HomeMy WebLinkAboutGoodwin Tracts - Camp Hope and Vicinity Sewer Lift StationWastewater / Stormwater Division
July 27, 2026
Victoria Baker,
2220 I . Viol;:
Yakima. WA 98909
On June 29, 2026 the City solicited RFQ No. WF2892 to hire an A/E firm to develop design and provide
construction services.
Three (3) proposals were received on July 13, 20'26 forthe above project from the following firms:
• Wilson Engineering LLC.
• Ardurra Engineering Inc.
• Paratnetrix Engineering Inc..
The analysis committee was formed and given materials and instructions on how to conduct the analysis and
score the proposals on July 23''d and July 24th, 2026. Committee members included:
• Jennifer Cleary
• Marc Cawley
• Robert Brown
• Adrian Vasquez
• Raymond Scott
• Walter Hansen
The proposals were checked for responsiveness by Walter Hansen and deemed to be responsive. Respondents
were invited for interviews and presentations on July 23' and July 24th, 2026
The proposals were scored for the content of their SOQs and Interviews utilizing the following scoring matrix
for each: Total score 0-200
Evaluation Criterion
( I ) Key personnel qualifications and relevant experience
(2) Available staff to perform in timely fashion
(3) Past Performance
(4) Understanding Approach
Possible Points
0-30 / 0-30
0-25 / 0-25
0-20 / 0-20
0-25 / 0-25
Total 200
Based on the tabulated score logs from six evaluators, the firms scored as follows:
• Wilson Engineer LLC. — 999
• Ardurra Engineering Inc. — 1018
• Parametrix Engineering Inc, - 1 159
Parametric Engineering, Inc. was the highest -scoring firm in the evaluation.
The committee recommends that we proceed to contract negotiations with Parametric Engineering, Inc.
Price
astewater 1t laata
APP
Vielor^ic taker
City Manger
7-2 7-2b
CITY CONTRACT NO: "` _l�
Dale: j D1 DDIS
RESOLUTION NO' 14 ( k