Loading...
HomeMy WebLinkAboutR-2026-106 6-year TIP_adopt 2027-2032_Transp system plan 2040_AA RESOLUTION RESOLUTION NO. R-2026-106 adopting the Six -Year Transportation Improvement Program (TIP) for the period of 2027 through 2032 for transportation improvements to arterial streets in the City of Yakima and amending the 2040 Transportation System Plan, WHEREAS, the City of Yakima annually prepares, reviews and adopts a six -year program for transportation improvements to arterial streets in the City of Yakima for the ensuing six -year period, all as contemplated and required by the State RCW 35.77.010 and applicable federal law; and WHEREAS, the City of Yakima desires to amend the 2040 Transportation System Plan to ensure compliance with the Growth Management Act and the regional transportation plan for the construction of arterial streets in the City of Yakima, all as contemplated and required by State and Federal Law; and, WHEREAS, after a public hearing on the matter, held at the regular meeting of the Yakima City Council on July 7, 2026, with proper public notice as required by RCW 35.77.010, the City Council finds that the plan attached hereto should be adopted as the Six -Year Transportation Improvement Program for the period of 2027 through 2032 for transportation improvements to arterial streets in the City of Yakima; and, WHEREAS, adopting the Six -year Transportation Improvement Program and amending the 2040 Transportation System Plan are in the best interest of the City and its residents; now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The Six -Year Construction Program for the period of 2027 through 2032, a copy of which is attached hereto and by this reference made a part thereof, is hereby adopted as the official Six -Year Transportation Improvement Program for the City of Yakima, including proposed amendments to the 2040 Transportation System Plan along with Street Improvements, which are also approved, ADOPTED BY THE CITY COUNCIL this 7t' day of July, 2026. ATTEST: S-A Rsalinda Ibarra, CMC, City Cle Matt Brown, Mayor ."7"'1111111:. Washington State Va. Department of tlportaftto. Agency: Yakima County: Yakima MPOIRTPO: YVCOG Y Inside Six Year Transportation Improvement Program From 2027 to 2032 N Outside e r7 2' = c A. PIN/Project No. B. STIP ID C. Project Tllle D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID = m !, a y a $ 3 a Resolution No. Improvement Type a Total length', i i f E • a 03 WA-17221 16th Avenue and Mead Avenue Signal and Crossing Improvements S.18th Avenue to The project will incorporate the installation of a fully signaled traffic intersection, pedestrian signals, Illumination, high visibility crosswalks, ADA compliant curb ramps, and a dedicated tum lane to properly queue vehicles on Mead Ave 07/0726 07/07/26 R-2026-108 21 0.100 CE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2027 STBG 264,800 0 66,200 331,000 P RW 2027 STBG 80,000 0 20,000 100,000 P CN 2028 STBG 1,486,480 0 371,620 1,858,100 Totals 1,831,280 0 457,820 2,289,100 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 331,000 0 0 0 0 RW 100,000 0 0 0 0 CN 0 1,858,100 0 0 0 Totals 431,000 1,858,100 0 0 0 Report Date: July 09, 2026 Page 1 •Ti Washington State Agency: Yakima County: Yakima MPOIRTPO: YVCOG Y Inside Six Year Transportation Improvement Program From 2027 to 2032 N Outside cy o Priority Number A. PIN/Project No. B. ST1P ID C. Project Title D. Road Name or Number E. Begirt & End Termini F. Project Description G. Structure ID = m m D $ m 3 , z P Improvement Type $ 6 m ri 9 Environmental Type i i 14 YAK84 16th Avenue and Tieton Drive Intersection Improvements 16th Avenue 16th Avenue to Tieton Drive Reconstruct and widen 16th Avenue and Tluton Drive by adding felt-tum lanes for all movements at the intersection. Upgrade the traffic signal. 