BUSINESS OF THE CITY COUNCIL
YAKIMA, WASHINGTON
AGENDA STATEMENT
Item No. 9.A.
For Meeting of: February 3, 2026
ITEM TITLE: Resolution accepting Department of Ecology grant in the amount of
$3,395,000 for the Nelson Phase 2B Pipeline Conveyance
Improvements Project IC2010
SUBMITTED BY: *Scott Schafer, Director of Public Works
Daniel Tiliano, Water/Irrigation Manager
SUMMARY EXPLANATION:
The City of Yakima is moving forward with the construction of the Nelson Phase 2B Pipeline Conveyance
Improvements Project IC2010. This Agreement sets forth the terms and conditions for the City of Yakima
to utilize the $3,395,000 in funding that was made available from the State of Washington's 2025-2027
biennial budget through the Department of Ecology from a request made as part of the Yakima Basin
Integrated Plan. The funds will be used to construct a portion of the overall pipeline project between April
2026 and March 2027. There is no additional match requirement as part of the funding agreement.
ITEM BUDGETED: Yes
STRATEGIC PRIORITY 24-25: A Resilient Yakima
RECOMMENDATION: Adopt Resolution.
ATTACHMENTS:
Resolution_Dept Ecology grant_Nelson Phase 2B proj
WAECOL Simple Agreement Template DRAFT (79).pdf
197
RESOLUTION NO. R-2026-
A RESOLUTION authorizing an Agreement with the State of Washington Department of
Ecology (Ecology) for a grant of $3,395,000 for the Nelson Phase 2B
Pipeline Conveyance Improvements Project IC2010.
WHEREAS, funding has been provided from the State of Washington's 2025-2027
biennial budget through Ecology from a request made as part of the Yakima Basin Integrated
Plan; and
WHEREAS, the City of Yakima owns the Nelson Diversion at West Powerhouse Road
and South Naches Road in accord with applicable Federal, State and Local regulations; and
WHEREAS, the City, along with its consultant HDR Engineering, Inc., has designed an
irrigation pipeline conveyance system from the Nelson Diversion east to the Hwy 12/North 40th
Avenue interchange to replace the existing Fruitvale Canal and the Old Union Canal irrigation
diversions; and
WHEREAS, Ecology will provide a $3,395,000 grant to install a portion of the overall
irrigation pipeline conveyance system through Agreement WRYBIP-2527-YaWalr-00086,
attached hereto and incorporated herein by this reference; and
WHEREAS, the City Council finds and determines that approval of such Grant
Agreement is in the best interests of residents of the City and the City of Yakima;
now, therefore,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA:
The City Council approves the Agreement and authorizes the City Manager to enter
into grant agreement WRYBIP-2527-YaWalr-00086 with the State of Washington Department
of Ecology, attached hereto and incorporated by this reference, to fund the Nelson Phase 2
Pipeline Conveyance Improvements Project IC2010.
ADOPTED BY THE CITY COUNCIL this 3rd day of February, 2026.
Matt Brown, Mayor
ATTEST:
Rosalinda Ibarra, CMC, City Clerk
198
DEPARTMENT OF
aim
ECOLOGY
State of Washington
Agreement No. WRYBIP-2527-YaWaIr-00086
WATER RESOURCES YAKIMA BASIN INTEGRATED PLANNING AGREEMENT
BETWEEN
THE STATE OF WASHINGTON DEPARTMENT OF ECOLOGY
AND
CITY OF YAKIMA-WATER AND IRRIGATION
This is a binding Agreement entered into by and between the state of Washington, Department of Ecology,
hereinafter referred to as"ECOLOGY,"and City of Yakima-Water and Irrigation,hereinafter referred to as the
"RECIPIENT,"to carry out with the provided funds activities described herein.
