Sevigny Construction, Inc - YPD Roofing Project
AGREEMENT CITY OF YAKIMA INVITATION TO QUOTE #22629S THIS AGREEMENT, entered into on the date of last execution, between the City of Yakima, a Washington municipal corporation ("City"), and M Sevigny Construction Inc, ("Contractor"). WITNESSETH: The parties, in consideration of the terms and conditions herein, do hereby covenant and agree as follows: 1. Scope of Work The Contractor shall perform all work and service(s) and fumish all tools, materials, labor and equipment (collectively referred to as "Services") according to the procedure outlined in the specifications of Quote #226298 titled YPD Roofing Project and the quote documents, which are all attached and incorporated herein as Exhibit A, and any applicable construction standard(s), which are by this reference incorporated herein and made a part hereof, and shall perform any alterations in or additions to the work provided under this Contract and every part thereof. Work is estimated to be completed by October 30, 2026. Final work schedule shall be coordinated with Project Coordinator Martin Cueva-Ramirez, Building Superintendent, (509) 728-6289. The Contractor shall provide and bear the expense of all equipment; work and labor of any sort whatsoever that may be required for the transfer of materials and completing the work provided for in this Contract and every part thereof, except such as are mentioned in the specifications to be fumished by the City of Yakima. 2. Compensation The City agrees to pay the Contractor according to Exhibit B, attached hereto and incorporated herein, which Exhibit includes the specifications and payment schedule of itemized prices as listed in the Contractor's Quote submittal at the time and in the manner and upon the conditions provided for the Contract. 3. Agency Relationship between City and Contractor Contractor shall, at all times, be an independent Contractor and not an agent or representative of City with regard to performance of the Services. Contractor shall not represent that it is, or hold itself out as, an agent or representative of City. In no event shall Contractor be authorized to enter into any agreement or undertaking for, or on behalf, of City. 4. Successors and Assigns a. Neither the City, nor the Contractor, shall assign, transfer, or encumber any rights, duties, or interests accruing from this Contract without the prior written consent of the other. b. The Contractor for himself, and for his heirs, executors, administrators, successors, and assigns, does hereby agree to the full performance of all the covenants herein contained upon the part of the Contractor. 5. Property Rights All records or papers of any sort relating to the City and to the project will at all times be the property of the City and shall be surrendered to the City upon demand. All information concerning the City and said project which is not otherwise a matter of public record or required by law to be made public, is confidential, and the Contractor will not, in whole or part, now or at any time disclose that information without the express written consent of the City. 6. Inspection and Production of Records a. The records relating to the Services shall, at all times, be subject to inspection by and with the approval of the City, but the making of (or failure or delay in making) such inspection or approval shall not relieve Contractor of responsibility for performance of the Services in accordance with this Contract, notwithstanding the City's knowledge of defective or non -complying performance, its substantiality or the ease of its discovery. Contractor shall provide the City sufficient, safe, and proper facilities, and/or send copies of the requested documents to the City. Contractor's records relating to the Services will be provided to the City upon the City's request. b. Contractor shall promptly fumish the City with such information and records which are related to the Services of this Contract as may be requested by the City. Until the expiration of six (6) years after final payment of the 226295 Roofing Project — YPD Page 1 of 30 compensation payable under this Contract, or for a longer period if required by law or by the Washington Secretary of State's record retention schedule, Contractor shall retain and provide the City access to (and the City shall have the right to examine, audit and copy) all of Contractors books, documents, papers and records which are related to the Services performed by Contractor under this Contract. If any litigation, claim or audit is started before the expiration of the six (6) year period, the records shall be retained until all litigation, claims, or audit findings involving the records have been resolved. c. All records relating to Contractor's services under this Contract must be made available to the City, and the records relating to the Services are City of Yakima records. They must be produced to third parties, if required pursuant to the Washington State Public Records Act, Chapter 42.56 RCW, or by law. All records relating to Contractor's services under this Contract must be retained by Contractor for the minimum period of time required pursuant to the Washington Secretary of State's records retention schedule. d. The terms of this section shall survive any expiration or termination of this Contract. 7. Work Made for Hire All work the Contractor performs under this Contract shall be considered work made for hire and shall be the property of the City. The City shall own any and all data, documents, plans, copyrights, specifications, working papers, and any other materials the Contractor produces in connection with this Contract. On completion or termination of the Contract, the Contractor shall deliver these materials to the City. 8. Guarantee Contractor warrants the Services will be free from defects in material and workmanship for a period of one year following the date of completion and acceptance of the Services. 9. Compliance with Law Contractor agrees to perform all Services under and pursuant to this Contract in full compliance with any and all applicable laws, rules, and regulations adopted or promulgated by any govemmental agency or regulatory body, whether federal, state, local, or otherwise. Contractor shall procure and maintain all applicable and necessary permits, licenses and approvals of any federal, state, and local govemment or govemmental authority or this project, pay all charges and fees, and give all notices necessary and incidental to the due and lawful execution of the work. a. Procurement of a City Business License. Contractor must maintain a City of Yakima Business License and pay all charges, fees, and taxes associated with said license. Contractor must provide proof of a valid Washington Department of Revenue state excise tax registration number, as required in Title 85 RCW. b. Contractor must provide proof of a valid Washington State Contractor Registration number. c. Contractor must provide proof of a valid Washington department of Revenue state excise tax registration number, as required in Title 82 RCW. d. Contractor must provide proof of a valid Washington Unified Business Identification (UBI) number. Contractor must have a current UBI number and not be disqualified from bidding on any public works contract under RCW 39.06.010 or 39.12.065(3). e. Contractor must provide proof of a valid Washington Employment Security Department number as required by Title 50 RCW. Foreign (Non -Washington) Corporations: Although the City does not require foreign corporate proposers to qualify in the City, County or State prior to submitting a proposal, it is specifically understood and agreed that any such corporation will promptly take all necessary measures to become authorized to conduct business in the City of Yakima at their own expense, without regard to whether such corporation is actually awarded the contract, and in the event that the award is made, prior to conducting any business in the City. 226295 Roofing Project — YPD Page 2 of 30 10. Prevailing Wages The Contractor will comply with all provisions of Chapter 39,12 RCW - Prevailing Wages on Public Work. a. RCW 39.12,010 - the Prevailing Rate of Wage. It is solely the responsibility of the Contractor to determine the appropriate prevailing wage rate for the services being provided. b. RCW 39.12.040 - Statement of Intent to Pay Prevailing Wages and an Affidavit of Wages Paid. Before an awarding agency may pay any sum due on account, it must receive a statement of Intent to Pay Prevailing Wages approved by the Department of Labor and Industries. Following final acceptance of a public work project, and before any final money is disbursed, each Contractor and Subcontractor must submit to the awarding agency an Affidavit of Wages Paid, certified by the Department of Labor and Industries. c. RCW 39.12.070 - Fees Authorized for Approval Certification and Arbitrations. Any fees charged by the Department of Labor and Industries for approvals or fees to cover costs of arbitration conducted shall be the responsibility of the Contractor. The State of Washington prevailing wage rates applicable for this public works project, which is located in Yakima County, may be found at the following website address of the Department of Labor and Industries: httnsillni,wa,govilicensing-permitsi ublic-works- re'ects/ revailin -wa e-rates, Based on the quote submittal for this project, the applicable effective (start) date of this project for the purposes of determining prevailing wages is the quote date, August 6, 2026. 