BUSINESS OF THE CITY COUNCIL
YAKIMA, WASHINGTON
AGENDA STATEMENT
Item No. 3.B.
For Meeting of: February 10, 2026
ITEM TITLE: Review of Community Development Proposed Fee Changes -
Planning, Codes, Engineering
SUBMITTED BY: Bill Preston, Community Development Director
SUMMARY EXPLANATION:
As part of the 2025 budget process, Community Development staff reviewed current permit fees and
determined changes were needed in order recover the costs associated with staffs time processing
these permits. The attached fees are being proposed.
ITEM BUDGETED: N/A
STRATEGIC PRIORITY 24-25: A Resilient Yakima
RECOMMENDATION: Provide direction to staff on the proposed fees; direct staff to bring back a
Resolution for adoption.
ATTACHMENTS:
Proposed Fee Changes Council Presentation_2026-02-10.pdf
6
qb
l�l
YA� 1
...:64 , ... • . • ..+ Iiii
. OW di• . M #0 • • 100.1 iP0
: lC
• ...4.4 0,1•000
•
•
V Vir i ' ` 1I f01 i , ill
II I — �t •
coy
••i I tat i Ir� r
— if —_ — is:. =` �'� —�
": .:. 0 I. I ,,kit RPORATI v 1COMMUNITY DEVELOPMENTI Fee Adlustment
DEPARTMENT Proposals
0
CITY OF YAKIMA - PERMITTING
What does it take to build something in Yakima?
Permitting crosses multiple departments and regulations. Broadly, here is what you will need to build a
commercial building in City of Yakima, or pretty much anywhere in Washington State.
Land-Use/Zoning Review - Verify zoning, site plan, conditional use
Building Permit - For new construction or major alterations
- Requires stamped plans and WA State Energy Code compliance
Change-of-Occupancy Permit - If building use changes
Demolition Permit - For removing existing structures
Mechanical Permit - HVAC systems, gas piping, oil tank removal
Plumbing Permit - New or modified plumbing systems
Electrical Permit - Issued by WA State Department of Labor & Industries
Fire Code Permit - Sprinklers, alarms, life safety systems
Sign Permit - For new signage (requires site and structural plans)
Noise Permit - If construction exceeds sound limits
Grading Permit - For earthwork and site preparation
Stormwater Management Permit - Required for >_ 1 acre disturbance or >_5,000 ft2 new hard surface
Water/Wastewater Connection Permit - For new utility connections
Street Excavation Permit — Excavations in the right-of-way (driveway approaches, sidewalks, etc.)
piEngineering Permit — private development of public improvements (frontage, streetlights, sidewalks, etc.)
CITY OF YAKIMA - PERMITTING
Why Do We Do Permitting?
Most of these permits are required by State law or the builder is accessing a city asset (i.e. streets or
utilities) — Governing Laws
Permit Type Governing Statute & Mandate
Land use/Zoning Growth Management Act
Building RCW 19.27
Electrical RCW 19.28
Plumbing RCW 19.28
Mechanical/HVAC/Gas RCW 19.27
Fire/Life Safety RCW 70.92
Grading/Subdivision RCW 58. 17
Stormwater/Erosion RCW 90.48
Signage/Noise RCW 35.21 (local implementation)
I 9
CITY OF YAKIMA - PERMITTING
Permit Fees & Development
Fast, Cheap, Accurate — pick two
Iron Triangle
Permit fees historically set low (,1(ieCip
ro Supplemented by General Fund (wtov+,et}
For developers, time is money
Reviewing permit fees to:
Update to state law
Close the gap to actual cost
Reflect annual increases in cost of
service (COS) faSt OOot
Part of a multi-year effort (tLviit ) (cva Litt' )
Right Sizing and Resourcing _ _ 62 cLLt TKO VI. Le.
