Loading...
HomeMy WebLinkAboutGoodwin Tracts - Camp Hope and Vicinity Sewer Lift StationWastewater / Stormwater Division July 27, 2026 Victoria Baker, 2220 I . Viol;: Yakima. WA 98909 On June 29, 2026 the City solicited RFQ No. WF2892 to hire an A/E firm to develop design and provide construction services. Three (3) proposals were received on July 13, 20'26 forthe above project from the following firms: • Wilson Engineering LLC. • Ardurra Engineering Inc. • Paratnetrix Engineering Inc.. The analysis committee was formed and given materials and instructions on how to conduct the analysis and score the proposals on July 23''d and July 24th, 2026. Committee members included: • Jennifer Cleary • Marc Cawley • Robert Brown • Adrian Vasquez • Raymond Scott • Walter Hansen The proposals were checked for responsiveness by Walter Hansen and deemed to be responsive. Respondents were invited for interviews and presentations on July 23' and July 24th, 2026 The proposals were scored for the content of their SOQs and Interviews utilizing the following scoring matrix for each: Total score 0-200 Evaluation Criterion ( I ) Key personnel qualifications and relevant experience (2) Available staff to perform in timely fashion (3) Past Performance (4) Understanding Approach Possible Points 0-30 / 0-30 0-25 / 0-25 0-20 / 0-20 0-25 / 0-25 Total 200 Based on the tabulated score logs from six evaluators, the firms scored as follows: • Wilson Engineer LLC. — 999 • Ardurra Engineering Inc. — 1018 • Parametrix Engineering Inc, - 1 159 Parametric Engineering, Inc. was the highest -scoring firm in the evaluation. The committee recommends that we proceed to contract negotiations with Parametric Engineering, Inc. Price astewater 1t laata APP Vielor^ic taker City Manger 7-2 7-2b CITY CONTRACT NO: "` _l� Dale: j D1 DDIS RESOLUTION NO' 14 ( k