ITEM TITLE: Resolution accepting Change Order No. 1 with Ascent Foundation &
More LLC for Project AC2750/SC2605 Expanding Water and
Wastewater Access to Underserved Communities (Wastewater
Capital Fund 476)
SUBMITTED BY: Scott Schafer, Director of Public Works
* Mike Price, Wastewater/Stormwater Manager
SUMMARY EXPLANATION:
The City of Yakima selected Ascent Foundations & More LLC for Project AC2570/SC2605 Expanding
Water and Wastewater Access to Underserved Communities. The additional work in the attached
Change Order No. 1 with Ascent was required to replace a deficient 250 linear foot segment of existing
sewer pipe to meet the slope requirements of the new sewer main in the expanded southcentral service
area. The Change Order is in an amount not to exceed $224,665.31 and includes the addition of 18
working days to the contract term (City Contract 2025-074). The Change Order is funded through
Wastewater Capital Fund 476.
ITEM BUDGETED: N/A
STRATEGIC PRIORITY 24-25: A Safe and Healthy Yakima
RECOMMENDATION: Adopt Resolution.
ATTACHMENTS:
Resolution.docx
Change Order.pdf
296
RESOLUTION NO. R-2026-
A RESOLUTION accepting Change Order No. 1 to City Contract 2025-074 with Ascent
Foundation & More LLC for Project AC2750/SC2605 Expanding Water and
Wastewater Access to Underserved Communities (Wastewater Capital Fund
476)
WHEREAS, the City of Yakima (City) selected Ascent Foundation & More LLC as the
contractor for Expanding Water and Wastewater Access to Underserved Communities Project
AC2750/SC2605 as approved through Resolution 2025-078; and
WHEREAS, additional work was required of Ascent Foundation & More LLC to replace a
segment of deficient existing sewer main to meet the slope requirements of the new sewer main
in the expanded southcentral service area; and
WHEREAS, the total cost of Change Order No. 1 is $224,665.31 with an increase of
eighteen working days to the contract term; and
WHEREAS, City wastewater capital funds will be used to pay for the change; and
WHEREAS, the City finds that it is in the best interest of the City of Yakima and its
residents to approve the City Manager's execution of Change Order No. 1; now, therefore,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA:
The City Manager is hereby authorized to execute the attached Change Order No. 1 with
Ascent Foundation & More LLC for additional work associated with Project AC2570/SC2605
Expanding Water and Wastewater Access to Underserved Communities in the amount of TWO
HUNDRED TWENTY-FOUR THOUSAND SIX HUNDRED SIXTY-FIVE DOLLARS AND THIRTY-
ONE CENTS ($224,665.31) with an increase of eighteen (18) working days. A true and correct
copy of the Change Order is attached hereto and fully incorporated herein.
ADOPTED BY THE CITY COUNCIL this 7th day of April, 2026.
ATTEST: Matt Brown, Mayor
Rosalinda Ibarra, City Clerk
297
' ,,„. Change Order
l City of Yakima
Change Order Number: 01
Exp.Water and VVUJ Access to Underse ved Commun. Change Order Date: December 8,2025
Project Name: _ —
Project Number: BOR No. R24P00579, HLA Project No.22133 Contract Number: AC-25701S0-2605
Contract Date: May 7, 2025
Contractor: Ascent Foundation & More, LLC
106 N. Peoh Ave, Suite C
Address: Cle Elum. WA 98922
City, State, Zip:
Change Order work, materials, and measurements shall be in accordance with provisions of the WSDOT Standard
Specifications, Special Provisions, and City of Yakima Standard Plans. The contract is revised as follows:
Description of Work.This Change Order was necessary to extend the new sewer main from MH#14 to the existing manhole at the Spokane
Street and 10th Avenue intersection due to the existing sewer main insufficient slope and"bellies',and associated hydraulic deficiencies of
this existing pipe segment.
'Verbal Approval Date:August 20, 2025
Construction Requirements:Additionai work outlined by this Change Order shall be completed in accordance with WSDOT Standard
Specification, Section 7-17 Sanitary Sewer,existing contract specifications where applicable,and City of Yak ma Construction standards.
Measurement and Payment Work performed under this Change Order shall be measured in accordance with Section 1-09.6 of the WSDOT
Standard Specifications.Only those quantities of Work completed,accepted,and directly attributable to the change described herein will be
measured for payment, Payment for the Work outlined by the Change Order will be made at the lump sum price calculated by force account,
which shall constitute full compensation for furnishing all labor.matenats,equipment,tools, incidentals,and for performing all Work necessary
to cnmptete the Work as modified When the Work is paid by force account,compensation will be made in accordance to 1-09.6 for labor,
materials.equipment,and applicable markups.Payment provided under this Change Order include all costs associated with the change,and
no additional compensation will be allowed.
Adding Lump Sum Bid Item 53-"10th Ave, Sewer Extension,Complete"
The contractor provided a cost proposal for the sewer main extension which was reviewed by the Engineer and found to be unjustified. The
contractor was directed to proceed with the modified work utilizing the force account provisions of the contract.
Change Order Sub Total:S207,447.19
8.3%Sales Tax:S17,218.12
Change Order Total S224,665.31
Not valid until signed by both the Approving Authority and Contractor.
Signature of the Contractor indicated agreement herewith, including any adjustment on the Contract Sum or Contract Time.
The original Contract Sum was g 2,206,003.41
Net change by previous Change Orders 0.00
The Contract Sum prior to this Change Order $ 2,206,003.41
The Contract Sum will be: B Increased ❑ Decreased ❑ Unchanged by this Change Order $ 224,665.31
The New Contract Sum including this Change Order will be $ 2,430,668.72
The Contract Time will be: I Increased ❑ Decreased ❑ Unchanged by 18 working days
The New Contract Time will be 178_ working days
Contractor Approval Recommended ro I R m ed
nrni=c'Engmser Gay BY.:mq ^w r
By Digitally signed by JJJ
By 3s„ Benjamin A.Annen By >,
Title i Date ,27 J' rDa_e 17:22:33-08'00' Date a `G tit Yakima•• o Manager Approved
DatL � / Victoria Baker City
y Manager
By
BY
Date 37/.z-07a Date
Based on Original to: ❑ Contractor Copies to: ❑ Region ❑ Construction Administrator
DOT Form 570-00:eF ❑ OSC AccountingEn
Revbed 09/2021 ❑ City Engineering
9
298