GENERAL INFORMATION
Project Title: Nelson Ph. 2B Pipeline
Total Cost: $15,800,000.00
Total Eligible Cost: $3,395,000.00
Ecology Share: $3,395,000.00
Recipient Share: $0.00
The Effective Date of this Agreement is: 02/01/2026
The Expiration Date of this Agreement is no later than: 12/31/2026
Project Type: Yakima Basin Integrated Planning
Project Short Description:
The RECIPIENT will complete Nelson Ph. 2B by installing new 42-inch irrigation pipeline in W. Powerhouse
Rd. from Ackley Rd. to S.Naches Rd.
Project Long Description:
Completion of the Nelson Dam Removal Project(Ph. 1)in 2022,included a new irrigation diversion structure
for the RECIPIENT(General Irrigation System and Fruitvale Canal),the Naches Cowiche Canal Association
and Old Union Canal. The fish passage and flood conveyance have been greatly improved in the Naches River
system. Phase 2 of the Nelson Dam Removal Project will install multiple pipelines connecting the new
diversion and screening facility to existing irrigation delivery systems. Phase 2 will be split into three separate
phases (A,B,& C). Phase 2A is fully funded by a previous ECOLOGY grant,WRYBIP-2325-YaWalr-00057
and installed approximately 2800'of 42-inch and 3200'of 32-inch HDPE pipe with appurtenances. Additional
materials were purchased for future phases with 2A funds.
The pipeline project was designed and permitted along with the Nelson Dam Removal Ph. 1 project including
199
State of Washington Department of Ecology Page 2 of 21
Agreement No: WRYBIP-2527-YaWaIr-00086
Project Title: Nelson Ph.2B Pipeline
Recipient Name: City of Yakima-Water and Irrigation
NEPA and Cultural Resources. The RECIPIENT's new General pipeline and a portion of the new consolidated
(Fruitvale/Old Union)pipeline,which parallel the US 12 right-of-way and cross Cowiche Creek,were installed
as part of Nelson Ph. 2A project. The pipelines were installed via open trench under Cowiche Creek and set at a
depth that accommodates future Cowiche Creek restoration efforts planned by Yakima County.
The overall pipeline improvements include:
-Installation of a 42-inch HDPE"Consolidated"pipeline from the intake which will distribute water to the
Fruitvale and Old Union canal systems. The pipeline will extend from the intake for a distance of approximately
7,000 feet along the eastbound Highway 12 right-of-way and terminate near the existing Fruitvale Canal. At this
point,flow will be bifurcated using two valves and metered branches: one discharging into the existing Fruitvale
Canal and the other extending north easterly and discharging into the existing Old Union Canal.
-Installation of a 32-inch HDPE pipeline from the new intake to the RECIPIENT's"General"pipeline system
3,000 feet to just downstream of its existing sedimentation pond,eliminating that which lies adjacent to US 12.
Here,the new pipe will connect directly to the existing HDPE pipe at that location.
The RECIPIENT contributed over$400,000 in irrigation capital funding available in FY2024/25. In addition,
the RECIPIENT was awarded$7.6M as part of the state's 2023-25 biennial budget from a request made through
the Yakima Basin Integrated Plan and this funding has been utilized to complete Ph. 2A of the project.
This grant for an additional$3.395M in state funding allows the RECIPIENT to continue with completing a
large portion of the overall project with construction and completion of Phase 2B. Ph. 2B will take place in 2026
with the available $3.395M in funding.
Construction of Ph. 2B is anticipated for 2026. Yakima County can then move forward with the Cowiche
Confluence Complex Project to restore Cowiche Creek and surrounding floodplain areas along the confluence
with the Naches River,improving spawning habitat and fish passage in Cowiche Creek for coho salmon and
steelhead.
Construction of Ph. 2C is anticipated to take place in 2026 and 2027. Ph. 2C is currently unfunded. Yakima
County (a partner agency in the Nelson project) was selected for a USBOR WaterSMART AERP grant in 2025
for the Cowiche Confluence Complex Project,which is a floodplain restoration project,but also includes the
Nelson Ph. 2 pipeline. An additional$5M in funding has been identified in the grant for Nelson Ph. 2. An
agreement with Yakima County and the USBOR to spend the awarded grant funding is pending. Additional
RECIPIENT irrigation capital funding is expected to become available as part of the FY2026-27 biennial budget
approval, allowing for the continued construction of the new pipelines and completion of Nelson Ph.2. Ph. 2B
and 2C combined is estimated at$8M.
