HomeMy WebLinkAboutR-2026-022 amend 6-year TIP 2026-2031_Comp plan capital facilities element_BA RESOLUTION
RESOLUTION NO. R-2026-022
amending the Yakima Urban Area Comprehensive Plan Capital Facilities
Element to incorporate the amended Six -year Transportation
Improvement Program (TIP) for the period of 2026 through 2031.
WHEREAS, the City of Yakima annually prepares, reviews and adopts a six -year
Transportation Improvement Program for transportation improvements to arterial streets in the
City of Yakima for the ensuing six -year period, all as contemplated and required by the State
RCW 35.7T010 and applicable Federal law; and
WHEREAS, the City of Yakima desires to amend the Yakima Urban Area
Comprehensive Plan Capital Facilities Element to reflect the adoption of the Six -year TIP, as
contemplated and required by RCW 36.70A.070(6) to ensure compliance with the Growth
Management Act and consistency of the Comprehensive Plan and the Six -year TIP; and
WHEREAS, this amendment is limited to incorporation of the projects listed in the Six -
Year Transportation Improvement Plan for the period of 2026 to 2031 to the Capital Facilities
Element of the Yakima Urban Area Comprehensive Plan, which is required under RCW
36.70A.130(2B) and RCW 35.77.010; and
WHEREAS, a public hearing was held by the Yakima City Council on the Six -year TIP
on Tuesday, February 3, 2026, with the proper public notice as required by RCW 35.77.010;
and
WHEREAS, the City Council of the City of Yakima, after reviewing the information and
holding the public hearing, finds that amending the Yakima Area Comprehensive Plan Capital
Facilities Element is in the best interest of the City and its residents; now, therefore,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA:
The adopted Six -year Transportation Improvement Program for the period of 2026
through 2031 for the City of Yakima shall be incorporated as an amendment to the Capital
Facilities Element of the Yakima Urban Area Comprehensive Plan.
ADOPTED BY THE CITY COUNCIL this 3`d day of February, 2026.
Matt Brown, Mayor
ATTEST:
R•salinda Ibarra, CMC, City Clerk
MIL
•Ti
Aganry: Yakima
County: Yakima
MPO/RTPO: WCOG
Y Inside
Six Year Transportation Improvement Program
From 2026 to 2031
N Outside
el
Sit
o Z
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin 6 End Termini
F. Project Description G. Structure ID
Hearing
o
$
a.
I
'eN UOgn1e821
Improvement Type
g
0
$
oT�
Total Length
m
I
m
A
3.
03
YAK118
S. let SL Pavement Rehabilitation
S. 1st Street
W. Walnut Street to Pacific Ave
The proposed Improvements consist of milling end overlaying the existing asphall,
crack sealing, new pavement markings, end replacement of sidewalks, curb end
gutter and curb ramps, end Illumination. Improvements include spot pavement repair
areas where pavement has failed In isolated locations.
02/03/26
06
C G P S T
w
0.540
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
PE
2026
NHPP
945,300
0
0
945,300
S
CN
2027
NHPP
6,497,700
0
750,000
7,247,700
Totals
7,443,000
0
750,000
8,193,000
Expenditure Schedule
Phase
let
2nd
3rd
4th
5th & 6th
PE
675,000
270,300
0
0
0
CN
0
6,497,700
0
0
0
Totals
875,000
8,768,000
0
0
0
Report Date: December 29, 2025
Page 1
•Tim Of 11rantsportation
Agency: Yakima
County: Yakima
MPO/RTPO: WCOG
Y Inside
Six Year Transportation Improvement Program
From 2026 to 2031
N Outside
°
n gE.
gm
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
Begin & End Termini
F. Project Description G. Structure ID
Hearing
D
n
$
3
;
a
a
Resolution No.
Improvement Type
n
&
Total Length
Environmental Type
a
d
-
03
YAK117
Yakima Ave S. Overlay
Yeldma Avenue
S. 6th Street to Yakima River Bridge
The proposed improvements consist of mating and overlaying the existing asphalt,
crack sealing, new pavement markings, and replacement of non-ADA compliant curb
ramps. Improvements include spot pavement repair areas where pavement has
failed in isolated locations.
02/03/26
05
G P S W
1.000
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
PE
2026
NHPP
297,000
0
0
297,000
S
CN
2027
NHPP
2,273,000
0
0
2,273,000
Totals
2,570,000
0
0
2,570,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & Bth
PE
225,000
72,000
0
0
0
CN
0
2,273,000
0
0
0
Totals
225,000
2,345,000
0
0
0
Federal Funds
State Funds
Local Funds
Total Funds
Grand Totals for Yakima
10,013,000
0
750,000
10,783,000
Report Date: December 29, 2025
Page 2
ITEM TITLE:
BUSINESS OF THE CITY COUNCIL
YAKIMA, WASHINGTON
AGENDA STATEMENT
Item No. S.A.
For Meeting of: February 3, 2026
Public Hearing to consider: A) Resolution adopting the amended Six -
Year Transportation Improvement Program for the period of 2026-
2031, and to amend the Transportation Systems Plan 2040; and B)
Resolution amending the Yakima Urban Area Comprehensive Plan
Capital Facilities Element (No budgetary impact)
SUBMITTED BY: Robert Washabaugh, City Engineer
SUMMARY EXPLANATION:
On June 17, 2025 the City of Yakima adopted R-2025-103 and R-2025-104 as required by state statute
to update its Six -year Transportation Improvement Program (TIP) for submittal in the Statewide
Transportation Improvement Program (STIP) to the Washington State Department of Transportation. The
City is amending the Six -year TIP to include these additional projects:
• 5 1st St Pavement Rehabilitation
• Yakima Ave S. Overlay
A Public Hearing will be held to consider including the additional projects in adoption of an amended
Resolution approving the Six -year TIP and amending the regional Metropolitan Transportation Plan and
Comprehensive Plan Capital Facilities Element.
ITEM BUDGETED: N/A
STRATEGIC PRIORITY 24-25: A Resilient Yakima
RECOMMENDATION: Adopt both resolutions,
ATTACHMENTS:
Resolution Amend TIP_A
Resolution Amend TIP__B
S 1st St and Yakima Ave Amendments.pdf