07/07/26 07/0726 R-2026-106 04 C G O P S TW 0.400 CE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2031 0 OTHER 358,512 53,592 412,104 P RW 2031 0 OTHER 1,498,607 233,893 1.732,500 P CN 2032 0 OTHER 1,640,683 252,483 1,893,166 Totals 0 3,497,802 539,968 4,037,770 Expenditure Schedule Phase 1st 2nd 3rd 41h 5th 6 6th PE 0 0 0 0 412,104 RW 0 0 0 0 1,732,500 CN 0 0 0 0 1,893,166 Totals 0 0 0 0 4,037,770 Report Date: July 09, 2026 Page 2 INK •Ti Mato Agency Yakima County: Yakima MPOIRTPO: YVCOG Y Inside Six Year Transportation Improvement Program From 2027 to 2032 N Outside tt Z a 1. A. PIN/Pro ect No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m aw $ S g o� o tmprovoment Type utility codes Environmental Type �o c 14 YAK57 18th Street Underpass Yakima Avenue Yakima Avenue to 18th Street Replace the bridge on E. Yakima Avenue that crosses over 18th Street. 07/07/26 07/07/26 R-2026-106 11 CPT 0.010 CE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2027 BR 1,145,250 0 178,739 1,323,989 P RW 2028 BR 86,500 0 13,500 100,000 P CN 2029 BR 5,286,015 0 824,985 6,111,000 Totals 6,517,765 0 1,017,224 7,534,989 Expenditure Schedule Phase 1s1 2nd 3rd 4th 5th & 6th PE 834,113 489,876 0 0 0 RW 0 100,000 0 0 0 CN 0 0 6,111,000 0 0 Totals 834,113 589,876 6,111,000 0 0 Report Date: July 09, 2026 Page 3 vii,#1111 Washington '// n vti t w i ' ntspo tatdon Agency: Yakima County: Yakima MPO/RTPO: YVCOG Y Inside Six Year Transportation Improvement Program From 2027 to 2032 N Outside Functional Class v e 3 A. PIN/ProJecl No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Temtinl F. Project Description G. Structure ID a �' Eo e W Imc S z Improvement Type nt 4 �7 jS i o S Environmental Type at m 3 04 YAK 111 6th Avenue Roadway Improvements 6th Avenue Walnut Street to River Road Reconstruct roadway induding trolley provisions. Per Council directive no City funds shall be used for trolley track Infrastructure consistent with Council's previous direction regarding TBD funds, this does not apply to donated specific funds or Council approved funds. 07/07/26 07/07/26 R-2026-106 04 C G P S T w 1.500 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2027 0 0 250,000 250,000 S RW 2027 0 0 100,000 100,000 S CN 2027 0 0 17,000,000 17,000,000 Totals 0 0 17,350,000 17,350,000 Expendlture Schedule Phase 1st 2nd 3rd 4th 5th S 6th PE 250,000 0 0 0 0 RW 100,000 0 0 0 0 CN 17,000,000 0 0 0 0 Totals 17,350,000 0 0 0 0 Report Date: July 09, 2026 Page 4 washIngton state wrap Department et t1t1e«t Agency: Yakima County: Yakima MPO/RTPO: YVCOG Y Inside Six Year Transportation Improvement Program From 2027 to 2032 N Outside Priority Number A Improvement Type Environmental Type RW Required m A. PIN/Project No. B. STIP ID � o a o C. Protect TIOe D. Road Name or Number = p $ a a n n E. Begin 8 End Termini $ _ I g F. Project Description G. Structure ID a $ o 06 WA-16437 07/07/26 07/07/26 R-2026-103 28 C O P T 0.240 No 72nd Ave 8 Washington Ave Active Transportation Components 72nd Avenue Washington Avenue to Coolidge Road Construct approximately 1250 LF of sidewalk from Washington Ave to Coolidge Rd to fill In a gap to provide amass to residential neighborhoods. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S P6 2027 0 MAW 65,000 0 65,000 S CN 2027 0 MAW 435,000 0 435,000 Totals 0 500,000 0 500,000 Expenditure Schedule Phase 1st 2nd 3rd 401 5th & 6th PE 65,000 0 0 0 0 CN 435,000 0 0 0 0 Totals 500,000 0 0 0 0 Report Date: July 09, 2026 Page 5 •TAt Washington State i Department of TIransportation Agency: Yakima County: Yakima MPO/RTPO: YVCOG Y Inside Six Year Transportation Improvement Program From 2027 to 2032 N Outside Z A. PIN/Project No. B. STIP ID A o Improvement Type g g' s. 9 RW Required ct Z c C. ProjedTltle D. Road NameNumber E. orBegln 8 End Tennlnl = m n $ a a o ' ' �f i i -I G F. Project Description G. Structure ID m 3 o R 5 04 YAK11 07/07/26 07/07/26 R-2026-106 01 O P S T W 0.280 EA No Bravo Company Boulevard, Phase 1 Bravo Company Blvd Railroad Tracks to '0' Street Construct four -lane roadway section with median, bike lanes and roundabouts, install curb, gutter, sidewalk, street righting and storm drainage system, along with water and sewer systems. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P CN 2027 0 0 6,000,000 6,000,000 Totals 0 0 6,000,000 6,000,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 2,000,000 4,000,000 0 0 0 Totals 2,000,000 4,000,000 0 0 0 Report Date: July 09, 2026 Page 6 IS= Washingtonvar tat Siete Agency: Yakima County: Yakima MPOIRTPO: YVCOG Y Inside Six Year Transportation Improvement Program From 2027 to 2032 N Outside Functional Class Z c ffi3 A. PIN/Project No. C. Project Title D. Road Name or Number E. Begin 8 End Termini F. Project Description 8. STIP ID G. Structure ID = m m p a 130 S 'a a a o c 3 c Improvement Type a . n o a S i m 1 s i ri 1 RW Required 04 Bravo Company Boulevard, Phase 2 Bravo Company Boulevard 'H' Street to Railroad Tracks Construct four -lane roadway section with median, bike lanes and roundabouts, install curb, gutter, sidewalk, street fighting end storm drainage system. along with water and sewer systems. WA-13520 07/07/26 07/07/26 R-2026-106 01 S W 0.280 EA No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P CN 2029 0 OTHER 6,500,000 0 6,500,000 Totals 0 6,500,000 0 8,500,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 61h CN 0 0 6.500,000 0 0 Totals 0 0 6,500,000 0 0 Report Date: July 09. 2026 Page 7 =JP"Allit Washington State VW Department ot Transportation Agency: Yakima County: Yakima MPO/RTPO: YVCOG Y Inside Six Year Transportation Improvement Program From 2027 to 2032 N Outside Functional Class R No. B. STIP ID C. Project Title C. Project Title D. Road Name or Number E. Begin 8 End Termini F. Project Description G. Structure ID = p 5. m a 1 a ,r . M Z o Improvement Type Utility Codes Total Length Environmental Type t? 07 WA•13522 Browne Avenue Sidewalk Browne Avenue 71h Avenue 10 16th Avenue Replace damaged sidewalk panels. 07/07/26 07/07/26 R-2026-106 28 C G P S T W 0.530 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2030 0 0 108,000 108,000 P CN 2031 0 0 828,000 828,000 Totals 0 0 938,000 938,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th 8 6th PE 0 0 0 108,000 0 CN 0 0 0 0 828,000 Totals 0 0 0 108,000 828,000 Report Date: July 09, 2026 Page 8 •ari'► t'�°" Transportation Department et Agency: Yakima County: Yakima MPOIRTPO: YVCOG Y Inside Six Year Transportation Improvement Program From 2027 to 2032 N Outside n 0 , A. PIN/Project No. B. STIP ID C. Project Title 3. Resolution No. Improvement Type Utility Codes Environmental Type RW Required Z c D. Road Name or Number x o a $ s g r a _ 1. E. Begin 3 End Termini F. Project Description G. Structure ID a ar 0 a g 05 WA-14955 07/07/26 07/0726 R-2026.106 04 0.750 CE Yes Coolidge Road horn 72nd Ave to 84th Ave - Roadway Improvements Coolidge Road 72nd Avenue to 841h Avenue Rehabilitate existing pavement and update roadway to current dry standards. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2029 0 0 200,000 200,000 P RW 2030 0 0 200,000 200,000 P CN 2031 0 0 1,100,000 1,100,000 Totals 0 0 1,500,000 1,500,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 200,000 0 0 RW 0 0 0 200,000 0 CN 0 0 0 0 1,100,000 Totals 0 0 200,000 200,000 1,100,000 Report Date: July 09, 2026 Page 9 4.6 Wlrttasftlnaton State AO Deportment of hanapovtatton Agency: Yakima County: Yakima MPOIRTPO: YVCOG Y Inside Six Year Transportation Improvement Program From 2027 to 2032 N Outside Functional Class Priority Number 7, Improvement Type Utility Codes Total Length Environmental Type RW Required A. PIN/Project No. B. STIP ID Q C. Project Title D 55. D. Road Name or Number o o. g E. Begin & End Termini Protect Deecrlptlon G. Structure ID m IsF. a P 16 YAK10 07/07/26 07/07/26 R-2026-106 01 O P S T W 0.550 EA Yes E. "H" Street Extension, Phase 1 E. "H" Street 1st Street to 7th Street Construct new roadway intcuding water, sewer, curb, gutter, sidewalk,streel lighting and storm drainage system. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds 8tato Fund Code State Funds Local Funds Total Funds P PE 2028 0 OTHER 566,500 0 566,500 P RW 2028 0 OTHER 150,000 0 150,000 P CN 2029 0 OTHER 6,758,400 0 6,758,400 Totals 0 7,474,900 0 7,474,900 Expenditure Schedule Phase tat 2nd 3rd 4th 5th & 6th PE 0 566,500 0 0 0 RW 0 150,000 0 0 0 CN 0 0 6,758,400 0 0 Totals 0 716,500 6,758,400 0 0 Report Date: July 09, 2026 Page 10 VTT► I Department o `WunepertaUon Agency: Yakima County: Yakima MPOIRTPO: YVCOG Y Inside Six Year Transportation Improvement Program From 2027 to 2032 N Outside rt o Z c $� A. PIN/Project No. C. Project Title D. Road Name or Number E. Begin 8 End Termini F. Protect Description B. STIP ID G. Structure ID m 4_ , a 3 g$A 7i o ='t o 3 a Utility Codes v g m 3 1 RW Required 04 Fair Avenue Sidewalk Fair Avenue Pacific Avenue to Nob Hill Boulevard Construct sidewalk on west side of roadway. YAK 109 07/07/26 07/07/26 R-2026-106 28 C G P 5 T W 0.500 CE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2027 0 TIB 138,320 34,580 172,900 S RW 2027 0 0 100,000 100,000 S CN 2027 0 TIB 1,061,680 265,420 1,327,100 Totals 0 1,260,000 400,000 1,600,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th 8 6th PE 172,900 0 0 0 0 RW 100,000 0 0 0 0 CN 1,259,000 0 0 0 0 Totals 1,531,900 0 0 0 0 Report Date: July 09, 2026 Page 11 T� '// Department Transportation Agency: Yakima County: Yakima MPO/RTPO: YVCOG Y Inside Six Year Transportation Improvement Program From 2027 to 2032 N Outside Priority Number A. PIN/Project No. B, STIP ID C. Project Title D. Road Name or Number E. Begin 8 End Terrain'a F. Project Description G. Structure ID m m $ Resolution No. Improvement Type R a 00 $ a = Environmental Type RW Required 04 YAK 113 Mead Avenue Pedestrian Signal Mead Avenue 10th Avenue to 12th Avenue Install school zone flashers and pedestrian signal RRFBs. 07/07/26 07/07/26 R-2026-106 28 C G P S T W 0.010 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2028 0 OTHER 50,000 0 50,000 P CN 2029 0 OTHER 346,750 0 346,750 Totals 0 396,750 0 396,750 Expenditure Schedule Phase let 2nd 3rd 4th 5th 8 6th PE 0 50.000 0 0 0 ALL 0 0 346,750 0 0 Totals 0 50,000 346,750 0 0 Report Date: July 09, 2026 Page 12 Washington State W/ Department of Transportation Agency: Yakima County: Yakima MPO/RTPO: YVCOG Y Inside Six Year Transportation Improvement Program From 2027 to 2032 N Outside m Priority Number A. PIN/Project No. B. STIP ID •oN UOI{nloaea r improvement Typo Utility Codes Environmental Type 73 m C. Project Title D. Road Name or Number E. Begin & End Termini a a D $a R. I z m _ F. Project Description G. Structure ID a a 3 16 YAK102 07/07/26 07/07/26 R-2026-106 21 P T 0.030 CE No N 1st St & R St Signal N.1st St. R Street to R Street Install traffic signal at the intemection. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2029 0 OTHER 66,990 10,395 77,385 P CN 2030 0 OTHER 401,709 62,722 464,431 Totals 0 468,699 73,117 541,616 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 77,385 0 0 CN 0 0 0 464,431 0 Totals 0 0 77,385 464,431 0 Report Date: July 09, 2026 Page 13 i Wash iw Agency: Yakima County: Yakima MPO/RTPO: YVCOG Y Inside Six Year Transportation Improvement Program From 2027 to 2032 N Outside Priority Number A. PIN/Project No. B. STIP ID' Total Length Environmental Type C. Project Titte = jr W a c ' ' o - D. Road Name or Number n c t1 0 E. Begin 8 End Termini a v ZP .s'lr S. 1 w F. Project Description G. Structure ID a' a ffi 04 YAK 110 07/07/26 07/07/26 R-2026-108 28 C G P S T w 1.500 CE Yes Nob Hill Boulevard Sidewalk Nob HIV Boulevard 121h Street to 14th Street Construct sidewalk on south side of roadway. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P ALL 2031 0 0 172,500 172,500 Totals 0 0 172,500 172,500 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th it 6th ALL 0 0 0 0 172,500 Totals 0 0 0 0 172,500 Report Date: July 09, 2026 Page 14 •Ti 01 Agency: Yakima County: Yakima MPOI RTPO: YVCOG Y Inside Six Year Transportation Improvement Program From 2027 to 2032 N Outside c o a g o $ z c v $ A. PIN/Protect No. B. STIP ID C. Project Title D. Road Name or Number E. Begin 8 End Termini F. Protect Description G. Structure ID Hearing p S . Y a a g a, 3 • Improvement Type Utility Codes m g Environmental Type xi 07 YAK103 Nob Hill Elementary School Safety Improvements various streets various locations to various locations This project will make various pedestrian safety improvements in the vicinity of Nob Hill Elementary School, such as new sidewalk and constructing ADA ramps. 07/07/26 07/07/26 R-2026-106 28 C O P T 0.500 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2029 0 SRTS 101,200 0 101,200 P CN 2030 0 SRTS 674,520 0 874,520 Totals 0 775,T20 0 775,720 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th 8 6th PE 0 0 101,200 0 0 CN 0 0 0 1374,520 0 Totals 0 0 101,200 674,520 0 Report Date: July 09, 2026 Page 15 7 Washington of Agency: Yakima County: Yakima MPOIRTPO: YVCOG Y Inside Six Year Transportation Improvement Program From 2027 to 2032 N Outside r n 1 1 Z e A. PIN/Project No. B. STIP ID C. Project TIUe D. Road Name or Number E. Begin II End Termini F. Project Description G. Structure ID x o1 a co > S ' A o z P Improvement Type Utility Codes Total Length m ry = 73 3e3' 03 WA-15881 Nob Hill RR #2 and 72nd Ave S #87 Bridges - Joint Replacement Nob HIP Boulevard, 72nd Avenue Nob HIO Blvd to 72nd Avenue Replace expansion joints on the Nob Hill RR 02 bridge and expansion joints and 8548900, 839000 girder grout channels on the 72nd Ave S #87 bridge. 07/07126 07/07/26 R-2026-106 47 0.160 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2028 0 OTHER 189,390 0 189,390 P CN 2029 0 OTHER 1,172,552 0 1,172,552 Totals 0 1,361,942 0 1,361,942 Expenditure Schedule Phase 1st 2nd 3rd 4th 501$ 6th PE 0 189,390 0 0 0 CN 0 0 1,172.552 0 0 Totals 0 189,390 1,172,552 0 0 Report Date: July 09. 2026 Page 16 4111 ir7i Department of W000port Agency: Yakima County: Yakima MPOIRTPO: YVCOG Y Inside Six Year Transportation Improvement Program From 2027 to 2032 N Outside Functional''' Class' -o 2. = c A. PIN/project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin 6 End Termini F. Project Description G. Structure ID = e co D $ a ' a W S Z o Improvement Type 4 It a $ m g Environmental Typo RW Required 07 WA-16439 North Yakima Active Transportation Improvements 3rd Street East 'G" Street to MLK Jr Blvd Install new sidewalk, ADA compliamd curb ramps, and remove and replace damaged and non-ADA compliant sidewalk and curb amps, and add bike lanes on 3rd Street. 07/07/26 07/07/26 R-2026-106 28 C G O P S TW 0.500 CE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2027 0 CWA 95,000 0 95,000 P RW 2027 0 CWA 100,000 0 100,000 P CN 2028 0 CWA 661,479 0 661,479 Totals 0 856,479 0 856,479 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 50,000 0 0 0 0 124Y 100,000 0 0 0 0 CN 0 861,000 0 0 0 Totals 150,000 661,000 0 0 0 Report Date: July 09, 2026 Page 17 6012"1i 4. n Slate Deoe t` ,sportatta, Agency: Yakima County: Yakima MPOIRTPO: YYCOG Y Inside Six Year Transportation Improvement Program From 2027 to 2032 N Outside a go S m Priority Number A. PINIProject No. B. STIP ID.ctc C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID o ro a o. '� & a P. F P Improvement Type c = m Environmental Typo 4.z 07 WA-16438 Northeast Yakima Sidewalk Improvements 'T Street to Lincoln Avenue Install new sidewalk, ADA compliant curb ramps, and remove and replace damaged and non-ADA compliant sidewalk and curb ramps In the Barge -Lincoln Elementary School area of northeast Yakima. 