Two
4 10
CITY OF YAKIMA - PERMITTING
Permit Fees & Development
Fast, Cheap, Accurate — pick two
Iron Triangle
Permit fees historically set low
Supplemented by General
FundP.C.y Yekl.n. city of Yakima Government Transparency Portal
For developers, time is money
Building and Land Use Permits Explorer
Reviewing permit fees to: 1 ,268
•Update to state law '' ' 4i : Total Permits
Close the gap to actual cost • •. • '•• • ••.: •• N.• --• ~.• • 207
Reflect annual increases in cost of •4. .• . .` •., • '�'•. .• ' '• ': • -
•_,, • :• : •:r :ea .1% .. • Pending Permits
s.. C. . •. Z.. • . w. . S,.
service (COS) • :. ,• • . . • • •:• •:;: ,a.
'••. •••r .r..V •;' �••. Issued Permits
Part of a multi-year effort ' '• •''• • ' 209 692
• •r •• 4• Conditions.Outstanding Mood Amnia
%
s• . 15 '�
Right Sizing and Resourcing � '• ' •
Transparency�KPl's �µ• °'°°"° Finalized Permits
47.8
�_n °,..e�w.._-. �sr.„ m m,n.°�.�.�.�ro,• .. e� �E�,.�. a w. Average Days to Issue Per..
5 11 ,
CITY OF YAKIMA - PERMITTING
Permit Fees & Development
Fast, Cheap, Accurate — pick two
Iron Triangle
Permit fees historically set low
Supplemented by General Fund
For developers, time is money
Reviewing permit fees to:
Update to state law44111111 .
Close the gap to actual cost ,, li
- _ ,, ,
Reflect annual increases in cost of 4111& 54. •
li
service (COS) -411114 44, NMI ' j
Part of a multi-year effort ,_ \1 -4%
Right Sizing and Resourcing Y %' "`" f
Transparency/KPI's 1di
Process Efficiency -
• 12
CITY OF YAKIMA - PERMITTING
Permit Fees & Development
Fast, Cheap, Accurate — pick two
Iron Triangle
Permit fees historically set low
e Supplemented by General Fund
For developers, time is money 7. 9.
PERMIT LIFE CYCLE Approved Permit Congratulations!
Once approved,permit is Ready to
BASICS 5
Issue.Issue through the Online Closed-Finaled
Manage Your Permit Permit Centern
• Permit is Under Review!
Reviewing permit fees to: 3. Track progress and manage in the
1 Intake Screening Online Permit Center
Research Permit technician screens
Update to state l a w Research your project and confirms your application is _, ,,,,�
Prepare to apply ready for reviewers ��� \y /
Close the gap to actual cost ,sc v,J —� /
/ �O
Part of a multi-year effort•
���►VV/ u�
/ _} 8. Manage Project
Right Sizing and Re s o u r c i n g _ / Complete work&order inspections,
�i J V / as applicable to your project
°° Transparency/KPl's ,-®0_i. 6. Information Request
As applicable,if reviewers need more
• • info.Upload response to the Online
el' Process Efficiency 4. Permit Center
Pay °
Followprovided instructions to pay 0
- Pro Development
2. Apply for your permit.Once paid you're in •earn project is unique.Consult with Department tor questions related to
Go to the Permit Application Portal line for reviewers! your individual project
PI 13
PLANNING DIVISION
Land Use - Development Services - Special Events
The arm of City government used to guide processes for development and
future growth.
= Works with ALL City departments for different applications related to
economic development, special events, zoning, development services, and
long-range planning.
= Planning has processed 193 current land use applications over the past 2
years.
