BUSINESS OF THE CITY COUNCIL
YAKIMA, WASHINGTON
AGENDA STATEMENT
Item No. 8.A.
For Meeting of: July 7, 2026
ITEM TITLE: Public hearing to consider: A) Resolution adopting the Six-Year
Transportation Improvement Program for the period of 2027 through
2032, and to amend the 2040 Transportation System Plan; and B)
Resolution amending the Yakima Comprehensive Plan Capital
Facilities Element (No budgetary impact)
SUBMITTED BY: Robert Washabaugh, City Engineer
SUMMARY EXPLANATION:
A) Each year the City of Yakima (City) is required by state statute to update its Six-year Transportation
Improvement Program (TIP)for submittal to the Washington State Department of Transportation. This
plan must include all transportation projects for which state gas tax revenue or federal revenue will be
used.
Attached is the complete 2027 - 2032 Six-Year TIP, which describes all projects currently on the list. The
City will continue to seek funding for projects that do not currently have secured funding. City Council
and the public are welcome to add other arterial system projects to the TIP. The Six-Year TIP project
listing will be finalized at this hearing and sent to the Yakima Valley Conference of Governments
(YVCOG) after approval. In order to utilize federal funds, such as those administered by the Federal
Highway Administration (FHWA) and the Federal Transit Authority (FTA), projects must be included in
the Statewide Transportation Improvement Program (STIP). The STIP is a program of transportation
projects, compiled from local and regional plans, along with the Washington Transportation System Plan
(WTP), which provides a backbone for developing projects for the inter-modal transportation network in
the State of Washington.
The STIP contains federally funded projects plus state and local projects that are regionally significant.
These projects have been identified through the planning process as the highest priority for the available
funding to the state's Transportation Program. Planning activities of state and local governments are
essential parts of integrated regional planning processes. Long range transportation planning is a part of
the comprehensive land use planning carried out by local governments. Public participation is an integral
part of the planning process at all levels. Local agencies are required to develop and adopt a Six-year
Transportation Program; holding at least one public hearing during its development.
B) The City is required to amend the Yakima Comprehensive Plan Capital Facilities Element by
incorporating the adopted Six-Year TIP for 2027 to 2032. This will ensure that we are in compliance with
the Growth Management Act and that we are consistent with the Comprehensive Plan as required. The
amendment is limited to incorporating only those projects that are adopted in the Six-Year TIP and is not
subject to the once a year change required under the laws of the Growth Management Act.
106
The Public Hearing notice has been provided to all Yakima-area media outlets.
ITEM BUDGETED: N/A
STRATEGIC PRIORITY 24-25: A Resilient Yakima
RECOMMENDATION: Adopt both Resolutions.
ATTACHMENTS:
Resolution A- adopt 6 year TIP 2027-2032
Resolution B - amend Comp Plan_TIP 2027-2032
27-32 STIP Draft 6-18-26 WM.pdf
107
RESOLUTION NO. R-2026-
A RESOLUTION adopting the Six-Year Transportation Improvement Program (TIP) for the
period of 2027 through 2032 for transportation improvements to arterial
streets in the City of Yakima and amending the 2040 Transportation
System Plan.
WHEREAS, the City of Yakima annually prepares, reviews and adopts a six-year
program for transportation improvements to arterial streets in the City of Yakima for the ensuing
six-year period, all as contemplated and required by the State RCW 35.77.010 and applicable
federal law; and
WHEREAS, the City of Yakima desires to amend the 2040 Transportation System Plan
to ensure compliance with the Growth Management Act and the regional transportation plan for
the construction of arterial streets in the City of Yakima, all as contemplated and required by
State and Federal Law; and,
WHEREAS, after a public hearing on the matter, held at the regular meeting of the
Yakima City Council on July 7, 2026, with proper public notice as required by RCW 35.77.010,
the City Council finds that the plan attached hereto should be adopted as the Six-Year
Transportation Improvement Program for the period of 2027 through 2032 for transportation
improvements to arterial streets in the City of Yakima; and,
WHEREAS, adopting the Six-year Transportation Improvement Program and amending
the 2040 Transportation System Plan are in the best interest of the City and its residents; now,
therefore,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA:
The Six-Year Construction Program for the period of 2027 through 2032, a copy of which
is attached hereto and by this reference made a part thereof, is hereby adopted as the official
Six-Year Transportation Improvement Program for the City of Yakima, including proposed
amendments to the 2040 Transportation System Plan along with Street Improvements, which
are also approved.
ADOPTED BY THE CITY COUNCIL this 7th day of July, 2026.
ATTEST: Matt Brown, Mayor
Rosalinda Ibarra, City Clerk
108
RESOLUTION NO. R-2026-
A RESOLUTION to amend the Yakima Comprehensive Plan Capital Facilities Element to
incorporate the Six-year Transportation Improvement Program (TIP) for
the period of 2027 through 2032.
