Loading...
HomeMy WebLinkAbout02/10/2026 03.B. Review of Community Development Proposed Fee Changes - Planning, Codes, Engineering 'V e+ i'i i 1�•• r 1.:4'" • t:',gin;*•'*'_1a _- BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No. 3.B. For Meeting of: February 10, 2026 ITEM TITLE: Review of Community Development Proposed Fee Changes - Planning, Codes, Engineering SUBMITTED BY: Bill Preston, Community Development Director SUMMARY EXPLANATION: As part of the 2025 budget process, Community Development staff reviewed current permit fees and determined changes were needed in order recover the costs associated with staffs time processing these permits. The attached fees are being proposed. ITEM BUDGETED: N/A STRATEGIC PRIORITY 24-25: A Resilient Yakima RECOMMENDATION: Provide direction to staff on the proposed fees; direct staff to bring back a Resolution for adoption. ATTACHMENTS: Proposed Fee Changes Council Presentation_2026-02-10.pdf 6 qb l�l YA� 1 ...:64 , ... • . • ..+ Iiii . OW di• . M #0 • • 100.1 iP0 : lC • ...4.4 0,1•000 • • V Vir i ' ` 1I f01 i , ill II I — �t • coy ••i I tat i Ir� r — if —_ — is:. =` �'� —� ": .:. 0 I. I ,,kit RPORATI v 1COMMUNITY DEVELOPMENTI Fee Adlustment DEPARTMENT Proposals 0 CITY OF YAKIMA - PERMITTING What does it take to build something in Yakima? Permitting crosses multiple departments and regulations. Broadly, here is what you will need to build a commercial building in City of Yakima, or pretty much anywhere in Washington State. Land-Use/Zoning Review - Verify zoning, site plan, conditional use Building Permit - For new construction or major alterations - Requires stamped plans and WA State Energy Code compliance Change-of-Occupancy Permit - If building use changes Demolition Permit - For removing existing structures Mechanical Permit - HVAC systems, gas piping, oil tank removal Plumbing Permit - New or modified plumbing systems Electrical Permit - Issued by WA State Department of Labor & Industries Fire Code Permit - Sprinklers, alarms, life safety systems Sign Permit - For new signage (requires site and structural plans) Noise Permit - If construction exceeds sound limits Grading Permit - For earthwork and site preparation Stormwater Management Permit - Required for >_ 1 acre disturbance or >_5,000 ft2 new hard surface Water/Wastewater Connection Permit - For new utility connections Street Excavation Permit — Excavations in the right-of-way (driveway approaches, sidewalks, etc.) piEngineering Permit — private development of public improvements (frontage, streetlights, sidewalks, etc.) CITY OF YAKIMA - PERMITTING Why Do We Do Permitting? Most of these permits are required by State law or the builder is accessing a city asset (i.e. streets or utilities) — Governing Laws Permit Type Governing Statute & Mandate Land use/Zoning Growth Management Act Building RCW 19.27 Electrical RCW 19.28 Plumbing RCW 19.28 Mechanical/HVAC/Gas RCW 19.27 Fire/Life Safety RCW 70.92 Grading/Subdivision RCW 58. 17 Stormwater/Erosion RCW 90.48 Signage/Noise RCW 35.21 (local implementation) I 9 CITY OF YAKIMA - PERMITTING Permit Fees & Development Fast, Cheap, Accurate — pick two Iron Triangle Permit fees historically set low (,1(ieCip ro Supplemented by General Fund (wtov+,et} For developers, time is money Reviewing permit fees to: Update to state law Close the gap to actual cost Reflect annual increases in cost of service (COS) faSt OOot Part of a multi-year effort (tLviit ) (cva Litt' ) Right Sizing and Resourcing _ _ 62 cLLt TKO VI. Le. Two 4 10 CITY OF YAKIMA - PERMITTING Permit Fees & Development Fast, Cheap, Accurate — pick two Iron Triangle Permit fees historically set low Supplemented by General FundP.C.y Yekl.n. city of Yakima Government Transparency Portal For developers, time is money Building and Land Use Permits Explorer Reviewing permit fees to: 1 ,268 •Update to state law '' ' 4i : Total Permits Close the gap to actual cost • •. • '•• • ••.: •• N.