111 14
PLANNING DIVISION
Team
Planning Manager: Trevor Martin
Senior Planners (2): Eric Crowell, Jason Radtke
Associate Planner: Connor Kennedy
Planning Technician: Eva Rivera
Department Assistant (Temp): Irene Linos
Honorable Mentions
r Community Development Director: Bill Preston
Community Development Admin Assistant: Lisa Maxey
PI 15
CITY OF YAKIMA PLANNING DIVISION
TYPE 3 REVIEW— Land Use Application Process(YMc ch.15.15)
PLANNING DIVISION .PRE-APPLICATION MEETING
REQUEST SUBMITTED,MEETING HELD
1
Planning has processed 193 current land use *APPLICATION SUBMITTED
&FEES PAID
applications over the past 2 years. 1 _
PLANNER DETERMINES IF COMPLETE
(w/iin 28 days of submittal)
CITY OF YAKIMA PLANNING DIVISION
TYPE 1 REVIEW— Land Use Application Process (YMC Ch.15.13) COMPLETE INCOMPLETE
FOR FURTHER PROCESSING DITIONAL INFO REQ'D)
— �r*APPLICATION SUBMITTED I
&FEES PAID DEVELOPMENT SERVICES TEAM ADDITIONAL INFO
I \ (DST)MEETING SUBMITTED
1 I / I
PLANNER DETERMINES IF COMPLETE
(w/in 28 days of submittal) IIII POST LAND USE ACTION SIGN PLANNER DETERMINES IF
(provided by Planning Division;applicant COMPLETE
returns the posting certificate}
COMPLETE [w/in 14 days of new submittal)
INCOMPLETE NOTICE OF APPLICATION&PUBLIC HEARING
FOR FURTHER PROCESSING (ADDITIONAL INFO REQ'D)
[sent to property owners win 300 ft w/chance to
II comment and/or attend hearing)
-1 ADDITIONAL INFO PLANNER DRAFTS RECOMMENDATIOj
**DVELOPMENT SERVICES TEAM SUBMITTED TO HEARING EXAMINER
(DST)MEETING (w/applicatio ,public comments rec'vd,etc I I
I I
PLANNER DETERMINES IF HEARING EXAMINER HOLDS PUBLIC HEARING
COMPLETE (applicant or representative attends)
PLANNER DRAFTS&ISSUES DECISION , (w/in 14 days of new submittal) i
(w/in 65 days of complete application(per RCW HEARING EXAMINER ISSUES DECISION
36.70B.080)-sent to applicant/property owner) (w/in 10 business days)
I ) *Required for most Type 3 Reviews.
1 1 NOTICE OF DECISION SENT Submit request online.
(warn 170 days of complete application and w/in 3 business **Building permit application may be
"**IF APPLICATION APPROVED: IF APPLICATION DENIED: days after decision is rendered—sent to applicant,property
COMPLY W/CONDITIONS APPLICANT MAY APPEAL owner,parties of record w/a 14-day appeal period) submitted to the Codes Division at the same
OF APPROVAL W/IN 14 DAYS PER I time for processing but there may be
conditions that need to be satisfied prior to
YMC CH. 16.08 "IF APPLICATION APPROVED: permit issuance.
Iii0_ I COMPLY W/CONDITIONS OF APPROVAL 16
NOTE:This chart shows the process of a typical Type 3 Rewew appncaton and is for demonstration purposes only.
PLANNING DIVISION
Fee Updates
The Community Development Department went through a fee evaluation in
2022.
The evaluation projects the fees into 2028.
Rate of fee increase is based upon Cost of Service.
Fees based upon market rate analysis
PI 17
PLANNING DIVISION
Fee Updates
r .� NEW FEES
sal
&ewar€ -- -- • Site Plan Review $335
.-' SUBARU
"'�""T�� irV�l l j��fl ft so - - "� Result of SB 5290
��EeAC: WEST VALLEY '�� � • Site • -: ' ,- FITNESS , 1.1 - Plan Re-Review $56
if
l, ft • Critical Area Review Present, No Impact - $493
��: ' '�' • Per Lot Long Plat - $ 150 per lot
1 i...._ JO_ Unit Lot Subdivision / Lot Splitting - $ 1 ,626
�
Result of SB 5258 and 5559
1.
REVISED FEES
Special Event Permit — $250
Special Event Late Fee - $ 1 ,000
Letter sent to applicants at end of year
• 18
QUESTIONS ?