WHEREAS, the City of Yakima annually prepares, reviews and adopts a six-year
Transportation Improvement Program for transportation improvements to arterial streets in the
City of Yakima for the ensuing six-year period, all as contemplated and required by the State
RCW 35.77.010 and applicable Federal law; and
WHEREAS, the City of Yakima desires to amend the Yakima Comprehensive Plan
Capital Facilities Element to reflect the adoption of the Six-year TIP, as contemplated and
required by RCW 36.70A.070(6) to ensure compliance with the Growth Management Act and
consistency of the Comprehensive Plan and the Six-year TIP; and,
WHEREAS, this amendment is limited to incorporation of the projects listed in the Six-
Year Transportation Improvement Plan for the period of 2027 to 2032 to the Capital Facilities
Element of the Yakima Comprehensive Plan, which is required under RCW 36.70A.130(2B) and
RCW 35.77.010; and,
WHEREAS, a public hearing was held by the Yakima City Council on the Six-year TIP
on July 7, 2026, with the proper public notice as required by RCW 35.77.010; and
WHEREAS, the City Council of the City of Yakima, after reviewing the information and
holding the public hearing, finds that amending the Yakima Comprehensive Plan Capital
Facilities Element is in the best interest of the City and its residents; now, therefore,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA:
The adopted Six-year Transportation Improvement Program for the period of 2027
through 2032 for the City of Yakima shall be incorporated as an amendment to the Capital
Facilities Element of the Yakima Comprehensive Plan.
ADOPTED BY THE CITY COUNCIL this 7th day of July, 2026.
ATTEST: Matt Brown, Mayor
Rosalinda Ibarra, City Clerk
109
State A
Six Year Transportation Improvement Program
Departmtent of Transportation
From 2027 to 2032
Agency: Yakima 1c)41C
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
v
c ta < c � ' 73
A.PIN/Project No. B.STIP ID 3 o 3 c o m
a z C.Project Title D m E m z' °' F. x
n 0 a D.Road Name or Number a c Q. o' ' n m °' 2
�, . E.Begin&End Termini Z ,< o. co ,<
H E - F.Project Description G.Structure ID 2 Q. o m CD m Q.
03 WA-17221 21 0.100 CE Yes
16th Avenue and Mead Avenue Signal and Crossing Improvements
S. 16th Avenue
to
The project will incorporate the installation of a fully signaled traffic intersection,
pedestrian signals,illumination, high visibility crosswalks,ADA compliant curb
ramps,and a dedicated turn lane to properly queue vehicles on Mead Ave
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2027 STBG 264,800 0 66,200 331,000
P RW 2027 STBG 80,000 0 20,000 100,000
P CN 2028 STBG 1,486,480 0 371,620 1,858,100
Totals 1,831,280 0 457,820 2,289,100
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 331,000 0 0 0 0
RW 100,000 0 0 0 0
CN 0 1,858,100 0 0 0
Totals 431,000 1,858,100 0 0 0
Report Date: June 18, 2026 Page 1 110
i
Washington State Six Year Transportation Improvement Program
Department of Transportation p p g
From 2027 to 2032
Agency: Yakima 1c)41C
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
v
c t < c � ' 73
A.PIN/Project No. B.STIP ID 3 o 3 c o m
c z C.Project Title D m E co z' °' P. x
n 0 c D.Road Name or Number C cr. Q. 0' ' n m °' c
�, . E.Begin&End Termini Z ,< Q. co ,<
H E - F.Project Description G.Structure ID 2 Q. o m CD m Q.
14 YAK84 06/17/25 06/17/25 R-2025-103 04 C G O P S 0.400 CE Yes
TW
16th Avenue and Tieton Drive Intersection Improvements
16th Avenue
16th Avenue to Tieton Drive
Reconstruct and widen 16th Avenue and Tieton Drive by adding left-turn lanes for all
movements at the intersection. Upgrade the traffic signal.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2031 0 OTHER 358,512 53,592 412,104
P RW 2031 0 OTHER 1,498,607 233,893 1,732,500
P CN 2032 0 OTHER 1,640,683 252,483 1,893,166
Totals 0 3,497,802 539,968 4,037,770
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 0 0 0 0 412,104
RW 0 0 0 0 1,732,500
CN 0 0 0 0 1,893,166
Totals 0 0 0 0 4,037,770
Report Date: June 18, 2026 Page 2 111
i
Washington State Six Year Transportation Improvement Program
Department of Transportation
From 2027 to 2032
Agency: Yakima 1c)41C
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
v
c o < c � ' 73
A.PIN/Project No. B.STIP ID 3 o 3 c o m
c z C.Project Title D m E co z' °' C
n 0 c D.Road Name or Number a c Q. 0' ' c) m °' c
�, . E.Begin&End Termini Z a ,<
Ho E F.Project Description G.Structure ID Q. P m H 3 m Q.