07/07/26 07/07/26 R-2026-106 28 C G O P S TW CE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2028 0 CWA 100,000 0 100,000 P RW 2028 0 CWA 100,000 0 100,000 P CN 2029 0 CWA 800,000 0 800,000 Totals 0 1,000,000 0 1,000,000 Errpendlturo Schedule Phase 1st 2nd 3rd 4th 5th 8 6th PE 0 100,000 0 0 0 RW 0 100,000 0 0 0 CN 0 0 800,000 0 0 Totals 0 200,000 800,000 0 0 Report Date: July 09, 2026 Page 18 •Tim of Ttanspartation Agency: Yakima County: Yakima MPOIRTPO: YVCOG Y Inside Six Year Transportation Improvement Program From 2027 to 2032 N Outside Functional Class 2- A. PINIProject No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project DoscrlpUon G. Structure ID �[ o. g S Z p Improvement Type o a lR 0 m s0 %S 05 YAK 112 Powerhouse Road and Englewood Avenue Intersection Improvements Powerhouse Road Englewood Avenue to Englewood Avenue Intersection Improvements, 07/07/26 07/07/26 R-2026.106 04 C G P S T W 0.030 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Coda State Funds Local Funds Total Funds P ALt. 2031 0 0 1,325,700 1,325,700 Totals 0 0 1,325,700 1,325,700 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 0 0 0 0 1,325,700 Totals 0 0 0 0 1,325,700 Report Date: July 09, 2026 Page 19 I► Agency: Yakima County: Yakima MPOIRTPO: YVCOG Of a`it tt:pot•tattat Y Inside Six Year Transportation Improvement Program From 2027 to 2032 N Outside Priority Nurnber, Adopted Amendment A$ Improvement Type Environmental Type RW Required A. PIN/Project No. B. STIP ID & a C. Project Title ra D. Road Name or Number m 0 o E, Begin 6 End Termini F. Project Description G. Structure ID in P 07 WA-15118 07/07/26 07/07/26 R-2026-106 28 P T 0.300 CE No Prasch Avenue Sidewalk Improvements Prasch Avenue S 20th Avenue 10 S 161h Avenue Construct sidewalks against existing curbing on Prasch Avenue from S. 161h Avenue to S. 20th Avenue, end along S 16th Ave from Prasch Avenue to Nob Hill Blvd. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2028 0 OTHER 25,000 0 25,000 P CN 2029 0 OTHER 185,000 0 185,000 Totals 0 210,000 0 210,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 25.000 0 0 0 CN 0 0 185,000 0 0 Totals 0 25,000 185,000 0 0 Report Date: July 09, 2026 Page 20 State ' VW TM tom, Agency: Yakima County: Yakima MPOIRTPO: YVCOG Y Inside Six Year Transportation Improvement Program From 2027 to 2032 N Outside r Priority Number A. PIN/Project No. B. STIP ID z i Improvement Type Utility Codes Total Length Environmental Type RW Required C C. Project Title D. Road Name or Number x is$ D o ill $ E. Begin 8 End Termini F. Project Description G. Structure ID m Z P 03 YAK118 07107/26 07/07/26 R-2026.106 06 C G P S T w 0.540 CE No S. 1st St. Pavement Rehabilitation S. 1st Street W. Walnut Street to Pacific Ave The proposed Improvements consist of milling and overlaying the existing asphalt, crack sealing, new pavement markings, and replacement of sidewalks, curb end gutter and curb ramps, and Illumination. Improvements include spot pavement repair areas where pavement has failed in isolated locations. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2027 NHPP 6,497,700 0 1,900,000 8,397,700 Totals 6,497,700 0 1,900,000 8,397,700 Expenditure Schedule Phase let 2nd 3rd 4th 5th 8 6th CN 8,397,700 0 0 0 0 Totals 8,397,700 0 0 0 0 Report Date: July 09, 2026 Page 21 •TWatsitbsgtOtt State i DePitrtmallt ThinsPcwtation Agency: Yakima County: Yakima MPO/RTPO: YVCOG Y Inside Six Year Transportation Improvement Program From 2027 to 2032 N Outside -n c t3 o C m 1 = A. PINIProJed No, B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Protect Description G. Structure ID a �. co $ Amendment c o Improvement Type Utility Codes', o Si g RW Required 04 YAK 108 S. 1st Street and E. Washington Avenue Intersection Improvements 1st Street Washington Avenue to Washington Avenue Realign Intersection, widen E. Washington Ave. for additional lane, replace curb, gutter, sidewalk, and construct new signal. 07/07/26 07/07/26 R-2026.106 03 C G P S T W 0.030 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P ALL 2031 0 0 2,897,500 2,697,500 Totals 0 0 2,597,500 2,597,500 Expenditure Schedule Phase 1st 2nd 3rd 41h 5th & 6th ALL 0 0 0 0 2,897,500 Totals 0 0 0 0 2,897,500 Report Date: July 09, 2026 Page 22 Departmert at 'Yansonrtattort Agency: Yakima County: Yakima MPOIRTPO: YVCOG Y Inside Six Year Transportation Improvement Program From 2027 to 2032 N Outside is o Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID = o m n w 72 o a o c tmprovement Type g 4 0ix Environmental Type f 04 YAK104 Tieton Drive Resuladng Tieton Drive S. 48th Ave. to S. 72nd Ave. Grind and overlay, and ADA curb ramp replacement. 