Loading...
HomeMy WebLinkAbout09/01/2026 07.E. Resolution authorizing a agmt with Parametrix_engineering svcs_Goodwin Tracts sanitary sewer lift station improv !, !:::;5 • •••:,"?..1 � F - BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No. 7.E. For Meeting of: September 1, 2026 ITEM TITLE: Resolution authorizing a Professional Services Agreement with Parametrix, Inc. to provide engineering services for Goodwin Tracts Sanitary Sewer Lift Station Improvements (Wastewater Capital Fund 476) SUBMITTED BY: Scott Schafer, Public Works Director * Marc Cawley, Acting Wastewater/Stormwater Manager SUMMARY EXPLANATION: The City of Yakima (City) Wastewater Division desires to enter into a Professional Services Agreement with Parametrix, Inc. to provide engineering services for Goodwin Tracts Sanitary Sewer Lift Station Improvements. The City's existing lift station requires replacement and improvements to increase service areas to adjacent city property which includes serving Camp Hope. Parametrix will design an improved lift station capable of replacing the current lift station at Camp Hope in addition to serving the U-Haul property to the north by decommissioning the City's problematic lift station. Such improvements will also provide the ability for future wastewater service on City-owned property further to the north of the wastewater treatment plant adjacent to SR-24. The Professional Services Agreement with Parametrix, Inc., in an amount not to exceed $784,432, has been attached for City Council review and is funded by Wastewater Capital Fund 476. ITEM BUDGETED: Yes STRATEGIC PRIORITY 24-25: A Safe and Healthy Yakima RECOMMENDATION: Adopt Resolution. ATTACHMENTS: Resolution_WWTP_Goodwin Tracts Sewer Lift Station1.docx SC2911_PSA Parametrix_08132026 print.pdf 42 RESOLUTION NO. R-2026- A RESOLUTION authorizing a Professional Services Agreement with Parametrix, Inc. to provide engineering services for Goodwin Tracts Sanitary Sewer Lift Station Improvements.(Wastewater Capital Fund 476) WHEREAS, the City of Yakima (City) maintains the Yakima Regional Wastewater Treatment Facility and collection system in accordance with applicable Federal, State and Local regulations; and WHEREAS, the City's Wastewater Division's existing lift station requires replacement and improvements to increase service areas to adjacent city property; and WHEREAS, the City of Yakima Wastewater Division representatives have complied with the provisions of RCW 39.80 which concerns the procurement of engineering and architectural services by a city; and WHEREAS, on July 23, and 24, 2026, the City held interviews with three engineering firms listed on the Municipal Research and Services Center (MRSC) of Washington roster as having the experience and expertise necessary to perform these services; and WHEREAS, as a result of these interviews, the City selected Parametrix, Inc. as the most qualified Engineering Firm to perform the required work; and WHEREAS, the City Council has determined that it is in the best interest of the City of Yakima to enter into a professional services agreement with Parametrix, Inc. for engineering services to replace the existing wastewater lift station and increase service levels to adjacent city owned property; now, therefore BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The City Manager is hereby authorized and directed to execute a Professional Services Agreement between the City of Yakima and Parametrix, Inc., in an amount not to exceed SEVEN HUNDRED EIGHTY-FOUR THOUSAND FOUR HUNDRED THIRTY-TWO DOLLARS AND ZERO CENTS ($784,432.00), to provide engineering services for Goodwin Tracts Sanitary Sewer Lift Station Improvements; a copy of the Agreement is attached hereto and by this reference made a part hereof. ADOPTED BY THE CITY COUNCIL this 1st day of September 2026 ATTEST: Matt Brown, Mayor Rosalinda Ibarra, City Clerk 43 AGREEMENT BETWEEN CITY OF YAKIMA,WASHINGTON AND FOR PROFESSIONAL SERVICES THIS AGREEMENT, made and entered into on this day of , 2026, by and between the City of Yakima, Washington, a municipal corporation with its principal office at 129 North Second Street, Yakima, WA 98901, (hereinafter referred to as "CITY"), and Parametrix, Inc. with its principal office at 1019 39th Avenue SE, Suite 100, Puyallup, WA 98374, (hereinafter referred to as "ENGINEER"); said corporation being licensed and registered to do business in the State of Washington, and will provide planning, surveying, easement support, design, construction administration, and inspection services for the Goodwin Tracts Sanitary Sewer Lift Station (SLS) SC2911 under this Agreement on behalf of the City of Yakima's Projects, herein referred to as the "PROJECT." WITNESSETH: RECITALS WHEREAS, CITY desires to retain the ENGINEER to provide engineering services for design and construction of the PROJECT, as described in this Agreement and subsequent Amendments thereto; and WHEREAS, ENGINEER represents that it has available and offers to provide personnel with knowledge and experience necessary to satisfactorily accomplish the work within the required time and that it has no conflicts of interest prohibited by law from entering into this Agreement; NOW, THEREFORE, CITY and ENGINEER agree as follows: SECTION 1 INCORPORATION OF RECITALS 1.1 The above recitals are incorporated into these operative provisions of the Agreement. SECTION 2 SCOPE OF SERVICES 2.0.1 ENGINEER agrees to perform those services described hereafter. Unless modified in writing by both parties, duties of ENGINEER shall not be construed to exceed those services specifically set forth herein. 2.0.2 ENGINEER shall use its best efforts to maintain continuity in personnel and shall assign, JC Hungerford, PE as Principal-in-Charge throughout the term of this Agreement unless other personnel are approved by the CITY. 2.1 Basic Services: ENGINEER agrees to perform those tasks described in Exhibit A, entitled "Goodwin Tracts Sanitary Sewer Lift Station (SLS) SC2911 - Design and Engineering Services" (WORK) which is attached hereto and made a part of this Agreement as if fully set forth herein. 2.2 Additional Services: CITY and ENGINEER agree that not all WORK to be performed by ENGINEER can be defined in detail at the time this Agreement is executed, and that additional WORK related to the Project and not covered in Exhibit A may be needed during performance of this Agreement. CITY may, at any time, by written order, direct the ENGINEER to revise portions of the PROJECT WORK previously completed in a satisfactory manner, delete portions of the PROJECT, or request that the ENGINEER perform additional WORK beyond the scope of the PROJECT WORK. Such changes hereinafter shall be referred to as "Additional Services." Page 1 44 2.2.1 If such Additional Services cause an increase or decrease in the ENGINEER'S cost of, or time required for, performance of any services under this Agreement, a contract price and/or completion time adjustment pursuant to this Agreement shall be made and this Agreement shall be modified in writing and accepted by the parties hereto. 2.2.2 Compensation for each such request for Additional Services shall be negotiated by the CITY and the ENGINEER according to the provisions set forth in Exhibit B, attached hereto and incorporated herein by this reference, and if so authorized, shall be considered part of the PROJECT WORK. The ENGINEER shall not perform any Additional Services until so authorized by CITY and agreed to by the ENGINEER in writing. 2.3 The ENGINEER must assert any claim for adjustment in writing within thirty(30)days from the date of the ENGINEER's receipt of the written notification of change. SECTION 3 TERM 3.1 The term of this AGREEMENT shall be Two Years from Notice to Proceed. SECTION 4 CITY'S RESPONSIBILITIES 4.1 CITY-FURNISHED DATA: The CITY will provide to the ENGINEER all technical data in the CITY'S possession relating to the ENGINEER'S services on the PROJECT including information on any pre-existing conditions known to the CITY that constitute hazardous waste contamination on the PROJECT site as determined by an authorized regulatory agency. 4.2 ACCESS TO FACILITIES AND PROPERTY: The CITY will make its facilities reasonably accessible to ENGINEER as required for ENGINEER'S performance of its services and will provide labor and safety equipment as reasonably required by ENGINEER for such access. 4.3 TIMELY REVIEW: The CITY will examine the ENGINEER'S studies, reports, sketches, drawings, specifications, proposals, and other documents; obtain advice of an attorney, insurance counselor, accountant, auditor, bond and financial advisors, and other consultants as CITY deems appropriate; and render in writing decisions required of CITY in a timely manner. Such examinations and decisions, however, shall not relieve the ENGINEER of any contractual obligations nor of its duty to render professional services meeting the standards of care applicable to its profession. 4.4 CITY shall appoint a CITY'S Representative with respect to WORK to be performed under this Agreement. CITY'S Representative shall have complete authority to transmit instructions and receive information. ENGINEER shall be entitled to reasonably rely on such instructions made by the CITY'S Representative unless otherwise directed in writing by the CITY, but ENGINEER shall be responsible for bringing to the attention of the CITY'S Representative any instructions which the ENGINEER believes are inadequate, incomplete, or inaccurate based upon the ENGINEER'S knowledge. 4.5 Any documents, services, and reports provided by the CITY to the ENGINEER are available solely as additional information to the ENGINEER and will not relieve the ENGINEER of its professional duties and obligations under this Agreement or at law. The ENGINEER shall be entitled to reasonably rely upon the accuracy and the completeness of such documents,services and reports, but shall be responsible for exercising customary professional care in using and reviewing such documents, services, and reports and drawing conclusions from them. SECTION 5 AUTHORIZATION, PROGRESS, AND COMPLETION 5.1 In signing this Agreement, CITY grants ENGINEER specific authorization to proceed with WORK described in Exhibit A. The time for completion is defined in Exhibit A, or as amended. SECTION 6 COMPENSATION 6.1 COMPENSATION ON A TIME SPENT BASIS AT SPECIFIC HOURLY RATES: For the services described in Exhibit A, compensation shall utilize current contractor hourly rates. Estimated rates Page 2 45 identified in Exhibit C-Schedule of Specific Hourly Rates, attached hereto and incorporated herein by this reference, on a time spent basis plus reimbursement for direct non-salary expenses. 6.1.1 DIRECT NON-SALARY EXPENSES: Direct Non-Salary Expenses are those costs incurred on or directly for the PROJECT including, but not limited to, necessary transportation costs, including current rates for ENGINEER'S vehicles; meals and lodging; laboratory tests and analyses; printing, binding and reproduction charges; all costs associated with other outside nonprofessional services and facilities; special CITY- requested and PROJECT-related insurance and performance warranty costs; and other similar costs. Reimbursement for Direct Non-Salary Expenses will be on the basis of actual charges plus a reasonable markup, not to exceed ten percent (10%), and on the basis of current rates when furnished by ENGINEER. Estimated Direct Non-Salary Expenses are shown in Exhibit B. 6.1.1.1 Travel costs, including transportation, lodging, subsistence, and incidental expenses incurred by employees of the ENGINEER and each of the Subconsultants in connection with PROJECT WORK; provided, as follows: • That a maximum of U.S. INTERNAL REVENUE SERVICE allowed cents per mile will be paid for the operation, maintenance, and depreciation costs of company or individually owned vehicles for that portion of time they are used for PROJECT WORK. ENGINEER,whenever possible,will use the least expensive form of ground transportation. • That reimbursement for meals inclusive of tips shall not exceed a maximum of forty dollars ($40) per day per person. This rate may be adjusted on a yearly basis. • That accommodation shall be at a reasonably priced hotel/motel. • That air travel shall be by coach class, and shall be used only when absolutely necessary. 6.1.2 Telephone charges, computer charges, in-house reproduction charges,first class postage, and FAX charges are not included in the direct expense costs, but are considered included in the Schedule of Specific Hourly Billing Rates. 