11. Certified Payroll for Non -Federally Funded Projects Upon request by the City or by an Interested Party, copies of certified payroll shall be provided to City, with employee information such as last name, SSN and address, redacted in accordance with RCW 42.56.230, in order to provide for public records requests. The City reserves the right to require Contractor to deliver to City a copy of the non -redacted Certified Payroll if City determines, in its sole discretion, that, such non -redacted copy is necessary or appropriate in order to enable City to comply with any applicable law. RCW 42.56.230 (7)(a) Personal Information Exemption: Any record used to prove identity, age, residential address, social security number, or other personal information required to apply for a drivers license or identicard. RCW 39.12.010 (4): An "Interested Party" for the purposes of this chapter shall include a Contractor, Subcontractor, an employee of a Contractor or Subcontractor, an organization whose memberswages, benefits, and conditions of employment are affected by this chapter, and the director of labor and industries or the director's designee. WAC 296-127-320 Payroll: (1) Each Contractor shall keep accurate payroll records for three years from the date of acceptance of the public works project by the contract awarding agency, showing the name, address, Social Security number, trade or occupation, straight time rate, hourly rate of usual benefits as defined by WAC 296- I 27-014(1), and overtime hours worked each day and week, including any employee authorizations executed pursuant to WAC 296-127-022, and the actual rate of wages paid, for each laborer, worker, and mechanic employed by the Contractor for work performed on a public works project. (2) A Contractor shall, within ten days after it receives a written request, from the department or from any interested party as defined by RCW 39,12,010(4), file a certified copy of the payroll records with the agency that awarded the public works contract and with the department. (3) A Contractors noncompliance with this section shall constitute a violation of RCW 39 12,o5q. 12. Nondiscrimination During the performance of this Contract, the Contractor agrees as follows: The Contractor shall not discriminate against any person on the grounds of race, creed, color, religion, national origin, sex, age, marital status, sexual orientation, pregnancy, veteran's status, political affiliation or belief, or the presence of any sensory, mental or physical handicap in violation of the Washington State Law Against Discrimination (RCW chapter 49.60) or the Americans with Disabilities Act (42 USC 12101 et seq.). 226295 Roofing Project — YPD Page 3 of 30 This provision shall include but not be limited to the following: employment, upgrading, demotion, transfer, recruitment, advertising, layoff or termination, rates of pay or other forms of compensation, selection for training, and the provision of Services under this Agreement. Contractor agrees to comply with the applicable provisions of State and Federal Equal Employment Opportunity and Nondiscrimination statutes and regulations. In the event of the Contractor's noncompliance with the non-discrimination clause of this contract or with any such rules, regulations, or orders, this Contract may be cancelled, terminated, or suspended in whole or in part and the Contractor may be declared ineligible for any future City contracts. No Provision of this Contract shall require or prohibit action or inaction by either party, or the agent(s) or subcontractor(s) or either party, that would violate Federal, State, or local law or that would affect the City's eligibility for any federal program or receipt of federal funds. The following provisions are included as required by Washington State law. RCW 35.22.650: Contractor agrees that the Contractor shall actively solicit the employment of minority group members. Contractor further agrees that the Contractor shall actively solicit bids for the subcontracting of goods or services from qualified minority businesses. Contractor shall fumish evidence of the Contractor's compliance with these requirements of minority employment and solicitation. Contractor further agrees to consider the grant of subcontracts to said minority bidders on the basis of substantially equal proposals in the light most favorable to said minority businesses. The Contractor shall be required to submit evidence of compliance with this section as part of the bid. Nothing in this Agreement shall require Contractor or any of its subcontractor(s) to take action that would be deemed discrimination or preferential treatment in violation of RCW 49.60.400. Pursuant to RCW 49.60.400(6), this Section does not prohibit action that must be taken to establish or maintain the City's eligibility for any federal program, if ineligibility would result in a loss of federal funds to the City. 13. Pay Transparency Nondiscrimination Provision The Contractor will not discharge or in any other manner discriminate against employees or applicants because they have inquired about, discussed, or disclosed their own pay or the pay of another employee or applicant. However, employees who have access to the compensation information of other employees or applicants as a part of their essential job functions cannot disclose the pay of other employees or applicants to individuals who do not otherwise have access to compensation information, unless the disclosure is (a) in response to a formal complaint or charge, (b) in furtherance of an investigation, proceeding, hearing, or action, including an investigation conducted by the employer, or (c) consistent with the contractor's legal duty to furnish information. 14. Indemnification and Hold Harmless a. Contractor shall take all necessary precautions in performing the Services to prevent injury to persons or property. The Contractor agrees to release, indemnify, defend, and hold harmless the City, its elected and appointed officials, officers, employees, agents, representatives, insurers, attorneys, and volunteers from all liabilities, losses, damages, and expenses related to all claims, suits, arbitration actions, investigations, and regulatory or other govemmental proceedings arising from or in connection with this Agreement or the acts, failures to act, errors or omissions of the Contractor, or any Contractors agent or subcontractor, in performance of this Agreement, except for claims caused by the City's sole negligence. b. Industrial Insurance Act Waiver. It is specifically and expressly understood that the Contractor waives any immunity that may be granted to it under the Washington State industrial insurance act, Title 51 RCW, solely for the purposes of this indemnification. Contractors indemnification shall not be limited in any way by any limitation on the amount of damages, compensation or benefits payable to or by any third party under workers' compensation acts, disability benefit acts or any other benefits acts or programs. Contractor shall require that its subcontractors, and anyone directly or indirectly employed or hired by Contractor, and anyone for whose acts Contractor may be liable in connection with its performance of this Agreement, comply with the terms of this paragraph, waive any immunity granted under Title 51 RCW, and assume all potential liability for actions brought by their respective employees. The Parties acknowledge that they have mutually negotiated this waiver. c. Should a court of competent jurisdiction determine that this Agreement is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Contractor and the City, the Contractors liability, including the duty and cost to defend, shall be only to the extent of the Contractors negligence. 226295 Roofing Project — YPD Page 4 of 30 d. Nothing contained in this Section or this Contract shall be construed to create a liability or a right of indemnification in any third party. e. The terms of this section shall survive any expiration or termination of this Contract. 