14 YAK57 06/17/25 06/17/25 R-2025-103 11 CPT 0.010 CE Yes
18th Street Underpass
Yakima Avenue
Yakima Avenue to 18th Street
Replace the bridge on E.Yakima Avenue that crosses over 18th Street.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2027 BR 1,145,250 0 178,739 1,323,989
P RW 2028 BR 86,500 0 13,500 100,000
P CN 2029 BR 5,286,015 0 824,985 6,111,000
Totals 6,517,765 0 1,017,224 7,534,989
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 834,113 489,876 0 0 0
RW 0 100,000 0 0 0
CN 0 0 6,111,000 0 0
Totals 834,113 589,876 6,111,000 0 0
Report Date: June 18, 2026 Page 3 112
WAir Six Year Transportation Improvement Program
[i p rtmt nt of Tra�rSportatio.
From 2027 to 2032
Agency: Yakima IOIC
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
v
c 0) < C -I ' 73
A.PIN/Project No. B.STIP ID 3 0 3 c o m
c z C.Project Title D m E co �' °' x
n 0 c D.Road Name or Number C c Q. 0' ' c) m °' c
•
�, . E.Begin&End Termini Z a ,<
H E F.Project Description G.Structure ID Q. o m CD 3 m Q.
04 YAK 111 06/17/25 06/17/25 R-2025-103 04 C G P S T 1.500 CE No
W
6th Avenue Roadway Improvements
6th Avenue
Walnut Street to River Road
Reconstruct roadway including trolley provisions.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S PE 2027 0 0 250,000 250,000
S RW 2027 0 0 100,000 100,000
S CN 2027 0 0 17,000,000 17,000,000
Totals 0 0 17,350,000 17,350,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 250,000 0 0 0 0
RW 100,000 0 0 0 0
CN 17,000,000 0 0 0 0
Totals 17,350,000 0 0 0 0
Report Date: June 18, 2026 Page 4 113
i
Washington State Six Year Transportation Improvement Program
Department of Transportation p p g
From 2027 to 2032
Agency: Yakima IOIC
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
v
c XI 2
< c � ' 73
A.PIN/Project No. B.STIP ID 3 o 3 c o m
c z C.Project Title D m E co z' °' P. x
n 0 c D.Road Name or Number C cr. Q. o' ' n m °' c
�, . E.Begin&End Termini Z ,< Q. co ,<
H E - F.Project Description G.Structure ID 2 Q. o m CD m Q.
06 WA-16437 06/17/25 06/17/25 R-2025-103 28 C O P T 0.240 No
72nd Ave&Washington Ave Active Transportation Components
72nd Avenue
Washington Avenue to Coolidge Road
Construct approximately 1250 LF of sidewalk from Washington Ave to Coolidge Rd
to fill in a gap to provide access to residential neighborhoods.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S PE 2027 0 MAW 65,000 0 65,000
S CN 2027 0 MAW 435,000 0 435,000
Totals 0 500,000 0 500,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 65,000 0 0 0 0
CN 435,000 0 0 0 0
Totals 500,000 0 0 0 0
Report Date: June 18, 2026 Page 5 114
WsZ State A
Six Year Transportation Improvement Program
ir Departmtent of Transportation
From 2027 to 2032
Agency: Yakima 1c)41C
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
v
c Of < C -I ' 73
A.PIN/Project No. B.STIP ID 3 0 3 c o m
a z C.Project Title D m E m z' °' x
n 0 a D.Road Name or Number a c Q. 0' ' c) m °' c
�, . E.Begin&End Termini Z ,< o. co ,<
H E F.Project Description G.Structure ID 2 a o m CD m Q.
04 YAK11 06/17/25 06/17/25 R-2025-103 01 O P S T W 0.280 EA No
Bravo Company Boulevard, Phase 1
Bravo Company Blvd
Railroad Tracks to'D'Street
Construct four-lane roadway section with median,bike lanes and roundabouts,install
curb,gutter,sidewalk,street lighting and storm drainage system,along with water
and sewer systems.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P CN 2027 0 0 6,000,000 6,000,000
Totals 0 0 6,000,000 6,000,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
CN 2,000,000 4,000,000 0 0 0
Totals 2,000,000 4,000,000 0 0 0
Report Date: June 18, 2026 Page 6 115
WsZ State A
Six Year Transportation Improvement Program
ir Departmtent of Transportation
From 2027 to 2032
Agency: Yakima 1c)41C
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
v
c ta < c � ' 73
A.PIN/Project No. B.STIP ID 3 o 3 c o m
a z C.Project Title D m E m z' °' X
n 0 a D.Road Name or Number a c Q. 0' ' c) m °' c
�, . E.Begin&End Termini Z ,< o. co ,<
H E F.Project Description G.Structure ID 2 Q. o m CD m Q.