6.1.3 Professional Subconsultants. Professional Subconsultants are those costs for engineering, architecture, geotechnical services and similar professional services approved by the CITY. Reimbursement for Professional Subconsultants will be on the basis of actual costs billed plus a reasonable markup, not to exceed ten percent (10%) for services provided to the CITY through this Agreement. Estimated Subconsultant costs are shown in Exhibit B. 6.2 Unless specifically authorized in writing by the CITY, the total budgetary amount for this PROJECT shall not exceed Seven Hundred Eighty-Four Thousand Four Hundred Thirty-Two Dollars and Zero Cents ($784,432.00) The ENGINEER shall make all reasonable efforts to complete the WORK within the budget and will keep CITY informed of progress toward that end so that the budget or WORK effort can be adjusted if found necessary. The ENGINEER is not obligated to incur costs beyond the indicated budget, as may be adjusted, nor is the CITY obligated to pay the ENGINEER beyond these limits. When any budget has been increased, the ENGINEER'S excess costs expended prior to such increase will be allowable to the same extent as if such costs had been incurred after the approved increase, and provided that the City was informed in writing at the time such costs were incurred. 6.3 The ENGINEER shall submit to the City's Representative an invoice each month for payment for PROJECT services completed through the accounting cut-off day of the previous month. Such invoices shall be for PROJECT services and WORK performed and costs incurred prior to the date of the invoice and not covered by previously submitted invoices. The ENGINEER shall submit with each invoice a summary of time expended on the PROJECT for the current billing period, copies of subconsultant invoices, and any other supporting materials and details determined necessary by the City to substantiate the costs incurred. CITY will use its best efforts to pay such invoices within thirty(30) days of receipt and upon approval of the WORK done and amount billed. CITY will Page 3 46 notify the ENGINEER promptly if any problems are noted with the invoice. CITY may question any item in an invoice, noting to ENGINEER the questionable item(s) and withholding payment for such item(s). The ENGINEER may resubmit such item(s) in a subsequent invoice together with additional supporting information requested. 6.4 If payment is not made within sixty(60) days following receipt of approved invoices, interest on the unpaid balance shall accrue beginning with the sixty-first (61st) day at the rate of 1.0% per month or the maximum interest rate permitted by law, whichever is less; provided, however, that no interest shall accrue pursuant to Chapter 39.76 RCW when before the date of timely payment a notice of dispute is issued in good faith by the CITY to the ENGINEER pursuant to the terms of RCW 39.76.020(4). 6.5 Final payment of any balance due the ENGINEER for PROJECT services will be made within forty- five(45)days after satisfactory completion of the services required by this Agreement as evidenced by CITY's written acceptance and after such audit or verification as CITY may deem necessary, together with ENGINEER's execution and delivery of a release of all known payment claims against CITY arising under or by virtue of this Agreement, other than such payment claims, if any, as may be specifically exempted by the ENGINEER from the operation of the release in stated amounts to be set forth therein. 6.6 Payment for any PROJECT services and WORK shall not constitute a waiver or release by CITY of any claims, right, or remedy it may have against the ENGINEER under this Agreement or by law, nor shall such payment constitute a waiver, remission, or discharge by CITY of any failure or fault of the ENGINEER to satisfactorily perform the PROJECT WORK as required under this Agreement. SECTION 7 RESPONSIBILITY OF ENGINEER 7.1 The ENGINEER shall be responsible for the professional quality,technical adequacy and accuracy, timely completion, and the coordination of all plans, designs, drawings, specifications, reports, and other services furnished by the ENGINEER under this Agreement. The ENGINEER shall, without additional compensation, correct or review any errors, omissions, or other deficiencies in its plans, designs, drawings, specifications, reports, and other services. The ENGINEER shall perform its WORK according to generally accepted civil engineering standards of care and consistent with achieving the PROJECT WORK within budget, on time, and in compliance with applicable laws, regulations, and permits. 7.2 CITY'S review or approval of, or payment for, any plans,drawings, designs, specifications, reports, and incidental WORK or services furnished hereunder shall not in any way relieve the ENGINEER of responsibility for the technical adequacy, completeness, or accuracy of its WORK and the PROJECT WORK. CITY'S review, approval, or payment for any of the services shall not be construed to operate as a waiver of any rights under this Agreement or at law or any cause of action arising out of the performance of this Agreement. 7.3 In performing WORK and services hereunder, the ENGINEER and its subcontractors, subconsultants, employees, agents, and representatives shall be acting as independent contractors and shall not be deemed or construed to be employees or agents of CITY in any manner whatsoever. The ENGINEER shall not hold itself out as, nor claim to be, an officer or employee of CITY by reason hereof and shall not make any claim, demand, or application to or for any right or privilege applicable to an officer or employee of CITY. The ENGINEER shall be solely responsible for any claims for wages or compensation by ENGINEER's employees, agents, and representatives, including subconsultants and subcontractors, and shall save and hold CITY harmless therefrom. 7.4 INDEMNIFICATION AND HOLD HARMLESS: 1. ENGINEER shall take all necessary precautions in performing the WORK to prevent injury to persons or property. The ENGINEER agrees to release, indemnify, defend, and hold harmless the City, its elected and appointed officials, officers, employees, agents, representatives, insurers, attorneys, and volunteers from all liabilities, losses, damages, and expenses related to all claims, suits, arbitration actions, investigations, and regulatory Page 4 47 or other governmental proceedings arising from or in connection with this Agreement or the negligent acts, failures to act, errors or omissions of the ENGINEER, or any of ENGINEER's agent(s) or subcontractor(s), in performance of this Agreement, except for claims caused by the City's sole negligence. 2. Industrial Insurance Act Waiver. It is specifically and expressly understood that the ENGINEER waives any immunity that may be granted to it under the Washington State industrial insurance act, Title 51 RCW, solely for the purposes of this indemnification. ENGINEER's indemnification shall not be limited in any way by any limitation on the amount of damages, compensation or benefits payable to or by any third party under workers' compensation acts, disability benefit acts or any other benefits acts or programs. ENGINEER shall require that its subcontractors, and anyone directly or indirectly employed or hired by ENGINEER, and anyone for whose acts ENGINEER may be liable in connection with its performance of this Agreement, comply with the terms of this paragraph, waive any immunity granted under Title 51 RCW, and assume all potential liability for actions brought by their respective employees. The Parties acknowledge that they have mutually negotiated this waiver. 3. Should a court of competent jurisdiction determine that this Agreement is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the ENGINEER and the City, the ENGINEER's liability, including the duty and cost to defend, shall be only to the extent of the ENGINEER's negligence. 4. Nothing contained in this Section or this Agreement shall be construed to create a liability or a right of indemnification in any third party. 5. The terms of this Section shall survive any expiration or termination of this Agreement. 7.5 In any and all claims by an employee of the ENGINEER, any subcontractor, anyone directly or indirectly employed by any of them, or anyone for whose acts any of them may be liable, the indemnification obligations under this Agreement shall not be limited in any way by any limitation on the amount or types of damages, compensation, or benefits payable by or for the ENGINEER or a subcontractor under workers' or workmens'compensation acts, disability benefit acts, or other employee benefit acts. The ENGINEER specifically and expressly waives its immunity under the Industrial Insurance Act, Title 51, RCW. Such waiver has been mutually negotiated by the ENGINEER and the CITY. 7.6 It is understood that any resident engineering or inspection provided by ENGINEER is for the purpose of determining compliance with the technical provisions of PROJECT specifications and does not constitute any form of guarantee or insurance with respect to the performance of a contractor. ENGINEER does not assume responsibility for methods or appliances used by a contractor, for a contractor's safety programs or methods, or for contractors' compliance with laws and regulations. CITY shall use its best efforts to ensure that the construction contract requires that the contractor(s) indemnify and name CITY, the CITY's and the ENGINEER's officers, principals, employees, agents, representatives, and engineers as additional insureds on contractors insurance policies covering PROJECT, exclusive of insurance for ENGINEER professional liability. 7.7 ENGINEER shall be solely responsible for and shall pay all taxes, deductions, and assessments, including but not limited to federal income tax, FICA, social security tax, assessments for unemployment and industrial injury insurance, and other deductions from income which may be required by law or assessed against either party as a result of this Agreement. In the event the City is assessed a tax or assessment as a result of this Agreement, ENGINEER shall pay the same before it becomes due. 7.8 SUBSURFACE INVESTIGATIONS: In soils, foundation, groundwater, and other subsurface investigations, the actual characteristics may vary significantly between successive test points and sample intervals and at locations other than where observation, exploration, and investigations have been made. Because of the inherent uncertainties in subsurface evaluations, changed or Page 5 48 unanticipated underground conditions may occur that could affect total PROJECT cost and/or execution. These conditions and cost/execution effects are not the responsibility of the ENGINEER, to the extent that ENGINEER has exercised the applicable and appropriate standard of professional care, thoroughness and judgment in performing such investigations. SECTION 8 PROJECT SCHEDULE AND BUDGET 8.1 The general PROJECT schedule and the budget for both the entire PROJECT and its component tasks shall be as set forth in this Agreement and attached Exhibits. The project schedule and performance dates for the individual tasks shall be mutually agreed to by the CITY and the ENGINEER within fifteen (15)days after execution of this Agreement. The performance dates and budgets for tasks may be modified only upon written agreement of the parties hereto. The performance date for tasks and the completion date for the entire PROJECT shall not be extended, nor the budget increased because of any unwarranted delays attributable to the ENGINEER, but may be extended or increased by the CITY in the event of a delay caused by special services requested by the CITY or because of unavoidable delay caused by any governmental action or other conditions beyond the control of the ENGINEER which could not be reasonably anticipated or avoided. 8.2 Not later than the tenth (10th)day of each calendar month during the performance of the PROJECT, the ENGINEER shall submit to the CITY's Representative a copy of the current schedule and a written narrative description of the WORK accomplished by the ENGINEER and subconsultants on each task, indicating a good faith estimate of the percentage completion thereof on the last day of the previous month. Additional oral or written reports shall be prepared at the CITY's request for presentation to other governmental agencies and/or to the public. SECTION 9 REUSE OF DOCUMENTS 9.1 All internal WORK products of the ENGINEER are instruments or services of this PROJECT. There shall be no reuse, change, or alteration by the CITY or others acting through or on behalf of the CITY without written permission of the ENGINEER, which shall not be unreasonably withheld and will be at the CITY's sole risk. The CITY agrees to indemnify the ENGINEER and its officers, employees, subcontractors, and affiliated corporations from all claims, damages, losses, and costs including, but not limited to, litigation expenses and attorneys fees arising out of or related to such unauthorized reuse, change, or alteration; provided, however, that the ENGINEER will not be indemnified for such claims, damages, losses, and costs including, without limitation, litigation expenses and attorney fees if they were caused by the ENGINEER's own negligent acts or omissions. 