07/07/26 07/07/26 R-2026-106 05 C G O P S TW 1.530 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2027 0 OTHER 97,000 24.260 121,260 P CN 2028 0 OTHER 1,108,800 277,200 1,386,000 Totals 0 1,205,800 301,460 1,507,260 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 121,260 0 0 0 0 CN 0 1,386,000 0 0 0 Totals 121,260 1,386,000 0 0 0 Report Date: July 09, 2026 Page 23 Washington State '►J/DeParimentot Waneportstio s Agency: Yakima County: Yakima MPOIRTPO: WCOG Y Inside Six Year Transportation Improvement Program From 2027 to 2032 N Outside Priority Number A. PIN/Project No. B. STIP ID C. Project Title m o a Improvement Type a Total Length Environmental Type F D. Road Name or Number m 3 g c E. Begin & End Termini S z ii g, a F. Project Description G. Structure ID m aa o $ 14 YAK14 07/07/26 07/07/26 R-2026-106 21 C O P S T CE Yes W Washington Avenue & Longliber Road Intersection Improvements Washington Avenue Washington Avenue to Longtiiber Road Improve the Washington AvenuelLongfiber Road intersection by construction of channelization, a signal, or a roundabout. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2027 0 0 269,000 269,000 P RW 2027 0 0 125,000 125,000 P CN 2028 0 0 2,062,500 2,062,500 Totals 0 0 2,458,500 2,458,500 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 169,000 0 0 0 0 RW 125,000 0 0 0 0 CN 0 2,062,500 0 0 0 Totals 294,000 2,062,500 0 0 0 Report Date: July 09, 2026 Page 24 State Department et 1 , Agency: Yakima County: Yakima INPO/RTPO: YVCOG Y Inside Six Year Transportation Improvement Program From 2027 to 2032 N Outside ii A. PIN/Protect No. 8. STIP ID C. Protect Title m N g Improvement Type Utility Codes m a zi n a Z c D. Road Name or Number = A c c g E. Begin & End Tomlin) i — _ F. Protect Description G. Structure ID a » p g n 06 WA-16436 07/07/26 07/0726 R-2026-106 28 C O P T W 0.550 Yes Wendy Baker Shared•Use Path Powerhouse Road Pecks Canyon Rd to Cowiche Canyon Rd Construct shared -use path, high visibility crosswalk, bicycle Intersection crossing maddngs, RRFBs, and bicyde wayfinding signing along Powerhouse Road. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code Slate Funds Local Funds Total Funds P CN 2027 0 Ped/Bike Program 932,800 0 932,800 Totals 0 932,800 0 932,800 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 932,800 0 0 0 0 Totals 932,800 0 0 0 0 Report Date: July 09, 2026 Page 25 •TiWashington Departmentof� Agency: Yakima County: Yakima MPOIRTPO: YVCOG Y Inside Six Year Transportation Improvement Program From 2027 to 2032 N Outside 1 Z A. PINIProJect No. B. STIP ID C. Project Tttle D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID a y $ n a �. A Q _ o ' If Improvement Type 0 $ o E Environmental Type RW Required 03 YAK117 Yakima Ave S. Overlay Yakima Avenue S. 6,h Street to Yakima River Bridge The proposed improvements consist of milling and overlaying the existing asphalt, crack sealing, new pavement markings, and replacement of non-ADA compliant curb ramps. Improvements include spot pavement repair areas where pavement has failed in isolated locations. 07/07/26 07/07/26 R•2026-106 05 G P S W 1.000 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2027 NHPP 2,273,000 0 750,000 3,023,000 Totals 2,273,000 0 750,000 3,023,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 8th CN 2,273,000 0 0 0 0 Totals 2,273,000 0 0 0 0 Report Date: July 09, 2026 Page 26 var Deportment at ttPwiaportatton Agency: Yakima County: Yakima MPOIRTPO: YVCOG Y Inside Six Year Transportation Improvement Program From 2027 to 2032 N Outside Functional Class o c A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID a a m D $ a, P.a 'ON uopfIOSON Improvement Type - n Total Length Environmental Type 77 05 YAK116 Zier Road Sidewalk Improvements Zler Road 75th Avenue to West Valley High School Add sidewalk. 