04 WA-13520 06/17/25 06/17/25 R-2025-103 01 S W 0.280 EA No
Bravo Company Boulevard, Phase 2
Bravo Company Boulevard
"H"Street to Railroad Tracks
Construct four-lane roadway section with median,bike lanes and roundabouts,install
curb,gutter,sidewalk,street lighting and storm drainage system,along with water
and sewer systems.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P CN 2029 0 OTHER 6,500,000 0 6,500,000
Totals 0 6,500,000 0 6,500,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
CN 0 0 6,500,000 0 0
Totals 0 0 6,500,000 0 0
Report Date: June 18, 2026 Page 7 116
i
Washington State Six Year Transportation Improvement Program
Department of Transportation
From 2027 to 2032
Agency: Yakima IOIC
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
v
c Of < C -I ' 73
A.PIN/Project No. B.STIP ID 3 0 3 c o m
c z C.Project Title D m E co �' °' x
n 0 c D.Road Name or Number C c Q. 0' ' c) m °' c
�, . E.Begin&End Termini Z a ,<
H LW F.Project Description G.Structure ID Q. o m CD 3 m Q.
07 WA-13522 06/17/25 06/17/25 R-2025-103 28 C G P S T 0.530 CE No
W
Browne Avenue Sidewalk
Browne Avenue
7th Avenue to 16th Avenue
Replace damaged sidewalk panels.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2030 0 0 108,000 108,000
P CN 2031 0 0 828,000 828,000
Totals 0 0 936,000 936,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 0 0 0 108,000 0
CN 0 0 0 0 828,000
Totals 0 0 0 108,000 828,000
Report Date: June 18, 2026 Page 8 117
WAir Six Year Transportation Improvement Program
[i p rtmt nt of Tra�rSportatio.
From 2027 to 2032
Agency: Yakima 1c)41C
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
v
c ta < c � ' 73
A.PIN/Project No. B.STIP ID 3 o 3 c o m
a z C.Project Title D m E co z' °' C
n 0 c D.Road Name or Number = c . 0 ' c) °'
�, . E.Begin&End Termini Z a ,<
H E F.Project Description G.Structure ID Q. o m H 3 m Q.
05 WA-14955 06/17/25 06/17/25 R-2025-103 04 0.750 CE Yes
Coolidge Road from 72nd Ave to 84th Ave-Roadway Improvements
Coolidge Road
72nd Avenue to 84th Avenue
Rehabilitate existing pavement and update roadway to current city standards.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2029 0 0 200,000 200,000
P RW 2030 0 0 200,000 200,000
P CN 2031 0 0 1,100,000 1,100,000
Totals 0 0 1,500,000 1,500,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 0 0 200,000 0 0
RW 0 0 0 200,000 0
CN 0 0 0 0 1,100,000
Totals 0 0 200,000 200,000 1,100,000
Report Date: June 18, 2026 Page 9 118
...m Washington State A Six Year Transportation Improvement Program
Department of Transportation
From 2027 to 2032
Agency: Yakima 1c)41C
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
v
c 0) < c -I ' 73
A.PIN/Project No. B.STIP ID 3 o 3 c o m
c z C.Project Title D m E co z' °' x
n 0 c D.Road Name or Number C c Q. o' ' n m °' c
�, . E.Begin&End Termini Z '< Q. co ,<
H E - F.Project Description G.Structure ID 2 Q. o m CD m Q.
16 YAK10 06/17/25 06/17/25 R-2025-103 01 O P S T W 0.550 EA Yes
E."H"Street Extension, Phase 1
E."H"Street
1st Street to 7th Street
Construct new roadway inlcuding water,sewer,curb,gutter,sidewalk,street lighting
and storm drainage system.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2028 0 OTHER 566,500 0 566,500
P RW 2028 0 OTHER 150,000 0 150,000
P CN 2029 0 OTHER 6,758,400 0 6,758,400
Totals 0 7,474,900 0 7,474,900
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 0 566,500 0 0 0
RW 0 150,000 0 0 0
CN 0 0 6,758,400 0 0
Totals 0 716,500 6,758,400 0 0
Report Date: June 18, 2026 Page 10 119
i
Washington State Six Year Transportation Improvement Program
Department of Transportation
From 2027 to 2032
Agency: Yakima IOIC
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
v
c Of < C -I ' 73
A.PIN/Project No. B.STIP ID 3 0 3 c o m
c z C.Project Title D m E co z' °' x
n 0 c D.Road Name or Number a c Q. 0' ' c) m °' c
�, . E.Begin&End Termini Z a ,<
H E F.Project Description G.Structure ID Q. o m CD 3 m Q.
04 YAK 109 06/17/25 06/17/25 R-2025-103 28 C G P S T 0.500 CE Yes
W
Fair Avenue Sidewalk
Fair Avenue
Pacific Avenue to Nob Hill Boulevard
Construct sidewalk on west side of roadway.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S PE 2027 0 TIB 138,320 34,580 172,900
S RW 2027 0 0 100,000 100,000
S CN 2027 0 TIB 1,061,680 265,420 1,327,100
Totals 0 1,200,000 400,000 1,600,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 172,900 0 0 0 0
RW 100,000 0 0 0 0
CN 1,259,000 0 0 0 0
Totals 1,531,900 0 0 0 0
Report Date: June 18, 2026 Page 11 120
State A
Six Year Transportation Improvement Program
Departmtent of Transportation
From 2027 to 2032
Agency: Yakima IOIC
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
v
c ta < c � ' 73
A.PIN/Project No. B.STIP ID 3 o 3 c o m
a z C.Project Title D m E co z' °' C
n 0 c D.Road Name or Number C cr. Q. 0' ' c) m °' c
�, . E.Begin&End Termini Z a ,<
H E F.Project Description G.Structure ID Q. _ o m CD 3 m Q.