15. Contractor's Liability Insurance At all times during performance of the Services and this Contract, Contractor shall secure and maintain in effect insurance to protect the City and Contractor from and against any and all claims, damages, losses, and expenses arising out of or resulting from the performance of this Contract. If Contractor carries higher coverage limits than the limits stated below, such higher limits shall be shown on the Certificate of Insurance and Endorsements and the City shall be named as an additional insured for such higher limits. Contractor shall provide and maintain in force insurance in limits no less than that stated below, as applicable. The City reserves the right to require higher limits should it deem it necessary in the best interest of the public. Contractor will provide a Certificate of Insurance to the City as evidence of coverage for each of the policies and outlined herein. A copy of the additional insured endorsement attached to the policy will be included with the certificate. This Certificate of insurance shall be provided to the City, prior to commencement of work. Failure of City to demand such verification of coverage with these insurance requirements or failure of City to identify a deficiency from the insurance documentation provided shall not be construed as a waiver of Contractor's obligation to maintain such insurance. Contractor's insurance coverage shall be primary insurance with respect to those who are Additional Insureds under this Contract. Any insurance, self-insurance or insurance pool coverage maintained by the City shall be in excess of the Contractor's insurance and neither the City nor its insurance providers shall contribute to any settlements, defense costs, or other payments made by Contractor's insurance. All additional insured endorsements required by this Section shall include an explicit waiver of subrogation. If at any time during the life of the Contract, or any extension, Contractor fails to maintain the required insurance in full force and effect, all work under the contract shall be discontinued immediately. Any failure to maintain the required insurance may be sufficient cause for the City to terminate the Contract. The following insurance is required: a. Commercial Liability Insurance Before this Contract is fully executed by the parties, Contractor shall provide the City with a certificate of insurance as proof of commercial liability insurance with a minimum liability limit of Two Million Dollars ($2,000,000.00) per occurrence, combined single limit bodily injury and property damage, and Four Million Dollars ($4,000,000.00) general aggregate. If Contractor carries higher coverage limits, such limits shall be shown on the Certificate of Insurance and Endorsements and the City, its elected and appointed officials, employees, agents, attomeys and volunteers shall be named as additional insureds for such higher limits. The certificate shall clearly state who the provider is, the coverage amount, the policy number, and when the policy and provisions provided are in effect. Said policy shall be in effect for the duration of this Contract. The certificate of insurance and additional insured endorsement shall name the City of Yakima, its elected and appointed officials, employees, agents, attorneys and volunteers as additional insureds, and shall contain a clause that the insurer will not cancel or change the insurance without first giving the City prior written notice. The insurance shall be with an insurance company or companies rated A-VII or higher in Best's Guide and admitted in the State of Washington. The requirements contained herein, as well as City of Yakima's review or acceptance of insurance maintained by Contractor is not intended to and shall not in any manner limit or qualify the liabilities or obligations assumed by Contractor under this contract. b. Automobile Liability Insurance Before this Contract is fully executed by the parties, Contractor shall provide the City with a certificate of insurance as proof of automobile liability insurance with a minimum liability limit of Two Million Dollars ($2,000,000.00) per occurrence. If Contractor carries higher coverage limits, such limits shall be shown on the Certificate of Insurance and Endorsements and the City, its elected and appointed officials, employees, agents, attorneys and volunteers shall be named as additional insureds for such higher limits. The certificate shall clearly state who the provider is, the coverage 226295 Roofing Project — YPD Page 5 of 30 amount, the policy number, and when the policy and provisions provided are in effect. Said policy shall be in effect for the duration of this Contract. The certificate of insurance and additional insured endorsement shall name the City of Yakima, its elected and appointed officials, employees, agents, attorneys and volunteers as additional insureds, and shall contain a clause that the insurer will not cancel or change the insurance without first giving the City prior written notice. The insurance shall be with an insurance company or companies rated A-VII or higher in Best's Guide and admitted in the State of Washington. The requirements contained herein, as well as City of Yakima's review or acceptance of insurance maintained by Contractor is not intended to and shall not in any manner limit or qualify the liabilities or obligations assumed by Contractor under this contract. The business auto liability shall include Hired and Non -Owned coverage if necessary. c. Employer's Liability (Stop Gap) Contractor and all Subcontractor(s) shall at all times comply with all applicable workers' compensation, occupational disease, and occupational health and safety laws, statutes, and regulations to the full extent applicable, and shall maintain Employer's Liability insurance with a limit of no less than $1,000,000.00. The City shall not be held responsible in any way for claims filed by Contractor or its employees for services performed under the terms of this Contract. Contractor agrees to assume full liability for all claims arising from this Contract including claims resulting from negligent acts of all Subcontractor(s). Contractor is responsible to ensure Subcontractor(s) have insurance as needed. Failure of Subcontractors(s) to comply with insurance requirements does not limit Contractor's liability or responsibility. 16. Severability If any term or condition of this Contract or the application thereof to any person(s) or circumstances is held invalid, such invalidity shall not affect other terms, conditions or applications which can be given effect without the invalid term, condition or application. To this end, the terms and conditions of this Contract are declared severable. 17. Contract Documents This Contract, the Invitation to Quote #22629S, Scope of Work, conditions, addenda, and modifications and Contractors proposal (to the extent consistent with Yakima City documents) constitute the Contract Documents and are complementary. Specific Federal and State laws and the terms of this Contract, in that order respectively, supersede other inconsistent provisions. These Contract Documents are on file in the Office of the Purchasing Manager, 129 No. 2nd St., Yakima, WA, 98901, and are hereby incorporated by reference into this Contract. 18. Termination Termination for Cause In the event the Contractor breaches this Contract, the City may terminate the Contract at its sole discretion in such event that it provides the Contractor with written notice of Contractors breach and the Contractor fails to cure its breach within 30 days of this notice. In the event the City breaches this Contract, the Contractor may terminate the Contract at its sole discretion in such event that it provides the City with written notice of City's breach and the City fails to cure its breach of the Contract within 60 days of this notice. The following represents a non-exclusive, illustrative list of instances that shall be considered a breach by the Contractor. a. Defaults on an obligation under the Contract; b. Fails to perform any material obligation required under the Contract; c. Files a petition in bankruptcy, becomes insolvent, or otherwise takes action to dissolve as a legal entity; d. Allows any final judgment not to be satisfied or a lien not to be disputed after a legally -imposed, 30-day notice; e. Makes an assignment for the benefit of creditors; f. Fails to follow the sales and use tax certification requirements of the State of Washington; g. Incurs a delinquent Washington tax liability; h. Becomes a State or Federally debarred Contractor; i. Is excluded from federal procurement and non -procurement Contracts; 226295 Roofing Project—YPD Page 6 of 30 j. Fails to maintain and keep in force all required insurance, permits and licenses as provided in the Contract; k. Fails to maintain the confidentiality of the City information that is considered to be Confidential Information, proprietary, or containing Personally