HomeMy WebLinkAbout07/07/2026 07.D. Resolution accept change order 1_ascent foundation_stormwater sys spot improv prj SW2832 r 'V ii _�ii •• i i t, gin.;—* _1a _- '^ BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No. 7.D. For Meeting of: July 7, 2026 ITEM TITLE: Resolution accepting Change Order No. 1 with Ascent Foundation & More LLC for the Stormwater System Spot Improvements Project SW2832 (Stormwater Capital Fund 442) SUBMITTED BY: Mike Price, Wastewater/Stormwater Manager SUMMARY EXPLANATION: The City of Yakima selected Ascent Foundations & More LLC for Project SW2832 Stormwater System Spot Improvements. The additional materials and work in the attached Change Order No. 1 with Ascent were required to remove and replace unsuitable foundation materials encountered by the contractor at the improvement sites. The Change Order is in an amount not to exceed $190,000 and includes the addition of 4 working days to the contract term (City Contract 2025-163). The Change Order is funded through Stormwater Capital Fund 442. ITEM BUDGETED: N/A STRATEGIC PRIORITY 24-25: A Safe and Healthy Yakima RECOMMENDATION: Adopt Resolution. ATTACHMENTS: Resolution_SW2832_Change_1.docx SW2832_Change_1.pdf 21 RESOLUTION NO. R-2026- A RESOLUTION accepting Change Order No. 1 to City Contract 2025-163 with Ascent Foundation & More LLC for Project SW2832 Stormwater System Spot Improvements (Stormwater Capital Fund 442) WHEREAS, the City of Yakima (City) selected Ascent Foundation & More LLC as the contractor for Stormwater System Spot Improvements Project SW2832 as approved through Resolution 2025-146; and WHEREAS, additional construction materials and working days were required of Ascent Foundation & More LLC due to unforeseen unsuitable foundation materials encountered at the project sites; and WHEREAS, the total cost of Change Order No. 1 is $190,000. with an increase of four working days to the contract term; and WHEREAS, City stormwater capital funds will be used to pay for the change; and WHEREAS, the City finds that it is in the best interest of the City of Yakima and its residents to approve the City Manager's execution of Change Order No. 1; now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The City Manager is hereby authorized to execute the attached Change Order No. 1 with Ascent Foundation & More LLC for additional work associated with Project SW2832 Stormwater System Spot Repairs in the amount of ONE HUNDRED AND NINETY THOUSAND AND 00/100ths DOLLARS ($190,000.00) with an increase of four (4) working days. A true and correct copy of the Change Order is attached hereto and fully incorporated herein. ADOPTED BY THE CITY COUNCIL this 7th day of July, 2026. ATTEST: Matt Brown, Mayor Rosalinda Ibarra, City Clerk 22 : Change Order City of Yakima Change Order Number 1 STORMWATER SYSTEM SPOT IMROVEMENTS Project: (Name) Change Order Date 5L15/26 (Number) G&O# 25804 COY NO. SW2832 Contract Number R-2025-147 To: (Contractor) Contract Date 10/23/2025 ASCENT FOUNDATION AND 7 MORE, LLC 106 N PEON AVENUE SUITE C CLE ELUM,WASHINGTON, 98922 L J You are directed to make the following changes in this Contract: Gray&Osborne,Inc.(G&O),on behalf of the City of Yakima,has reviewed Change Order Proposal COP-001 regarding additional work associated with the excavation and replacement of unsuitable foundation materials encountered during construction. Determination: G&O concurs that,dining construction operations,unforeseen unsuitable foundation materials were encountered at the project site.These materials were determined to be inadequate to support the design requirements and necessitated removal and ' replacement to ensure compliance with project specifications and structural integrity. Measurement:Measurement for the work described herein shall be made on a cubic yard basis for all unsuitable material excavated and replaced.No separate measurement will be made for individual components of the work. Payment: Additional Compensation for all labor,materials,equipment,and incidentals required to complete the work including,but not limited to,excavation.disposal of unsuitable materials,furnishing and placement of geotextile.import and placement of founda- tion rock,hauling,embankment construction.grading,compaction.and all required testing beyond work specified in the Contract Documents shall be made under the newly established bid items below.Payment shall constitute full compensation for all work associ- ated with this Change Order. Item No. Item Quantity Unit Unit Price Amount 35 Additional Excavation,Incl.Haul 1,300 CY $60.00 $78,000.00 36 Crushed Surfacing Base Course,Incl.Fabric 1,300 CY S77.00 $100,100.00 37 2"-4"Quarry Spalls,Incl.Fabric 100 CY S119.00 $11,900.00 Not valid until signed by both the Approving Authority and Contractor. Signature of the Contractor indicated agreement herewith,including any adjustment on the Contract Sum or Contract Time. The original Contract Sum was $ 1,224,760.00 Net change by previous Change Orders r $ 0.00 The Contract Sum prior to this Change Order $ 1,224,760.00 The Contract Sum will be: ll Increased ❑ Decreased ❑ Unchanged by this Change Order $ 190,000.00 The New Contract Sum including this Change Order will be $ 1,414,760.00 The Contract Time will be: Il Increased 0 Decreased 0 Unchanged by 4 working days The New Contract Time will be 89 working days Contract Approval Recommended . rova ec mended By -• Project Engineer 0' " or By By Title kT eV1 oYTJL S 11910* opv1/ �� Date [! /�iI�I/ Date Division Managed Approved 5/ �� /2/ City Manager Date lA By /--EZ / By i Date G�.zo/ c,o�6 Date Based an Original to: 0 Contractor Copies to: 0 Region 0 Construction Administrator DOT Form 570-001 EF ❑ OSC Accounting 0 City Engineering Revised 08/2021 23