Nelson Ph. 2 total project cost is currently estimated at$15.8M (including construction management and project
administration).
Under this agreement the RECIPIENT will work with contractor(s)to install approximately 1,200 LF of 42-inch
HDPE"Consolidated"irrigation pipeline in W. Powerhouse Rd. from Ackley Rd. to S.Naches Rd.,which will
connect pipelines previously installed with the Nelson Ph. 2A pipeline project.
The 42-inch Pipeline and Material procurement was completed under the WRYBIP-2325-YaWaIr-00057.
Template Version 12/10/2020 200
State of Washington Department of Ecology Page 3 of 21
Agreement No: WRYBIP-2527-YaWaIr-00086
Project Title: Nelson Ph.2B Pipeline
Recipient Name: City of Yakima-Water and Irrigation
Phase 2C construction,not associated with this agreement,will fully complete the Nelson Phase 2 project
allowing for the removal of two in-river diversion structures and water delivery to the RECIPIENTS Fruitvale,
General, and Old Union irrigation systems.
Overall Goal:
The goal of this Nelson Ph. 2B project will be to continue installation of the 42-inch consolidated irrigation
pipeline with the available funding.
The overall goal of the completed Nelson Ph. 2 pipeline project will allow for two existing irrigation diversions
(Fruitvale and Old Union)downstream of the Nelson diversion to be decommissioned and be diverted at a
single location at Nelson. Providing 4 diversions at the single Nelson location will improve operational
efficiencies and reduce maintenance, and eliminate nearly 1 mile of open channel canal. Decommissioning the
two existing diversions will allow for the removal of a fish barrier in Cowiche Creek,opening miles of river
habitat and spawning for coho and steelhead. It also allows Yakima County to complete their Cowiche
Confluence Complex Project,restoring the floodplain and habitat along Cowiche Creek. Cowiche Creek will
also be realigned back to its more natural pathway(north of Hwy 12).
Template Version 12/10/2020 201
State of Washington Department of Ecology Page 4 of 21
Agreement No: WRYBIP-2527-YaWaIr-00086
Project Title: Nelson Ph.2B Pipeline
Recipient Name: City of Yakima-Water and Irrigation
RECIPIENT INFORMATION
Organization Name: City of Yakima-Water and Irrigation
Federal Tax ID: 91-6001293
Mailing Address: 2301 Fruitvale Blvd.
Yakima,WA 98902
Physical Address: 2301 Fruitvale Blvd.