04 YAK 113 06/17/25 06/17/25 R-2025-103 28 C G P S T 0.010 CE No
W
Mead Avenue Pedestrian Signal
Mead Avenue
10th Avenue to 12th Avenue
Install school zone flashers and pedestrian signal RRFBs.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2028 0 OTHER 50,000 0 50,000
P CN 2029 0 OTHER 346,750 0 346,750
Totals 0 396,750 0 396,750
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 0 50,000 0 0 0
ALL 0 0 346,750 0 0
Totals 0 50,000 346,750 0 0
Report Date: June 18, 2026 Page 12 121
WAir Six Year Transportation Improvement Program
[i p rtmt nt of Tra�rSportatio.
From 2027 to 2032
Agency: Yakima IOIC
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
v
c ta < c � ' 73
A.PIN/Project No. B.STIP ID 3 o 3 c o m
a z C.Project Title D m E co z' °' C
n 0 c D.Road Name or Number C c o. 0' ' c) m °' c
�, . E.Begin&End Termini Z a ,<
H E F.Project Description G.Structure ID Q. P m H 3 m Q.
16 YAK102 06/17/25 06/17/25 R-2025-103 21 P T 0.030 CE No
N 1st St& R St Signal
N. 1st St.
R Street to R Street
Install traffic signal at the intersection.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2029 0 OTHER 66,990 10,395 77,385
P CN 2030 0 OTHER 401,709 62,722 464,431
Totals 0 468,699 73,117 541,816
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 0 0 77,385 0 0
CN 0 0 0 464,431 0
Totals 0 0 77,385 464,431 0
Report Date: June 18, 2026 Page 13 122
WsZ Washington State A Six Year Transportation Improvement Program
ir Department of Transportation
From 2027 to 2032
Agency: Yakima 1c)41C
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
v
c ta < c � ' 73
A.PIN/Project No. B.STIP ID 3 o 3 c o m
a z C.Project Title D m E m z' °' x
n 0 c D.Road Name or Number C c Q. o' ' n m °' 2
�, . E.Begin&End Termini Z a ,<
Ho E F.Project Description G.Structure ID Q. P m H 3 m Q.
00 /1485(030) WA-15913 06/17/25 06/17/25 R-2025-103 47 0.060 CE No
Naches River Bridge Repair
Naches River to Naches River
The project will complete repairs to the Yakima Valley Trolley Bridge over the 08593100
Naches River. Repairs include removing and replacing decayed timber elements,
regrading and compacting approach fills, replacements of the timber sill footings and
the timber backwall,and scour protection of a bridge pier.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S CN 2027 0 WSDOT 60,000 140,000 200,000
Totals 0 60,000 140,000 200,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
CN 473,000 0 0 0 0
Totals 473,000 0 0 0 0
Report Date: June 18, 2026 Page 14 123
i
Washington State Six Year Transportation Improvement Program
Department of Transportation
From 2027 to 2032
Agency: Yakima IOIC
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
v
c Of < C -I ' 73
A.PIN/Project No. B.STIP ID 3 0 3 c o m
c z C.Project Title D m E co z' °' x
n 0 c D.Road Name or Number a c Q. 0' ' c) m °' c
�, . E.Begin&End Termini Z a ,<
H E F.Project Description G.Structure ID Q. o m CD 3 m Q.
04 YAK 110 06/17/25 06/17/25 R-2025-103 28 C G P S T 1.500 CE Yes
W
Nob Hill Boulevard Sidewalk
Nob Hill Boulevard
12th Street to 14th Street
Construct sidewalk on south side of roadway.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2031 0 0 172,500 172,500
Totals 0 0 172,500 172,500
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
ALL 0 0 0 0 172,500
Totals 0 0 0 0 172,500
Report Date: June 18, 2026 Page 15 124
WsZ State A
Six Year Transportation Improvement Program
ir Departmtent of Transportation
From 2027 to 2032
Agency: Yakima 1c)41C
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
v
c ta < c � ' 73
A.PIN/Project No. B.STIP ID 3 o 3 c o m
a z C.Project Title D m E co z' °' x
n 0 c D.Road Name or Number C cr. Q. o' ' n m °' 2
�, . E.Begin&End Termini Z a ,<
Ho E F.Project Description G.Structure ID Q. o m H 3 m Q.