• --• ~.• • 207 Reflect annual increases in cost of •4. .• . .` •., • '�'•. .• ' '• ': • - •_,, • :• : •:r :ea .1% .. • Pending Permits s.. C. . •. Z.. • . w. . S,. service (COS) • :. ,• • . . • • •:• •:;: ,a. '••. •••r .r..V •;' �••. Issued Permits Part of a multi-year effort ' '• •''• • ' 209 692 • •r •• 4• Conditions.Outstanding Mood Amnia % s• . 15 '� Right Sizing and Resourcing � '• ' • Transparency�KPl's �µ• °'°°"° Finalized Permits 47.8 �_n °,..e�w.._-. �sr.„ m m,n.°�.�.�.�ro,• .. e� �E�,.�. a w. Average Days to Issue Per.. 5 11 , CITY OF YAKIMA - PERMITTING Permit Fees & Development Fast, Cheap, Accurate — pick two Iron Triangle Permit fees historically set low Supplemented by General Fund For developers, time is money Reviewing permit fees to: Update to state law44111111 . Close the gap to actual cost ,, li - _ ,, , Reflect annual increases in cost of 4111& 54. • li service (COS) -411114 44, NMI ' j Part of a multi-year effort ,_ \1 -4% Right Sizing and Resourcing Y %' "`" f Transparency/KPI's 1di Process Efficiency - • 12 CITY OF YAKIMA - PERMITTING Permit Fees & Development Fast, Cheap, Accurate — pick two Iron Triangle Permit fees historically set low e Supplemented by General Fund For developers, time is money 7. 9. PERMIT LIFE CYCLE Approved Permit Congratulations! Once approved,permit is Ready to BASICS 5 Issue.Issue through the Online Closed-Finaled Manage Your Permit Permit Centern • Permit is Under Review! Reviewing permit fees to: 3. Track progress and manage in the 1 Intake Screening Online Permit Center Research Permit technician screens Update to state l a w Research your project and confirms your application is _, ,,,,� Prepare to apply ready for reviewers ��� \y / Close the gap to actual cost ,sc v,J —� / / �O Part of a multi-year effort• ���►VV/ u� / _} 8. Manage Project Right Sizing and Re s o u r c i n g _ / Complete work&order inspections, �i J V / as applicable to your project °° Transparency/KPl's ,-®0_i. 6. Information Request As applicable,if reviewers need more • • info.Upload response to the Online el' Process Efficiency 4. Permit Center Pay ° Followprovided instructions to pay 0 - Pro Development 2. Apply for your permit.Once paid you're in •earn project is unique.Consult with Department tor questions related to Go to the Permit Application Portal line for reviewers! your individual project PI 13 PLANNING DIVISION Land Use - Development Services - Special Events The arm of City government used to guide processes for development and future growth. = Works with ALL City departments for different applications related to economic development, special events, zoning, development services, and long-range planning. = Planning has processed 193 current land use applications over the past 2 years. 111 14 PLANNING DIVISION Team Planning Manager: Trevor Martin Senior Planners (2): Eric Crowell, Jason Radtke Associate Planner: Connor Kennedy Planning Technician: Eva Rivera Department Assistant (Temp): Irene Linos Honorable Mentions r Community Development Director: Bill Preston Community Development Admin Assistant: Lisa Maxey PI 15 CITY OF YAKIMA PLANNING DIVISION TYPE 3 REVIEW— Land Use Application Process(YMc ch.15.15) PLANNING DIVISION .PRE-APPLICATION MEETING REQUEST SUBMITTED,MEETING HELD 1 Planning has processed 193 current land use *APPLICATION SUBMITTED &FEES PAID applications over the past 2 years. 