9.2 The ENGINEER agrees that any and all plans, drawings, designs, specifications, computer programs, technical reports, operating manuals, calculations, notes, and other WORK submitted or which are specified to be delivered under this Agreement or which are developed or produced and paid for under this Agreement, whether or not complete, shall be owned by and vested in the CITY. 9.3 All rights to patents, trademarks, copyrights, and trade secrets owned by ENGINEER (hereinafter "Intellectual Property") as well as any modifications, updates or enhancements to said Intellectual Property during the performance of the WORK remain the property of ENGINEER, and ENGINEER does not grant CITY any right or license to such Intellectual Property. SECTION 10 AUDIT AND ACCESS TO RECORDS 10.1 The ENGINEER, including its subconsultants, shall maintain books, records, documents and other evidence directly pertinent to performance of the WORK under this Agreement in accordance with generally accepted accounting principles and practices consistently applied. The CITY, or the CITY's duly authorized representative, shall have access to such books, records, documents, and other evidence for inspection, audit, and copying for a period of three years after completion of the PROJECT. The CITY shall also have access to such books, records, and documents during the performance of the PROJECT WORK, if deemed necessary by the CITY,to verify the ENGINEER's WORK and invoices. Page 6 49 10.2 Audits conducted pursuant to this section shall be in accordance with generally accepted auditing standards and established procedures and guidelines of the reviewing or auditing agency. 10.3 The ENGINEER agrees to the disclosure of all information and reports resulting from access to records pursuant to this section provided that the ENGINEER is afforded the opportunity for an audit exit conference and an opportunity to comment and submit any supporting documentation on the pertinent portions of the draft audit report and that the final audit report will include ENGINEER's written comments, if any. 10.4 The ENGINEER shall ensure that the foregoing paragraphs are included in each subcontract for WORK on the Project. 10.5 Any charges of the ENGINEER paid by the CITY which are found by an audit to be inadequately substantiated shall be reimbursed to the CITY. SECTION 11 INSURANCE 11.1 At all times during performance of the WORK or obligations under this Agreement, ENGINEER shall secure and maintain in effect insurance to protect the CITY and the ENGINEER from and against all claims, damages, losses, and expenses arising out of or resulting from the performance of this Agreement. ENGINEER shall provide and maintain in force insurance in limits no less than those stated below, as applicable. The CITY reserves the right to require higher limits should it deem it necessary in the best interest of the public. If ENGINEER carries higher coverage limits than the limits stated below, such higher limits shall be shown on the Certificate of Insurance and Endorsements and City of Yakima shall be named as an additional insured for such higher limits. ENGINEER shall provide a Certificate of Insurance to the City as evidence of coverage for each of the policies and outlined herein. A copy of the additional insured endorsement attached to the policy shall be included with the certificate. This Certificate of insurance shall be provided to the City prior to commencement of work. Failure to provide the City with proof of insurance and/or to maintain such insurance outlined herein shall be a material breach of this agreement and a basis for termination. Failure by the City to demand such verification of coverage with these insurance requirements or failure of the City to identify a deficiency from the insurance documentation provided shall not be construed as a waiver of ENGINEER's obligation to maintain such insurance. ENGINEER's insurance coverage shall be primary insurance with respect to those who are Additional Insureds under this Agreement, and any insurance, self-insurance or insurance pool coverage maintained by the City shall be in excess of the ENGINEER's insurance and neither the City nor its insurance providers shall contribute to any settlements, defense costs, or other payments made by ENGINEER's insurance. All additional insured endorsements required by this Section shall include an explicit waiver of subrogation. 11.1.1 Commercial General Liability Insurance. Before this Agreement is fully executed by the parties, ENGINEER shall provide the CITY with a certificate of insurance as proof of commercial liability insurance and commercial umbrella liability insurance with a total liability limit of the limits required in the policy, subject to minimum limits of Two Million Dollars ($2,000,000.00) per occurrence combined single limit bodily injury and property damage, and Four Million Dollars ($4,000,000.00) general aggregate. The certificate shall clearly state who the provider is,the coverage amount,the policy number,and when the policy and provisions provided are in effect. Said policy shall be in effect for the duration of this Agreement. The policy shall name the CITY, its elected and appointed officials, officers, agents, employees, and volunteers as additional insureds. The insured shall not cancel or change the insurance without first giving the CITY thirty(30) calendar days prior written notice. The insurance shall be with an insurance company or companies rated A-VII or higher in Best's Guide and admitted in the State of Washington. 11.1.2. Commercial Automobile Liability Insurance. Page 7 50 a. If ENGINEER owns any vehicles, before this Agreement is fully executed by the parties, ENGINEER shall provide the CITY with a certificate of insurance as proof of commercial automobile liability insurance and commercial umbrella liability insurance with a total liability limit of the limits required in the policy, subject to minimum limits of Two Million Dollars ($2,000,000.00) per occurrence combined single limit bodily injury and property damage. Automobile liability will apply to "Any Auto" and be shown on the certificate. b. If ENGINEER does not own any vehicles, only"Non-owned and Hired Automobile Liability" will be required and may be added to the commercial liability coverage at the same limits as required in that section of this Agreement,which is Section 10.1.1 entitled "Commercial General Liability Insurance". c. Under either situation described above in Section 10.1.2.a. and Section 10.1.2.b., the required certificate of insurance shall clearly state who the provider is, the coverage amount, the policy number, and when the policy and provisions provided are in effect. Said policy shall be in effect for the duration of this Agreement. The policy shall name the CITY, its elected and appointed officials, officers, agents, employees, and volunteers as additional insureds. The insured shall not cancel or change the insurance without first giving the CITY thirty(30) calendar days prior written notice. The insurance shall be with an insurance company or companies rated A-VII or higher in Best's Guide and admitted in the State of Washington. 11.1.3. Statutory workers' compensation and employer's liability insurance as required by state law. 11.1.4. Professional Liability Coverage. Before this Contract is fully executed by the parties, ENGINEER shall provide the City with a certificate of insurance as proof of professional liability coverage with a total liability limit of the limits required in the policy, subject to minimum limits of Two Million Dollars($2,000,000.00) per claim, and Four Million Dollars ($4,000,000.00) aggregate. The certificate shall clearly state who the provider is, the coverage amount, the policy number, and when the policy and provisions provided are in effect. Said policy shall be in effect for the duration of this Contract. The insured shall not cancel or change the insurance without first giving the CITY thirty(30) calendar days prior written notice. The insurance shall be with an insurance company or companies rated A-VII or higher in Best's Guide. If the policy is written on a claims made basis the coverage will continue in force for an additional two years after the completion of this contract. Failure of either or all of the additional insureds to report a claim under such insurance shall not prejudice the rights of the CITY, its elected and appointed officials, officers, employees, agents, and representatives there under. The CITY and the CITY's elected and appointed officials, officers, principals, employees, representatives, and agents shall have no obligation for payment of premiums because of being named as additional insureds under such insurance. None of the policies issued pursuant to the requirements contained herein shall be canceled, allowed to expire, or changed in any manner that affects the rights of the CITY until thirty(30)days after written notice to the CITY of such intended cancellation, expiration or change. 11.2 If at any time during the life of the Agreement, or any extension, ENGINEER fails to maintain the required insurance in full force and effect, all work under the Agreement shall be discontinued immediately. Any failure to maintain the required insurance may be sufficient cause for the City to terminate the Agreement. SECTION 12 SUBCONTRACTS 12.1 ENGINEER shall be entitled, to the extent determined appropriate by ENGINEER, to subcontract any portion of the WORK to be performed under this Agreement. However, ENGINEER shall be considered the Prime Contractor hereunder and shall be the sole point of contact with regard to all contractual matters arising hereunder, including the performance of WORK and payment of any and all charges resulting from contractual obligations. Page 8 51 12.2 Any subconsultants or subcontractors to the ENGINEER utilized on this PROJECT, including any substitutions thereof, will be subject to prior approval by CITY, which approval shall not be unreasonably withheld. Each subcontract shall be subject to review by the CITY's Representative, if requested, prior to the subconsultant or subcontractor proceeding with the WORK. Such review shall not constitute an approval as to the legal form or content of such subcontract. The ENGINEER shall be responsible for the architectural and engineering performance, acts, and omissions of all persons and firms performing subcontract WORK. 12.3 CITY anticipates ENGINEER subcontracting with GeoEngineers for specialized geotechnical services for the purpose of completing this Agreement. 12.4 The ENGINEER shall submit, along with its monthly invoices, a description of all WORK completed by subconsultants and subcontractors during the preceding month and copies of all invoices thereto. 12.5 If dissatisfied with the background, performance, and/or general methodologies of any subcontractor,the City may request in writing that the subcontractor be removed. The ENGINEER shall comply with this request at once and shall not employ the subcontractor for any further WORK under this Agreement. SECTION 13 ASSIGNMENT 13.1 This Agreement is binding on the heirs, successors and assigns of the parties hereto. This Agreement may not be assigned by CITY or ENGINEER without prior written consent of the other, which consent will not be unreasonably withheld. The ENGINEER for itself and its heirs, executors, administrators, successors and assigns, does hereby agree to the full performance of all of the covenants herein contained upon the part of the ENGINEER. It is expressly intended and agreed that no third party beneficiaries are created by this Agreement, and that the rights and remedies provided herein shall inure only to the benefit of the parties to this Agreement. SECTION 14 INTEGRATION 14.1 This Agreement represents the entire understanding of CITY and ENGINEER as to those matters contained herein. No prior oral or written understanding shall be of any force or effect with respect to those matters covered herein. This Agreement may not be modified or altered except in writing signed by both parties. SECTION 15 JURISDICTION AND VENUE 15.1 This Agreement shall be administered and interpreted under the laws of the State of Washington. Jurisdiction of litigation arising from this Agreement shall be in Washington State. If any part of this Agreement is found to conflict with applicable laws, such part shall be inoperative, null, and void insofar as it conflicts with said laws, but the remainder of this Agreement shall be in full force and effect. Venue for all disputes arising under this Agreement shall lie in a court of competent jurisdiction in Yakima County, Washington. SECTION 16 EQUAL EMPLOYMENT and NONDISCRIMINATION 16.1 During the performance of this Agreement, ENGINEER and ENGINEER's subconsultants and subcontractors shall not discriminate in violation of any applicable federal, state and/or local law or regulation on the basis of age, sex, race, creed, religion, color, national origin, marital status, disability, honorably discharged veteran or military status, pregnancy, sexual orientation, gender identity, political affiliation or belief, or the presence of any sensory, mental or physical handicap, and any other classification protected under federal, state, or local law, including, but not limited to the Washington State Law Against Discrimination (RCW chapter 49.60) or the Americans with Disabilities Act (42 USC 12101 et. seq.). This provision shall include but not be limited to the following: employment, upgrading, demotion, transfer, recruitment, advertising, layoff or termination, rates of pay or other forms of compensation, selection for training, and the provision of services under this Agreement. ENGINEER agrees to comply with the applicable provisions of State and Federal Equal Employment Opportunity and Nondiscrimination statutes and regulations. In the event of the ENGINEER's or ENGINEER's subcontractor's noncompliance with the non- Page 9 52 discrimination clause of this Agreement or with any such rules, regulations, or orders, this Agreement may be cancelled, terminated, or suspended in whole or in part and the ENGINEER may be declared ineligible for any future City contracts. 