07 YAK103 06/17/25 06/17/25 R-2025-103 28 C O P T 0.500 CE No
Nob Hill Elementary School Safety Improvements
various streets
various locations to various locations
This project will make various pedestrian safety improvements in the vicinity of Nob
Hill Elementary School,such as new sidewalk and constructing ADA ramps.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2029 0 SRTS 101,200 0 101,200
P CN 2030 0 SRTS 674,520 0 674,520
Totals 0 775,720 0 775,720
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 0 0 101,200 0 0
CN 0 0 0 674,520 0
Totals 0 0 101,200 674,520 0
Report Date: June 18, 2026 Page 16 125
State A
Six Year Transportation Improvement Program
Departmtent of Transportation
From 2027 to 2032
Agency: Yakima 1c)41C
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
v
c CD < c -I ' 73
A.PIN/Project No. B.STIP ID 3 o 3 c o m
c z C.Project Title D m E co z' °' x
n 0 c D.Road Name or Number C c Q. o' ' n m °' 2
�, . E.Begin&End Termini Z a ,<
H E F.Project Description G.Structure ID Q. o m CD 3 m Q.
03 WA-15881 06/17/25 06/17/25 R-2025-103 47 0.160 CE No
Nob Hill RR#2 and 72nd Ave S#87 Bridges-Joint Replacement
Nob Hill Boulevard,72nd Avenue
Nob Hill Blvd to 72nd Avenue
Replace expansion joints on the Nob Hill RR#2 bridge and expansion joints and 8548900,839000
girder grout channels on the 72nd Ave S#87 bridge.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2028 0 OTHER 189,390 0 189,390
P CN 2029 0 OTHER 1,172,552 0 1,172,552
Totals 0 1,361,942 0 1,361,942
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 0 189,390 0 0 0
CN 0 0 1,172,552 0 0
Totals 0 189,390 1,172,552 0 0
Report Date: June 18, 2026 Page 17 126
...m Washington State A Six Year Transportation Improvement Program
Department of Transportation
From 2027 to 2032
Agency: Yakima IOIC
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
v
c ta < c � ' 73
A.PIN/Project No. B.STIP ID 3 o 3 c o m
c z C.Project Title D m E co z' °' X
n 0 c D.Road Name or Number C c Q. o' ' n m °' c
�, . E.Begin&End Termini Z ,< Q. co ,<
H E - F.Project Description G.Structure ID 2 Q. o m CD m Q.
07 WA-16439 06/17/25 06/17/25 R-2025-103 28 C G O P S 0.500 CE Yes
TW
North Yakima Active Transportation Improvements
3rd Street
East"G"Street to MLK Jr Blvd
Install new sidewalk,ADA compliant curb ramps,and remove and replace damaged
and non-ADA compliant sidewalk and curb ramps,and add bike lanes on 3rd Street.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2027 0 CWA 95,000 0 95,000
P RW 2027 0 CWA 100,000 0 100,000
P CN 2028 0 CWA 661,479 0 661,479
Totals 0 856,479 0 856,479
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 50,000 0 0 0 0
RW 100,000 0 0 0 0
CN 0 661,000 0 0 0
Totals 150,000 661,000 0 0 0
Report Date: June 18, 2026 Page 18 127
WsZ Washington State A Six Year Transportation Improvement Program
ir Department of Transportation
From 2027 to 2032
Agency: Yakima 1c)41C
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
v
c ta < c � ' 73
A.PIN/Project No. B.STIP ID 3 o 3 c o m
c z C.Project Title D m E co z' °' X
n 0 c D.Road Name or Number C c Q. 0' ' c) m °' c
�, . E.Begin&End Termini Z ,< Q. co ,<
H E F.Project Description G.Structure ID 2 Q. o m CD m Q.
07 WA-16438 06/17/25 06/17/25 R-2025-103 28 C G O P S CE Yes
TW
Northeast Yakima Sidewalk Improvements
"T"Street to Lincoln Avenue
Install new sidewalk,ADA compliant curb ramps,and remove and replace damaged
and non-ADA compliant sidewalk and curb ramps in the Barge-Lincoln Elementary
School area of northeast Yakima.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2028 0 CWA 100,000 0 100,000
P RW 2028 0 CWA 100,000 0 100,000
P CN 2029 0 CWA 800,000 0 800,000
Totals 0 1,000,000 0 1,000,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 0 100,000 0 0 0
RW 0 100,000 0 0 0
CN 0 0 800,000 0 0
Totals 0 200,000 800,000 0 0
Report Date: June 18, 2026 Page 19 128
i
Washington State Six Year Transportation Improvement Program
Department of Transportation p p g
From 2027 to 2032
Agency: Yakima IOIC
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
v
c Of < C -I ' 73
A.PIN/Project No. B.STIP ID 3 0 3 c o m
c z C.Project Title D m E co z' °' x
n 0 c D.Road Name or Number a c Q. 0' ' c) m °' c
�, a E.Begin&End Termini Z a ,< q•
H E F.Project Description G.Structure ID Q. o m CD 3 m Q.
