BUSINESS OF THE CITY COUNCIL
YAKIMA, WASHINGTON
AGENDA STATEMENT
Item No. 7.E.
For Meeting of: July 7, 2026
ITEM TITLE: Resolution authorizing a contract with Interwest Construction, Inc. for
the Industrial Waste Force Main Replacement at the Wastewater
Treatment Facility Project WF2715 (Wastewater Capital Fund 478)
SUBMITTED BY: Mike Price, Wastewater/Stormwater Manager
SUMMARY EXPLANATION:
City of Yakima (City) project WF2715A replaces the Industrial Waste Force Main at the wastewater
treatment plant. The existing force main was installed in 1960s and ruptures in the pipe have required
three emergency repairs over the past 18 months. This pipe has reached the end of its service life and
requires replacement to ensure the reliable conveyance of industrial wastewater from the industrial
waste pump station to the industrial waste treatment reactors.
The City previously entered into an agreement with Gray & Osborne Engineering, Inc. under Resolution
R-2023-118 to provide design, bidding, and construction services for the Industrial Waste Force Main
replacement. The City utilized the procedure established by the State of Washington for competitively
bidding projects. Seven contractors submitted bids, with Interwest Construction, Inc. submitting the low
bid of$247,380. The Agreement in an amount not to exceed $247,380 is attached for City Council
review. The project is funded by Wastewater Capital Fund 478.
ITEM BUDGETED: Yes
STRATEGIC PRIORITY 24-25: A Safe and Healthy Yakima
RECOMMENDATION: Adopt Resolution.
ATTACHMENTS:
Resolution_W F2715A.docx
Agreement_WF2715.pdf
24
RESOLUTION NO. R-2026-
A RESOLUTION authorizing a contract with Interwest Construction, Inc. for Project WF2715
Industrial Waste Force Main Replacement at the Wastewater Treatment
Facility (Wastewater Capital Fund 478)
WHEREAS, the City of Yakima maintains the Wastewater Treatment Facility in
accordance with applicable Federal, State and Local regulations; and
WHEREAS, the Industrial Waste Force Main at the Wastewater Treatment Facility has
reached the end its service life and requires replacement to maintain reliable conveyance of
industrial wastewater from the Industrial Waste Pump Station to the treatment units; and
WHEREAS, The Wastewater Division requires the services of a qualified contractor to
properly install the replacement force main; and
WHEREAS, The City of Yakima used the procedure established by the State of
Washington for competitively bidding projects; and
WHEREAS, Interwest Construction, Inc. submitted the lowest responsible bid and can
perform the contract-specified work; and
WHEREAS, the City Council finds that it is in the best interest of the City of Yakima and
its residents to enter a contract with Interwest Construction, Inc. to perform the work detailed in
the contract documents for the installation of Industrial Waste Force Main at the Wastewater
Treatment Facility; now, therefore
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA:
The City Manager is hereby authorized to execute the attached contract with Interwest
Construction, Inc. in the amount of TWO HUNDRED FORTY-SEVEN THOUSAND THREE
HUNDRED AND EIGHTY DOLLARS ($247,380.) for the replacement of the Industrial Waste
Force Main at the Wastewater Treatment Facility.
ADOPTED BY THE CITY COUNCIL this 7th day of July 2026.
Matt Brown, Mayor
ATTEST:
Rosalinda Ibarra, City Clerk
25
cG
N
CONTRACT
THIS AGREEMENT, made and entered into in triplicate,this day of , 20 , by and
between the City of Yakima, hereinafter called the Owner, and Interwest Construction, Inc., a Washington
Corporation, hereinafter called the Contractor.
WITNESSETH:
That in consideration of the terms and conditions contained herein and attached and made a part of this
agreement, the parties hereto covenant and agree as follows:
I. The Contractor shall do all work and furnish all tools, materials,labor and equipment for THE BID AMOUNT
OF: $247,380.00, for WWTF IW Force Main Replacement, City Project No. WF2715, all in accordance
with, and as described in the attached specifications and the 2026 Standard Specifications for Road, Bridge,
and Municipal Construction which are by this reference incorporated herein and made a part hereof, and
shall perform any alterations in or additions to the work provided under this contract and every part thereof.
Contract time shall begin on the first working day following the Notice to Proceed Date and shall be
substantially completed in 20 working days, and physically completed in 25 working days. If work has not
commenced within the ten (10) days after the notice to proceed, the first chargeable working day shall be
the eleventh (11th)working day after the date on which the City issues the Notice to Proceed.
If said work is not completed within the time specified, the Contractor agrees to pay to the Owner the sum
specified in the Proposal for each and every day said work remains uncompleted after expiration of the
specified time, as liquidated damages.
The Contractor shall provide and bear the expense of all equipment; work and labor of any sort whatsoever
that may be required for the transfer of materials and for constructing and completing the work provided for
in this contract and every part thereof, except such as are mentioned in the specifications to be furnished by
the City of Yakima.
II. The City of Yakima hereby promises and agrees with the Contractor to employ, and does employ the
Contractor to provide the materials and to do and cause to be done the above described work and to
complete and finish the same according to the attached plans and specifications and the terms and conditions
herein contained and hereby contracts to pay for the same according to the attached specifications and the
schedule of unit or itemized prices hereto attached, at the time and in the manner and upon the conditions
provided for in this contract.
III. The Contractor for himself, and for his heirs, executors, administrators, successors, and assigns, does
hereby agree to the full performance of all the covenants herein contained upon the part of the Contractor.
IV. It is further provided that no liability shall attach to the City of Yakima by reason of entering into this
contract, except as expressly provided herein.
IN WITNESS WHEREOF the parties hereto have caused this agreement to be executed the day and year
first herein above written.
Countersigned: CITY OF YAKIMA CONTRACTOR
this day of 2026. Interwest Construction, Inc. , a S Corporation
Page 1 of 2
ti
N
By: Cam/
City Manager Signature Contra lor ignature
Brad Wyman
(Printed Name) (Printed Name)
Attest:
Its: Vice President
City Clerk (President, Owner, etc.)
Address: 609 North Hill Blvd.
Burlington, WA 98233
Page 2 of 2