CODE ADMINISTRATION DIVISION SERVICE UNITS
Permitting - Licensing - Code Enforcement
A division of the Community Development Department
• We're the face of the City
£
• 17 full-time employees
Si 1
W. 4 4 \ , 1,
Like three divisions within one ,: `� '' r` -
• PERMITTING = building, plumbing, mechanical, fire (state mandated) -� - -'
• LICENSING = business, regulatories v
• CODE ENFORCEMENT = community health, safety and maintenance - • ` "N., ,, . ......p ,, , ..
' '
, ,t , ..,,k„...„,,,,
pe
�. // c f-')7 S' d of Epos*
+ �-- !„ ' jam "
14 20
CODE ADMINISTRATION DIVISION
Team
Division Manager: Glenn Denman
Supervising Code Inspector: Julia Rosales
Plans Examiners (2): Suzanne DeBusschere, John Zabel!
Building Inspectors (3): Mike Musgrove, Anson Morgan, Vacant
Permit Project Coordinators (2): Linda Kuntz, Samantha Grenz
Permit Technicians (3): Carissa Dellinger, Carla Hernandez, Jenseni Gutierrez
€° Code Compliance (4): Pedro Contreras (Clean City), Isidro Mendoza, Jeremy Viveros
r Code Compliance Project Coordinator: Jose Armenta
Department Assistant (Temp): Irene Linos
Honorable Mentions
Community Development Director: Bill Preston
Community Development Admin Assistant: Lisa Maxey
15 21
WHY WE ' RE HERE
General Fee Updates
Council has given direction to cover cost of services rendered
RCW 82.02.020 - "permit fees must reasonably cover the cost" of
application processing, conducting inspections and reviewing plans
\‘07/fiv
•
160/1
4ke
•
22
PROPOSALS
=11.1F Fee Updates
BUILDING PERMITS
• Updating minimum permit fees
Going from building valuation data table to local cost of living adjustment
• Hourly rates
PLUMBING PERMITS
Going from valuation method to per fixture method
17 23
BUILDING PERMITS
IMMEMPIF MI=51
BASELINE PERMIT FEES
_. Correcting the minimum permit fee to cover processing and inspections
VALUATION DATA TABLE kali, INTERNATIONAL
EMICODE COUNCIL
People Helping People Build a Safer World'
.' A nationally recognized table to reflect
final project value Square Foot Construction Costs;h
Group(2024International Building Code) IA IB IIA IIB IIIA IIIB IV VA VB
Established based on FCS Group Study in 2022 A-1 Assembly,theaters,with stage 340.8 328,7 319.0 306.4 286.3 278.0 295.9 266.8 256.6
3 0 0 3 3 3 5 2 1
A-1 Assembly,theaters,without stage 312.9 300.7 291.0 278.5 258.6 250.3 268.0 239.1 228.9
.' Last valuation table was increased by 2.6% 272.0 264.1 255.8 246.0 230.4 224.2 237.6 209.5 201.6
A-2 Assembly,nightclubs 9 1 2 6 7 1 2 8 3
Move to 2.5% local cost of service increase, A-2 Assembly,restaurants,bars,banquet halls 279
1.0 263.1 252.8 24fi5.0 228.4 227 1.2 236.6 207.5 203.6
1 317.6 305.4 295.7 283.2 263.4 255.1 272.7 243.9 233.7
effective January 1 , 2027 A-3 Assembly,churches
0 7 7 0 7 8 3 6 5
A-3 Assembly,general,community halls,libraries, 266.7 254.5 243.8 232.3 211.4 204.1 221.8 191.9 182.7
museums 2 9 9 1 6 7 4 5 4