05 YAK 112 06/17/25 06/17/25 R-2025-103 04 C G P S T 0.030 CE No
W
Powerhouse Road and Englewood Avenue Intersection Improvements
Powerhouse Road
Englewood Avenue to Englewood Avenue
Intersection improvements.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2031 0 0 1,325,700 1,325,700
Totals 0 0 1,325,700 1,325,700
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
ALL 0 0 0 0 1,325,700
Totals 0 0 0 0 1,325,700
Report Date: June 18, 2026 Page 20 129
i
Washington State Six Year Transportation Improvement Program
Department of Transportation
From 2027 to 2032
Agency: Yakima 1c)41C
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
v
c XI 2
< c � c 73
A.PIN/Project No. B.STIP ID 3 o 3 c o m
c z C.Project Title D m E co z' °' P. x
n 0 c D.Road Name or Number C c Q. o' ' n m °' c
�, . E.Begin&End Termini Z ,< Q. co ,<
H E - F.Project Description G.Structure ID 2 Q. _ o m CD m Q.
07 WA-15118 06/17/25 06/17/25 R-2025-103 28 P T 0.300 CE No
Prasch Avenue Sidewalk Improvements
Prasch Avenue
S 20th Avenue to S 16th Avenue
Construct sidewalks against existing curbing on Prasch Avenue from S. 16th Avenue
to S.20th Avenue,and along S 16th Ave from Prasch Avenue to Nob Hill Blvd.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2028 0 OTHER 25,000 0 25,000
P CN 2029 0 OTHER 185,000 0 185,000
Totals 0 210,000 0 210,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 0 25,000 0 0 0
CN 0 0 185,000 0 0
Totals 0 25,000 185,000 0 0
Report Date: June 18, 2026 Page 21 130
WsZ State A
Six Year Transportation Improvement Program
ir Departmtent of Transportation
From 2027 to 2032
Agency: Yakima 1c)41C
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
v
c CD < c � ' 73
A.PIN/Project No. B.STIP ID 3 o 3 c o m
a z C.Project Title D m E co z' °' x
n 0 c D.Road Name or Number C c Q. 0' ' n m °' c
�, . E.Begin&End Termini Z a ,<
H E F.Project Description G.Structure ID Q. o m CD 3 m Q.
03 YAK118 02/03/26 02/03/26 R-2026-021 06 C G P S T 0.540 CE No
W
S. 1st St. Pavement Rehabilitation
S. 1st Street
W.Walnut Street to Pacific Ave
The proposed improvements consist of milling and overlaying the existing asphalt,
crack sealing,new pavement markings,and replacement of sidewalks,curb and
gutter and curb ramps,and illumination. Improvements include spot pavement repair
areas where pavement has failed in isolated locations.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S CN 2027 NHPP 6,497,700 0 1,900,000 8,397,700
Totals 6,497,700 0 1,900,000 8,397,700
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
CN 8,397,700 0 0 0 0
Totals 8,397,700 0 0 0 0
Report Date: June 18, 2026 Page 22 131
WAIF Six Year Transportation Improvement Program
[i p rtmt nt of Tra�rSportatio.
From 2027 to 2032
Agency: Yakima 1c)41C
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
v
c 0) < C -I ' 73
A.PIN/Project No. B.STIP ID I:,
0 3 c o m
c z C.Project Title D m E m z' °' x
n 0 c D.Road Name or Number a cr. Q. 0' ' c) m °' c
�, . E.Begin&End Termini Z a ,<
H E F.Project Description G.Structure ID a o m CD 3 m Q.
04 YAK 108 06/17/25 06/17/25 R-2025-103 03 C G P S T 0.030 CE No
W
S. 1st Street and E.Washington Avenue Intersection Improvements
1st Street
Washington Avenue to Washington Avenue
Realign intersection,widen E.Washington Ave.for additional lane,replace curb,
gutter,sidewalk,and construct new signal.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2031 0 0 2,897,500 2,897,500
Totals 0 0 2,897,500 2,897,500
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
ALL 0 0 0 0 2,897,500
Totals 0 0 0 0 2,897,500
Report Date: June 18, 2026 Page 23 132
i
Washington State Six Year Transportation Improvement Program
Department of Transportation p p g
From 2027 to 2032
Agency: Yakima IOIC
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
v
c Of < C -I ' 73
A.PIN/Project No. B.STIP ID 3 0 3 c o m
c z C.Project Title D m E co z' °' x
n 0 c D.Road Name or Number a c Q. 0' ' c) m °' c
�, . E.Begin&End Termini Z a ,<
H E F.Project Description G.Structure ID Q. o m CD 3 m Q.
04 YAK104 06/17/25 06/17/25 R-2025-103 05 C G O P S 1.530 CE No
TW
Tieton Drive Resurfacing
Tieton Drive
S.48th Ave.to S.72nd Ave.