07/0726 07/0726 R-2028.106 28 1.130 CE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2028 0 OTHER 196,600 0 196,600 P RW 2029 0 OTHER 150,000 0 150,000 P CN 2030 0 OTHER 1,130,400 0 1,130,400 Totals 0 1,477,000 0 1,477,000 Expenditure Schedule Phase 151 2nd 3rd 4th 5th & 6th PE 0 196,600 0 0 0 RW 0 0 120,000 0 0 CN 0 0 0 1,130.400 0 Totals 0 196,600 120,000 1,130,400 0 Federal Funds Slate Funds Local Funds Total Funds Grand Totals for Yakima 17,119,745 27,857,892 38,077,789 83,055,426 Report Date: July 09, 2026 Page 27 ITEM TITLE: BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No. 8.A. For Meeting of: July 7, 2026 Public hearing to consider: A) Resolution adopting the Six -Year Transportation Improvement Program for the period of 2027 through 2032, and to amend the 2040 Transportation System Plan; and B) Resolution amending the Yakima Comprehensive Plan Capital Facilities Element (No budgetary impact) SUBMITTED BY: Robert Washabaugh, City Engineer SUMMARY EXPLANATION: A) Each year the City of Yakima (City) is required by state statute to update its Six -year Transportation Improvement Program (TIP) for submittal to the Washington State Department of Transportation. This plan must include all transportation projects for which state gas tax revenue or federal revenue will be used. Attached is the complete 2027 - 2032 Six -Year TIP, which describes all projects currently on the list. The City will continue to seek funding for projects that do not currently have secured funding. City Council and the public are welcome to add other arterial system projects to the TIP. The Six -Year TIP project listing will be finalized at this hearing and sent to the Yakima Valley Conference of Governments (YVCOG) after approval. In order to utilize federal funds, such as those administered by the Federal Highway Administration (FHWA) and the Federal Transit Authority (FTA), projects must be included in the Statewide Transportation Improvement Program (STIP). The STIP is a program of transportation projects, compiled from local and regional plans, along with the Washington Transportation System Plan (WTP), which provides a backbone for developing projects for the inter -modal transportation network in the State of Washington. The STIP contains federally funded projects plus state and local projects that are regionally significant. These projects have been identified through the planning process as the highest priority for the available funding to the state's Transportation Program. Planning activities of state and local governments are essential parts of integrated regional planning processes. Long range transportation planning is a part of the comprehensive land use planning carried out by local governments. Public participation is an integral part of the planning process at all levels. Local agencies are required to develop and adopt a Six -year Transportation Program; holding at least one public hearing during its development. B) The City is required to amend the Yakima Comprehensive Plan Capital Facilities Element by incorporating the adopted Six -Year TIP for 2027 to 2032. This will ensure that we are in compliance with the Growth Management Act and that we are consistent with the Comprehensive Plan as required. The amendment is limited to incorporating only those projects that are adopted in the Six -Year TIP and is not subject to the once a year change required under the laws of the Growth Management Act. 106 The Public Hearing notice has been provided to all Yakima -area media outlets. ITEM BUDGETED: N/A STRATEGIC PRIORITY 24-25: A Resilient Yakima RECOMMENDATION: Adopt both Resolutions. ATTACHMENTS: Resolution A - adopt 6 year TIP 2027-2032 Resolution B - amend Comp Plan_ TIP 2027-2032 27-32 STIP Draft 6-18-26 WM.pdf 107