BUSINESS OF THE CITY COUNCIL
YAKIMA, WASHINGTON
AGENDA STATEMENT
Item No. 9.C.
For Meeting of: June 16, 2026
ITEM TITLE: Resolution authorizing the acceptance of AIG Grant# 3-53-0089-065-
2026 from the FAA for the amount of$1,559,556.00 for Work
Package#2 -Airport Terminal Ticket Counter and Baggage Handling
at the Yakima Air Terminal-McAllister Field
SUBMITTED BY: Christopher Hopkins, Director of Yakima Air Terminal
SUMMARY EXPLANATION:
Authorizing the acceptance of AIG Grant# 3-53-0089-065-2026 from the FAA for the amount of
$1,559,556.00 for Work Package #2 -Airport Terminal Ticket Counter and Baggage Handling at the
Yakima Air Terminal — McAllister Field.
This project covers the Terminal Core Modernization project that is separated into phases. Phase I
consists of creating a new rental car ticketing counter, on the opposite side of the current location, and
rental car offices. The new counter will complement the new baggage claim carousel area.
Matching funds come from Strategic Investment in Economic Development (SIED) dollars authorized by
Yakima County. No City General Funds are used in the project.
ITEM BUDGETED: Yes
STRATEGIC PRIORITY 24-25: A Thriving Yakima
RECOMMENDATION: Adopt Resolution.
ATTACHMENTS:
Resolution_FAA grant acceptance_airport ticket counter and baggage claim
YKM-065 Concurrence in Award.pdf
223
RESOLUTION NO. R-2026-
A RESOLUTION authorizing acceptance grant award 3-53-0089-065-2026 from the Federal
Aviation Administration (FAA) for construction of Terminal Ticket Counter
and Baggage Claim Handling, a capital improvement project at the Yakima
Air Terminal -McAllister Field.
WHEREAS, the City owns and operates the Yakima Air Terminal-McAllister Field in
accordance with applicable Federal, State, and Local regulations; and
WHEREAS, the FAA makes grants available to airports to maintain and improve airport
facilities; and
WHEREAS, in accordance with the Yakima Air Terminal -McAllister Field Airport Master
Plan, which details a variety of Federal Aviation Administration required capital improvement
projects, including the construction of Terminal Ticket Counter and Baggage Claim Handling; and,
WHEREAS, the Yakima Air Terminal- McAllister Field has coordinated with the Federal
Aviation Administration through the airport's Capital Improvement Plan to utilize approximately
One Million Fiver Hundred-Fifty-Nine Thousand Five-Hundred and Fifty-Six ($ 1,559,556 dollars
of federal grant funds and for the airport's local match requirement, SIED Funds will be utilized,
to fund the work to be performed on the Terminal Modernization Project; and
WHEREAS, the City Council deems it to be in the best interest of the City and its residents
to authorize acceptance of the FAA grant award needed to accomplish the identified capital
improvements, now, therefore,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA:
The City Manager is hereby authorized to accept grant award 3-53-0089-065-2026 in the
amount of One Million Fiver Hundred-Fifty-Nine Thousand Five-Hundred and Fifty-Six
($1,559,556) dollars.
ADOPTED BY THE CITY COUNCIL this 16th day of June, 2026.
Matt Brown, Mayor
ATTEST:
Rosalinda Ibarra, CMC, City Clerk
1
224
0
U.S. Department Northwest Mountain Region Denver Airports District Office
of Transportation Colorado • Idaho • Montana • Oregon • Utah 26805 E. 68th Ave., Suite 224
Federal Aviation Washington • Wyoming Denver, CO 80249
Administration
June 11, 2026
Yakima Air Terminal-McAllister Field (YKM)
Yakima, WA
AIP: 3-53-0089-065-2026
Concurrence in Award
Dear Christopher Hopkins:
We have reviewed the bid documents and concur with your recommendation to award M. Sevigny
Construction Inc. in the amount of$1,994,700.00 Furthermore, we accept your statement that the
cost is reasonable based on the cost analysis performed by you or your consultant. Please maintain
a copy of your cost analysis for future audit purposes.
FAA regulations require the sponsor certify that adequate construction supervision and inspection
have been arranged. Also, the sponsor ensures that construction conforms to the approved plans and
specifications.
Please provide us with the following documents:
1. One copy of the executed contract.
2. A copy of the Notice to Proceed so we will be aware of the beginning construction date.
This should be provided only after the sponsor determines that all necessary contracts,
bonds, certificates of insurance, etc., are satisfactory, so that a Notice to Proceed may be
issued to the contractor.
A preconstruction conference should be scheduled after the contract is awarded. Please inform us
of the time and place of this meeting. The contractor's construction schedule and the overall project
should be discussed. We will attempt to attend this meeting, however, if we cannot attend the
meeting, please include the FAA preconstruction guidance package, in the agenda for your
preconstruction meeting. This information can be found in Advisory Circular 150/5370-12. Please
provide us with a copy of the minutes of the meeting and a list of those in attendance.
Federal participation is contingent upon construction conforming to the approved plans and
specifications. To accomplish this, your resident engineer and inspectors must be familiar with the
specification requirements and perform testing as required.
Copies of all test results should be available, during construction, at the job site for our review. In
addition, Construction Progress and Inspection Reports, using FAA Form 5370-1 must be
submitted on a weekly basis during construction.
225
Changes to the plans and specifications should be made by change order or supplemental
agreement. Approval by the FAA should be obtained prior to performing the work to be eligible for
participation.
If you have questions regarding your responsibilities during construction, please call me at(303)
342-1265.
Sincerely,
ERIC W. Digitally signed by ERIC W.
TRINKLEIN
TRINKLEIN Date:2026.06.11 07:04:33-06'00'
Eric Trinklein
Civil Engineer, Denver Airports District Office
226
Eligibility
Rooms Square Cost Eligible Ineligible Cost Eligible I Cost Cost 100%
Footages SF SF Ineligible Ineligible
Concourse 2767 2767
Entry North Vestibule 103 103
Office 114 114
Storage 47 47
Rental B 68 68
Rental B Finish $8,750
Rental A 68 68
Rental A Finish $8,750
Circulation 165 165
Car Rental Breakroom 241 241
Storage 51 51
Office 135 135
Total 3759 3006 753
Percentage% 100% 1,994,700 80% 20% 1,595,760 $398,940 $17,500
Formula per N-4[(Cost of A+B+C) * (Eligible Proration)+(Cost of D)]
A=Eligible Areas $ 1,595,760
B=Ineligible Areas $ 398,940
C=Prorated Areas $ 0
D=High Cost 100%Eligible $ 0
E=High Cost Ineligible $ 0
227