16.2 Pay transparency nondiscrimination. The ENGINEER will not discharge or in any other manner discriminate against employees or applicants because they have inquired about, discussed, or disclosed their own pay or the pay of another employee or applicant. However, employees who have access to the compensation information of other employees or applicants as a part of their essential job functions cannot disclose the pay of other employees or applicants to individuals who do not otherwise have access to compensation information, unless the disclosure is (a) in response to a formal complaint or charge, (b) in furtherance of an investigation, proceeding, hearing, or action, including an investigation conducted by the employer, or(c) consistent with the contractor's legal duty to furnish information. 16.3 RCW 35.22.650: ENGINEER agrees that the ENGINEER shall actively solicit the employment of minority group members. ENGINEER further agrees that the ENGINEER shall actively solicit bids for the subcontracting of goods or services from qualified minority businesses. ENGINEER shall furnish evidence of the ENGINEER'S compliance with these requirements of minority employment and solicitation. ENGINEER further agrees to consider the grant of subcontracts to said minority bidders on the basis of substantially equal proposals in the light most favorable to said minority businesses. 16.4 Nothing in this Agreement, including, without limitation, the provisions of Section 16, shall require ENGINEER or any of its subcontractor(s) to take action that would be deemed discrimination or preferential treatment in violation of RCW 49.60.400. Pursuant to RCW 49.60.400(6), this Section does not prohibit action that must be taken to establish or maintain the CITY'S eligibility for any federal program, if ineligibility would result in a loss of federal funds to the CITY. SECTION 17 SUSPENSION OF WORK 17.1 CITY may suspend, in writing by certified mail, all or a portion of the WORK under this Agreement if unforeseen circumstances beyond CITY's control are interfering with normal progress of the WORK. ENGINEER may suspend, in writing by certified mail, all or a portion of the WORK under this Agreement if unforeseen circumstances beyond ENGINEER's control are interfering with normal progress of the WORK. ENGINEER may suspend WORK on the PROJECT in the event CITY does not pay invoices when due, except where otherwise provided by this Agreement. The time for completion of the WORK shall be extended by the number of days WORK is suspended. If the period of suspension exceeds ninety (90) days, the terms of this Agreement are subject to renegotiation, and both parties are granted the option to terminate WORK on the suspended portion of Project in accordance with SECTION 18. SECTION 18 TERMINATION OF WORK 18.1 Either party may terminate this Agreement, in whole or in part, if the other party materially breaches its obligations under this Agreement and is in default through no fault of the terminating party. However, no such termination may be effected unless the other party is given: (1) not less than fifteen (15) calendar days written notice delivered by certified mail, return receipt requested, of intent to terminate; and (2) an opportunity for consultation with the terminating party and for cure within the 15-day notice period before termination. Notice shall be considered issued within seventy-two (72) hours of mailing by certified mail to the place of business of either party as set forth in this Agreement. 18.2 In addition to termination under subsection 18.1 of this Section, CITY may terminate this Agreement for its convenience, in whole or in part, provided the ENGINEER is given: (1) not less than fifteen (15) calendar days written notice delivered by certified mail, return receipt requested, of intent to terminate; and (2) an opportunity for consultation with CITY before the effective termination date. 18.3 If CITY terminates for default on the part of the ENGINEER, an adjustment in the contract price pursuant to the Agreement shall be made, but (1) no amount shall be allowed for anticipated profit on unperformed services or other WORK, and (2) any payment due to the ENGINEER at the time Page 10 53 of termination may be adjusted to the extent of any additional costs or damages CITY has incurred, or is likely to incur, because of the ENGINEER'S breach. In such event, CITY shall consider the amount of WORK originally required which was satisfactorily completed to date of termination, whether that WORK is in a form or of a type which is usable and suitable to CITY at the date of termination and the cost to CITY of completing the WORK itself or of employing another firm to complete it. Under no circumstances shall payments made under this provision exceed the contract price. In the event of default, the ENGINEER agrees to pay CITY for any and all damages, costs, and expenses whether directly, indirectly, or consequentially caused by said default. This provision shall not preclude CITY from filing claims and/or commencing litigation to secure compensation for damages incurred beyond that covered by contract retainage or other withheld payments. 18.4 If the ENGINEER terminates for default on the part of CITY or if CITY terminates for convenience, the adjustment pursuant to the Agreement shall include payment for services satisfactorily performed to the date of termination, in addition to termination settlement costs the ENGINEER reasonably incurs relating to commitments which had become firm before the termination, unless CITY determines to assume said commitments. 18.5 Upon receipt of a termination notice under subsections 18.1 or 18.2 above, the ENGINEER shall (1) promptly discontinue all services affected (unless the notice directs otherwise), and (2) deliver or otherwise make available to CITY all originals of data, drawings, specifications, calculations, reports, estimates, summaries, and such other information, documents, and materials as the ENGINEER or its subconsultants may have accumulated or prepared in performing this Agreement, whether completed or in progress, with the ENGINEER retaining copies of the same. 18.6 Upon termination under any subparagraph above, CITY reserves the right to prosecute the WORK to completion utilizing other qualified firms or individuals; provided, the ENGINEER shall have no responsibility to prosecute further WORK thereon. 18.7 If, after termination for failure of the ENGINEER to fulfill contractual obligations, it is determined that the ENGINEER has not so failed, the termination shall be deemed to have been effected for the convenience of CITY. In such event, the adjustment pursuant to the Agreement shall be determined as set forth in subparagraph 18.4 of this Section. 18.8 If, because of death, unavailability or any other occurrence, it becomes impossible for any key personnel employed by the ENGINEER in PROJECT WORK or for any corporate officer of the ENGINEER to render his services to the PROJECT, the ENGINEER shall not be relieved of its obligations to complete performance under this Agreement without the concurrence and written approval of CITY. If CITY agrees to termination of this Agreement under this provision, payment shall be made as set forth in subparagraph 18.3 of this Section. SECTION 19 DISPUTE RESOLUTION 19.1 In the event that any dispute shall arise as to the interpretation or performance of this Agreement, or in the event of a notice of default as to whether such default does constitute a breach of the contract, and if the parties hereto cannot mutually settle such differences,then the parties shall first pursue mediation as a means to resolve the dispute. If neither of the afore mentioned methods are successful then any dispute relating to this Agreement shall be decided in the courts of Yakima County, Washington in accordance with SECTION 15. If both parties consent in writing, other available means of dispute resolution may be implemented. SECTION 20 NOTICE 20.1 Any notice required to be given under the terms of this Agreement shall be directed to the party at the address set forth below. Notice shall be considered issued and effective upon receipt thereof by the addressee-party, or seventy-two (72) hours after mailing by certified mail to the place of business set forth below, whichever is earlier. CITY: City of Yakima 129 N 2nd Street Yakima, WA 98901 Attn: Walter Hansen, Utility Project Manager Page 11 54 ENGINEER: Parametrix, Inc. 1019 39th Avenue SE, Suite 100 Puyallup,WA 98374 Attn: Brian Casey, PE, PMP, PSAP SECTION 21 INSPECTION AND PRODUCTION OF RECORDS 21.1 The records relating to the WORK shall, at all times, be subject to inspection by and with the approval of the City, but the making of(or failure or delay in making) such inspection or approval shall not relieve ENGINEER of responsibility for performance of the WORK in accordance with this Agreement, notwithstanding the City's knowledge of defective or non-complying performance, its substantiality or the ease of its discovery. ENGINEER shall provide the City sufficient, safe, and proper facilities, and/or send copies of the requested documents to the City. ENGINEER's records relating to the WORK will be provided to the City upon the City's request. 21.2 ENGINEER shall promptly furnish the City with such information and records which are related to the WORK of this Agreement as may be requested by the City. Until the expiration of six(6) years after final payment of the compensation payable under this Agreement, or for a longer period if required by law or by the Washington Secretary of State's record retention schedule, ENGINEER shall retain and provide the City access to (and the City shall have the right to examine, audit and copy) all of ENGINEER's books, documents, papers and records which are related to the WORK performed by ENGINEER under this Agreement. If any litigation, claim, or audit is started before the expiration of the six-year period, the records shall be retained until all litigation, claims, or audit findings involving the records have been resolved. Prior to converting any paper records to electronic format and/or destroying any records, ENGINEER shall contact CITY's Records Administrator (509-575-6037) to discuss retention. In no event shall any record relating to the WORK be destroyed without CITY consultation. 21.3 All records relating to ENGINEER's services under this Agreement must be made available to the City, and the records relating to the WORK are City of Yakima records. They must be produced to third parties, if required pursuant to the Washington State Public Records Act, Chapter 42.56 RCW, or by law. All records relating to ENGINEER's services under this Agreement must be retained by ENGINEER for the minimum period of time required pursuant to the Washington Secretary of State's records retention schedule. 