BUSINESS OF THE CITY COUNCIL
YAKIMA, WASHINGTON
AGENDA STATEMENT
Item No. 7.E.
For Meeting of: September 15, 2026
ITEM TITLE: Resolution authorizing a contract with TTC Construction, Inc. for the
Bravo Company Boulevard Utilities Project 2770 (Capital Fund)
SUBMITTED BY: Robert Washabaugh, City Engineer
SUMMARY EXPLANATION:
The Bravo Company Boulevard Utilities Project 2770 consists of installing underground utilities. Work
includes extension of domestic water and sewer lines, and an irrigation drain south of the railroad tracks.
The city of Yakima used the procedure established by Washington State law for the bidding and
awarding of public capital improvement projects with TTC Construction, Inc. being selected to provide
construction on the project in the amount not to exceed $1,563,741.17.
The federal project is funded with ARPA and Mill Site (323)funds.
ITEM BUDGETED: Yes
STRATEGIC PRIORITY 24-25: A Resilient Yakima
RECOMMENDATION: Adopt Resolution.
ATTACHMENTS:
Resolution TTC Final.docx
Blank Contract for Project 2770.pdf
19
RESOLUTION NO. R-2026-
A RESOLUTION authorizing the Contract with TTC Construction, Inc. to conduct
the construction of the Bravo Company Boulevard Utilities Project 2770.
WHEREAS, the city of Yakima (City) desires to enter into a contract with TTC
Construction, Inc. for the construction of the Bravo Company Boulevard Utilities Project 2770
(Project); and
WHEREAS, the Project consists of extending domestic water, sewer, and an irrigation
drain south of the railroad tracks, and other related work at the mill site; and
WHEREAS, the City used the procedure established by Washington State law for the
bidding and awarding of public capital improvement projects; and
WHEREAS, TTC Construction Inc was determined to be qualified to perform the needed
construction work; and
WHEREAS, the contract will be null and void if bond, certificate, and required insurance
certificate and endorsement are not received within specified timeframe; and
WHEREAS, the Scope of Work and Budget included in this contract meets the needs
and requirements of the city of Yakima for this Project; and
WHEREAS, the City Council of the City of Yakima finds that entering into the contract with
TTC Construction, Inc. for construction of the Bravo Company Boulevard Utilities Project 2770 is
in the best interests of the City and its residents; now, therefore
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA:
The City Manager is hereby authorized to execute the Contract with TTC Construction,
Inc., attached hereto and incorporated herein by this reference not to exceed One Million Five
Hundred Sixty Three Thousand Seven Hundred Forty One dollars and Seventeen Cents
($1,563,741.17) to provide the Construction Services outlined in the contract.
ADOPTED BY THE CITY COUNCIL this 15th day of September, 2026.
ATTEST: Matt Brown, Mayor
Rosalinda Ibarra, City Clerk
20
CONTRACT
THIS AGREEMENT, made and entered into in triplicate, this day of , 20_, by and
between the City of Yakima, hereinafter called the Owner, and
a Washington Corporation, hereinafter called the
Contractor.
WITNESSETH:
That in consideration of the terms and conditions contained herein and attached and made a part of this
agreement, the parties hereto covenant and agree as follows:
I. The Contractor shall do all work and furnish all tools, materials, labor and equipment for THE BID
AMOUNT OF:$1,563,741.17 , for Bravo Company Boulevard Utilities -South of Tracks. City of
Yakima Proiect No. 2770, all in accordance with, and as described in the attached specifications and the
2026 Standard Specifications for Road, Bridge, and Municipal Construction which are by this reference
incorporated herein and made a part hereof, and shall perform any alterations in or additions to the work
provided under this contract and every part thereof.
Contract time shall begin on the first working day following the Notice to Proceed Date and shall be
completed in seventy(70)working days. If work has not commenced within the ten (10)days after the
notice to proceed, the first chargeable working day shall be the eleventh (11th)working day after the date
on which the City issues the Notice to Proceed.
If said work is not completed within the time specified, the Contractor agrees to pay to the Owner the sum
specified in the Standard Specifications for each and every day said work remains uncompleted after
expiration of the specified time, as liquidated damages.
The Contractor shall provide and bear the expense of all equipment;work and labor of any sort
whatsoever that may be required for the transfer of materials and for constructing and completing the
work provided for in this contract and every part thereof, except such as are mentioned in the
specifications to be furnished by the City of Yakima.
II. The City of Yakima hereby promises and agrees with the Contractor to employ, and does employ the
Contractor to provide the materials and to do and cause to be done the above described work and to
complete and finish the same according to the attached plans and specifications and the terms and
conditions herein contained and hereby contracts to pay for the same according to the attached
specifications and the schedule of unit or itemized prices hereto attached, at the time and in the manner
and upon the conditions provided for in this contract.
III. RCW 35.22.650: Contractor agrees that the Contractor shall actively solicit the employment of
minority group members. Contractor further agrees that the Contractor shall actively solicit bids for the
subcontracting of goods or services from qualified minority businesses. Contractor shall furnish evidence
of the Contractor's compliance with these requirements of minority employment and solicitation.
Contractor further agrees to consider the grant of subcontracts to said minority bidders on the basis of
substantially equal proposals in the light most favorable to said minority businesses. The Contractor shall
be required to submit evidence of compliance with this section as part of the bid.
Nothing in this Agreement, including,without limitation, the provisions of Section 16, shall require
Contractor or any of its subcontractor(s)to take action that would be deemed discrimination or
preferential treatment in violation of RCW 49.60.400. Pursuant to RCW 49.60.400(6), this Section does
not prohibit action that must be taken to establish or maintain the City of Yakima's eligibility for any
federal program, if ineligibility would result in a loss of federal funds to the City of Yakima.
IV. The Contractor for itself, and for its heirs, executors, administrators, successors, and assigns, does
hereby agree to the full performance of all the covenants herein contained upon the part of the
Contractor.
V. It is further provided that no liability shall attach to the City of Yakima by reason of entering into this
contract, except as expressly provided herein.
G:\PROJECTS\2026\26116\07.Specifications\26116 Spec.docx 4-2
21
IN WITNESS WHEREOF the parties hereto have caused this agreement to be executed the day and year
first herein above written.
Countersigned: CITY OF YAKIMA CONTRACTOR
this day of 2026.
, a Corporation
Construction Company
By:
City Manager Signature Contractor Signature
(Printed Name) (Printed Name)
Attest:
Its:
City Clerk (President, Owner, etc.)
Address:
G:\PROJECTS\2026\26116\07.Specifications\26116 Spec.docx 4-3