Identifiable Information; I. Contractor performance threatens the health or safety of a City, County or municipal employee. Termination for Convenience The City may terminate the Contract, without cause, by providing 30 days written notice of termination. In the event of termination for convenience, the Contractor shall be entitled to receive compensation for any fees owed under the Contract The Contractor shall also be compensated for partially completed services. In this event, compensation for such partially completed services shall be no more than the percentage of completion of the services requested, at the sole discretion of the City, multiplied by the corresponding payment for completion of such services as set forth in the Contract. Alternatively, at the sole discretion of the City, the Contractor may be compensated for the actual service hours provided. The City shall be entitled to a refund for goods or services paid for but not received or implemented, such refund to be paid within 30 days of written notice to the Contractor requesting the refund. Change in Funding In addition to the above termination provisions, if the funds upon which the City relied to establish this Contract are withdrawn, reduced, or limited, or if additional or modified conditions are placed on such funding, the City may terminate this Contract by providing at least five business days written notice to the Contractor. The termination shall be effective on the date specified in the notice of termination. 19. Prime Contractor Contractor is the Prime Contractor hereunder. The Prime Contractor shall be the sole point of contact with regard to all contractual matters arising hereunder, including the performance of work and the payment of any and all charges resulting from its contractual obligations. 20. Removal of Subcontractor If dissatisfied with the background, performance, and/or general methodologies of any subcontractor, the City may request in writing that the subcontractor be removed. The Contractor shall comply with this request at once and shall not employ the subcontractor for any further work/services under this Contract. 21. Taxes and Assessments Contractor shall be solely responsible for and shall pay all taxes, deductions, and assessments, including but not limited to federal income tax, FICA, social security tax, assessments for unemployment and industrial injury insurance, and other deductions from income which may be required by law or assessed against either party as a result of this Contract. In the event the City is assessed a tax or assessment as a result of this Contract, Contractor shall pay the same before it becomes due. 22. Waiver of Breach A waiver by either party hereto of a breach of the other party hereto of any covenant or condition of this Contract shall not impair the right of the party not in default to avail itself of any subsequent breach thereof. Leniency, delay or failure of either party to insist upon strict performance of any agreement, covenant or condition of this Contract, or to exercise any right herein given in any one or more instances, shall not be construed as a waiver or relinquishment of any such agreement, covenant, condition or right. 23. Force Majeure Contractor will not be responsible for delays in delivery due to acts of God, fire, strikes, epidemics, war, riot, delay in transportation or railcar transport shortages, provided Contractor notifies the City immediately in writing of such pending or actual delay. Normally, in the event of any such delays (acts or God, etc.) the date of delivery will be extended for a period equal to the time lost due to the reason for delay. 24. Governing Law This Contract shall be governed by and construed in accordance with the laws of the State of Washington. 25. Venue The venue for any action to enforce or interpret this Contract shall lie in a competent jurisdiction in Yakima County, Washington. 226295 Roofing Project —YPD Page 7 of 30 26. Authority The person executing this Contract, on behalf of Contractor, represents and warrants that they have been fully authorized by Contractor to execute this Contract on its behalf and to legally bind Contractor to all the terms, performances and provisions of this Contract. 27. Change or Notice Any alterations, including changes to the nature of the service, made to the Contract shall be rendered in writing and signed by both responsible parties; no changes without such signed documentation shall be valid. No alterations outside of the general scope and intent of the original Request for Proposals or in excess of allowable and accepted price changes shall be made. In no event shall the Contractor be paid or be entitled to payment for services that are not authorized herein or in any properly executed amendment. Notice of Business Changes: Contractor shall notify the City in writing within three (3) business days of any change in ownership of the facilities of the Contractor or of the facilities of any subcontractor. The Contractor shall notify the City in writing as soon as possible, and in no event later than three (3) business days, after any decision by the Contractor to change or discontinue service that will affect services provided to the City under this Contract. The City shall have the right to renegotiate the terms and conditions of this Contract to the extent required to accommodate a change in governing law or policy that, in the sole discretion of the City, either substantially and unreasonably enlarges the Contractor's duties hereunder, or renders performance, enforcement or compliance with the totality of the Contract impossible, patently unreasonable, or unnecessary. Notices and demands under and related to this Contract shall be in writing and sent to the parties at their addresses as follows: TO CITY: City of Yakima Purchasing TO CONTRACTOR: M Sevigny Construction Inc Christina Payer, Buyer II 1212 N 161h Ave 129 North Second Street Yakima, WA 98902 Yakima, WA 98901 28. Survival The foregoing sections of this Contract, 1-27 inclusive, shall survive the expiration or termination of this Contract in accordance with their terms. IN WITNESS WHEREOF, the parties hereto execute this Contract as of the day and year first above written. M SEVIGNY CONSTRUCTION INC 'Niggly signed by Mean .. &Mrs Matthew Sevigny CF7=�1Phhaw Sangsy By. gOgg 09 11 07,36534WD° ©ate: { .t- t.- Date: 9/1 1/2026 CITY CONTRACT N©- RESOLUTION NO: atthew Sevigny Ades "`. print name) List of Exhibits attached to this contract Exhibit. A — Specifications Exhibit B — Contractors Quote Proposal 226295 Roofing Project — YP© Page 8 of 30 EXHIBIT A - Specifications Page 9 of 30 CITY OF YAKIMA LIMITED PUBLIC WORKS INVITATION TO QUOTE #22629S FOR NON -FEDERALLY FUNDED WORK BETWEEN $10,000-35,000 PROJECT NAME: Roof Project LOCATION: Richard A Zais Jr Law and 200 S 3rd Street, Yakima WA 98901 ISSUE DATE: August 6, 2026 DUE DATE/TIME: August 20, 2026, 2:00:00 PM Local WA State Time stice Center CITY PROJECT COORDINATOR NAME/NUMBER: Marin Cueva-Ramirez, Building Superintendent 509-728-6289, martin.cueva-ramirez@yakinnawa,gov RETURN QUOTES TO: Christina Payer 509-576-6696 Christinaa er yakimawa. ov Small Works Roster Project Contractor must be signed up with WWW,I tRSCROSTERS.ORG in order to respond to this Invitation to Quote. Prevailing Wage This project is considered Public Work and shall be completed in accordance with 39.04 RCW. This is a Prevailing Wage project. Intent to Pay Prevailing Wages, and Affidavit of Prevailing Wages paid must be filed by both the General Contractor and any Subcontractors working on the project, at Contractor's expense, and posted as approved by Labor and Industries (L&I) prior to payment. See attached contract for further details. Certificate of Insurance — Attachment B Please contact your insurance company and have them send us a Certificate of Insurance. The certificate of insurance and additional insured endorsement shall name "The City of Yakima, its elected and appointed officials, employees, agents, attorneys and volunteers as additional insureds," per the attached sample, with the same limits of coverage. The Certificate needs to be addressed as shown and includes an attached Additional Insured Endorsement and an explicit waiver of subrogation, or it will be returned to you for correction, and you will not be able to start work until it is accepted. Subcontractors must also submit Certificates of Insurance with Additional Insured Endorsement. See attached contract for further details, Site Visit An onsite meeting will be convened on August 12, 2026, 9 a.m. local Washington State time at the City of Yakima Richard A Zais Jr Law & Justice Center, located at 200 S 3rd Street, Yakima, WA, 98901. The site meeting is not mandatory; however, interested parties are strongly urged to attend. Questions All questions shall be submitted to the Buyer at christina. aver(cP klnnawa, ,v three {3) days before the Quote due date. Work. Coordination Contractor will coordinate their work with the City of Yakima Project Coordinator listed above as to when work will be accomplished. Work shall be completed as agreed upon in the resulting contract. Work Hours and Schedule Work to be completed M-F, 8:00 a.m. to 5:00 p.m., excluding legal holidays Scope of Work Replace section of roof for the Yakima Police Department, backup dispatch center, located at the Richard A Zais Jr Law and Justice Center, 200 5 3`d Street, Yakima WA 98901. Work to be completed on the section of roof that is highlighted on the attachment labeled "Attachment A Location of Roofing Project" in this quote document and as described below. 