21.4 The terms of this section shall survive any expiration or termination of this Agreement. SECTION 22 COMPLIANCE WITH THE LAW 22.1 ENGINEER agrees to perform all WORK under and pursuant to this Agreement in full compliance with any and all applicable laws, rules, and regulations adopted or promulgated by any governmental agency or regulatory body, whether federal, state, local, or otherwise, including policies adopted by the City, as those laws, ordinances, rules, regulations, and policies now exist or may hereafter be amended or enacted. ENGINEER shall procure and have all applicable and necessary permits, licenses and approvals of any federal, state, and local government or governmental authority or this project, pay all charges and fees, and give all notices necessary and incidental to the due and lawful execution of the work. 22.2 ENGINEER shall procure and have all applicable and necessary permits, licenses and approvals of any federal,state, and local government or governmental authority or this project, pay all charges and fees, and give all notices necessary and incidental to the due and lawful execution of its work. a. Procurement of a City Business License. ENGINEER must procure a City of Yakima Business License and pay all charges, fees, and taxes associated with said license. b. ENGINEER must provide proof of a valid Washington department of Revenue state excise tax registration number, as required in Title 85 RCW. Page 12 55 c. ENGINEER must provide proof of a valid Washington Unified Business Identification (UBI) number. ENGINEER must have a current UBI number and not be disqualified from bidding on any public works contract under RCW 39.06.101 or 36.12.065(3). d. ENGINEER must provide proof of a valid Washington Employment Security Department number as required by Title 50 RCW. e. Foreign (Non-Washington) Corporations: Although the City does not require foreign corporate proposers to qualify in the City, County or State prior to submitting a proposal, it is specifically understood and agreed that any such corporation will promptly take all necessary measures to become authorized to conduct business in the City of Yakima, at their own expense, without regard to whether such corporation is actually awarded the contract, and in the event that the award is made, prior to conducting any business in the City. SECTION 23 MISCELLANEOUS PROVISIONS 23.1 Severability. If any term or condition of this Agreement or the application thereof to any person(s) or circumstances is held invalid, such invalidity shall not affect other terms, conditions or applications which can be given effect without the invalid term, condition or application. To this end, the terms and conditions of this Agreement are declared severable. 23.2 Agreement documents. This Agreement,the Request for Qualifications &Proposals No. N/A,titled N/A Scope of Work, conditions, addenda, and modifications and ENGINEER's proposal (to the extent consistent with Yakima City documents) constitute the Agreement Documents and are complementary. Specific Federal and State laws and the terms of this Agreement, in that order respectively, supersede other inconsistent provisions. These Agreement Documents are on file in the Office of the Purchasing Manager, 129 No. 2nd St., Yakima, WA, 98901, and are hereby incorporated by reference into this Agreement. 23.3 Notice of change in financial condition. If, during this Agreement, the ENGINEER experiences a change in its financial condition that may affect its ability to perform under the Agreement, or experiences a change of ownership or control, the ENGINEER shall immediately notify the City in writing. Failure to notify the City of such a change in financial condition or change of ownership or control shall be sufficient grounds for termination. 23.4 No conflicts of interest. ENGINEER represents that it or its employees do not have any interest and shall not hereafter acquire any interest, direct or indirect, which would conflict in any manner or degree with the performance of this Agreement. ENGINEER further covenants that it will not hire anyone or any entity having such a conflict of interest during the performance of this Agreement. 23.5 Promotional advertising prohibited. Reference to or use of the City, any of its departments, agencies or other subunits, or any official or employee for commercial promotion is prohibited. News releases pertaining to this procurement shall not be made without prior approval of the City. Release of broadcast emails pertaining to this procurement shall not be made without prior written authorization of the City. 23.6 Time is of the essence. Timely provision of the WORK required under this Agreement shall be of the essence of the Agreement, including the provision of the WORK within the time agreed or on a date specified herein. 23.7 Waiver of breach. A waiver by either party hereto of a breach of the other party hereto of any covenant or condition of this Agreement shall not impair the right of the party not in default to avail itself of any subsequent breach thereof. Leniency, delay or failure of either party to insist upon strict performance of any agreement, covenant or condition of this Agreement, or to exercise any right herein given in any one or more instances, shall not be construed as a waiver or relinquishment of any such agreement, covenant, condition or right. 23.8 Force Majeure. ENGINEER will not be responsible for delays in delivery due to acts of God, fire, strikes, riots,delay in transportation, or those effects of epidemics or pandemics that could not have Page 13 56 been reasonably anticipated or mitigated through acts of the ENGINEER; provided ENGINEER notifies the City immediately in writing of such pending or actual delay. Normally in the event of such delays, the date of delivery of WORK will be extended for a period of time equal to the time lost due to the reason for delay. 23.9 Authority. The person executing this Agreement on behalf of ENGINEER represents and warrants that they have been fully authorized by ENGINEER to execute this Agreement on its behalf and to legally bind ENGINEER to all terms, performances, and provisions of this Agreement. 23.10 Survival. The foregoing sections of this Agreement, inclusive, shall survive the expiration or termination of this Agreement, in accordance with their terms. IN WITNESS WHEREOF,the parties hereto have caused this Agreement to be executed by their respective authorized officers or representatives as of the day and year first above written. CITY OF YAKIMA PARAMETRIX, INC. Victoria Baker Signature Printed Name: Printed Name: Title: City Manager Title: President Date: Date: Attest City Clerk List of Exhibits attached to this contract Exhibit A—Goodwin Tracts Sanitary Sewer Lift Station (SLS)SC2911 -Scope of Services Exhibit B—SC2911 Level of Effort Exhibit C—Rate Fee by Responsibility STATE OF WASHINGTON ) Page 14 57 ) ss. COUNTY OF YAKIMA ) I certify that I know or have satisfactory evidence that Victoria Baker is the person who appeared before me, and said person acknowledged that she signed this instrument, on oath stated that she was authorized to execute the instrument, and acknowledged it as the CITY MANAGER of the CITY OF YAKIMA,to be the free and voluntary act of such party for the uses and purposes mentioned in the instrument. Dated: Seal or Stamp (Signature) Title Printed Name My commission expires: Page 15 58 STATE OF WASHINGTON ) ) ss. COUNTY OF YAKIMA ) I certify that I know or have satisfactory evidence that is the person who appeared before me, and said person acknowledged that he/she signed this instrument, on oath stated that he/she was authorized to execute the instrument, and acknowledged it as the of to be the free and voluntary act of such party for the uses and purposes mentioned in the instrument. Dated: Seal or Stamp (Signature) Title Printed Name My commission expires: Page 16 59 EXHIBIT A Page 17 60 Parametrik Scope of Work let's create tomorrow, together City of Yakima Goodwin Tracts Sanitary Sewer Lift Station (SLS) SC2911 Introduction The City of Yakima (City) has selected Parametrix, Inc. (Consultant)to provide engineering services for the Goodwin Tracts Sanitary Sewer Lift Station Project(Project).This will be a new lift station to serve the sewer basin to the north of the wastewater treatment plant(WWTP)and east of Interstate 82, which is currently served by the Camp Hope Lift Station and the U-Haul Lift Station, which has failed and requires weekly pumping of the wet well by City staff. The Project is anticipated to include new gravity sewer, force main, and a lift station that will discharge flow to or near the headworks of the WWTP. The lift station will be a submersible wastewater lift station, complete with a wet well, valve vault, control panel, backup power, and other ancillary components. The scope of services is generally separated into the following tasks: • Task 1 - Project Management • Task 2 - Survey and Data Collection • Task 3 - Site Investigation • Task 4 - Preliminary Design • Task 5 - Detailed Design • Task 6 - Permitting • Task 7 - Bid Phase • Task 8 - Construction Management Task 1 - Project Management The objective of this task is to provide overall project management of the consultant contract with City. Subtask 1.1 - Project Management Plan (PMP) Develop and submit a Project Management Plan (PMP)that includes the signed contract, Scope of Services, contact list, baseline project schedule, quality assurance/quality control plan, decision log template, and other project management procedures. Subtask 1.2 - Invoices/Status Reports Consultant will prepare monthly invoices, including expenditures by task, hours worked by project personnel, and other direct expenses with the associated backup documentation. Monthly status reports will accompany each invoice. City of Yakima Goodwin Tracts Sanitary Sewer Lift Station(SLS) 1 FINAL Rev3 August 2026 SC2911 61 ParametrOk Scope of Work Subtask 1.3 - Coordination with City Consultant will maintain communication with the City through meetings via phone, email, virtual meetings, and mail communication. Consultant project manager will facilitate a bi-weekly virtual meeting with City project manager to review the current and projected activities as they relate to the overall project schedule and deliverables through the design phase. Subtask 1.4 - Coordination with Team Consultant will manage and coordinate the technical and scope issues of the overall project through weekly team meetings through the design phase of the project with key team members. Subtask 1.5 - Schedule, Budget, Risk, and Quality Oversight Consultant Principal will review the status of the project relative to scope, budget, risk, and schedule on a monthly basis, meeting with Consultant Project Manager, to proactively identify potential issues and address any identified risks. Focused reviews will occur at 30%Submittal, Intermediate Design Check (-60%), and 90%Submittal. Deliverables Deliverables for this task include: • PMP, draft and final • Consultant will deliver to the City a monthly invoice and status report covering: • Work on the project performed during the previous month • Challenges encountered and actions taken for their resolution • Potential impacts to schedule or budget • Budget status • Meeting notes documenting decisions following weekly check-in meetings in an email. Check- in meetings will follow a standard agenda, agreed upon between the City and Consultant project managers. Assumptions Assumptions for this task include: • Notice to Proceed issued by September 1st, 2026 • Project duration is 14 months, including 5 months for design. • Budget assumes 10 bi-weekly meetings, with up to 2 in-person and the remainder on a virtual platform. Meetings will include the City's project manager and Consultant's project manager and design lead. • Internal team meetings will occur weekly, one hour each for the Consultant PM with the civil/mechanical design lead and the electrical/instrumentation design lead plus an additional 1 hour per week for the Consultant PM to coordinate with other team members. A total of 16 weeks of active design is estimated for these meetings. City of Yakima Goodwin Tracts Sanitary Sewer Lift Station(SLS) 2 FINAL Rev3 August 2026 SC2911 62 ParametrOk Scope of Work Task 2 - Survey and Data Collection This Task includes efforts associated with surveying the project area, collecting and reviewing data, and facilitating the project kick-off meeting. Subtask 2.1 - Topographic and Utility Survey Consultant will complete a topographic and utility survey of the public right-of-way along East Birch Street and East Viola Street from South 22nd Street to South 24th Street, South 22nd Street between East Birch Street and East Viola Street, a 50-foot swath along the east side of the Camp Hope property(extension of South 24th Street), the existing U-Haul Lift Station site, and the existing Camp Hope Lift Station site. Subtask 2.2 - Private Property Coordination Consultant will coordinate with City to communicate with private property owners currently served in the local service area basin. Purpose of communications will be to share information about the project need and scope and to collect any information related to utility lines that may run into the public right-of-way or in the area of potential improvements associated with this project. Subtask 2.3 - Data Collection and Existing Utility Review Data collection will focus on identifying utility connections, especially sanitary sewer services,from existing utility customers. Additional information will be requested of the City by Consultant, including documentation on the existing lift stations and lift station component standards and preferences. Additionally, City-provided CCTV video of existing sewer lines showing connections will be reviewed by Consultant. Subtask 2.4 - Project Kick-off Meeting Prepare for and facilitate kick-off meeting with City. Meeting to be held at City facilities. Consultant PM and Design Lead will attend in-person and others may join on a virtual platform. Meeting will review the project scope and schedule, with a focus on activities planned over the course of the first six weeks of the project, through