1 _ PLANNER DETERMINES IF COMPLETE (w/iin 28 days of submittal) CITY OF YAKIMA PLANNING DIVISION TYPE 1 REVIEW— Land Use Application Process (YMC Ch.15.13) COMPLETE INCOMPLETE FOR FURTHER PROCESSING DITIONAL INFO REQ'D) — �r*APPLICATION SUBMITTED I &FEES PAID DEVELOPMENT SERVICES TEAM ADDITIONAL INFO I \ (DST)MEETING SUBMITTED 1 I / I PLANNER DETERMINES IF COMPLETE (w/in 28 days of submittal) IIII POST LAND USE ACTION SIGN PLANNER DETERMINES IF (provided by Planning Division;applicant COMPLETE returns the posting certificate} COMPLETE [w/in 14 days of new submittal) INCOMPLETE NOTICE OF APPLICATION&PUBLIC HEARING FOR FURTHER PROCESSING (ADDITIONAL INFO REQ'D) [sent to property owners win 300 ft w/chance to II comment and/or attend hearing) -1 ADDITIONAL INFO PLANNER DRAFTS RECOMMENDATIOj **DVELOPMENT SERVICES TEAM SUBMITTED TO HEARING EXAMINER (DST)MEETING (w/applicatio ,public comments rec'vd,etc I I I I PLANNER DETERMINES IF HEARING EXAMINER HOLDS PUBLIC HEARING COMPLETE (applicant or representative attends) PLANNER DRAFTS&ISSUES DECISION , (w/in 14 days of new submittal) i (w/in 65 days of complete application(per RCW HEARING EXAMINER ISSUES DECISION 36.70B.080)-sent to applicant/property owner) (w/in 10 business days) I ) *Required for most Type 3 Reviews. 1 1 NOTICE OF DECISION SENT Submit request online. (warn 170 days of complete application and w/in 3 business **Building permit application may be "**IF APPLICATION APPROVED: IF APPLICATION DENIED: days after decision is rendered—sent to applicant,property COMPLY W/CONDITIONS APPLICANT MAY APPEAL owner,parties of record w/a 14-day appeal period) submitted to the Codes Division at the same OF APPROVAL W/IN 14 DAYS PER I time for processing but there may be conditions that need to be satisfied prior to YMC CH. 16.08 "IF APPLICATION APPROVED: permit issuance. Iii0_ I COMPLY W/CONDITIONS OF APPROVAL 16 NOTE:This chart shows the process of a typical Type 3 Rewew appncaton and is for demonstration purposes only. PLANNING DIVISION Fee Updates The Community Development Department went through a fee evaluation in 2022. The evaluation projects the fees into 2028. Rate of fee increase is based upon Cost of Service. Fees based upon market rate analysis PI 17 PLANNING DIVISION Fee Updates r .� NEW FEES sal &ewar€ -- -- • Site Plan Review $335 .-' SUBARU "'�""T�� irV�l l j��fl ft so - - "� Result of SB 5290 ��EeAC: WEST VALLEY '�� � • Site • -: ' ,- FITNESS , 1.1 - Plan Re-Review $56 if l, ft • Critical Area Review Present, No Impact - $493 ��: ' '�' • Per Lot Long Plat - $ 150 per lot 1 i...._ JO_ Unit Lot Subdivision / Lot Splitting - $ 1 ,626 � Result of SB 5258 and 5559 1. REVISED FEES Special Event Permit — $250 Special Event Late Fee - $ 1 ,000 Letter sent to applicants at end of year • 18 QUESTIONS ? CODE ADMINISTRATION DIVISION SERVICE UNITS Permitting - Licensing - Code Enforcement A division of the Community Development Department • We're the face of the City £ • 17 full-time employees Si 1 W. 4 4 \ , 1, Like three divisions within one ,: `� '' r` - • PERMITTING = building, plumbing, mechanical, fire (state mandated) -� - -' • LICENSING = business, regulatories v • CODE ENFORCEMENT = community health, safety and maintenance - • ` "N., ,, . ......p ,, , .. ' ' , ,t , ..,,k„...„,,,, pe �. // c f-')7 S' d of Epos* + �-- !