226295 Roofing Project—YPD Page 10 of 30 • Approximately 6GQSquare Feet * Remove existing coping metal and dispose, (re-useifpossible) ° Carefully remove 2-3 courses of roof tiles located at north side of roof. Set aside for reuse (re -use if possible). * K4echanicaUyattacha&"highdensi!ycoverbmardoverexisdn8roofsystem. w Overlay cover board with 60mil. TPOmembrane mechanically attached. w Flash parapet walls, curbs, drains and all other miscellaneous protrusions as necessary. w Install newpreOnished 24'Oaugeed8e metal. Match current metal flashing color, forest green. w Atnorth side flash uponto sloped tile roof approx. 36"with fully adhered TPOmembrane. * Reinstall roof tiles back to original state. • Roof replacement permit tubeincluded. w Prevailing wages tobeincluded. MIT 11, 01 -'--' - �0 r Zlu All work is to be done in accordance with the Manufacturer's Instructions, Industry Standards, and Specifications as presented by the City of Yakima. Work shall be performed accordingly to manufacturers' recommendation, using specified materials and brands orapproved and acceptable equal. Recommended Process/Material (by Contractor). *Bidder may quote alternate process for City consideration: Yes ,'o/NuO CONTRACTORTO FILL OUT THIS SECTION Number nfDays umComplete Work: Comments: Quote isFirm for: Days (Minimum o[30Days) page11 o,3O Guarantee: (Minimum of one (1) year on work) Warranty: (Minimum One (1) years on materials) Delivery Terms: All materials are to he quoted F.O.B. destination. All anticipated shipping costs necessary to meet the delivery schedule must be included in the lump sum. No additional charges for shipping or handling will be allowed. Lump Sum (Pre -Tax): To include all permit and Public Work filing fees Tax 8.6%: TOTAL: in signing this Quote we certify that we have not, either directly or indirectly, entered into any agreement or participated in any collusion or otherwise taken any action in restraint of free competition; that no attempt has been made to induce any other person or firm to submit or not to submit a Quote; that this Quote has been independently arrived at without collusion with a ny other Bidder, competitor or potential competitor; that this Quote has not been knowingly disclosed prior to the opening of Quote to any other Bidder or competitor; that the above statement is accurate under penalty of perjury. We will comply with all terms, conditions and specifications required by the City of Yakima in this Invitation to Quote and all terms of our Quote. Company Name Company Address Name of Authorized Company Representative (Type or Print) Title Signature of Above Email Address WMBE/DBE Vendor Certification Number (if applicable) Phone Number © I hereby acknowledge receiving Addendum (a) (Use as many spaces as addenda received.) 226295 Roofing Project — YPD Page 12 of 30 CITY OFYAKIR8ALIMITED PUBLIC WORKS INVITATION TO QUOTE #22629S 1. GENERAL/SPECIAL INSTRUCTIONS A. Additional Work Any additional workfound necessary that is not specified in the Scope of Work shall be listed on a separate sheet entitled "Additional Materials/Labor Required" B. Estimated Quantities Estimated quantities, if any, set forth in the Scope of Work are estimates only, being given only as basis for the comparison of Quotes. The City does not warrant, expressly orby implication; that the actual amount of work will correspond to the estimated quantities. Bidder is responsible for verification of square footage and units,of measure, which are to be provided with Quote submittal. C. Qualified Quotes The General and Special Instructions included inthis quote document and in the resulting contract will govern the performance of the work. No other terms and conditions will be accepted. Quotes that are conditioned in any way, o, Quotes that take exception in any way to the City ofYakirna's General and Special Terms and Conditions, may result in the Quote being considered non -responsive. D. Proprietary Material Submitted Any information contained in the bid submitted that is proprietary must be clearly designated. Marking the entire bid as proprietary will be neither accepted nor honored. if o request is made to view a Contractor's bid, the City of Yakima will comply according to the Public Records Act, [hapter4I56 KCVV. If any information is marked as proprietary in the proposal, such information may not be made available until the affected bidder has been given an opportunity to seek court injunction against the requested disclosure. E. Award qfQuote The City of Yakima reserves the right to reject any or all quotes or accept any presented which meet or exceed these specifications, and which would be in the best interest Vfthe City and will not necessarily be bound to accept the low quote. F. Business License, Permits and Fees All bidders shall have a valid and current business license issued by the State of WA Department of Revenue, Business Licensing Service covering this type of work. Contractor shall also obtain and provide proof of a current City of Yakima business license endorsement or license, as necessary. It will be the Contractor's responsibility to procure any licenses or permits required to complete the project. The Contractor is responsible for all traffic control and barricades, if applicable. You can contact the Codes Department at (509) 575-8121 or (509) 575-6226 or visit the [odes website at: https-//vvyvw.yak|maw!a�gov/serv|ces/cgdes/for information. Contractor [sresponsible for filing all Public VVork paperwork and any charges or fees associated with the filings. All filing fees and charges shall be included inthe pnject'slump sum. G. Background Checks-Specia|Conditions for Yakima Police Department (YPD)FaciUties All Contractors, employees, and Subcontractors who will be working on site must participate in a Washington State and National fingerprint a nd background check process in order to work in YPD facilities. This process must be completed no less than five /5> days prior to start of work. Contractors must also complete CAS Security Awareness training every two (Z)years and sign a Criminal Justice Information Services <CJ|5\ Security Addendum. Washington State Patrol (VVSP) also requires that all employees working on site must watch o 10-15'minutevideo. The YPD Police Services Manager will coordinate with Page 1nof 30 Contractor toensure compliance. Failure to undergo this process may result in loss of contract. If any person does not pass the background check, they must be replaced and will not be allowed on site. There may be few instances where a Contractor may be supervised directly by the Facilities Manager, and this requirement may bewaived onacase-bx-camebasis. H. Best Modern Practices All work, including design, shall be performed and completed in accordance with the best modern practices, further, no detail necessary for safe and regular operation shall be omitted, although specific mention thereof may not bamade inthese specifications. 