preliminary design. Subtask 2.5 - Flow Projections Development Consultant will develop flow projections for the service area basin, respective properties and land use zoning, and resulting collection system flows that are aligned with the City's Collection System Plan. Flow projections will be presented to City staff at either a bi-weekly project coordination meeting or at the beginning of the design camp. The flow projections development will be documented in the preliminary design report. Subtask 2.6 - Easement Exhibit(s) and Legal Description Support Consultant will develop an easement exhibit and legal description to support City negotiations in acquiring an easement to support this project. City of Yakima Goodwin Tracts Sanitary Sewer Lift Station(SLS) 3 FINAL Rev3 August 2026 SC2911 63 Parametrik Scope of Work Deliverables • Topographic and utility survey in AutoCAD Civil 3D 2020 format in one drawing file • Kick off meeting agenda and summary • Data request log • Sewer lateral inventory • Easement exhibit and legal description (PDF) Assumptions • City review comments for all deliverables will be received by the Consultant within one week of submission to maintain fast-track project schedule. • Project kick-off meeting will be held at City facilities, scheduled during field data collection. • Utility locates will be completed by public request and private utility locating agency for all known metallic and traceable pipes within the survey area. • Up to one easement is included, requiring a property boundary survey with figure and description. A single iteration of the figure and description is anticipated. • Consultant will be provided reasonable access to all areas requiring surveys. • Consultant will be provided right of entry on private property for the Camp Hope property and the U-Haul property to access the lift stations for mapping purposes. • For safety reasons, Consultant is not allowed to enter subsurface vaults and structures. All work will be conducted from the surface using measure-down techniques. • City has authority and allows Consultant field crews to perform minor brushing with machetes to conduct this survey. • Unless otherwise specified by the City, horizontal datum shall be NAD 83/11 Washington Coordinate System, South Zone, US Survey Foot, and vertical datum shall be NAVD88. • City will lead the video inspection of sewer pipes, including CCTV with crawler where pipe size is sufficient and push camera in clean outs to locate private sewer connections. • City will perform potholing of sewer service connections to document location and depth. • City will serve as primary point of contact for all private property owners. Task 3 - Site Investigation Subtask 3.1 - Geotechnical Exploration, Analysis, and Report No geotechnical research, investigations, evaluation, or reporting will be conducted as part of this scope of work. Deliverables • None City of Yakima Goodwin Tracts Sanitary Sewer Lift Station(SLS) 4 FINAL Rev3 August 2026 SC2911 64 Parametrik Scope of Work Assumptions • Underground structure buoyancy calculations will be based on the FEMA floodplain water surface elevation for the local area. • Geotechnical conditions are sufficient to accept the bearing weight of the structures and piping. Without geotechnical information, piping connections to structures will be designed to accommodate up to two inches of vertical settlement • Construction documents will require contractor to collect geotechnical information sufficient for designing shoring systems. • Without estimated dewatering rates, construction documents will simply require contractor to dewater to a level one foot below the bottom of the excavation. Task 4 - Preliminary Design This Task includes efforts associated with developing and documenting design criteria for the Project. In an effort to fast-track this project, a design camp is proposed to rapidly advance the design to at least a 30%complete level. Subtask 4.1 - Design Camp Preparation Develop conceptual design of the lift station, gravity sewer pipe, and force main options that can be shifted and scaled during the Design Camp. Preliminary equipment options will be selected to facilitate discussion wherever possible. Subtask 4.2 - Design Camp The Design Camp will take place over the course of two consecutive days when key Consultant team members will remain in Yakima to rapidly advance the design of the Project. Focus areas of the Design Camp include: • Lift station location (and capacity) • Gravity sewer and force main alignments • Force main discharge location • Lift station layout and site access • Confirm equipment/component preferences The agenda for the two-day Design Camp will be mutually agreed on by the City and Consultant. Subtask 4.3 - Hydraulics, Siting, Route, and Tie-In Alternatives Consultant will develop hydraulic calculations for the pumping system associated with the selected site, gravity sewer routes,force main route, and tie-in alternatives for discussion and decision at the Design Camp. Some of this effort will be completed prior to the Design Camp. Subtask 4.4 - Preliminary Design Report/ Basis of Design Develop and document design criteria for the lift station improvements, including decisions made during Design Camp. The preliminary design report will document the project need, design criteria City of Yakima Goodwin Tracts Sanitary Sewer Lift Station(SLS) 5 FINAL Rev3 August 2026 SC2911 65 ParametrOk Scope of Work associated with the project, operating strategy, preliminary opinion of probable construction cost (OPCC), technical specification table of contents (TOC), and other components necessary to establish the framework of the design. The report will also address site development requirements including grading and list of permits. Subtask 4.4 - 30% Design Plans Develop the 30%drawings, which will include up to 26 sheets, anticipated as: • Cover Sheet, Vicinity Map, and • FM Connection Plan & Details Drawing Index • Lift Station Site Plan • General Notes, Abbreviations, & • Lift Station Site Grading Plan Legend • Lift Station Site Restoration Plan • Existing Lift Station Sites • Lift Station Site Piping Plan • Lift Stations Demolition Plans • Lift Station Plan and Section • SS and FM Plan & Profile - 1 • Wiring Symbols and Legend • SS and FM Plan & Profile - 2 • One Line Diagram • SS and FM Plan & Profile - 3 • Load Schedules • SS and FM Plan & Profile - 4 • Electrical Site Plan • SS and FM Plan & Profile - 5 • Motor Elementary Diagram • SS and FM Plan & Profile - 6 • Network Block Diagram • SS and FM Plan & Profile - 7 • Main Control Cabinet Layout • SS and FM Plan & Profile - 8 • Discrete and Analog Block Diagram Deliverables • Design Camp meeting materials, agendas, and decision log • Preliminary Design Report(with OPCC, specifications TOC, and project schedule), draft and final, in PDF format • 30% Design plans, in PDF format Assumptions • City staff will be present and participate in requested portions of the Design Camp. • City review comments for all deliverables will be received by the Consultant within one week of submission to maintain fast-track project schedule. • In order to meet the City's desired fast-track project schedule, it is likely that long-lead equipment, such as pumps, a control cabinet, and possibly a backup power generator will need to be pre-purchased prior to construction. Any pre-purchase efforts will be decided as part of the design camp, in accordance with City purchasing requirements, and budget for these efforts will be provided through a contract amendment to this scope of work. City of Yakima Goodwin Tracts Sanitary Sewer Lift Station(SLS) 6 FINAL Rev3 August 2026 SC2911 66 ParametrOk Scope of Work Task 5 - Detailed Design With the Predesign Report and 30%drawings serving as the basis of design, Consultant will complete the design and preparation of contract documents.The contract documents shall include plans, specifications, and an opinion of probable construction cost(OPCC), and will be submitted for City review at the 90%completion level as well as a Bid-Check Set prior to finalizing and delivering Final Bid Documents for public advertisement. For the purpose of this Scope of Work, the following drawings are anticipated in the final plan: General Electrical & Instrumentation Cover Sheet, Vicinity Map, & Drawing Index Wiring Symbols and Legend General Notes, Abbreviations, & Legend One-Line Diagram Design Data Summary Load Schedules Existing Lift Station Sites Cable and Conduit Schedule Off-Site Piping Survey Control - 1 Electrical Site Plan Off-Site Piping Survey Control - 2 Electrical Lift Station Site Plan Contractor Potholing Plan Electrical Details Civil Motor Elementary Diagram Lift Stations Demolition Plans Network Block Diagram Temp Erosion &Sediment Control - 1 Main Control Cabinet Layout Temp Erosion &Sediment Control - 2 Main Control Cabinet Wiring Diagram Demolition and TESC Details Analog Input Slot Diagram SS and FM Plan & Profile - 1 Analog Output Slot Diagram SS and FM Plan & Profile - 2 Discrete Input Slot Diagram SS and FM Plan & Profile - 3 Discrete Output Slot Diagram SS and FM Plan & Profile - 4 Typical Details SS and FM Plan & Profile - 5 Typical Details - 1 SS and FM Plan & Profile - 6 Typical Details - 2 SS and FM Plan & Profile - 7 Typical Details - 3 SS and FM Plan & Profile - 8 Typical Details - 4 Roadway Restoration - 1 Roadway Restoration - 2 Roadway Restoration - 3 Roadway Restoration - 4 SS and FM Details - 1 SS and FM Details - 2 FM Connection Plan and Details Proposed LS Site Plan Proposed LS Site Grading Plan Proposed LS Site Restoration Plan Proposed LS Site Piping Plan Lift Station Plan and Section City of Yakima Goodwin Tracts Sanitary Sewer Lift Station(SLS) 7 DRAFT Rev3 August 2026 SC2911 67 Parametrik Scope of Work let's create tomorrow, together Subtask 5.1 - Intermediate Design Check A 60 percent design submittal will not be developed for City review. An intermediate design check review workshop will be held during the design development on the way to the 90 percent deliverable. Files will be presented in a virtual meeting in the currently available file formats. Consultant team members will include the project manager, civil/mechanical design lead, electrical/instrumentation design lead, and CAD design lead. Subtask 5.2 - 90% Design Revise the 30%design package based on City review comments and further develop the design to the 90%level. Submit the 90%completion package to the City for review, receive comments, and conduct a design review meeting to discuss City comments. Subtask 5.3 - Final Documents/ Bid-Check Set Revise the 90%design package based on City review comments and finalize the development of the contract documents for public advertisement, bidding, and construction. Subtask 5.4 - Final Bid Documents Incorporate any additional minor comments prior to public advertisement for construction bids. elivezebaes • 30%comment-response log, submitted with 90%submittal • 90% plans, specifications, and OPCC in electronic PDF format • 90%comment-response log, submitted with Bid-Check Set • Bid-Check Set plans, specifications, and OPCC in electronic PDF format • Final plans, specifications, and OPCC in electronic PDF format Assumptions • City review comments for all deliverables will be received by the Consultant within one week of submission to maintain fast-track project schedule. • Decisions will be documented throughout the life of the project in a single decision log. Decisions may come from official design reviews as well as meetings and workshops. • All 52 drawings will be submitted with the 90%, Final Documents, and Bid Documents submittals. • To maintain the fast-track schedule, City approvals of design submittals will come as over- the-shoulder reviews in a deliverable presentation workshop where the Consultant will walk the City through the design deliverable, facilitating discussion and collecting comments that will be addressed in the subsequent submittal. City of Yakima Goodwin Tracts Sanitary Sewer Lift Station(SLS) 8 DRAFT Rev3 August 2026 SC2911 68 Parametrik Scope of Work • City will submit any follow-up comments within a week of each deliverable presentation workshop. • City review comments from all reviewers will be consolidated into a single review set and be provided electronically in PDF format. • OPCC will be AACE Class 1 estimate (-10%to +15% range)for all deliverables under this task. • Landscaping is not required for this project. • No retaining wall is required and elevation changes will be accommodated with sloped fill. • City will provide as-built documentation of the Headworks power distribution system, and the as-builts can be used as a basis for the electrical one-lines. • The Consultant will evaluate options for providing power to the new lift station, however it is assumed that the Headworks power distribution system has electrical capacity and standby power for the new lift station, and therefore a new electrical service and generator are not required. This also assumes that the proposed