HomeMy WebLinkAbout07/07/2026 08.A. Resolution 6-year TIP_adopt 2027-2032_Transp system plan 2040_A ; 6-year TIP 2027-2032_amend Comp plan capital facilities plan_B 'V i'ii (7--- / l i t,'^gin.;k NT1V 1a c= BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No. 8.A. For Meeting of: July 7, 2026 ITEM TITLE: Public hearing to consider: A) Resolution adopting the Six-Year Transportation Improvement Program for the period of 2027 through 2032, and to amend the 2040 Transportation System Plan; and B) Resolution amending the Yakima Comprehensive Plan Capital Facilities Element (No budgetary impact) SUBMITTED BY: Robert Washabaugh, City Engineer SUMMARY EXPLANATION: A) Each year the City of Yakima (City) is required by state statute to update its Six-year Transportation Improvement Program (TIP)for submittal to the Washington State Department of Transportation. This plan must include all transportation projects for which state gas tax revenue or federal revenue will be used. Attached is the complete 2027 - 2032 Six-Year TIP, which describes all projects currently on the list. The City will continue to seek funding for projects that do not currently have secured funding. City Council and the public are welcome to add other arterial system projects to the TIP. The Six-Year TIP project listing will be finalized at this hearing and sent to the Yakima Valley Conference of Governments (YVCOG) after approval. In order to utilize federal funds, such as those administered by the Federal Highway Administration (FHWA) and the Federal Transit Authority (FTA), projects must be included in the Statewide Transportation Improvement Program (STIP). The STIP is a program of transportation projects, compiled from local and regional plans, along with the Washington Transportation System Plan (WTP), which provides a backbone for developing projects for the inter-modal transportation network in the State of Washington. The STIP contains federally funded projects plus state and local projects that are regionally significant. These projects have been identified through the planning process as the highest priority for the available funding to the state's Transportation Program. Planning activities of state and local governments are essential parts of integrated regional planning processes. Long range transportation planning is a part of the comprehensive land use planning carried out by local governments. Public participation is an integral part of the planning process at all levels. Local agencies are required to develop and adopt a Six-year Transportation Program; holding at least one public hearing during its development. B) The City is required to amend the Yakima Comprehensive Plan Capital Facilities Element by incorporating the adopted Six-Year TIP for 2027 to 2032. This will ensure that we are in compliance with the Growth Management Act and that we are consistent with the Comprehensive Plan as required. The amendment is limited to incorporating only those projects that are adopted in the Six-Year TIP and is not subject to the once a year change required under the laws of the Growth Management Act. 106 The Public Hearing notice has been provided to all Yakima-area media outlets. ITEM BUDGETED: N/A STRATEGIC PRIORITY 24-25: A Resilient Yakima RECOMMENDATION: Adopt both Resolutions. ATTACHMENTS: Resolution A- adopt 6 year TIP 2027-2032 Resolution B - amend Comp Plan_TIP 2027-2032 27-32 STIP Draft 6-18-26 WM.pdf 107 RESOLUTION NO. R-2026- A RESOLUTION adopting the Six-Year Transportation Improvement Program (TIP) for the period of 2027 through 2032 for transportation improvements to arterial streets in the City of Yakima and amending the 2040 Transportation System Plan. WHEREAS, the City of Yakima annually prepares, reviews and adopts a six-year program for transportation improvements to arterial streets in the City of Yakima for the ensuing six-year period, all as contemplated and required by the State RCW 35.77.010 and applicable federal law; and WHEREAS, the City of Yakima desires to amend the 2040 Transportation System Plan to ensure compliance with the Growth Management Act and the regional transportation plan for the construction of arterial streets in the City of Yakima, all as contemplated and required by State and Federal Law; and, WHEREAS, after a public hearing on the matter, held at the regular meeting of the Yakima City Council on July 7, 2026, with proper public notice as required by RCW 35.77.010, the