1. Workmanship Contractor warrants and guarantees to the City that the work shall be performed in a manner consistent with industry standards for the performance of construction and services of a similar nature. The Contractor warrants to the City that materials and equipment furnished will be of good quality and new, that the work will be free from defects, will be fully compatible with the existing materials and equipment and that the work will conform to all requirements. Work not conforming to these requirements, including substitutions (if allowed) not properly approved and authorized, may be considered defective. The Contractor shall comply with recognized workmanship quality standards within the industry as applicable tmeach unit ofwork. All references tostandards whether for materials, processes, assemblies, workmanship, performance, or similar purposes shall mean, unless otherwise noted, the most recently published version of such standard. When reference is made to standards, the standards are to be made a part of this contract, and to have the same effect as if fully reproduced herein. It is a requirement that each category of trades person or installer perform the work be qualified, to the extent of being familiar with applicable and recognized quality standards for that category of work and being capable of workmanship complying with those standards. J. New and Unused All units, equipment, parts and material shall benew, unused, manufacturer's current model year and in current production. All materials shall have physical and chemical properties tmwithstand the intended service' Equipment design shall have sufficient excess capacity for durability and safety. K. Equal/Approved Equal These specifications are intended tmbeprecise where a specific make, model ortrade name is requested. Whenever mnake, model or trade name is used, it shall be that orequal or approved equal. Equal or approved equal means that the make, model or trade name will be given consideration if they fulfill the same performance requirements. The City reserves the right to make the decision on acceptability. Each bidder shall clearly identifV make, model or trade name of equipment bid onthe face mftheir quote. Any equipment proposed as an equal to that herein specified must be substantiated with supporting data to justify such request for substitution. L. Hazardous Materials if asbestos or other hazardous materials are discovered during performance of work under this project, Contractor will immediately notify the Project Coondinator,mothataChangm<JnderaddressingPo||utiun Control aswell asany change incost may beexecuted byPurchasing. M.No Disturbance The Contractor shall not disturb grounds or materials outside the sphere of the contracted project. N. Protection of Utilities The Contractor shall protect from damage public and private utilities encountered during the work. Prior to beginning work, the Contractor shall give proper notification as required by RCW 19.122.030 to the Page 14 of 30 agencies that have utilities in place and shall cooperate with these agencies in the protection and relocation of underground utilities, facilities and structures. The number to call is #811. O. Waste Materials All refuse and waste material must be collected and disposed of, in a legal manner, by the Contractor off the City's property, at the Contractor's expense. The Contractor must immediately clean up any spilled material from streets, roads, etc. Storage of debris on site is not allowed. P. Repair or Replacement The work shall consist of repairing any incidental damage to walls, moldings, electrical, flooring, landscaping, fencing, paved areas, topsoil, turf, or other miscellaneous items within or adjacent to the project area. This includes complete replacement of items that are beyond repair as determined by the City. Should adjacent property be damaged in any manner, Contractor shall immediately contact the Project Coordinator. Contractor shall promptly repair damage caused to adjacent areas, rooms, facilities, property, streets, and sidewalks by construction operations as directed by the City and at no cost to the City. Q. Mobilization and Demobilization Mobilization shall be included in the base unit price for each work order and shall consist of preparatory work and operations performed by Contractor, including his personnel, equipment, supplies and incidentals to the project site. No separate measurement or payment will be made for costs associated with mobilization and demobilization. R. Final Inspection and Acceptance When the Contractor considers the work physically complete and ready for final inspection, the Contractor shall request the City's Project Coordinator to inspect the work. The City will notify the Contractor of any deficiencies in the work after inspection. The Contractor shall immediately take such corrective measures as are necessary to remedy the listed deficiencies. Corrective work shall be pursued vigorously, diligently, and without interruption until physical completion of the listed deficiencies. This process will continue until the City is satisfied and the listed deficiencies have been corrected. If action to correct the listed deficiencies is not initiated within seven (7) days after receipt of the written notice listing the deficiencies, the City may, upon written notice to the Contractor, take whatever steps are necessary to correct those deficiencies. The date of final acceptance shall be determined by the date the Contractor has properly invoiced the City for payment and turned in all required submittals after the final inspection and acceptance has occurred. S. Payments Upon final inspection and acceptance of the work by the City, the Contractor is to submit properly completed invoice(s) to the City of Yakima Accounts Payable, 129 North 2nd Street, Yakima, WA 98901. To ensure prompt payment each invoice should cite Quote number, purchase order number, discount terms and include the Contractor's name and return remittance address. In addition, the invoice shall include quote item description, quantity, unit price, total price, location of work and date work completed. Payment will be mailed within thirty (30) days of acceptance of the completed project, post -work submittals, Prevailing Wage Intents and Affidavits, and a properly completed invoice. Invoice shall be itemized to reflect hours worked and material costs. 22629S Roofing Project — YPD Page 15 of 30 T. Retainage (Must be withheld at 10% in order to waive performance/payment bonds) The City of Yakima shall have the right to withhold ten percent (10%) of the amount of any invoice submitted to the City of Yakima by the Contractor for labor, supervision, and materials furnished by the Contractor up to the time of completion and acceptance of job. Each invoice submitted by the Contractor shall include two separate line items. The first line item is to reflect the total price of the job being invoiced, less ten percent (10%) retainage. The second line item will reflect the ten percent (10%) retainage. Payment of said retainage shall be due thirty (30) days after City of Yakima's acceptance of completed work and verification of Prevailing Wage filings with Labor and Industries. 226295 Roofing Project — YPD Page 16 of 30 BIDDER RESPONSIBILITY CRITERIA FROM — EXCLUDED Completed form included as part of Exhibit B Quote Submittal CERTIFICATION OF COMPLIANCE WITH WAGE PAYMENT STATUTES - EXCLUDED Completed form included as part of Exhibit B Quote Submital SAMPLE AGREEMENT - EXCLUDED Executed agreement completed 22629S Roofing Project — YPD Page 17 of 30 ATTACHMENT A - Location of Roofing Project City of Yakima Richard A Zais Jr Law and Justice Center 200 S 3rd Street, Yakima WA 98901 226295 Roofing Project — YPD Page 18 of 30 ATTACHMENT B - SA PLE CERTIFICATE OF INSURANCE WITH ADDITIONAL INSURED ENDORSEMENT PRODUCE NSURANCE AGENT ISSUING CERTIF SUITED nilty Insured Address ACa THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY FICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AM OW, THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A C TATWE OR PRODUCER, AND THE CERTIFICATE HOLDER, CERTIFICATE OF PORTANT; If the certificate holder Is an ADDITIONAL_ INSURED, the poi IUBROGATION IS WAIVED, subject to the terms and conditions of the poi does not confer tights to the certificate holder in. lieu of such endear ,46,6WARANCE AGENT INFORMATION AME..,.....,......... ............_._�_ . ,.._ ' PA7(......,....._ PHONE .. IAIG No]=, NSURANCE RRENT DATE _RS NO RIGHTS UP N THE CERTIFICATE HOLDER, THIS OR ALTER THE COVERAGE AFFORDED BY THE POLICIES NTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED ATE dorssd A statement or AD ONAL INSURED pr ay require an endears IN WRENS) A R:M NNO COVERAGE „.__,�.�,. „„_..............._. . A: A Vlil OR BETTER, ADMITTED CARRIER COVERAGES CERTIFICATE NUMBER: REISiON NUMBER THIS 15 TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUE L1 TO THE INSURED NAMED ABOVE FOR THE INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONEHTlON OF ANY CONTRACT OR OTHER DC1CUMENT WITH RESPECT TO W CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN 15 SUBJECT TO ALL THE EXCLUSIONS AND CONDITIONS OF SUCH POLICIES LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. ......_ ..,..... .....,,w..., - _poitA t POLICY E(P' r TYPE OsuMD _MID hb L sUID uc" I POLICY NUMBER ° IMM7ODIYYYYI S thaveo!yYYY1 FINnANCE ...�.