Grind and overlay,and ADA curb ramp replacement.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2027 0 OTHER 97,000 24,260 121,260
P CN 2028 0 OTHER 1,108,800 277,200 1,386,000
Totals 0 1,205,800 301,460 1,507,260
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 121,260 0 0 0 0
CN 0 1,386,000 0 0 0
Totals 121,260 1,386,000 0 0 0
Report Date: June 18, 2026 Page 24 133
State A
Six Year Transportation Improvement Program
Departmtent of Transportation
From 2027 to 2032
Agency: Yakima 1c)41C
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
v
c CD < c � c 73
A.PIN/Project No. B.STIP ID 3 o 3 c o m
c z C.Project Title D m E co z' °' F. x
n 0 c D.Road Name or Number C c Q. 0' ' n m °' c
�, . E.Begin&End Termini Z ,< Q. co ,<
H E - F.Project Description G.Structure ID 2 Q. o m CD m Q.
14 YAK14 06/17/25 06/17/25 R-2025-103 21 CO P S T CE Yes
W
Washington Avenue&Longfiber Road Intersection Improvements
Washington Avenue
Washington Avenue to Longfiber Road
Improve the Washington Avenue/Longfiber Road intersection by construction of
channelization,a signal,or a roundabout.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2027 0 0 269,000 269,000
P RW 2027 0 0 125,000 125,000
P CN 2028 0 0 2,062,500 2,062,500
Totals 0 0 2,456,500 2,456,500
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 169,000 0 0 0 0
RW 125,000 0 0 0 0
CN 0 2,062,500 0 0 0
Totals 294,000 2,062,500 0 0 0
Report Date: June 18, 2026 Page 25 134
i
Washington State Six Year Transportation Improvement Program
Department of Transportation p p g
From 2027 to 2032
Agency: Yakima IOIC
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
v
c o < c � ' 73
A.PIN/Project No. B.STIP ID 3 o 3 c o m
c z C.Project Title D m E co z' °' P. C
n 0 c D.Road Name or Number a c Q. 0' ' c) m °' c
�, . E.Begin&End Termini Z a ,<
H E F.Project Description G.Structure ID Q. _ o m CD 3 m Q.
06 WA-16436 06/17/25 06/17/25 R-2025-103 28 C O P T W 0.550 Yes
Wendy Baker Shared-Use Path
Powerhouse Road
Pecks Canyon Rd to Cowiche Canyon Rd
Construct shared-use path, high visibility crosswalk, bicycle intersection crossing
markings, RRFBs,and bicycle wayfinding signing along Powerhouse Road.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P CN 2027 0 Ped/Bike Program 932,800 0 932,800
Totals 0 932,800 0 932,800
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
CN 932,800 0 0 0 0
Totals 932,800 0 0 0 0
Report Date: June 18, 2026 Page 26 135
WsZ State A
Six Year Transportation Improvement Program
ir Departmtent of Transportation
From 2027 to 2032
Agency: Yakima 1c)41C
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
v
c CD < c � ' 73
A.PIN/Project No. B.STIP ID 3 o 3 c o m
a z C.Project Title D m E co z' °' X
n 0 c D.Road Name or Number C c Q. 0' ' n m °' c
�, . E.Begin&End Termini Z a ,<
H E F.Project Description G.Structure ID Q. o m CD 3 m Q.
03 YAK117 02/03/26 02/03/26 R-2026-021 05 G P S W 1.000 CE No
Yakima Ave S.Overlay
Yakima Avenue
S.6th Street to Yakima River Bridge
The proposed improvements consist of milling and overlaying the existing asphalt,
crack sealing,new pavement markings,and replacement of non-ADA compliant curb
ramps. Improvements include spot pavement repair areas where pavement has
failed in isolated locations.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S CN 2027 N H P P 2,273,000 0 750,000 3,023,000
Totals 2,273,000 0 750,000 3,023,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
CN 2,273,000 0 0 0 0
Totals 2,273,000 0 0 0 0
Report Date: June 18, 2026 Page 27 136
State A
Six Year Transportation Improvement Program
Departmtent of Transportation
From 2027 to 2032
Agency: Yakima 1c)41C
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
v
c ta < c � ' 73
A.PIN/Project No. B.STIP ID 3 o 3 c o m
c z C.Project Title D m E co z' °' X
n 0 c D.Road Name or Number C c Q. 0' ' c) m °' c
�, . E.Begin&End Termini Z a ,<
H E F.Project Description G.Structure ID Q. _ o m CD 3 m Q.
05 YAK116 06/17/25 06/17/25 R-2025-103 28 1.130 CE Yes
Zier Road Sidewalk Improvements
Zier Road
75th Avenue to West Valley High School
Add sidewalk.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2028 0 OTHER 196,600 0 196,600
P RW 2029 0 OTHER 150,000 0 150,000
P CN 2030 0 OTHER 1,130,400 0 1,130,400
Totals 0 1,477,000 0 1,477,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 0 196,600 0 0 0
RW 0 0 120,000 0 0
CN 0 0 0 1,130,400 0
Totals 0 196,600 120,000 1,130,400 0
Federal Funds State Funds Local Funds Total Funds
Grand Totals for Yakima 17,119,745 27,917,892 38,217,789 83,255,426
Report Date: June 18, 2026 Page 28 137