A-4 Assembly,arenas 311.9 299.7 289.0 277.5 256.6 249.3 267.0 237.1 227.9
1 8 8 1 6 6 3 4 4
t3l3usiness 301.4 290.7 280.2 268.4 245.1 236.3 258.1 + 219.0 209.0
0 0 7 1 3 9 0 7 2
E Educational 290.1 279,7 270.3 258.9 240.4 228.2 250.0 210.4 203.6
1 8 4 7 5 0 6 6 5
F-1 Factory and industrial,moderate hazard 165.8 157.8 147.8 142.3 126.7 120.5 135.6 105.0
2 2 9 1 2 6 8 8 97.84
F-2 Factory and industrial,low hazard 164.8 156.8 147.8 141.3 126.7 119.5 134.6 105.0
2 2 9 1 2 6 8 8 96.84
1-1-1 High Hazard,explosives 154.6 146.6 137.7 131.1 116.9 109.7 124.5
9 9 6 8 1 5 5 95.27 - 0.00
H234 High Hazard 154.6 146,6 137.7 131.1 116.9 109.7 124.5
9 9 6 8 1 5 5 95.27 87.03
)8 H-5 HPM 301.4 290.7 280.2 268.4 245.1 236.3 258.1 219.0 209.0 ' 24
0 0 7 1 3 9 0 7 2
PLUMBING PERMITS
MINIE=IPEr Fee Structure Change
HISTORY OF PLUMBING PERMIT FEES
Flat rate per fixture
} Model was good, but fees were outdated,
didn't cover cost _
lbw
MOVED TO VALUATION MODEL IN 2023 �
7- Some fees don't reflect valuation well Araani
' r
REVERT TO PER FIXTURE STRUCTURE
With a flat rate to cover processing, reviews,
and inspections
19 25
BUILDING & PLUMBING PERMITS
Fee Comparisons
EXAMPLE — New 2,000 sq ft Single-Family Home, 14 plumbing fixtures
-�,; ,,,
CURRENT PROPOSED --�, �' • ' '
Building Permit Fees: r, Building Permit Fees:
- Permit Fee - $2,149 Permit Fee - $2,185 11
1 .) n [1. c
Plan Review - $1 ,397 Plan Review - $1 ,421 1V
IF
II
Tech Fee - $142 e� Tech Fee - $144 .� w
Surcharge - $6.50 1 Surcharge - $6.50 : ,; tr # -
TOTAL = $3,695 TOTAL = $3,757
' Plumbing Permit Fees (valuation based): $A, Plumbing Permit Fees (fixture-based):
Permit Fee: $ 180 Permit Fee: $50 (flat rate) + $308 ($22/fixture)
Plan Review: $ 1 17 Plan Review: $60 (flat rate)
Tech Fee: $12 Tech Fee: $17
nn TOTAL = $309 4. TOTAL = $435
20 TOTAL = $4,004 TOTAL = $4,192 26
.
BUILDING & PLUMBING PERMITS
Fee Comparisons
EXAMPLE — New 4,000 sq ft Office Building, 14 plumbing fixtures
CURRENT PROPOSED
Building Permit Fees: Building Permit Fees: ill
- Permit Fee - $4,323 Permit Fee - $4,435 i 1 ' ►l
Plan Review - $2,810 � Plan Review - $2,882 � ��I )i �.
1 ' til
Tech Fee - $285 Tech Fee - $293 ��_ '" '!
Surcharge - $25 Surcharge - $25 � ' -
.,,
TOTAL = $7,443 TOTAL = $7,635
' Plumbing Permit Fees (valuation based): $A, Plumbing Permit Fees (fixture-based):
Permit Fee: $ 180 Permit Fee: $50 (flat rate) + $308 ($22/fixture)
Plan Review: $ 1 17 Plan Review: $60 (flat rate)
Tech Fee: $12 Tech Fee: $17
nn TOTAL = $309 4. TOTAL = $435
21 TOTAL = $7,752 TOTAL = $8,070 27
BUILDING PERMITS
Fee Com pa risons
EXAMPLE — Remove a non-bearing wall in a house — valuation of $500
CURRENT PROPOSED
Building Permit Fees: Building Permit Fees:
Permit Fee - $21 Permit Fee - $90
Plan Review - $14 Plan Review - $59
TechFee - $1 TechFee - $6
Surcharge - $6.50 - Surcharge - $6.50
TOTAL = $43 TOTAL = $162
rMinimum permit fees increased to capture cost of staff time to process.