locations for the lift station are not changing. • Contract documents and specifications will follow EJCDC and CSI (six-digit)format. • No other formal design submittals will be produced other than those listed above. Task 6 - Permitting This Task is intended to capture all the non-construction permits that are required for the project to be permitted and approved for construction. Subtask 6.1 - Right-of-Way Permit and Excavation Permit Complete a right-of-way(ROW) permit application for all work within the public ROW. Permit will be picked up and issued in the name of the contractor awarded the construction project. Contractor may modify permit applications to accommodate their preferred means and methods. Complete an excavation permit application for all excavation, fill, and trenching activities within public right-of-way and City property. D iv Jb • Right-of-Way Permit application • Excavation Permit application Assumptions • Contractor will be responsible for pulling all other construction-related permits, if required. • City will serve as the lead for all permit processing communication, and Consultant will provide support. • No other permits are required by Consultant for this project, including environmental, cultural resources, and floodplain permits. • The project, including all piping, lift station, and restoration is allowed by the City and/or any other jurisdiction having authority. City of Yakima Goodwin Tracts Sanitary Sewer Lift Station(SLS) 9 DRAFT Rev3 August 2026 SC2911 69 Parametrik Scope of Work Task 7 - Bid Phase This Task supports the public advertisement of the project, engagement with potential bidders, and review of received bids to select the lowest, responsive bidder. Subtask 7.1 - Public Advertisement Consultant will compile bidding documents and coordinate with City's online plan center to publicly post project for bids in an online forum. City will coordinate public advertisement(s) based on Consultant-developed `Notice to Potential Bidders'. Subtask 7.2 - Bid Period Support Consultant will support the City during the bid advertisement period, responding to questions from bidders, as requested by the City. Consultant shall prepare draft addenda, as needed,for the City's use. Subtask 7.3 - Pre-Bid Meeting Consultant will prepare for and facilitate a pre-bid meeting for interested bidders during the bid period, on a date mutually agreed to with the City. Subtask 7.4 - Bid Opening and Bid Review Consultant will attend the project bid opening,which will be facilitated by the City. Consultant will review the bids received by the City for noncompliance and discrepancies. Following review of all bids, Consultant will submit a recommendation of award of contract to the lowest, responsive bidder to the City for review and processing. Subtask 7.5 - Conformed Construction Documents Consultant will update drawings and specifications to reflect any changes resulting from addenda issued during the bid period. Only modified drawings and specifications will be reissued, noting the change in the drawing revision title block and/or the footer, as appropriate. Deliverables • Bid advertisement • Pre-bid meeting agenda and sign-in sheet • Summary of bids and recommendation of award Assumptions • City will lead project bid advertisement and serve as the primary point of contact for bidder questions. • Consultant will coordinate with City's online plan center, and City will pay any costs associated with the online plan center. • Consultant PM will attend and help facilitate the Pre-Bid Meeting. • Consultant Design Lead will attend the Bid Opening and complete a review of the submitted bids. City of Yakima Goodwin Tracts Sanitary Sewer Lift Station(SLS) 10 DRAFT Rev3 August 2026 SC2911 70 Parametrik Scope of Work • Up to two addenda will be provided within the hours reflected in the attached level of effort. • Conformed documents that incorporate any modifications incorporated via addenda will be produced and submitted to City in PDF format. Task 8 - Construction Management This Task establishes the services provided by Consultant during the construction phase of the project. Subtask 8.1 - Construction Management Services The Consultant shall provide Construction Management services to support bid, preconstruction, construction, and project closeout activities. The Construction Manager shall provide overall coordination and administration of the construction phase and serve as the primary point of contact between the Owner, Contractor, and project team. Construction management services shall include: • Participating in preconstruction activities, including the preconstruction meeting. • Providing overall construction administration and coordination throughout the project. • Construction manager and onsite observation staff participating in weekly progress meetings. • Coordinating with the project team to resolve issues. • Monitoring the Contractor's progress and coordinating with the project team to address schedule or construction concerns. • Conducting site visits, as needed,to observe construction progress, support the Construction Inspector, and assist with issue resolution. • Supporting project closeout activities. • The Construction Manager is anticipated to perform the majority of these services remotely. Site visits will be conducted on an as needed basis. Up to 4 field visits are budgeted. Subtask 8.2 - Document Control Services The Consultant will provide document control services during preconstruction, construction, and project closeout activities. Document control services shall include: • Coordinating the review of submittals, RFIs, and field issues with the appropriate members of the project team. • Maintaining document logs including submittals, RFIs, change orders, Record of Materials (ROM), pay applications, and other tracking spreadsheets. • Attending and preparing meeting agendas and meeting minutes for preconstruction and weekly construction meetings. • Receiving, distributing, tracking, and filing correspondence and documentation. • Maintaining electronic project files in accordance with the Owner's requirements. City of Yakima Goodwin Tracts Sanitary Sewer Lift Station(SLS) 11 DRAFT Rev3 August 2026 SC2911 71 ParametrOk Scope of Work Subtask 8.3 - Technical Review The Consultant will provide technical engineering review of construction submittals, RFIs, and general field issues throughout the duration of construction. All documents will be reviewed for conformance with the Contract Documents.The following construction engineering services will be provided.Specific activities are undefined but will be completed up to the specified budget amount and may include the following: • Responses to RFIs during construction. • Materials submittal reviews. • Design clarifications. • Working drawing reviews. • Review of change orders. • Support/assistance for preparation of periodic cost to complete analysis. Subtask 8.4 - Construction Inspection Services The Consultant shall provide one full-time Construction Inspector for the 26-week construction period, 40 hours per week,. The Construction Inspector shall be experienced in all aspects of construction observation and documentation. Inspection services shall include: • Observing construction activities for compliance with the contract documents. • Preparing daily inspection reports documenting construction progress and field activities. • Measuring and documenting installed quantities for payment. • Tracking force account work, as required. • Notifying the Owner and Engineer of unforeseen field conditions, potential conflicts, or other issues requiring resolution. • The full-time Construction Inspector shall be present on site during active construction and shall provide daily inspection reports. ODCs include: • Lodging allowance for 6 months ($1,500 per month) • Meals for 130 days ($86 per day) • 10,400 miles • Wifi Hotspot • Hard Copy of Contact Documents City of Yakima Goodwin Tracts Sanitary Sewer Lift Station(SLS) 12 DRAFT Rev3 August 2026 SC2911 72 ParametrOk Scope of Work Subtask 8.5 - Schedule and Pay Application Monitoring The Consultant shall monitor the Contractor's construction schedule and review monthly pay applications during the construction phase of the project. Schedule and pay application monitoring services shall include: • Reviewing the Contractor's baseline construction schedule and subsequent schedule updates. • Monitoring the Contractor's progress against the project schedule. • Coordinating with the Owner and Contractor to address schedule concerns. • Coordinating with the Construction Inspector to verify quantities for payment. • Providing recommendations to the Owner regarding approval of monthly Pay Applications. • Maintaining records of schedule updates and Pay Application reviews. Subtask 8.6 - Change Order Services The Consultant shall provide change order services during the construction phase of the project. Change order services shall include: • Preparing and maintaining a change order log. • Reviewing change order proposals and evaluating for validity. • Coordinating with the project and design teams to evaluate proposed changes. • Preparing change orders and supporting backup documentation. • Preparing an independent cost estimating, as needed. • Providing recommendations to the Owner regarding approval of submitted change order requests Subtask 8.7 - System Testing, Startup, and Commissioning The Consultant shall provide engineering support during system testing, startup, and commissioning of the lift station. System testing and startup services shall include: • Reviewing the Contractor's testing and startup plan and schedule. • Witnessing testing and startup of the lift station systems and equipment to verify conformance with the Contract Documents. • Documenting testing activities and noting any deficiencies. Confirming all deficiencies have been remedied prior to contract completion. City of Yakima Goodwin Tracts Sanitary Sewer Lift Station(SLS) 13 DRAFT Rev3 August 2026 SC2911 73 ParametrOk Scope of Work Subtask 8.8 - Record Documents and Closeout The Consultant shall provide record documents and closeout services. Record documents and closeout services shall include: • Reviewing project closeout documentation including warranty and operation and maintenance manuals. • Reviewing prevailing wage documentation. • Preparing the Notice of Substantial Completion. • Monitoring the final punch list. • Preparing the Notice of Physical Completion • Reviewing the Contractors final Pay Application and providing recommendations to the Owner regarding final payment. Deliverables • Responses to RFIs and submittals • Change Order documents • Review comments on monthly pay requests • Comments and recommendations for contractor schedules • Inspection Daily Reports (IDRs) and daily photo documentation submitted daily • Field Note Records • Punch list documentation • Meeting agendas and minutes • Final completion inspection documentation • Final project closeout documentation review • Recommendation for Substantial and Physical Completion • As-Constructed Record Drawings Assumptions • The City of Yakima will establish and maintain the electronic project filing structure for all project documents. • It is assumed that the Construction Manager will perform 4 field visits throughout the construction of the project. 