City Council finds that the plan attached hereto should be adopted as the Six-Year Transportation Improvement Program for the period of 2027 through 2032 for transportation improvements to arterial streets in the City of Yakima; and, WHEREAS, adopting the Six-year Transportation Improvement Program and amending the 2040 Transportation System Plan are in the best interest of the City and its residents; now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The Six-Year Construction Program for the period of 2027 through 2032, a copy of which is attached hereto and by this reference made a part thereof, is hereby adopted as the official Six-Year Transportation Improvement Program for the City of Yakima, including proposed amendments to the 2040 Transportation System Plan along with Street Improvements, which are also approved. ADOPTED BY THE CITY COUNCIL this 7th day of July, 2026. ATTEST: Matt Brown, Mayor Rosalinda Ibarra, City Clerk 108 RESOLUTION NO. R-2026- A RESOLUTION to amend the Yakima Comprehensive Plan Capital Facilities Element to incorporate the Six-year Transportation Improvement Program (TIP) for the period of 2027 through 2032. WHEREAS, the City of Yakima annually prepares, reviews and adopts a six-year Transportation Improvement Program for transportation improvements to arterial streets in the City of Yakima for the ensuing six-year period, all as contemplated and required by the State RCW 35.77.010 and applicable Federal law; and WHEREAS, the City of Yakima desires to amend the Yakima Comprehensive Plan Capital Facilities Element to reflect the adoption of the Six-year TIP, as contemplated and required by RCW 36.70A.070(6) to ensure compliance with the Growth Management Act and consistency of the Comprehensive Plan and the Six-year TIP; and, WHEREAS, this amendment is limited to incorporation of the projects listed in the Six- Year Transportation Improvement Plan for the period of 2027 to 2032 to the Capital Facilities Element of the Yakima Comprehensive Plan, which is required under RCW 36.70A.130(2B) and RCW 35.77.010; and, WHEREAS, a public hearing was held by the Yakima City Council on the Six-year TIP on July 7, 2026, with the proper public notice as required by RCW 35.77.010; and WHEREAS, the City Council of the City of Yakima, after reviewing the information and holding the public hearing, finds that amending the Yakima Comprehensive Plan Capital Facilities Element is in the best interest of the City and its residents; now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The adopted Six-year Transportation Improvement Program for the period of 2027 through 2032 for the City of Yakima shall be incorporated as an amendment to the Capital Facilities Element of the Yakima Comprehensive Plan. ADOPTED BY THE CITY COUNCIL this 7th day of July, 2026. ATTEST: Matt Brown, Mayor Rosalinda Ibarra, City Clerk 109 State A Six Year Transportation Improvement Program Departmtent of Transportation From 2027 to 2032 Agency: Yakima 1c)41C County: Yakima MPO/RTPO: YVCOG Y Inside N Outside _ m v c ta < c � ' 73 A.PIN/Project No. B.STIP ID 3 o 3 c o m a z C.Project Title D m E m z' °' F. x n 0 a D.Road Name or Number a c Q. o' ' n m °' 2 �, . E.Begin&End Termini Z ,< o. co ,< H E - F.Project Description G.Structure ID 2 Q. o m CD m Q. 03 WA-17221 21 0.100 CE Yes 16th Avenue and Mead Avenue Signal and Crossing Improvements S. 16th Avenue to The project will incorporate the installation of a fully signaled traffic intersection, pedestrian signals,illumination, high visibility crosswalks,ADA compliant curb ramps,and a dedicated turn lane to properly queue vehicles on Mead Ave Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2027 STBG 264,800 0 66,200 331,000 P RW 2027 STBG 80,000 0 20,000 100,000 P CN 2028 STBG 1,486,480 0 371,620 1,858,100 Totals 1,831,280 0 457,820 2,289,100 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 331,000 0 0 0 0 RW 100,000 0 0 0 0 CN 0 1,858,100 0 0 0 Totals 431,000 1,858,100 0 0 0 Report Date: June 18, 2026 Page 1 110 i Washington State Six Year Transportation Improvement Program Department of Transportation p p g From 2027 to 2032 Agency: Yakima 1c)41C County: Yakima MPO/RTPO: YVCOG Y Inside N Outside _ m v c t < c � ' 73 A.PIN/Project No. B.STIP ID 3 o 3 c o m c z C.Project Title D m E co z' °' P. x n 0 c D.Road Name or Number C cr. Q. 0' ' n m °' c �, . E.Begin&End Termini Z ,< Q. co ,< H E - F.Project Description G.Structure ID 2 Q. o m CD m Q. 14 YAK84 06/17/25 06/17/25 R-2025-103 04 C G O P S 0.400 CE Yes TW 16th Avenue and Tieton Drive Intersection Improvements 16th Avenue 16th Avenue to Tieton Drive Reconstruct and widen 16th Avenue and Tieton Drive by adding left-turn lanes for all movements at the intersection. Upgrade the traffic signal. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2031 0 OTHER 358,512 53,592 412,104 P RW 2031 0 OTHER 1,498,607 233,893 1,732,500 P CN 2032 0 OTHER 1,640,683 252,483 1,893,166 Totals 0 3,497,802 539,968 4,037,770 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 0 0 0 0 412,104 RW 0 0 0 0 1,732,500 CN 0 0 0 0 1,893,166 Totals 0 0 0 0 4,037,770 Report Date: June 18, 2026 Page 2 111 i Washington State Six Year Transportation Improvement Program Department of Transportation From 2027 to 2032 Agency: Yakima 1c)41C County: Yakima MPO/RTPO: YVCOG Y Inside N Outside _ m v c o < c � ' 73 A.PIN/Project No. B.STIP ID 3 o 3 c o m c z C.Project Title D m E co z' °' C n 0 c D.Road Name or Number a c Q. 0' ' c) m °' c �, . E.Begin&End Termini Z a ,< Ho E F.Project Description G.Structure ID Q. P m H 3 m Q. 14 YAK57 06/17/25 06/17/25 R-2025-103 11 CPT 0.010 CE Yes 18th Street Underpass Yakima Avenue Yakima Avenue to 18th Street Replace the bridge on E.Yakima Avenue that crosses over 18th Street. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2027 BR 1,145,250 0 178,739 1,323,989 P RW 2028 BR 86,500 0 13,500 100,000 P CN 2029 BR 5,286,015 0 824,985 6,111,000 Totals 6,517,765 0 1,017,224 7,534,989 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 834,113 489,876 0 0 0 RW 0 100,000 0 0 0 CN 0 0 6,111,000 0 0 Totals 834,113 589,876 6,111,000 0 0 Report Date: June 18, 2026 Page 3 112 WAir Six Year Transportation Improvement Program [i p rtmt nt of Tra�rSportatio. From 2027 to 2032 Agency: Yakima IOIC County: Yakima MPO/RTPO: YVCOG Y Inside N Outside _ m v c 0) < C -I ' 73 A.PIN/Project No. B.STIP ID 3 0 3 c o m c z C.Project Title D m E co �' °' x n 0 c D.Road Name or Number C c Q. 0' ' c) m °' c • �, . E.Begin&End Termini Z a ,< H E F.Project Description G.Structure ID Q. o m CD 3 m Q. 04 YAK 111 06/17/25 06/17/25 R-2025-103 04 C G P S T 1.500 CE No W 6th Avenue Roadway Improvements 6th Avenue Walnut Street to River Road Reconstruct roadway including trolley provisions. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2027 0 0 250,000 250,000 S RW 2027 0 0 100,000 100,000 S CN 2027 0 0 17,000,000 17,000,000 Totals 0 0 17,350,000 17,350,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 250,000 0 0 0 0 RW 100,000 0 0 0 0 CN 17,000,000 0 0 0 0 Totals 17,350,000 0 0 0 0 Report Date: June 18, 2026 Page 4 113 i Washington State Six Year Transportation Improvement Program Department of Transportation p p g From 2027 to 2032 Agency: Yakima IOIC County: Yakima MPO/RTPO: YVCOG Y Inside N Outside _ m v c XI 2 < c � ' 73 A.PIN/Project No. B.STIP ID 3 o 3 c o m c z C.Project Title D m E co z' °' P. x n 0 c D.Road Name or Number C cr. Q. o' ' n m °' c �, . E.Begin&End Termini Z ,< Q. co ,< H E - F.Project Description G.Structure ID 2 Q. o m CD m Q. 06 WA-16437 06/17/25 06/17/25 R-2025-103 28 C O P T 0.240 No 72nd Ave&Washington Ave Active Transportation Components 72nd Avenue Washington Avenue to Coolidge Road Construct approximately 1250 LF of sidewalk from Washington Ave to Coolidge Rd to fill in a gap to provide access to residential neighborhoods. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2027 0 MAW 65,000 0 65,000 S CN 2027 0 MAW 435,000 0 435,000 Totals 0 500,000 0 500,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 65,000 0 0 0 0 CN 435,000 0 0 0 0 Totals 500,000 0 0 0 0 Report Date: June 18, 2026 Page 5 114 WsZ State A Six Year Transportation Improvement Program ir Departmtent of Transportation From 2027 to 2032 Agency: Yakima 1c)41C County: Yakima MPO/RTPO: YVCOG Y Inside N Outside _ m v c Of < C -I ' 73 A.PIN/Project No. B.STIP ID 3 0 3 c o m a z C.Project Title D m E m z' °' x n 0 a D.Road Name or Number a c Q. 0' ' c) m °' c �, . E.Begin&End Termini Z ,< o. co ,< H E F.Project Description G.Structure ID 2 a o m CD m Q. 04 YAK11 06/17/25 06/17/25 R-2025-103 01 O P S T W 0.280 EA No Bravo Company Boulevard, Phase 1 Bravo Company Blvd Railroad Tracks to'D'Street Construct four-lane roadway section with median,bike lanes and roundabouts,install curb,gutter,sidewalk,street lighting and storm drainage system,along with water and sewer systems. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P CN 2027 0 0 6,000,000 6,000,000 Totals 0 0 6,000,000 6,000,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th CN 2,000,000 4,000,000 0 0 0 Totals 2,000,000 4,000,000 0 0 0 Report Date: June 18, 2026 Page 6 115 WsZ State A Six Year Transportation Improvement Program ir Departmtent of Transportation From 2027 to 2032 Agency: Yakima 1c)41C County: Yakima MPO/RTPO: YVCOG Y Inside N Outside _ m v c ta < c � ' 73 A.PIN/Project No. B.STIP ID 3 o 3 c o m a z C.Project Title D m E m z' °' X n 0 a D.Road Name or Number a c Q. 0' ' c) m °' c �, . E.Begin&End Termini Z ,< o. co ,< H E F.Project Description G.Structure ID 2 Q. o m CD m Q. 04 WA-13520 06/17/25 06/17/25 R-2025-103 01 S W 0.280 EA No Bravo Company Boulevard, Phase 2 Bravo Company Boulevard "H"Street to Railroad Tracks Construct four-lane roadway section with median,bike lanes and roundabouts,install curb,gutter,sidewalk,street lighting and storm drainage system,along with water and sewer systems. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P CN 2029 0 OTHER 6,500,000 0 6,500,000 Totals 0 6,500,000 0 6,500,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th CN 0 0 6,500,000 0 0 Totals 0 0 6,500,000 0 0 Report Date: June 18, 2026 Page 7 116 i Washington State Six Year Transportation Improvement Program Department of Transportation From 2027 to 2032 Agency: Yakima IOIC County: Yakima MPO/RTPO: YVCOG Y Inside N Outside _ m v c Of < C -I ' 73 A.PIN/Project No. B.STIP ID 3 0 3 c o m c z C.Project Title D m E co �' °' x n 0 c D.Road Name or Number C c Q. 0' ' c) m °' c �, . E.Begin&End Termini Z a ,< H LW F.Project Description G.Structure ID Q. o m CD 3 m Q. 07 WA-13522 06/17/25 06/17/25 R-2025-103 28 C G P S T 0.530 CE No W Browne Avenue Sidewalk Browne Avenue 7th Avenue to 16th Avenue Replace damaged sidewalk panels. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2030 0 0 108,000 108,000 P CN 2031 0 0 828,000 828,000 Totals 0 0 936,000 936,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 0 0 0 108,000 0 CN 0 0 0 0 828,000 Totals 0 0 0 108,000 828,000 Report Date: June 18, 2026 Page 8 117 WAir Six Year Transportation Improvement Program [i p rtmt nt of Tra�rSportatio. From 2027 to 2032 Agency: Yakima 1c)41C County: Yakima MPO/RTPO: YVCOG Y Inside N Outside _ m v c ta < c � ' 73 A.PIN/Project No. B.STIP ID 3 o 3 c o m a z C.Project Title D m E co z' °' C n 0 c D.Road Name or Number = c . 0 ' c) °' �, . E.Begin&End Termini Z a ,< H E F.Project Description G.Structure ID Q. o m H 3 m Q. 05 WA-14955 06/17/25 06/17/25 R-2025-103 04 0.750 CE Yes Coolidge Road from 72nd Ave to 84th Ave-Roadway Improvements Coolidge Road 72nd Avenue to 84th Avenue Rehabilitate existing pavement and update roadway to current city standards. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2029 0 0 200,000 200,000 P RW 2030 0 0 200,000 200,000 P CN 2031 0 0 1,100,000 1,100,000 Totals 0 0 1,500,000 1,500,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 0 0 200,000 0 0 RW 0 0 0 200,000 0 CN 0 0 0 0 1,100,000 Totals 0 0 200,000 200,000 1,100,000 Report Date: June 18, 2026 Page 9 118 ...m Washington State A Six Year Transportation Improvement Program Department of Transportation From 2027 to 2032 Agency: Yakima 1c)41C County: Yakima MPO/RTPO: YVCOG Y Inside N Outside _ m v c 0) < c -I ' 73 A.PIN/Project No. B.STIP ID 3 o 3 c o m c z C.Project Title D m E co z' °' x n 0 c D.Road Name or Number C c Q. o' ' n m °' c �, . E.Begin&End Termini Z '< Q. co ,< H E - F.Project Description G.Structure ID 2 Q. o m CD m Q. 16 YAK10 06/17/25 06/17/25 R-2025-103 01 O P S T W 0.550 EA Yes E."H"Street Extension, Phase 1 E."H"Street 1st Street to 7th Street Construct new roadway inlcuding water,sewer,curb,gutter,sidewalk,street lighting and storm drainage system. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2028 0 OTHER 566,500 0 566,500 P RW 2028 0 OTHER 150,000 0 150,000 P CN 2029 0 OTHER 6,758,400 0 6,758,400 Totals 0 7,474,900 0 7,474,900 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 0 566,500 0 0 0 RW 0 150,000 0 0 0 CN 0 0 6,758,400 0 0 Totals 0 716,500 6,758,400 0 0 Report Date: June 18, 2026 Page 10 119 i Washington State Six Year Transportation Improvement Program Department of Transportation From 2027 to 2032 Agency: Yakima IOIC County: Yakima MPO/RTPO: YVCOG Y Inside N Outside _ m v c Of < C -I ' 73 A.PIN/Project No. B.STIP ID 3 0 3 c o m c z C.Project Title D m E co z' °' x n 0 c D.Road Name or Number a c Q. 0' ' c) m °' c �, . E.Begin&End Termini Z a ,< H E F.Project Description G.Structure ID Q. o m CD 3 m Q. 04 YAK 109 06/17/25 06/17/25 R-2025-103 28 C G P S T 0.500 CE Yes W Fair Avenue Sidewalk Fair Avenue Pacific Avenue to Nob Hill Boulevard Construct sidewalk on west side of roadway. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2027 0 TIB 138,320 34,580 172,900 S RW 2027 0 0 100,000 100,000 S CN 2027 0 TIB 1,061,680 265,420 1,327,100 Totals 0 1,200,000 400,000 1,600,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 172,900 0 0 0 0 RW 100,000 0 0 0 0 CN 1,259,000 0 0 0 0 Totals 1,531,900 0 0 0 0 Report Date: June 18, 2026 Page 11 120 State A Six Year Transportation Improvement Program Departmtent of Transportation From 2027 to 2032 Agency: Yakima IOIC County: Yakima MPO/RTPO: YVCOG Y Inside N Outside _ m v c ta < c � ' 73 A.PIN/Project No. B.STIP ID 3 o 3 c o m a z C.Project Title D m E co z' °' C n 0 c D.Road Name or Number C cr. Q. 0' ' c) m °' c �, . E.Begin&End Termini Z a ,< H E F.Project Description G.Structure ID Q. _ o m CD 3 m Q. 04 YAK 113 06/17/25 06/17/25 R-2025-103 28 C G P S T 0.010 CE No W Mead Avenue Pedestrian Signal Mead Avenue 10th Avenue to 12th Avenue Install school zone flashers and pedestrian signal RRFBs. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2028 0 OTHER 50,000 0 50,000 P CN 2029 0 OTHER 346,750 0 346,750 Totals 0 396,750 0 396,750 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 0 50,000 0 0 0 ALL 0 0 346,750 0 0 Totals 0 50,000 346,750 0 0 Report Date: June 18, 2026 Page 12 121 WAir Six Year Transportation Improvement Program [i p rtmt nt of Tra�rSportatio. From 2027 to 2032 Agency: Yakima IOIC County: Yakima MPO/RTPO: YVCOG Y Inside N Outside _ m v c ta < c � ' 73 A.PIN/Project No. B.STIP ID 3 o 3 c o m a z C.Project Title D m E co z' °' C n 0 c D.Road Name or Number C c o. 0' ' c) m °' c �, . E.Begin&End Termini Z a ,< H E F.Project Description G.Structure ID Q. P m H 3 m Q. 16 YAK102 06/17/25 06/17/25 R-2025-103 21 P T 0.030 CE No N 1st St& R St Signal N. 1st St. R Street to R Street Install traffic signal at the intersection. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2029 0 OTHER 66,990 10,395 77,385 P CN 2030 0 OTHER 401,709 62,722 464,431 Totals 0 468,699 73,117 541,816 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 0 0 77,385 0 0 CN 0 0 0 464,431 0 Totals 0 0 77,385 464,431 0 Report Date: June 18, 2026 Page 13 122 WsZ Washington State A Six Year Transportation Improvement Program ir Department of Transportation From 2027 to 2032 Agency: Yakima 1c)41C County: Yakima MPO/RTPO: YVCOG Y Inside N Outside _ m v c ta < c � ' 73 A.PIN/Project No. B.STIP ID 3 o 3 c o m a z C.Project Title D m E m z' °' x n 0 c D.Road Name or Number C c Q. o' ' n m °' 2 �, . E.Begin&End Termini Z a ,< Ho E F.Project Description G.Structure ID Q. P m H 3 m Q. 00 /1485(030) WA-15913 06/17/25 06/17/25 R-2025-103 47 0.060 CE No Naches River Bridge Repair Naches River to Naches River The project will complete repairs to the Yakima Valley Trolley Bridge over the 08593100 Naches River. Repairs include removing and replacing decayed timber elements, regrading and compacting approach fills, replacements of the timber sill footings and the timber backwall,and scour protection of a bridge pier. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2027 0 WSDOT 60,000 140,000 200,000 Totals 0 60,000 140,000 200,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th CN 473,000 0 0 0 0 Totals 473,000 0 0 0 0 Report Date: June 18, 2026 Page 14 123 i Washington State Six Year Transportation Improvement Program Department of Transportation From 2027 to 2032 Agency: Yakima IOIC County: Yakima MPO/RTPO: YVCOG Y Inside N Outside _ m v c Of < C -I ' 73 A.PIN/Project No. B.STIP ID 3 0 3 c o m c z C.Project Title D m E co z' °' x n 0 c D.Road Name or Number a c Q. 0' ' c) m °' c �, . E.Begin&End Termini Z a ,< H E F.Project Description G.Structure ID Q. o m CD 3 m Q. 04 YAK 110 06/17/25 06/17/25 R-2025-103 28 C G P S T 1.500 CE Yes W Nob Hill Boulevard Sidewalk Nob Hill Boulevard 12th Street to 14th Street Construct sidewalk on south side of roadway. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P ALL 2031 0 0 172,500 172,500 Totals 0 0 172,500 172,500 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th ALL 0 0 0 0 172,500 Totals 0 0 0 0 172,500 Report Date: June 18, 2026 Page 15 124 WsZ State A Six Year Transportation Improvement Program ir Departmtent of Transportation From 2027 to 2032 Agency: Yakima 1c)41C County: Yakima MPO/RTPO: YVCOG Y Inside N Outside _ m v c ta < c � ' 73 A.PIN/Project No. B.STIP ID 3 o 3 c o m a z C.Project Title D m E co z' °' x n 0 c D.Road Name or Number C cr. Q. o' ' n m °' 2 �, . E.Begin&End Termini Z a ,< Ho E F.Project Description G.Structure ID Q. o m H 3 m Q. 07 YAK103 06/17/25 06/17/25 R-2025-103 28 C O P T 0.500 CE No Nob Hill Elementary School Safety Improvements various streets various locations to various locations This project will make various pedestrian safety improvements in the vicinity of Nob Hill Elementary School,such as new sidewalk and constructing ADA ramps. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2029 0 SRTS 101,200 0 101,200 P CN 2030 0 SRTS 674,520 0 674,520 Totals 0 775,720 0 775,720 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 0 0 101,200 0 0 CN 0 0 0 674,520 0 Totals 0 0 101,200 674,520 0 Report Date: June 18, 2026 Page 16 125 State A Six Year Transportation Improvement Program Departmtent of Transportation From 2027 to 2032 Agency: Yakima 1c)41C County: Yakima MPO/RTPO: YVCOG Y Inside N Outside _ m v c CD < c -I ' 73 A.PIN/Project No. B.STIP ID 3 o 3 c o m c z C.Project Title D m E co z' °' x n 0 c D.Road Name or Number C c Q. o' ' n m °' 2 �, . E.Begin&End Termini Z a ,< H E F.Project Description G.Structure ID Q. o m CD 3 m Q. 03 WA-15881 06/17/25 06/17/25 R-2025-103 47 0.160 CE No Nob Hill RR#2 and 72nd Ave S#87 Bridges-Joint Replacement Nob Hill Boulevard,72nd Avenue Nob Hill Blvd to 72nd Avenue Replace expansion joints on the Nob Hill RR#2 bridge and expansion joints and 8548900,839000 girder grout channels on the 72nd Ave S#87 bridge. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2028 0 OTHER 189,390 0 189,390 P CN 2029 0 OTHER 1,172,552 0 1,172,552 Totals 0 1,361,942 0 1,361,942 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 0 189,390 0 0 0 CN 0 0 1,172,552 0 0 Totals 0 189,390 1,172,552 0 0 Report Date: June 18, 2026 Page 17 126 ...m Washington State A Six Year Transportation Improvement Program Department of Transportation From 2027 to 2032 Agency: Yakima IOIC County: Yakima MPO/RTPO: YVCOG Y Inside N Outside _ m v c ta < c � ' 73 A.PIN/Project No. B.STIP ID 3 o 3 c o m c z C.Project Title D m E co z' °' X n 0 c D.Road Name or Number C c Q. o' ' n m °' c �, . E.Begin&End Termini Z ,< Q. co ,< H E - F.Project Description G.Structure ID 2 Q. o m CD m Q. 07 WA-16439 06/17/25 06/17/25 R-2025-103 28 C G O P S 0.500 CE Yes TW North Yakima Active Transportation Improvements 3rd Street East"G"Street to MLK Jr Blvd Install new sidewalk,ADA compliant curb ramps,and remove and replace damaged and non-ADA compliant sidewalk and curb ramps,and add bike lanes on 3rd Street. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2027 0 CWA 95,000 0 95,000 P RW 2027 0 CWA 100,000 0 100,000 P CN 2028 0 CWA 661,479 0 661,479 Totals 0 856,479 0 856,479 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 50,000 0 0 0 0 RW 100,000 0 0 0 0 CN 0 661,000 0 0 0 Totals 150,000 661,000 0 0 0 Report Date: June 18, 2026 Page 18 127 WsZ Washington State A Six Year Transportation Improvement Program ir Department of Transportation From 2027 to 2032 Agency: Yakima 1c)41C County: Yakima MPO/RTPO: YVCOG Y Inside N Outside _ m v c ta < c � ' 73 A.PIN/Project No. B.STIP ID 3 o 3 c o m c z C.Project Title D m E co z' °' X n 0 c D.Road Name or Number C c Q. 0' ' c) m °' c �, . E.Begin&End Termini Z ,< Q. co ,< H E F.Project Description G.Structure ID 2 Q. o m CD m Q. 07 WA-16438 06/17/25 06/17/25 R-2025-103 28 C G O P S CE Yes TW Northeast Yakima Sidewalk Improvements "T"Street to Lincoln Avenue Install new sidewalk,ADA compliant curb ramps,and remove and replace damaged and non-ADA compliant sidewalk and curb ramps in the Barge-Lincoln Elementary School area of northeast Yakima. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2028 0 CWA 100,000 0 100,000 P RW 2028 0 CWA 100,000 0 100,000 P CN 2029 0 CWA 800,000 0 800,000 Totals 0 1,000,000 0 1,000,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 0 100,000 0 0 0 RW 0 100,000 0 0 0 CN 0 0 800,000 0 0 Totals 0 200,000 800,000 0 0 Report Date: June 18, 2026 Page 19 128 i Washington State Six Year Transportation Improvement Program Department of Transportation p p g From 2027 to 2032 Agency: Yakima IOIC County: Yakima MPO/RTPO: YVCOG Y Inside N Outside _ m v c Of < C -I ' 73 A.PIN/Project No. B.STIP ID 3 0 3 c o m c z C.Project Title D m E co z' °' x n 0 c D.Road Name or Number a c Q. 0' ' c) m °' c �, a E.Begin&End Termini Z a ,< q• H E F.Project Description G.Structure ID Q. o m CD 3 m Q. 05 YAK 112 06/17/25 06/17/25 R-2025-103 04 C G P S T 0.030 CE No W Powerhouse Road and Englewood Avenue Intersection Improvements Powerhouse Road Englewood Avenue to Englewood Avenue Intersection improvements. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P ALL 2031 0 0 1,325,700 1,325,700 Totals 0 0 1,325,700 1,325,700 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th ALL 0 0 0 0 1,325,700 Totals 0 0 0 0 1,325,700 Report Date: June 18, 2026 Page 20 129 i Washington State Six Year Transportation Improvement Program Department of Transportation From 2027 to 2032 Agency: Yakima 1c)41C County: Yakima MPO/RTPO: YVCOG Y Inside N Outside _ m v c XI 2 < c � c 73 A.PIN/Project No. B.STIP ID 3 o 3 c o m c z C.Project Title D m E co z' °' P. x n 0 c D.Road Name or Number C c Q. o' ' n m °' c �, . E.Begin&End Termini Z ,< Q. co ,< H E - F.Project Description G.Structure ID 2 Q. _ o m CD m Q. 07 WA-15118 06/17/25 06/17/25 R-2025-103 28 P T 0.300 CE No Prasch Avenue Sidewalk Improvements Prasch Avenue S 20th Avenue to S 16th Avenue Construct sidewalks against existing curbing on Prasch Avenue from S. 16th Avenue to S.20th Avenue,and along S 16th Ave from Prasch Avenue to Nob Hill Blvd. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2028 0 OTHER 25,000 0 25,000 P CN 2029 0 OTHER 185,000 0 185,000 Totals 0 210,000 0 210,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 0 25,000 0 0 0 CN 0 0 185,000 0 0 Totals 0 25,000 185,000 0 0 Report Date: June 18, 2026 Page 21 130 WsZ State A Six Year Transportation Improvement Program ir Departmtent of Transportation From 2027 to 2032 Agency: Yakima 1c)41C County: Yakima MPO/RTPO: YVCOG Y Inside N Outside _ m v c CD < c � ' 73 A.PIN/Project No. B.STIP ID 3 o 3 c o m a z C.Project Title D m E co z' °' x n 0 c D.Road Name or Number C c Q. 0' ' n m °' c �, . E.Begin&End Termini Z a ,< H E F.Project Description G.Structure ID Q. o m CD 3 m Q. 03 YAK118 02/03/26 02/03/26 R-2026-021 06 C G P S T 0.540 CE No W S. 1st St. Pavement Rehabilitation S. 1st Street W.Walnut Street to Pacific Ave The proposed improvements consist of milling and overlaying the existing asphalt, crack sealing,new pavement markings,and replacement of sidewalks,curb and gutter and curb ramps,and illumination. Improvements include spot pavement repair areas where pavement has failed in isolated locations. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2027 NHPP 6,497,700 0 1,900,000 8,397,700 Totals 6,497,700 0 1,900,000 8,397,700 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th CN 8,397,700 0 0 0 0 Totals 8,397,700 0 0 0 0 Report Date: June 18, 2026 Page 22 131 WAIF Six Year Transportation Improvement Program [i p rtmt nt of Tra�rSportatio. From 2027 to 2032 Agency: Yakima 1c)41C County: Yakima MPO/RTPO: YVCOG Y Inside N Outside _ m v c 0) < C -I ' 73 A.PIN/Project No. B.STIP ID I:, 0 3 c o m c z C.Project Title D m E m z' °' x n 0 c D.Road Name or Number a cr. Q. 0' ' c) m °' c �, . E.Begin&End Termini Z a ,< H E F.Project Description G.Structure ID a o m CD 3 m Q. 04 YAK 108 06/17/25 06/17/25 R-2025-103 03 C G P S T 0.030 CE No W S. 1st Street and E.Washington Avenue Intersection Improvements 1st Street Washington Avenue to Washington Avenue Realign intersection,widen E.Washington Ave.for additional lane,replace curb, gutter,sidewalk,and construct new signal. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P ALL 2031 0 0 2,897,500 2,897,500 Totals 0 0 2,897,500 2,897,500 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th ALL 0 0 0 0 2,897,500 Totals 0 0 0 0 2,897,500 Report Date: June 18, 2026 Page 23 132 i Washington State Six Year Transportation Improvement Program Department of Transportation p p g From 2027 to 2032 Agency: Yakima IOIC County: Yakima MPO/RTPO: YVCOG Y Inside N Outside _ m v c Of < C -I ' 73 A.PIN/Project No. B.STIP ID 3 0 3 c o m c z C.Project Title D m E co z' °' x n 0 c D.Road Name or Number a c Q. 0' ' c) m °' c �, . E.Begin&End Termini Z a ,< H E F.Project Description G.Structure ID Q. o m CD 3 m Q. 04 YAK104 06/17/25 06/17/25 R-2025-103 05 C G O P S 1.530 CE No TW Tieton Drive Resurfacing Tieton Drive S.48th Ave.to S.72nd Ave. Grind and overlay,and ADA curb ramp replacement. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2027 0 OTHER 97,000 24,260 121,260 P CN 2028 0 OTHER 1,108,800 277,200 1,386,000 Totals 0 1,205,800 301,460 1,507,260 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 121,260 0 0 0 0 CN 0 1,386,000 0 0 0 Totals 121,260 1,386,000 0 0 0 Report Date: June 18, 2026 Page 24 133 State A Six Year Transportation Improvement Program Departmtent of Transportation From 2027 to 2032 Agency: Yakima 1c)41C County: Yakima MPO/RTPO: YVCOG Y Inside N Outside _ m v c CD < c � c 73 A.PIN/Project No. B.STIP ID 3 o 3 c o m c z C.Project Title D m E co z' °' F. x n 0 c D.Road Name or Number C c Q. 0' ' n m °' c �, . E.Begin&End Termini Z ,< Q. co ,< H E - F.Project Description G.Structure ID 2 Q. o m CD m Q. 14 YAK14 06/17/25 06/17/25 R-2025-103 21 CO P S T CE Yes W Washington Avenue&Longfiber Road Intersection Improvements Washington Avenue Washington Avenue to Longfiber Road Improve the Washington Avenue/Longfiber Road intersection by construction of channelization,a signal,or a roundabout. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2027 0 0 269,000 269,000 P RW 2027 0 0 125,000 125,000 P CN 2028 0 0 2,062,500 2,062,500 Totals 0 0 2,456,500 2,456,500 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 169,000 0 0 0 0 RW 125,000 0 0 0 0 CN 0 2,062,500 0 0 0 Totals 294,000 2,062,500 0 0 0 Report Date: June 18, 2026 Page 25 134 i Washington State Six Year Transportation Improvement Program Department of Transportation p p g From 2027 to 2032 Agency: Yakima IOIC County: Yakima MPO/RTPO: YVCOG Y Inside N Outside _ m v c o < c � ' 73 A.PIN/Project No. B.STIP ID 3 o 3 c o m c z C.Project Title D m E co z' °' P. C n 0 c D.Road Name or Number a c Q. 0' ' c) m °' c �, . E.Begin&End Termini Z a ,< H E F.Project Description G.Structure ID Q. _ o m CD 3 m Q. 06 WA-16436 06/17/25 06/17/25 R-2025-103 28 C O P T W 0.550 Yes Wendy Baker Shared-Use Path Powerhouse Road Pecks Canyon Rd to Cowiche Canyon Rd Construct shared-use path, high visibility crosswalk, bicycle intersection crossing markings, RRFBs,and bicycle wayfinding signing along Powerhouse Road. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P CN 2027 0 Ped/Bike Program 932,800 0 932,800 Totals 0 932,800 0 932,800 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th CN 932,800 0 0 0 0 Totals 932,800 0 0 0 0 Report Date: June 18, 2026 Page 26 135 WsZ State A Six Year Transportation Improvement Program ir Departmtent of Transportation From 2027 to 2032 Agency: Yakima 1c)41C County: Yakima MPO/RTPO: YVCOG Y Inside N Outside _ m v c CD < c � ' 73 A.PIN/Project No. B.STIP ID 3 o 3 c o m a z C.Project Title D m E co z' °' X n 0 c D.Road Name or Number C c Q. 0' ' n m °' c �, . E.Begin&End Termini Z a ,< H E F.Project Description G.Structure ID Q. o m CD 3 m Q. 03 YAK117 02/03/26 02/03/26 R-2026-021 05 G P S W 1.000 CE No Yakima Ave S.Overlay Yakima Avenue S.6th Street to Yakima River Bridge The proposed improvements consist of milling and overlaying the existing asphalt, crack sealing,new pavement markings,and replacement of non-ADA compliant curb ramps. Improvements include spot pavement repair areas where pavement has failed in isolated locations. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2027 N H P P 2,273,000 0 750,000 3,023,000 Totals 2,273,000 0 750,000 3,023,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th CN 2,273,000 0 0 0 0 Totals 2,273,000 0 0 0 0 Report Date: June 18, 2026 Page 27 136 State A Six Year Transportation Improvement Program Departmtent of Transportation From 2027 to 2032 Agency: Yakima 1c)41C County: Yakima MPO/RTPO: YVCOG Y Inside N Outside _ m v c ta < c � ' 73 A.PIN/Project No. B.STIP ID 3 o 3 c o m c z C.Project Title D m E co z' °' X n 0 c D.Road Name or Number C c Q. 0' ' c) m °' c �, . E.Begin&End Termini Z a ,< H E F.Project Description G.Structure ID Q. _ o m CD 3 m Q. 05 YAK116 06/17/25 06/17/25 R-2025-103 28 1.130 CE Yes Zier Road Sidewalk Improvements Zier Road 75th Avenue to West Valley High School Add sidewalk. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2028 0 OTHER 196,600 0 196,600 P RW 2029 0 OTHER 150,000 0 150,000 P CN 2030 0 OTHER 1,130,400 0 1,130,400 Totals 0 1,477,000 0 1,477,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 0 196,600 0 0 0 RW 0 0 120,000 0 0 CN 0 0 0 1,130,400 0 Totals 0 196,600 120,000 1,130,400 0 Federal Funds State Funds Local Funds Total Funds Grand Totals for Yakima 17,119,745 27,917,892 38,217,789 83,255,426 Report Date: June 18, 2026 Page 28 137