�.. x AIM9•AtAOh X I OCCUR AGGREGATE LIMIT AP PRO ^_ JECT AUTOMOBILE UABILrrY X' ANY AUTO AUTOS ONLY HIRED SCHEDULED AUTOS NON-ONRaEO AUTOS ONLY UMaAEL.LA t„IAa ;OCCUR CeatdRENSATl0 A ©r F c°°araitu IMxr&tO1Yh NN} yes, Aesca'r O :D€SCRIPTION OF OP Ti POLICY NUMBER START DATE STOP • DATE POLICY NUMBER START STOP DATE DATE POLICY NUMBER START ATE STOP GAP/ EL ONLY STOP DATE ' GE;NEAAtApCIFEiir L P4i09UCTs• COMP1©P AGO Com BODILY IN.IU BODILY INJURY (Par a AY ;PER E. L- EACH ACCIDENT E L DISEASE EA EMPLOYEE_ $ 5EASE POLICY LIMIT GL PERIOD H THIS TERMS, s 2,000,000 5w.,.100,000 s 5.0©Li 1",000 000 4,000,000 S 4,000,000 2,0 00A00 00,000 000,000 DESCRIPTION OF 6PENATTQNS I LG6A"r1OHS/ A The Clly of Yakima, Its agents, employees, authorized volunteer r bA A6AAh*d d and appofnled o with a Waiver of Subrogation, See attached Additional Insured Endorsement. eluded as Primary/Nan-Conlebutory addi nalinaured ERTIPICATE HOLDER ANCELLATION City of Yakima Purchasing Department 129 N. 2nd 51. Yakima, WA 98901 ACORD 25 (2016/03) SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE 'THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WrrH THE POUCY PROVISIONS. AFaZIED REPNIESESITA SIGNATURE 1StIS2o The ACORD name and logo are registered marks of A 5 ACORD CORPORATIO ORO hts reserved 226295 Roofing Project — YPD Page 19 of 30 POLICY NUMBER: MERCtAL GENERAL LIABILITY CG 20 10 07 04 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ T CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - SCHEDULED PERSON OR ORGANIZATION This endorsement modifies insurance provided under the folowing: COMMERCIAL GENERAL LIABILITY COVERAGE PART SCHEDULE Name Of Additional Insured Person(s) Or Organizations): The City of Yakima,, its agents, employees, authorized volunteers, elected and app ii.nted officials are included as Primary/Non-Contributory additional insured, Information required to complete this Sch A:. Section 11 — Who Is An .Insured is inctude as an additional insured.the organizatn(si shown in the .Soh with respect to liability for '`bodity ihiu damage" or "personal and advedits caused, in whole or in part, by: 1. Your acts CI omissions; or 2. The acts or omissions of those acting on your behalf-. in the performance of your ongoing operations for the additional insuredts) at the locations) desig- nated above. his) or but only "property injury" Locations) Of Covered Operations h n above, will be shs wn in the C:ec ra ons. B. With respect to the insuance afforded to these a thtonal insureds, the fol owlng additional er:ciu- siorts apply;. This insurance does not apply to ''bodily inju "&roperty damage" occurring after: 1. At work, including materials, parts or equip- ment furnished in connection with such work, on the project (other than service, maintenance or repairs) to be performed by or on behalf of the additional insureds at the rotator' of Me covere•tf operations has been completed; or 2. That portion of "your work" out of which Me injury^ or damage arises has been put to its in- tended use by any person o« organization other than another contractor or subcontractor en- gaged in performing operations for a principal as a part of the same project 22629S Roofing Project—YPLD Page 20 of 30 POLICY NUMBER:CGD300i S4g07 COMMERCIAL. GENERAL LIABILITY CG2+1041219 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. WAIVER OF TRANSFER OF RIGHTS OF RECOVERY AGAINST OTHERS TO US (WAIVER OF SUBROGATION) This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY' COVERAGE PART ELECTRONIC DATA LIABILITY COVERAGE PART LIQUOR LIABILITY COVERAGE PART POLLUTION LIABILITY COVERAGE PART DESIGNATED SITES POLLUTION LIABILITY LIMITED COVERAGE PART DESIGNATED SITES PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART RAILROAD PROTECTIVE LIABILITY COVERAGE PART UNDERGROUND STORAGE TANK POLICY DESIGNATED TANKS SCHEDULE Name Of Person(s) Or Organization(s): 'Mere required by written contract or agreement executed prior to loss (except where not permitted by law). n required to complete this Schedule, if not shown above, will be shown in the Declarations. The following is added to Paragraph 8. Transfer Of Rights Of Recovery Against Others To Us of Section IV — Conditions: We waive any right of recovery against the person(s) or organization(s) shown in the Schedule above because of payments we make under this Coverage Part. Such waiver by us applies only to the extent that the insured has waived its right of recovery against such person(s) or organization(s) prior to loss. This endorsement applies only to the persons) or organizations) shown in the Schedule above. 225295 Roofing Project - YPD Page 21 of 30 129 North 2nd Street Yakima, Washington 98901 (509) 575-6093 August 12, 2026 Dear Sir or Madam: Subject: Quote 226295 Roof Project - YPD Addendum No. 1 — Site Visit Questions/Answers Site Visit Questions/Answers: The following questions were asked during the site visit that was held today at 9:00 AM. 1. Does the city want the roof repaired or replaced? Answer: The city wants the roof replaced. 2, Why does the city want the roof replaced? Answer: Theroof has been patched at least twice during the last 10 years and is now 30 years old. Please acknowledge receipt of this addendum on page three (3) of the Quote document. If you have any questions, please contact me at (509) 576-6696. Sincerely, Christina Payer, CPPB Buyer ll - City of Yakima Purchasing CC: Martin Cueva-Ramirez, Building Superintendent File Page 22 of 30 22629-5 Addendum No. 1 0 F Y A 1FOi A P 1 J R C H A 1; 1 ikl G DKV I S 10 N 0 (509)575'6093 August1B' 2026 Dear Sir orMadam: Subject: Quote Z2629SRoof Project -YPD Addendum No. 2—Clarifications tnQuote Specifications & Due Date Extension Clarifications: l. Removal of the existing membrane is not required. A new roof system can be installed directly over the existing roof assembly. I The repairs that were previously completed on the existing roof system are permanent in nature and will not adversely affect the performance or installation of a new roof system. Due Date Extension: The due date will be extended to August 27, 2026, 2 PM Local WA State Time Please acknowledge receipt of this addendum on page three (3) of the Quote document. |fyou have any questions, please contact meat(GO9)S7G'GGB6. Christina Payer, CPPB Buyer 11 - City of Yakima Purchasing CC- Martin Cueva'Ramimez,Building Superintendent File 22629-SAddendum No. u Page 23 of 30 EXHIBIT B - Contractor's Quote Proposal Separate Attachment Page 24 of 30 CITY OF YAKIMA LIMITED PUBLIC WORKS INVITATION TO QUOTE #22629S FOR NON -FEDERALLY FUNDED WORK BETWEEN $10,000-35,000 PROJECT NAME: Roof Project LOCATION: Richard A Zais Jr Law and Justice Center 200 5 3rd Street, Yakima WA 98901 ISSUE DATE: August 6, 2026 DUE DATE/TIME: August 20, 2026, 2:00:00 PM Local WA State Time CITY PROJECT COORDINATOR NAME/NUMBER: Marin Cueva-Ramirez, Building Superintendent 509-728-6289, martin.cueva-ramirez@yakirnawa.gov RETURN QUOTES TO: Christina Payer — 509-576-6696 Christina. payer@yakimawa.gov Small Works Roster Project Contractor must be signed up with W W.MRSCROSTER S.ORG in order to respond to this Invitation to Quote. Prevailing Wage This project is considered Public Work and shall be completed in accordance with 39.04 RCW. This is a Prevailing Wage project. Intent to Pay Prevailing Wages, and Affidavit of Prevailing Wages paid must be filed by both the General Contractor and any Subcontractors working on the project, at Contractor's expense, and posted as approved by Labor and Industries (L&I) prior to payment. See attached contract for further details. Certificate of Insurance — Attachment B Please contact your insurance company and have them send us a Certificate of Insurance. The certificate of insurance and additional insured endorsement shall name "The City of Yakima, its elected and appointed officials, employees, agents, attorneys and volunteers as additional insureds," per the attached sample, with the same limits of coverage. The Certificate needs to be addressed as shown and includes an attached Additional Insured Endorsement and an explicit waiver of subrogation, or it wil be returned to you for correction, and you will not be able to start work until it is accepted. Subcontractors must also submi Certificates of Insurance with Additional Insured Endorsement. See attached contract for further details. Site Visit An onsite meeting will be convened on August 12, 2026, 9 a.m. local Washington State time at the City of Yakima Richard A Zais Jr Law & Justice Center, located at 200 S 3rd Street, Yakima, WA, 98901. The site meeting is not mandatory; however, interested parties are strongly urged to attend. Questions All questions shall be submitted to the Buyer a Work Coordination Contractor will coordinate their work with the City of Yakima Project Coordinator listed above as to when work will be accomplished. Work shall be completed as agreed upon in the resulting contract. hri ki nawa.gov three (3) days before the Quote due date. ork Hours and Schedule k to be completed M-F, 8:00 a.m. to 5:00 p.m., excluding legal holiday:. Scope of Work Replace section of roof for the Yakima Police Department, backup dispatch center, located at the Richard A Zais Jr Law and Justice Center, 200 S 3`d Street, Yakima WA 98901. Work to be completed on the section of roof that is highlighted on the attachment labeled "Attachment A Location of Roofing Project" in this quote document and as described below. 