Organization Email: mike.shane@yakimawa.gov
Contacts
Project Manager Daniel Tiliano
Water/Irrigation Manager
2301 Fruitvale Blvd.
Yakima,Washington 98902
Email: daniel.tiliano@yakimawa.gov
Phone: (509) 576-6480
Billing Contact Kimberly Domine
Financial Services Manager
2301 Fruitvale Blvd.
Yakima,Washington 98902
Email: kimberly.domine@yakimawa.gov
Phone: (509) 576-6480
Authorized Victoria Baker
Signatory City Manager
129 North 2nd Street
Yakima,Washington 98901
Email: vicki.baker@yakimawa.gov
Phone: (509) 575-6000
Template Version 12/10/2020 202
State of Washington Department of Ecology Page 5 of 21
Agreement No: WRYBIP-2527-YaWaIr-00086
Project Title: Nelson Ph.2B Pipeline
Recipient Name: City of Yakima-Water and Irrigation
ECOLOGY INFORMATION
Mailing Address: Department of Ecology
Office of the Columbia River
PO BOX 47600
Olympia,WA 98504-7600
Physical Address: Office of the Columbia River
300 Desmond Drive SE
Lacey,WA 98503
Contacts
Kevin Haydon
Project
Manager
1250 W Alder St.
Union Gap,Washington 98903-0009
Email: keha461@ecy.wa.gov
Phone: (509) 823-6947
Shanyese Trujillo
Financial
Manager
PO Box 47600
Olympia,Washington 98504-7600
Email: stru461@ecy.wa.gov
Phone: (360) 628-2451
Template Version 12/10/2020 203
State of Washington Department of Ecology Page 6 of 21
Agreement No: WRYBIP-2527-YaWaIr-00086
Project Title: Nelson Ph.2B Pipeline
Recipient Name: City of Yakima-Water and Irrigation
SCOPE OF WORK
Task Number: 1 Task Cost: $0.00
Task Title: Project Administration/Management
Task Description:
A. The RECIPIENT will administer the project. Responsibilities will include,but not be limited to: maintenance of
project records; submittal of requests for reimbursement and corresponding backup documentation, progress reports
and recipient closeout report(including photos); compliance with applicable procurement,contracting, and interlocal
agreement requirements; application for,receipt of, and compliance with all required permits,licenses,easements,or
property rights necessary for the project; and submittal of required performance items.
B. The RECIPIENT must manage the project. Efforts will include: conducting,coordinating, and scheduling project
activities and assuring quality control. Every effort will be made to maintain effective communication with the
RECIPIENT's designees;the DEPARTMENT; all affected local, state,or federal jurisdictions; and any interested
individuals or groups. The RECIPIENT must carry out this project in accordance with any completion dates outlined
in this agreement.
Task Goal Statement:
Properly managed project that meets agreement and Ecology administrative requirements.
Task Expected Outcome:
* Timely and complete submittal of requests for reimbursement, quarterly progress reports and recipient closeout
report.
* Properly maintained project documentation
Recipient Task Coordinator: Daniel Tiliano
Project Administration/Management
Deliverables
Number Description Due Date
1.1 Progress Reports
1.2 Recipient Closeout Report 12/31/2026
Template Version 12/10/2020 204
State of Washington Department of Ecology Page 7 of 21
Agreement No: WRYBIP-2527-YaWaIr-00086
Project Title: Nelson Ph.2B Pipeline
Recipient Name: City of Yakima-Water and Irrigation
SCOPE OF WORK
Task Number: 2 Task Cost: $3,035,000.00
Task Title: 42"HDPE Pipe Installation
Task Description:
Under this task Nelson Ph. 2B will be completed by:.
-Installing approximately 1,200 LF of 42-inch HDPE"Consolidated"irrigation pipeline in W. Powerhouse Rd. from
Ackley Rd. to S.Naches Rd.,which will connect pipelines previously installed with the Nelson Ph. 2A pipeline
project.
The 42-inch Pipeline and Material procurement was completed under the WRYBIP-2325-YaWaIr-00057.
Task Goal Statement:
The goal will be to complete installation of the Consolidated pipeline as part of Ph. 2B. This allows for the future
completion of Ph. 2C and the project's final completion of the Nelson Ph. 2 pipeline project, allowing irrigation water
to be distributed to the Fruitvale and Old Union canal systems from the Nelson diversion.
Task Expected Outcome:
Completion of the Consolidated pipeline as part of the Ph. 2B project will provide a new pipeline ready for future
extension as part of the Ph. 2C project.
Recipient Task Coordinator: Daniel Tiliano
42" HDPE Pipe Installation
Deliverables
Number Description Due Date
2.1 Fruitvale and Old Union Canal Systems Consolidated Pipeline 04/30/2026
Improvements Construction Bid Documents
2.2 Copies of Applicable Environmental and Cultural Permits 04/30/2026
2.3 Estimated Construction Timeline 04/30/2026
2.4 Project as-built documents 12/31/2026
2.5 Photos of site before,during and after project construction 12/31/2026
Template Version 12/10/2020 205
State of Washington Department of Ecology Page 8 of 21
Agreement No: WRYBIP-2527-YaWaIr-00086
Project Title: Nelson Ph.2B Pipeline
Recipient Name: City of Yakima-Water and Irrigation
SCOPE OF WORK
Task Number: 3 Task Cost: $270,000.00
Task Title: Construction Management& Engineering Services
Task Description:
During the execution of Task 2,weekly construction meetings will be coordinated and facilitated by the RECIPIENT
and/or their Contractor. These meetings provide a regularly scheduled opportunity to accurately communicate and
address project needs. Contractually defined procedures are followed to cooperatively address unanticipated
construction challenges.
