which includes, at a minimum,the structures, facilities, and equipment for roads, highways, and bridges; public transportation; dams, ports, harbors, and other maritime facilities; intercity passenger and freight railroads; freight and intermodal facilities; airports;water systems, including drinking water and wastewater systems; electrical transmission facilities and systems; utilities; broadband infrastructure; and buildings and real property; and structures, facilities, and equipment that generate, transport, and distribute energy including electric vehicle (EV) charging. "Infrastructure project" means any activity related to the construction, alteration, maintenance, or repair of infrastructure in the United States regardless of whether infrastructure is the primary purpose of the project. See also paragraphs (c) and (d) of 2 CFR 184.4. "Iron or steel products" means articles, materials, or supplies that consist wholly or predominantly of iron or steel or a combination of both. "Manufactured products" means: (1) Articles, materials, or supplies that have been: (i) Processed into a specific form and shape; or (ii) Combined with other articles, materials, or supplies to create a product with different properties than the individual articles, materials, or supplies. Page 17 of 19 176 (2) If an item is classified as an iron or steel product, a construction material, or a Section 70917(c) material under 2 CFR 184.4(e) and the definitions set forth in 2 CFR 184.3, then it is not a manufactured product. However, an article, material, or supply classified as a manufactured product under 2 CFR 184.4(e) and paragraph (1) of this definition may include components that are construction materials, iron or steel products, or Section 70917(c) materials. "Predominantly of iron or steel or a combination of both" means that the cost of the iron and steel content exceeds 50 percent of the total cost of all its components.The cost of iron and steel is the cost of the iron or steel mill products (such as bar, billet, slab,wire, plate, or sheet), castings, or forgings utilized in the manufacture of the product and a good faith estimate of the cost of iron or steel components. "Section 70917(c) materials" means cement and cementitious materials; aggregates such as stone, sand, or gravel; or aggregate binding agents or additives. See Section 70917(c) of the Build America, Buy America Act. 1. Liability a. In general, except as provided under 28 U.S.C. Chapter 171 (known as the "Federal Tort Claims Act") at https://uscode.house.gov/view.xhtml?path=/prelim@title28/part6/chapter171&edition=prelim, the United States shall not be liable for monetary damages of any kind for any injury arising out of an act, omission, or occurrence that arises in relation to any facility created or improved under this Agreement, the title of which is not held by the United States. b. Tort Claims Act. Nothing in this section increases the liability of the United States beyond that provided in 28 U.S.C. Chapter 171, United States Code (commonly known as the "Federal Tort Claims Act"). VII. Reclamation Contacts 1. Grants Officer The Reclamation GO is the only official with legal authority to; obligate funds, approve amendments, interpret financial assistance statutes, regulations, circulars, policies, and terms of this Agreement. The GO, or Grants Management Official, contact information can be found on the bottom of the Notice of Award cover page. 2. Grants Management Specialist The Reclamation GMS works in conjunction with the GO and is the primary administrative point of contact for this Agreement regarding issues related to the day-to-day management. Requests for approval regarding changes to the terms and conditions of the Agreement, including but not limited to amendments and prior approval, may be submitted to a GMS but can only be Page 18 of 19 177 approved, in writing, by a Reclamation GO. For some agreements, the Reclamation GO and the Reclamation GMS may be the same individual. 3. Grants Officer's Technical Representative The Grants Officer Technical Representative (GOTR), or Federal Project Officer, is the primary point of contact for the programmatic performance, compliance, and progress for this Agreement and represents Reclamation in questions regarding interpretation of specifications, drawings, and other technical matters. The GOTR assists the GO in documenting performance, resolving compliance issues with project activities/milestones, and other technical conditions of the Agreement, however only the GO has the legal authority over management of this award. The GOTR holds no authority to modify, approve, or make determinations related to the terms and conditions of this award. VIII. Department of Interior Standard Terms and Conditions The Department of the Interior (DOI) Standard Award Terms and Conditions found at https://www.doi.gov/grants/doi-standard-terms-and-conditions are hereby incorporated by reference as though set forth in full text. The Recipient is responsible for ensuring their subrecipients and contractors are aware of and comply with applicable statutes, regulations, and agency requirements. Page 19 of 19 178