226295 Roofing Project — YPD Page 25 of 30 • Approximately 660 Square Feet • Remove existing coping metal and dispose. (re -use if possible) • Carefully remove 2-3 courses of roof tiles located at north side of roof. Set aside for reuse (re -use if possible). • Mechanically attach a 'A" high density cover board over existing roof system. • Overlay cover board with 60 mil. TPO membrane mechanically attached. • Flash parapet walls, curbs, drains and all other miscellaneous protrusions as necessary. • install new prefinished 24-gauge edge metal. Match current metal flashing color, forest green. • At north side flash up onto sloped tile roof approx. 36" with fully adhered TPO membrane. • Reinstall roof tiles back to original state. • Roof replacement permit to be included. • Prevailing wages to be included. All work is to be done in accordance with the Manufacturer's Instructions, Industry Standards, and Specifications as presented by the City of Yakima. Work shall be performed accordingly to manufacturers' recommendation, using specified materials and brands or approved and acceptable equal. Recommended Process/Material (by Contractor): *Bidder may quote alternate process for City consideration: Yes or No L CONTRACTOR TO FILL OUT THIS SECTION Number of Days to Complete Work: Comments: Quote is Firm for: Days (Minimum of 30 Days) 226295 Roofing Project — YPD Page 26 of 30 mrantee (Minimum oƒone /2/year onwork) Warranty: (Minimum One /1/years onmaterials) Delivery Terms: All materials are to be quoted F.O.B. destination. All anticipated shipping costs necessary to meet the delivery schedule must be included inthe lump sum. No additional charges for shipping orhandling will be allowed. Lump Sum (Pre-Tox): To include allpermit and Public Workfilingfees � |nsigning this Quote wecertify that we have not, either directly or indirectly, entered into any agreement or participated in any collusion or otherwise token any action in restraint of free competition; that no attempt has been made to induce any other person nrfirm tasubmit ornot tosubmit aQuote; that this Quote has been independently arrived atwithout collusion with any other Bidder, competitor or potential competitor; that this Quote has not been knowingly disclosed prior to the opening of Quote toany other Bidder orcompetitor; that the above statement isaccurate under penalty ofperjury. VVewill comply with all terms, conditions and specifications required by the City of Yakima in this Invitation to Quote and all terms ofour Quote. Company Name Company Address Name ofAuthorized Company Representative (Type o«Print) Title Sign I Above Email Address ``�- —vvxGE/DBEVendor Certification Number (if applicable) Phone Number I hereby acknowledge receiving Addendum (a) (Use asmany spaces asaddenda received] Page 27 of 30 DER RESPONSIBILITY CRITERIA FORM submitted ith € uote Form) It is the intent of City to award a contract to the low responsible bidder. Before award, the bidder must meet the following bidder responsibility criteria to be considered a responsible bidder, The bidder may be required by the City to submit documentation demonstrating compliance with the criteria, The bidder must: 1. Have a current certificate of registration as a Contractor in compliance with chapter 18.27 RCW, which must have been in effect at the time of quote submittal; Contractor #: MSEVISC9320K Effective Date: 9/12/2007 Expiration Date: 10/30/2027 2. Have a current Washington Unified Business Identifier (UBI) number; UBI #: 602-749-875 If applicable: a. Have Industrial Insurance (workers' compensation) coverage for the bidder's employees working in Washington, as required in Title 51 RCW; Is account current? Yes (Yes/No) b. Have a Washington Employment Security Department number, as required in Title 50 RCW; # 000-379614-00-0 c. Have a Washington Department of Revenue state excise tax registration number, as required in Title 82 RCW; 270,760-00 4. Has Contractor been disqualified from bidding on any public works contract under RCW 39.06.010 or 39.12.065(3). Is Contractor disqualified? No (Yes/No) 5. Until December 31, 2013, not have violated more than one time the off -site, prefabricated, non-standard, project specific items reporting requirements of RCW 39.04.370. Does Contractor have violations? No (Yes/No) For public works projects subject to the apprenticeship utilization requirements of RCW 39.04.320, not have been found out of compliance by the Washington state apprenticeship and training council for working apprentices out of ratio, without appropriate supervision, or outside their approved work processes as outlined in their standards of apprenticeship under chapter 49.04 RCW for the one-year period immediately preceding the first date of advertising for the project. Is Contractor in compliance? Yes (Yes/No) 7. Per RCW 39.04.350 and RCW 39.06.020, has the Contractor had Labor and Industries Training or are they exempt? Training Complete ® Exempt E Is Contractor in compliance? Yes (Yes/No) Federal Suspension and Debarment: The contractor certifies, that neither it nor its "principals" (as defined in 49 CFR 29.105(p) is presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any federal department or agency. 226295 Roofing Project — YPD Page 28 of 30 Subcontractor Responsibility The Contractor shall include the language ofthis section in each of its first -tier subcontracts and shall requireeach of its Subcontractors to include substantially the same language of this section in each oftheir subcontracts, adjusting only as necessarythe terms used for the contracting parties. The requirements of this section apply toall Subcontractors regardless oftier. 2. At the time of subcontract execution, the Contractor shall verify that each of its first tier Subcontractors meets the following bidder responsibility criteria: a. Have a current certificate of registration in compliance with chapter 18.27 RCW, which must have been ineffect atthe time ofsubcontract quote submittal; b. Have acurrent Washington Unified Business Identifier number (U8|); 3. Ifapplicable, have: /. Industrial insurance (worker's compensation) coverage forthe Subcontractor's employeesworking inWashington asrequired inTitle 5lRCVV; b. AWashington Employment Security Department number asrequired inTitle 5OR[W; c. A Washington Department mfRevenue state excise tax registration number as required |nTitle 82 RCVV; b. Anelectrical Contractor license, lfrequired bvChapter 19'28R[VV n. Anelevator Contractor license, ifrequired bYChapter 7O.87RCVV. 4. Has Contractor been disqualified from bidding on any public works contract under R[VV39I6.O1O or S. Until December 31, 2013, not have violated more than one time the off -site, prefabricated, non-standard, project specific items reporting requirements mfRCVV39.O437O. 6. For public works projects subject to the apprenticeship utilization requirements ofRCVV]9.04.33O, not have been found out of compliance by the Washington state apprenticeship and training council for vxmrhln8 apprentices out of ratio, without appropriate supervision, or outside their approved work processes as outlined in their standards of apprenticeship under chapter 4g.04 RCVV for the one-year period immediately preceding the first date ofadvertising for the project. 7. Per RCVV39.043S0and RCVV3S-06.O2D has the Subcontractor had Labor and Industries Training prare they exempt? Signature by person authorized to certify information included in Bidder Responsibility Criteria Form: low Signature Mmtthsw8ev| ny,Pmsident Printed Name, Title M/26/2D26 Page 29of 30 Certification of Compliance with Wage Payment Statutes (To be submitted with Quote Form) The bidder hereby certifies that, within the three-year period immediately preceding the quote solicitation date ( 8/27/2026 ), that the bidder is not a "willful" violator, as defined in RCW 49.48.082, of any provision of chapters 49.46, 49.48, or 49.52 RCW, as determined by a final and binding citation and notice of assessrnent issued by the Department of Labor and Industries or through a civil judgment entered by a court of limited or general jurisdiction. I certify under penalty of perjury under the laws of the State of Washington that the foregoing is true and correct. M Sevigny Construction Inc Bidder Signatu Matthew Sevigny zed Official* Printed Name President Title 8/27/2026 Date Yakima City WA State Check One: Individual 0 Partnership 0 Joint Venture 0 Corporation I State of Incorporation, or if not a corporation, State where business entity was formed: Washington if a co -partnership, give firm name under which business is transacted: if a corporation, proposal must be executed in the corporate name by the president or vice-president (or any other corporate officer accompanied by evidence of authority to sign). if a co partnership, proposal must be executed by a partner. 226295 Roofing Project —YPD Page 30 of 30