Loading...
HomeMy WebLinkAboutR-2026-022 amend 6-year TIP 2026-2031_Comp plan capital facilities element_BA RESOLUTION RESOLUTION NO. R-2026-022 amending the Yakima Urban Area Comprehensive Plan Capital Facilities Element to incorporate the amended Six -year Transportation Improvement Program (TIP) for the period of 2026 through 2031. WHEREAS, the City of Yakima annually prepares, reviews and adopts a six -year Transportation Improvement Program for transportation improvements to arterial streets in the City of Yakima for the ensuing six -year period, all as contemplated and required by the State RCW 35.7T010 and applicable Federal law; and WHEREAS, the City of Yakima desires to amend the Yakima Urban Area Comprehensive Plan Capital Facilities Element to reflect the adoption of the Six -year TIP, as contemplated and required by RCW 36.70A.070(6) to ensure compliance with the Growth Management Act and consistency of the Comprehensive Plan and the Six -year TIP; and WHEREAS, this amendment is limited to incorporation of the projects listed in the Six - Year Transportation Improvement Plan for the period of 2026 to 2031 to the Capital Facilities Element of the Yakima Urban Area Comprehensive Plan, which is required under RCW 36.70A.130(2B) and RCW 35.77.010; and WHEREAS, a public hearing was held by the Yakima City Council on the Six -year TIP on Tuesday, February 3, 2026, with the proper public notice as required by RCW 35.77.010; and WHEREAS, the City Council of the City of Yakima, after reviewing the information and holding the public hearing, finds that amending the Yakima Area Comprehensive Plan Capital Facilities Element is in the best interest of the City and its residents; now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The adopted Six -year Transportation Improvement Program for the period of 2026 through 2031 for the City of Yakima shall be incorporated as an amendment to the Capital Facilities Element of the Yakima Urban Area Comprehensive Plan. ADOPTED BY THE CITY COUNCIL this 3`d day of February, 2026. Matt Brown, Mayor ATTEST: R•salinda Ibarra, CMC, City Clerk MIL •Ti Aganry: Yakima County: Yakima MPO/RTPO: WCOG Y Inside Six Year Transportation Improvement Program From 2026 to 2031 N Outside el Sit o Z Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin 6 End Termini F. Project Description G. Structure ID Hearing o $ a. I 'eN UOgn1e821 Improvement Type g 0 $ oT� Total Length m I m A 3. 03 YAK118 S. let SL Pavement Rehabilitation S. 1st Street W. Walnut Street to Pacific Ave The proposed Improvements consist of milling end overlaying the existing asphall, crack sealing, new pavement markings, end replacement of sidewalks, curb end gutter and curb ramps, end Illumination. Improvements include spot pavement repair areas where pavement has failed In isolated locations. 02/03/26 06 C G P S T w 0.540 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2026 NHPP 945,300 0 0 945,300 S CN 2027 NHPP 6,497,700 0 750,000 7,247,700 Totals 7,443,000 0 750,000 8,193,000 Expenditure Schedule Phase let 2nd 3rd 4th 5th & 6th PE 675,000 270,300 0 0 0 CN 0 6,497,700 0 0 0 Totals 875,000 8,768,000 0 0 0 Report Date: December 29, 2025 Page 1 •Tim Of 11rantsportation Agency: Yakima County: Yakima MPO/RTPO: WCOG Y Inside Six Year Transportation Improvement Program From 2026 to 2031 N Outside ° n gE. gm Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number Begin & End Termini F. Project Description G. Structure ID Hearing D n $ 3 ; a a Resolution No. Improvement Type n & Total Length Environmental Type a d - 03 YAK117 Yakima Ave S. Overlay Yeldma Avenue S. 6th Street to Yakima River Bridge The proposed improvements consist of mating and overlaying the existing asphalt, crack sealing, new pavement markings, and replacement of non-ADA compliant curb ramps. Improvements include spot pavement repair areas where pavement has failed in isolated locations. 02/03/26 05 G P S W 1.000 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2026 NHPP 297,000 0 0 297,000 S CN 2027 NHPP 2,273,000 0 0 2,273,000 Totals 2,570,000 0 0 2,570,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & Bth PE 225,000 72,000 0 0 0 CN 0 2,273,000 0 0 0 Totals 225,000 2,345,000 0 0 0 Federal Funds State Funds Local Funds Total Funds Grand Totals for Yakima 10,013,000 0 750,000 10,783,000 Report Date: December 29, 2025 Page 2 ITEM TITLE: BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No. S.A. For Meeting of: February 3, 2026 Public Hearing to consider: A) Resolution adopting the amended Six - Year Transportation Improvement Program for the period of 2026- 2031, and to amend the Transportation Systems Plan 2040; and B) Resolution amending the Yakima Urban Area Comprehensive Plan Capital Facilities Element (No budgetary impact) SUBMITTED BY: Robert Washabaugh, City Engineer SUMMARY EXPLANATION: On June 17, 2025 the City of Yakima adopted R-2025-103 and R-2025-104 as required by state statute to update its Six -year Transportation Improvement Program (TIP) for submittal in the Statewide Transportation Improvement Program (STIP) to the Washington State Department of Transportation. The City is amending the Six -year TIP to include these additional projects: • 5 1st St Pavement Rehabilitation • Yakima Ave S. Overlay A Public Hearing will be held to consider including the additional projects in adoption of an amended Resolution approving the Six -year TIP and amending the regional Metropolitan Transportation Plan and Comprehensive Plan Capital Facilities Element. ITEM BUDGETED: N/A STRATEGIC PRIORITY 24-25: A Resilient Yakima RECOMMENDATION: Adopt both resolutions, ATTACHMENTS: Resolution Amend TIP_A Resolution Amend TIP__B S 1st St and Yakima Ave Amendments.pdf