„ ' jam " 14 20 CODE ADMINISTRATION DIVISION Team Division Manager: Glenn Denman Supervising Code Inspector: Julia Rosales Plans Examiners (2): Suzanne DeBusschere, John Zabel! Building Inspectors (3): Mike Musgrove, Anson Morgan, Vacant Permit Project Coordinators (2): Linda Kuntz, Samantha Grenz Permit Technicians (3): Carissa Dellinger, Carla Hernandez, Jenseni Gutierrez €° Code Compliance (4): Pedro Contreras (Clean City), Isidro Mendoza, Jeremy Viveros r Code Compliance Project Coordinator: Jose Armenta Department Assistant (Temp): Irene Linos Honorable Mentions Community Development Director: Bill Preston Community Development Admin Assistant: Lisa Maxey 15 21 WHY WE ' RE HERE General Fee Updates Council has given direction to cover cost of services rendered RCW 82.02.020 - "permit fees must reasonably cover the cost" of application processing, conducting inspections and reviewing plans \‘07/fiv • 160/1 4ke • 22 PROPOSALS =11.1F Fee Updates BUILDING PERMITS • Updating minimum permit fees Going from building valuation data table to local cost of living adjustment • Hourly rates PLUMBING PERMITS Going from valuation method to per fixture method 17 23 BUILDING PERMITS IMMEMPIF MI=51 BASELINE PERMIT FEES _. Correcting the minimum permit fee to cover processing and inspections VALUATION DATA TABLE kali, INTERNATIONAL EMICODE COUNCIL People Helping People Build a Safer World' .' A nationally recognized table to reflect final project value Square Foot Construction Costs;h Group(2024International Building Code) IA IB IIA IIB IIIA IIIB IV VA VB Established based on FCS Group Study in 2022 A-1 Assembly,theaters,with stage 340.8 328,7 319.0 306.4 286.3 278.0 295.9 266.8 256.6 3 0 0 3 3 3 5 2 1 A-1 Assembly,theaters,without stage 312.9 300.7 291.0 278.5 258.6 250.3 268.0 239.1 228.9 .' Last valuation table was increased by 2.6% 272.0 264.1 255.8 246.0 230.4 224.2 237.6 209.5 201.6 A-2 Assembly,nightclubs 9 1 2 6 7 1 2 8 3 Move to 2.5% local cost of service increase, A-2 Assembly,restaurants,bars,banquet halls 279 1.0 263.1 252.8 24fi5.0 228.4 227 1.2 236.6 207.5 203.6 1 317.6 305.4 295.7 283.2 263.4 255.1 272.7 243.9 233.7 effective January 1 , 2027 A-3 Assembly,churches 0 7 7 0 7 8 3 6 5 A-3 Assembly,general,community halls,libraries, 266.7 254.5 243.8 232.3 211.4 204.1 221.8 191.9 182.7 museums 2 9 9 1 6 7 4 5 4 A-4 Assembly,arenas 311.9 299.7 289.0 277.5 256.6 249.3 267.0 237.1 227.9 1 8 8 1 6 6 3 4 4 t3l3usiness 301.4 290.7 280.2 268.4 245.1 236.3 258.1 + 219.0 209.0 0 0 7 1 3 9 0 7 2 E Educational 290.1 279,7 270.3 258.9 240.4 228.2 250.0 210.4 203.6 1 8 4 7 5 0 6 6 5 F-1 Factory and industrial,moderate hazard 165.8 157.8 147.8 142.3 126.7 120.5 135.6 105.0 2 2 9 1 2 6 8 8 97.84 F-2 Factory and industrial,low hazard 164.8 156.8 147.8 141.3 126.7 119.5 134.6 105.0 2 2 9 1 2 6 8 8 96.84 1-1-1 High Hazard,explosives 154.6 146.6 137.7 131.1 116.9 109.7 124.5 9 9 6 8 1 5 5 95.27 - 0.00 H234 High Hazard 154.6 146,6 137.7 131.1 116.9 109.7 124.5 9 9 6 8 1 5 5 95.27 87.03 )8 H-5 HPM 301.4 290.7 280.2 268.4 245.1 236.3 258.1 219.0 209.0 ' 24 0 0 7 1 3 9 0 7 2 PLUMBING PERMITS MINIE=IPEr Fee Structure Change HISTORY OF PLUMBING PERMIT FEES Flat rate per fixture } Model was good, but fees were outdated, didn't cover cost _ lbw MOVED TO VALUATION MODEL IN 2023 � 7- Some fees don't reflect valuation well Araani ' r REVERT TO PER FIXTURE STRUCTURE With a flat rate to cover processing, reviews, and inspections 19 25 BUILDING & PLUMBING PERMITS Fee Comparisons EXAMPLE — New 2,000 sq ft Single-Family Home, 14 plumbing fixtures -�,; ,,, CURRENT PROPOSED --�, �' • ' ' Building Permit Fees: r, Building Permit Fees: - Permit Fee - $2,149 Permit Fee - $2,185 11 1 .) n [1. c Plan Review - $1 ,397 Plan Review - $1 ,421 1V IF II Tech Fee - $142 e� Tech Fee - $144 .