22 28
OTHER CLEAN UP
Miscellaneous Changes
{ Hourly rates to capture staff labor and overhead
• Correct fireworks fee
• Correct mobile home installation duplicated fees
• Create fee for permit expiration extensions
• Clarify reinspection and re-review fees
• Eliminate change of ownership fee for business licenses
23 29
CODE ADMINISTRATION DIVISION
Wrap Up
PLAN OF ACTION
• Final resolution proposal forthcoming
* Modernizing or reducing regulatory licenses
24 30
QUESTIONS ?
ENGINEERING DIVISION
Permits
EXCAVATION (EXC) — Any work occurring in the right-of-way, including adding or modifying
driveway approaches.
RIGHT OF WAY USE -
Short-Term (Less than 30 days)
Cranes, dumpsters, material storage, etc.
Long-Term (Permanent)
Signs, Fences, Stairs, etc.
ENGINEERING (ENG) — Private construction of public improvements
Frontage improvements (Curb, gutter, & sidewalk)
Wastewater and water mainline extensions
Streetlights
26 32
ENGINEERING DIVISION
Team
City Engineer: Robert Washabaugh
Engineering Contract Specialist: Brenda Fehlhafer
Chief Engineer: Dana Kallevig
Senior Engineer: Randy Tabert
Supervising Traffic Engineer: Vacant
Traffic Technician II: Alexander Tikhomirov
c° Development Engineer: Kirsten McPherson
y Construction Supervisor: Nick Rogers
Construction Inspector (2): Tim Daniels, Josh Gaub
Honorable Mentions
Community Development Director: Bill Preston
Community Development Admin Assistant: Lisa Maxey
27 33
ENGINEERING DIVISION
Excavation (EXC) Fee Changes
CURRENT: PROPOSED:
Base Administration Fee - $ 100 Base Administration Fee - $262
Inspection Fee ( 1 hour minimum) - $60 Inspection Fee ( 1 hour minimum) — $66
Fees to be adjusted in accordance with the
City's labor contracts.
Restoration fees are required when there is any disturbance of pavement.
The fees are calculated based on the trench size and pavement condition index (PCI).
28 34
ENGINEERING DIVISION
Excavation (EXC) Fee Changes
EXAMPLE — new residential driveway approach
CURRENT:
`o" 4
Base Administration Fee - $ 100 41/11111
Inspection Fee ( 1 hour minimum) — $60
Restoration Fee - $ 100
Total = $260
PROPOSED:
Base Administration Fee - $262
Inspection Fee ( 1 hour minimum) - $660
Restoration Fee - $ 100 { xQ 7.
Total = $428
+c
'� 1
29 35
ENGINEERING DIVISION
Excavation (EXC) Fee Changes
EXAMPLE — excavating for new side sewer connection for residence
CURRENT:
Base Administration Fee - $ 100
Inspection Fee ( 1 hour minimum) — $60
Restoration Fee - $ 1 ,000
Total = $1 ,160
PROPOSED:
Base Administration Fee - $262
Inspection Fee ( 1 hour minimum) - $66 arr T
Restoration Fee - $ 1 ,000
Total = $1 ,328
30 36
ENGINEERING DIVISION
Right-of-Way Use Fee Changes
CURRENT: PROPOSED:
Short-Term Permit Short-Term Permit
Application Fee - $50
Application Fee - $ 164
Inspection Fee ( 1 hour minimum) - $66
Total = $230
Long-Term Permit Long-Term Permit — Council Approval Required
Application Fee - $ 100 Application Fee - $382
Annual Renewal Fee - $ 100 Inspection Fee ( 1 hour minimum) - $66
Total = $448
Annual Renewal Fee — $ 109
Long-Term Permit for Signs — No Council Approval Required
Application Fee - $ 164
Annual Renewal Fee — $ 109
31 37
ENGINEERING DIVISION
Short-Term Use Fee Changes
EXAMPLE — Crane lifting an AC unit onto a building roof
CURRENT:
..k. ' Application Fee - $50
��.�-
.;.?.,li�_. V Total = $50
, ,ileki•
�' PROPOSED:
'`r<<a,, ,4 Application Fee - $ 164
,..