8 hours is budgeted for each field visit. • General administration of the Contract assumes 8 hours per week for the Construction Manager. • Project Administration, Documentation, and Electronic Transmittal Protocols: Assumes 2 hours per week for Project Coordinator. • Shop Drawings, Samples, and Other Submittals: Assumes approximately 40 submittals (3 hours), with 15 resubmittals (1.5 hours), and a total of 55 separate reviews. City of Yakima Goodwin Tracts Sanitary Sewer Lift Station(SLS) 14 DRAFT Rev3 August 2026 SC2911 74 ParametrOk Scope of Work • Field Orders: Assumes 5 Field Orders requiring 2 hours each for Construction Manager and EOR, and 1 hour each for Project Coordinator. • RFIs, Clarifications, and Interpretations: Assumes 1 hour per week for Construction Manager and EOR. • Change Orders and Work Change Directives: Assumes 3 Change Orders requiring 4 hours each for Construction Manager and EOR, 1 hours each for CAD, and 1 hours each for Project Coordinator. • Construction Observation: Assumes 26 weeks of observation, 40 hours per week. Any additional inspection time will require City authorization. • Pay Applications: Assumes 9 pay applications; 2 hours for Construction Manager and 1 hour for Project Coordinator. • Schedule Maintenance: Assumes up to 2 hours per month for Construction Manager. • Record drawings are estimated at 1 hour per drawing. • Office space will be provided for Consultant's Construction Observation Staff by the City or Contractor. City of Yakima Goodwin Tracts Sanitary Sewer Lift Station(SLS) 15 DRAFT Rev3 August 2026 SC2911 75 EXHIBIT B Page 18 76 SC2911 Consultant LOE Budget Input Responsibility billingclassification. Mechanical/ Construction Construction P ty/ PIC/Senior QA- Project Manager/ l&C/SCADA Survey/ROW Project Controls/ Design Lead Hydraulic Electrical Engineer Civil Engineer(EIT) Cost Estimator Publications CAD Designer Manager(Task 8 Inspector(Task 8 QC EOR Fneineer Engineer Lead Admin nnh,l nnh,l Billing rate/ wage row(firm- $330 $330 $220 $270 $250 $270 $125 $220 $270 $150 $150 $170 .. ,- E enteredl Basis effort-based fee proposal using continuous City over-the-shoulder review and timestamped 30%,60%,and90°%design-maturity records.Technical production,discipline coordination,independent QA/QC,permitting,final signed/sealed PS&E,bidding,construction services,and Task 8.3 inspection remain required. Mechanical/ Parent Task Task/Sub-Task PIC/Senior QA- Project Manager Design Lead Electrical I&C/SCADA Civil Engineer Survey/ROW Cost Estimator Publications Project Controls CAD Designer Construction Construction Other Direct Subconsultant Subconsultant Line Type Total Fee ID ID Task/Sub-Task Description QC Hours /EOR Hours Hours Hydraulic Engineer Hours Engineer Hours (EIT)Hours Lead Hours Hours Hours /Admin Hours Hours Manager Hours Inspector Hours Total Hours Labor Cost Costs Cost Markup Engineer Hours Parent Task 100 100 Task 1-Project Management 14.00 74.00 48.00 - - 16.00 - - - 2.00 28.00 - - - 182.0 $48,420 $1,416 - - $49,836 Sub-task 100 101 1.1 I Project Management Plan(PM P) 2.0 6.0 2.0 10.0 $2,280 - $2,280 Sub-task 100 102 1.2 I Invoices/Status Reports 14.0 28.0 42.0 $8,820 - $8,820 Sub-task 100 103 1.3 I Coordination with City 26.0 26.0 52.0 $14,300 $1,416 - $15,716 Sub-task 100 104 1.4 I Coordination with Team 32.0 16.0 16.0 64.0 $18,400 - $18,400 Sub-task 100 105 1.5 I Schedule,Budget,Risk and Quality Oversight 14.0 14.0 $4,620 - $4,620 Parent Task 200 200 Task 2-Survey and Data Collection - 12.00 52.00 - 6.00 6.00 48.00 180.00 - 2.00 - - 306.0 $6,004 $5,865 $587 , Sub-task 200 201 2.1 I Topographic and Utility Survey 156.0 156.0 $34,320 $4,588 $5,865 $587 $45,360 Sub-task 200 202 2.2 I Private Property Coordination 12.0 12.0 24.0 $4,140 - $4,140 Sub-task 200 203 2.3 I Data Collection and Existing Utility Review 4.0 12.0 6.0 6.0 12.0 40.0 $8,580 $708 - $9,288 Sub-task 200 204 2.4 I Project Kickoff Meeting 4.0 4.0 2.0 10.0 $2,500 $708 - $3,208 Sub-task 200 205 2.5 I Flow Projections Development 4.0 20.0 16.0 40.0 $7,720 - $7,720 Sub-task 200 206 2.5 I Easement Exhibit(s)and Legal Description Support 4.0 8.0 24.0 36.0 $7,160 - $7,160 ,!, 300 Task -Site Investigation Sub-task 300 301 3.1 16eotechnical Exploration,Analysis and Report - - - - Ritteitt+T3ik: 400 400 Task Preliminary Design 28.00 50.00' 104.00 20.00' 4.00 76.00 - - 8.00 12.00 - 82.00 - - 384.0 $93,440 $6,982 - - $100,422 Sub-task 400 401 4.1 I Design Camp Preparation 16.0 8.0 8.0 30.0 62.0 $14,300 - $14,300 Sub-task 400 402 4.2 I Design Camp 16.0 16.0 16.0 16.0 16.0 80.0 $21,120 $5,020 - $26,140 Sub-task 400 4034.3 I Hydraulics,Siting,Route and Tie-In Alternatives 6.0 16.0 12.0 4.0 38.0 $9,820 - $9,820 Sub-task 400 4044.4 I Preliminary Design Report/Basis of Design 4.0 4.0 24.0 12.0 44.0 $9,720 - $9,720 Sub-task 400 405 4.5 130 Percent Design Plans 8.0 8.0 40.0 8.0 4.0 48.0 8.0 36.0 160.0 $38,480 $1,962 - $40,442 Parent.Task 500 500 Task S-Detailed Design 30-00 40.00 142.00 12.00 24.00 154.00 102.00 - 22.00 34.00 294.00 854.9 $178,930 $5,886 - - $184,816 Sub-task 500 5015.1 I Intermediate Design Check 2.0 2.0 2.0 2.0 8.0 $1,980 - $1,980 Sub-task 500 502 5.2 190 Percent Design 24.0 24.0 96.0 12.0 18.0 120.0 80.0 16.0 16.0 240.0 646.0 $134,620 $3,924 - $138,544 Sub-task 500 503 5.3 I Final Documents/Bid-Check Set 4.0 8.0 28.0 4.0 24.0 16.0 4.0 12.0 40.0 140.0 $29,280 $1,962 - $31,242 Sub-task 500 504 5.4 I Final Bid Documents 2.0 6.0 16.0 2.0 8.0 6.0 2.0 6.0 12.0 60.0 $13,050 - $13,050 Parent Task 600 600 Task 6.-Permitting 11.11 _-:: ( ;y°. y�y° - - 12.00 - - - - - - - 26:0 a se - $4,800 Sub-task 600 601 6.1 I Right-of-Way and Excavation Permit LL 2.0 12.0 12.0 26.0 $4,800 - $4,800 77 SC2911 Consultant LOE Budget Input Responsibility billingclassification. Mechanical/ Construction Construction P ty/ PIC/Senior QA- Project Manager/ l&C/SCADA Survey/ROW Project Controls/ Design Lead Hydraulic Electrical Engineer Civil Engineer(EIT) Cost Estimator Publications CAD Designer Manager(Task 8 Inspector(Task 8 QC EOR Fneineer Engineer Lead Admin nnh,l nnh,l Billing rate/ wage row(firm- $330 $330 $220 $270 $250 $270 $125 $220 $270 $150 $150 $170 .. ,- E enteredl Basis effort-based fee proposal using continuous City over-the-shoulder review and timestamped 30%,60%,and90°%design-maturity records.Technical production,discipline coordination,independent QA/QC,permitting,final signed/sealed PS&E,bidding,construction services,and Task 8.3 inspection remain required. Mechanical/ Parent Task Task/Sub-Task PIC/Senior QA- Project Manager Design Lead Electrical I&C/SCADA Civil Engineer Survey/ROW Cost Estimator Publications Project Controls CAD Designer Construction Construction Other Direct Subconsultant Subconsultant Line Type Total Fee ID ID Task/Sub-Task Description QC Hours /EOR Hours Hours Hydraulic Engineer Hours Engineer Hours (EIT)Hours Lead Hours Hours Hours /Admin Hours Hours Manager Hours Inspector Hours Total Hours Labor Cost Costs Cost Markup Engineer Hours Parent Task 700. 700.Task 7 Bid Phase.. 18.00 28.00 6.00 6.00 - - 4.00 10.00 12.00 - - 84.0 $19,360 $3,924 - $23,284 Sub-task 700 701 7.1 I Public Advertisement 2.0 2.0 4.0 8.0 $1,700 - $1,700 Sub-task 700 702 7.2 I Bid Period Support 6.0 10.0 4.0 4.0 4.0 28.0 $6,940 - $6,940 Sub-task 700 703 7.3 I Pre-Bid Meeting 8.0 2.0 10.0 $2,940 $1,962 - $4,902 Sub-task 700 704 7.4 I Bid Opening and Bid Review 2.0 12.0 14.0 $3,300 $1,962 - $5,262 Sub-task 700 705 7.5 I Conformed Construction Documents 4.0 2.0 2.0 4.0 4.0 8.0 24.0 $4,480 - $4,480 Parent Task 800 800 Task 8-Construction Management - 48.00 84.00 8.00 24.00 8.00 92.00 - - 97.00 42.00 300.00 1,040.00 1,743.0 $308,930 $35,468 - - $344,398 .-- Sub-task 800 801 8.1 I Construction Management Services 240.0 240.0 $68,400 $1,864 - $70,264 Sub-task 800 802 8.2 I Document Control Services 72.0 72.0 $10,800 - $10,800 Sub-task 800 803 8.3 I Technical Review 8.0 40.0 8.0 24.0 8.0 60.0 6.0 16.0 170.0 $34,720 $34,720 Sub-task 800 803 8.4 I Construction Inspection Services 1,040.0 1,040.0 $145,600 $31,684 - $177,284 - Sub-task 800 804 8.5 I Schedule and Pay Application Monitoring 12.0 8.0 16.0 36.0 $7,260 - $7,260 Sub-task 800 805 8.6 I Change Order Services 12.0 3.0 3.0 12.0 30.0 $7,020 - $7,020 Sub-task 800 806 8.7 I System Testing,Startup and Commissioning 40.0 20.4 20.0 16.0 96.0 $24,660 $1,920 - $26,580 Sub-task 800 807 8.8 I Record Documents and Closeout 12.0 8.0 39.0 59.0 $10,470 - $10,470 04044140 ] - DESIGN/PERMITTING/BIDDING SUBTOTAL 72.00 196.0e I - 162.00 180.00 30.00 52.00 40.00 388.00 - - 1,836.0 "( _ ( ` k_; - _I__' CONSTRUCTION PHASE SUBTOTAL • - 48.00 i 92.00 - - - 97.00 42.00 300.00 1,040.00 1,743.0 _ $$ 3 xi e .a i^;".' 7, TOTAL CONSULTANT-PROPOSED EFFORT-BASED LOE. L 72.00 = 244.00 -I I -I _ 254.00 1 180,00 30.00 52.00 137.00 430.00 300.00 1,040.00 3,579.0 =Y- ,,( Mgr ( k: ,g Submission basis:consultant-entered staffing,rates,hours,ODCs,subconsulta nt costs,and assumptions.The workbook contains no City-developed labor-hour baseline.Construction inspector hours are permitted only in Subtask 8.3. 78 EXHIBIT"C" Page 19 79 Parametrix Puget Sound Billing Rates-Effective through 2028 Classification Grade Min - Max Classification Grade Min - Max CADD Operator I 8 $110 $140 Jr.Planner 8 $110 $140 CADD Operator II 9 $115 $160 Planner I 10 $120 $165 CADD Operator III 11 $130 $175 Planner II 11 $130 $175 CADD Supervisor/Technical Lead 12 $140 $185 Planner III 12 $140 $185 CADD Services Manager 14 $160 $220 Planner III 13 $150 $195 Planner IV 14 $160 $220 Jr.Designer 8 $110 $140 Sr.Planner 15 $185 $245 Designer I 10 $125 $170 Sr.Planner 16 $205 $275 Designer ll 11 $135 $180 Sr.Planner 17 $220 $295 Designer III 12 $145 $190 Designer III 13 $155 $200 Jr.Scientist/Biologist 8 $110 $140 Designer IV 14 $160 $220 Scientist/Biologist I 10 $120 $165 Sr.Designer 15 $185 $245 Scientist/Biologist II 11 $130 $175 Sr.Designer 16 $205 $275 Scientist/Biologist III 12 $140 $185 Sr.Designer 17 $215 $290 Scientist/Biologist III 13 $150 $195 Scientist/Biologist IV 14 $160 $220 Jr.Engineer 8 $110 $140 Sr.Scientist/Biologist 15 $180 $240 Engineer I 10 $135 $180 Sr.Scientist/Biologist 16 $205 $275 Engineer II 11 $140 $185 Sr.Scientist/Biologist 17 $215 $290 Engineer III 12 $155 $200 Engineer III 13 $165 $225 Environmental Technician I 7-8 $110 $140 Engineer IV 14 $175 $235 Environmental Technician II 9 $115 $165 Sr.Engineer 15 $205 $280 Environmental Technician III 10 $120 $165 Sr.Engineer 16 $220 $295 Sr.Engineer 17 $245 $320 Jr.Cultural Resource Spec 8 $95 $125 Sr.Consultant 18 $275 $365 Cultural Resource Spec I 10 $100 $130 Sr.Consultant 19 $285 $375 Cultural Resource Spec II 11 $110 $140 Cultural Resource Spec III 12-13 $115 $160 Electrical Designer I 11 $140 $185 Cultural Resource Spec IV 14 $145 $190 Electrical Designer II 12 $155 $200 Cultural Resource Spec Sr 15-16 $170 $230 Electrical Designer III 13 $165 $225 Cultural Resource Spec Sr 17 $205 $275 Electrical Designer IV 14 $175 $235 Sr.Electrical Designer 15-16 $205 $275 Jr.Hydrogeologist 8 $110 $140 Sr.Electrical Designer 17 $220 $295 Hydrogeologist I 10 $115 $160 Electrical Engineer I 11 $140 $185 Hydrogeologist II 11 $130 $175 Electrical Engineer II 12 $155 $200 Hydrogeologist III 12-13 $145 $190 Electrical Engineer III 13 $165 $225 Hydrogeologist IV 14 $165 $225 Electrical Engineer IV 14-15 $200 $260 Sr.Hydrogeologist 15 $185 $245 Sr.Electrical Engineer 16-17 $230 $305 Sr.Hydrogeologist 16 $205 $275 Sr.Electrical Engineer 18 $270 $360 Sr.Hydrogeologist 17 $220 $295 Jr.Surveyor 8 $105 $165 GIS Technician 9 $115 $160 Surveyor I 9 $115 $150 GIS Analyst 10 $120 $165 Surveyor II 10 $115 $160 Sr.GIS Analyst 11-12 $135 $180 Surveyor III 11 $135 $180 Sr.Surveyor 12 $150 $200 Graphic Designer 10-11 $135 $180 Sr.Surveyor 13 $170 $230 Sr.Graphic Designer 12-13 $150 $200 Survey Supervisor 14-15 $190 $250 Survey Supervisor 16-17 $205 $280 Publications Specialist I 8 $100 $130 Survey Prevailing Wage* Publications Specialist II 9-10 $115 $160 Sr.Publications Specialist 10-11 $130 $175 Jr.Inspector 8 $110 $140 Publications Supervisor 12-13 $140 $185 Construction Inspector 10-11 $130 $175 Technical Editor 10-11 $130 $175 Sr.Construction Inspector 12-13 $145 $190 Sr.Technical Editor 12-13 $145 $190 Resident Engineer 13 $160 $215 Resident Engineer 14 $165 $225 Technical Aide 7 $100 $130 Construction Manager I 12-14 $170 $230 Sr.Technical Aide 8 $110 $142 Construction Manager II 15-17 $180 $240 Project Coordinator 9 $115 $160 Sr.Construction Manager 15 $205 $275 Sr.Project Coordinator 10 $125 $170 Sr.Construction Manager 16-17 $230 $305 Project Controls Specialist 11 $135 $180 Owner's Representative 18-19 $250 $340 Sr.Project Controls Specialist 12-13 $150 $200 Division Manager 16-17 $230 $305 Project Biller 8 $110 $140 Division Manager,Regional DM 18-19 $260 $350 Project Accountant 9 $115 $160 Operations Manager 16-17 $225 $300 Sr.Project Accountant 10-11 $130 $175 Operations Manager/Program Manager 18-19 $260 $350 Accounting Specialist 9 $115 $160 Project Delivery Manager 18-20 $270 $360 Sr.Accounting Specialist 10-11 $125 $170 Principal Consultant 19 $285 $375 Principal Consultant 20 $295 $395 Admin Assistant 7 $100 $130 Director of Risk Management 20 $275 $365 Sr.Admin Assistant 8 $110 $140 Vice President/Sr.Vice President 18-20 $290 $380 Office Administrator 10-11 $130 $175 Sr.Office Administrator 12-13 $140 $185 UAV Pilot 12-13 $175 $235 Office Administrative Manager 14-15 $165 $225 Expert Witness $360 $480 Business Manager,Rgnl Off Mgr 15-16 $185 $245 Sr.Contract Administrator 12-13 $150 $200 *Prevailing Wage Rates apply to construction surveying on all Washington Public Works Projects. Note:Parametrix reserves the right to adjust billing classifications,grades,and rates at any time without impact to the Contract value(without an executed Contract amendment). 80 Parametrb let's create tomorrow, together IN-HOUSE EQUIPMENT GOVERNMENT (FAR-COMPLIANT) RATES Effective March 2025 Equipment Item Rate Category Mileage Current IRS mileage rate(day of travel)' Rate per mile Per Diem Not to exceed current GSA per diem rate(date/place of travel)2 Rate per day Survey Equipment $200 per day Rate per day Lieca Scanstation $450 per day Rate per day Wingtra UAV $600 per day Rate per day LiDAR UAV $1,065 per day Rate per day Single-Beam $200 per day Rate per day Multi-Beam $1,065 per day Rate per day Notes: All other direct costs—such as parking,transportation fares,postage,delivery,reproduction costs,rental equipment,and supplies—will be billed at cost without markup. FAR=Federal Acquisition Regulation;IRS=Internal Revenue Service;GSA=General Services Administration. 1 See www.irs.gov for current IRS mileage rate. 2 See www.gsa.gov for current GSA per diem rates. Parametrix,Inc. In-House Equipment—Government Rates 1 (Subject to annual adjustments) 81