� w Surcharge - $6.50 1 Surcharge - $6.50 : ,; tr # - TOTAL = $3,695 TOTAL = $3,757 ' Plumbing Permit Fees (valuation based): $A, Plumbing Permit Fees (fixture-based): Permit Fee: $ 180 Permit Fee: $50 (flat rate) + $308 ($22/fixture) Plan Review: $ 1 17 Plan Review: $60 (flat rate) Tech Fee: $12 Tech Fee: $17 nn TOTAL = $309 4. TOTAL = $435 20 TOTAL = $4,004 TOTAL = $4,192 26 . BUILDING & PLUMBING PERMITS Fee Comparisons EXAMPLE — New 4,000 sq ft Office Building, 14 plumbing fixtures CURRENT PROPOSED Building Permit Fees: Building Permit Fees: ill - Permit Fee - $4,323 Permit Fee - $4,435 i 1 ' ►l Plan Review - $2,810 � Plan Review - $2,882 � ��I )i �. 1 ' til Tech Fee - $285 Tech Fee - $293 ��_ '" '! Surcharge - $25 Surcharge - $25 � ' - .,, TOTAL = $7,443 TOTAL = $7,635 ' Plumbing Permit Fees (valuation based): $A, Plumbing Permit Fees (fixture-based): Permit Fee: $ 180 Permit Fee: $50 (flat rate) + $308 ($22/fixture) Plan Review: $ 1 17 Plan Review: $60 (flat rate) Tech Fee: $12 Tech Fee: $17 nn TOTAL = $309 4. TOTAL = $435 21 TOTAL = $7,752 TOTAL = $8,070 27 BUILDING PERMITS Fee Com pa risons EXAMPLE — Remove a non-bearing wall in a house — valuation of $500 CURRENT PROPOSED Building Permit Fees: Building Permit Fees: Permit Fee - $21 Permit Fee - $90 Plan Review - $14 Plan Review - $59 TechFee - $1 TechFee - $6 Surcharge - $6.50 - Surcharge - $6.50 TOTAL = $43 TOTAL = $162 rMinimum permit fees increased to capture cost of staff time to process. 22 28 OTHER CLEAN UP Miscellaneous Changes { Hourly rates to capture staff labor and overhead • Correct fireworks fee • Correct mobile home installation duplicated fees • Create fee for permit expiration extensions • Clarify reinspection and re-review fees • Eliminate change of ownership fee for business licenses 23 29 CODE ADMINISTRATION DIVISION Wrap Up PLAN OF ACTION • Final resolution proposal forthcoming * Modernizing or reducing regulatory licenses 24 30 QUESTIONS ? ENGINEERING DIVISION Permits EXCAVATION (EXC) — Any work occurring in the right-of-way, including adding or modifying driveway approaches. RIGHT OF WAY USE - Short-Term (Less than 30 days) Cranes, dumpsters, material storage, etc. Long-Term (Permanent) Signs, Fences, Stairs, etc. ENGINEERING (ENG) — Private construction of public improvements Frontage improvements (Curb, gutter, & sidewalk) Wastewater and water mainline extensions Streetlights 26 32 ENGINEERING DIVISION Team City Engineer: Robert Washabaugh Engineering Contract Specialist: Brenda Fehlhafer Chief Engineer: Dana Kallevig Senior Engineer: Randy Tabert Supervising Traffic Engineer: Vacant Traffic Technician II: Alexander Tikhomirov c° Development Engineer: Kirsten McPherson y Construction Supervisor: Nick Rogers Construction Inspector (2): Tim Daniels, Josh Gaub Honorable Mentions Community Development Director: Bill Preston Community Development Admin Assistant: Lisa Maxey 27 33 ENGINEERING DIVISION Excavation (EXC) Fee Changes CURRENT: PROPOSED: Base Administration Fee - $ 100 Base Administration Fee - $262 Inspection Fee ( 1 hour minimum) - $60 Inspection Fee ( 1 hour minimum) — $66 Fees to be adjusted in accordance with the City's labor contracts. Restoration fees are required when there is any disturbance of pavement. The fees are calculated based on the trench size and pavement condition index (PCI). 