I y�,� *
Inspection Fee ( 1 hour minimum) - $66
tiii
Total = $230
/). --i ‘ ',1 i
32 --��li l 38
ENGINEERING DIVISION
Short-Term Use Fee Changes
EXAMPLE — Install dumpster in right-of-way to use in demolition project
`'30 is ' Ft ,so i a s r, ;, ", f').f , CURRENT:
v 0., it-- ..i `�%e . ` tip - i
r-� ��Mi� . xh, 5, fir` ,e .W i
,,► o ' 1, , ,ir rvr ;�'. `� .N Application Fee - $50
T. f Tota I = $50
'6 "l'- 1 ii polo' Alm imp ,.
PROPOSED:
mil—,
Application Fee - $ 164
r'-glIllri ti;---.... . ______
'! oll _ "° ' Inspection Fee ( 1 hour minimum) - $66
Total = $230
33 39
ENGINEERING DIVISION
Long-Term Use Fee Changes
EXAMPLE — Sign projecting over sidewalk
CURRENT: . .
vrewri„1-11• .. _ ?......- 44 • . .. ,) _
vp
Application Fee - $ 100 ..
. . . ._ .
. •
_,A,
Annual I Renewal I Fee - $ 100 '
A A P
P
t • . C at{.7:di,it i A IIII
PROPOSED: . 6.. ON: ' T
Application Fee - $ 164 - ,
40pi
•
Annual Renewal Fee - $ 109 /..�
34 40
ENGINEERING DIVISION
Long -Term Use Fee Changes
EXAMPLE — Fence in right-of-way
.nimmumatioillimmoimc.
CURRENT:
_ - Application Fee - $ 100
- Annual Renewal Fee - $ 100
Y r `
_ .. ,� PROPOSED:
- ' �\ - Application Fee - $382
. �.1 _ter..---
R
`� •' Inspection Fee ( 1 hour minimum) - $66
n4, 4
Tota I = $448
, ,,, - Annual Renewal Fee - $ 109
!' 1�
35 41
.
ENGINEERING DIVISION
Engineering (ENG) Fee Changes
CURRENT.
.
$250 deposit I i ,....
5:--
IMMO•=lo Wm/am. : rya
• - -iir c 1 1,4' -7. Ir a
..,
1
7PROPfr' ' 1ik, i•j 1r`4'....
..,.
1:11 I'•
OSED.$500 application ee
---------.. -7'
-,e--
__ ''.-.0 T”i15111.••-- .....,
_
...
. _
. . ,
3 6 42
ENGINEERING DIVISION
Engineering (ENG) Fees
EXAMPLE — Frontage, sewer, and stormwater improvements for new housing development
CURRENT:
Deposit - $250
Plan review and inspection fees (based on bid price established in code for relevant items) - $ 14,413
Sewer TV inspection fee (rate schedule adopted in master fee schedule) - $2,350
Deposit deducted from plan review and inspection fees
TOTAL = $16,763
PROPOSED:
Application Fee - $500
} Plan review and inspection fees (no change) - $ 14,413
Sewer TV inspection fee (rate schedule adopted in master fee schedule) - $2,350
} TOTAL = $17,263
37 43
ENGINEERING DIVISION
Engineering (ENG) Fee Changes
ArNt.,.. • ..„._ 1 I. 14r.
•
r•
�• �� ` _ ,
•
- ' 1110r1" . 4!).: 1,1 I.- -4,40°) . .
s_.; -,..„"4 _:..)L.. t 'Pe' . .t: -' o• ' . 4' 1 • .P ,
.11
'. • K. ♦s _
iiii
•
'tit• . • - • , - • .of. .••,J3�' ♦ _ s. 1 ,- •+ i 1 ,'�1 4 .' Gt ,• a 1
Curb/Gutter/Sidewalk Sewer Main Install Water Main Install
35 44
QUESTIONS ?