28 34 ENGINEERING DIVISION Excavation (EXC) Fee Changes EXAMPLE — new residential driveway approach CURRENT: `o" 4 Base Administration Fee - $ 100 41/11111 Inspection Fee ( 1 hour minimum) — $60 Restoration Fee - $ 100 Total = $260 PROPOSED: Base Administration Fee - $262 Inspection Fee ( 1 hour minimum) - $660 Restoration Fee - $ 100 { xQ 7. Total = $428 +c '� 1 29 35 ENGINEERING DIVISION Excavation (EXC) Fee Changes EXAMPLE — excavating for new side sewer connection for residence CURRENT: Base Administration Fee - $ 100 Inspection Fee ( 1 hour minimum) — $60 Restoration Fee - $ 1 ,000 Total = $1 ,160 PROPOSED: Base Administration Fee - $262 Inspection Fee ( 1 hour minimum) - $66 arr T Restoration Fee - $ 1 ,000 Total = $1 ,328 30 36 ENGINEERING DIVISION Right-of-Way Use Fee Changes CURRENT: PROPOSED: Short-Term Permit Short-Term Permit Application Fee - $50 Application Fee - $ 164 Inspection Fee ( 1 hour minimum) - $66 Total = $230 Long-Term Permit Long-Term Permit — Council Approval Required Application Fee - $ 100 Application Fee - $382 Annual Renewal Fee - $ 100 Inspection Fee ( 1 hour minimum) - $66 Total = $448 Annual Renewal Fee — $ 109 Long-Term Permit for Signs — No Council Approval Required Application Fee - $ 164 Annual Renewal Fee — $ 109 31 37 ENGINEERING DIVISION Short-Term Use Fee Changes EXAMPLE — Crane lifting an AC unit onto a building roof CURRENT: ..k. ' Application Fee - $50 ��.�- .;.?.,li�_. V Total = $50 , ,ileki• �' PROPOSED: '`r<<a,, ,4 Application Fee - $ 164 ,.. I y�,� * Inspection Fee ( 1 hour minimum) - $66 tiii Total = $230 /). --i ‘ ',1 i 32 --��li l 38 ENGINEERING DIVISION Short-Term Use Fee Changes EXAMPLE — Install dumpster in right-of-way to use in demolition project `'30 is ' Ft ,so i a s r, ;, ", f').f , CURRENT: v 0., it-- ..i `�%e . ` tip - i r-� ��Mi� . xh, 5, fir` ,e .W i ,,► o ' 1, , ,ir rvr ;�'. `� .N Application Fee - $50 T. f Tota I = $50 '6 "l'- 1 ii polo' Alm imp ,. PROPOSED: mil—, Application Fee - $ 164 r'-glIllri ti;---.... . ______ '! oll _ "° ' Inspection Fee ( 1 hour minimum) - $66 Total = $230 33 39 ENGINEERING DIVISION Long-Term Use Fee Changes EXAMPLE — Sign projecting over sidewalk CURRENT: . . vrewri„1-11• .. _ ?......- 44 • . .. ,) _ vp Application Fee - $ 100 .. . . . ._ . . • _,A, Annual I Renewal I Fee - $ 100 ' A A P P t • . C at{.7:di,it i A IIII PROPOSED: . 6.. ON: ' T Application Fee - $ 164 - , 40pi • Annual Renewal Fee - $ 109 /..� 34 40 ENGINEERING DIVISION Long -Term Use Fee Changes EXAMPLE — Fence in right-of-way .nimmumatioillimmoimc. CURRENT: _ - Application Fee - $ 100 - Annual Renewal Fee - $ 100 Y r ` _ .. ,� PROPOSED: - ' �\ - Application Fee - $382 . �.1 _ter..--- R `� •' Inspection Fee ( 1 hour minimum) - $66 n4, 4 Tota I = $448 , ,,, - Annual Renewal Fee - $ 109 !' 1� 35 41 . ENGINEERING DIVISION Engineering (ENG) Fee Changes CURRENT. . $250 deposit I i ,.... 5:-- IMMO•=lo Wm/am. : rya • - -iir c 1 1,4' -7. Ir a .., 1 7PROPfr' ' 1ik, i•j 1r`4'.... ..,. 1:11 I'• OSED.$500 application ee ---------.. -7' -,e-- __ ''.-.0 T”i15111.••-- ....., _ ... . _ . . , 3 6 42 ENGINEERING DIVISION Engineering (ENG) Fees EXAMPLE — Frontage, sewer, and stormwater improvements for new housing development CURRENT: Deposit - $250 Plan review and inspection fees (based on bid price established in code for relevant items) - $ 14,413 Sewer TV inspection fee (rate schedule adopted in master fee schedule) - $2,350 Deposit deducted from plan review and inspection fees TOTAL = $16,763 PROPOSED: Application Fee - $500 } Plan review and inspection fees (no change) - $ 14,413 Sewer TV inspection fee (rate schedule adopted in master fee schedule) - $2,350 } TOTAL = $17,263 37 43 ENGINEERING DIVISION Engineering (ENG) Fee Changes ArNt.,.. • ..„._ 1 I. 14r. • r• �• �� ` _ , • - ' 1110r1" . 4!).: 1,1 I.- -4,40°) . . s_.; -,..„"4 _:..)L.. t 'Pe' . .t: -' o• ' . 4' 1 • .P , .11 '. • K. ♦s _ iiii • 'tit• . • - • , - • .of. .••,J3�' ♦ _ s. 1 ,- •+ i 1 ,'�1 4 .' Gt ,• a 1 Curb/Gutter/Sidewalk Sewer Main Install Water Main Install 35 44 QUESTIONS ?