Task Goal Statement:
The purpose of these meetings is to monitor and maintain the project's construction scope, schedule and budget.
Standard construction industry communication tools such as Requests for Information and contractually required
Submittals are utilized during these meetings to ensure the design intent is being met as construction proceeds.
Task Expected Outcome:
Execution of Task 3 results in a greater quantity of work being performed due to financial and schedule efficiencies.
Recipient Task Coordinator: Daniel Tiliano
Construction Management&Engineering Services
Deliverables
Number Description Due Date
3.1 Weekly meeting agendas and notes to be submitted with each PRPR.
3.2 RFI and Submittal Tracking Spreadsheets to be submitted with each
PRPR.
Template Version 12/10/2020 206
State of Washington Department of Ecology Page 9 of 21
Agreement No: WRYBIP-2527-YaWaIr-00086
Project Title: Nelson Ph.2B Pipeline
Recipient Name: City of Yakima-Water and Irrigation
SCOPE OF WORK
Task Number: 4 Task Cost: $90,000.00
Task Title: Construction Inspection Services
Task Description:
During execution of Task 2,full-time on-site construction inspection services will be provided Yakima County through
an interlocal agency agreement. Yakima County staff has provided daily inspection services throughout the execution
of Nelson Phase 1 and Nelson Phase 2A and will continue to provide those services during the execution of Phase 2B
and 2C.
Additional inspection work is required by WSDOT staff when construction activities take place within the WSDOT
ROW or may impact traffic on US 12. WSDOT may perform administrative reviews of traffic control plans and assess
impacts to traffic volumes on US 12.
Task Goal Statement:
The purpose of this task is to track on-site construction activities to ensure the design intent of the project is being met
while maintaining compliance with the contract requirements.
Task Expected Outcome:
Execution of Task 4 ensures the design intent of the construction plans is being accomplished.
Recipient Task Coordinator: Daniel Tiliano
Construction Inspection Services
Deliverables
Number Description Due Date
4.1 Daily Construction Inspection Reports due monthly
4.2 Copy of IAA with Yakima County for onsite inspections and any 04/30/2026
subsequent amendments.
4.3 Copy of WSDOT franchise agreement with City of Yakima 04/30/2026
Template Version 12/10/2020 207
State of Washington Department of Ecology Page 10 of 21
Agreement No: WRYBIP-2527-YaWaIr-00086
Project Title: Nelson Ph.2B Pipeline
Recipient Name: City of Yakima-Water and Irrigation
BUDGET
Funding Distribution EG260521
NOTE: The above funding distribution number is used to identify this specific agreement and budget on payment
remittances and may be referenced on other communications from ECOLOGY. Your agreement may have multiple
funding distribution numbers to identify each budget.
Funding Title: Nelson Ph. 2B Pipeline
Funding Type: Grant
Funding Effective Date: 02/01/2026 Funding Expiration Date: 12/31/2026
Funding Source:
Title: State Building Construction Account(SBCA)(WRYBIP-2527)
Fund: FD
Type: State
Funding Source%: 100%
Description: Grants for the purpose to assess,plan, and develop projects under the Yakima River
Basin Integrated Water Resource Management Plan or for any other actions
designed to provide access to new water supplies within the Yakima River basin or
any other actions to support the seven elements of the Yakima Basin Integrated
Plan.
Approved Indirect Costs Rate: Approved State Indirect Rate: 0%
Recipient Match%: 0%
InKind Interlocal Allowed: No
InKind Other Allowed: No
Is this Funding Distribution used to match a federal grant? No
Nelson Ph.2B Pipeline Task Total
Project Administration/Management $ 0.00
42"HDPE Pipe Installation $ 3,035,000.00
Construction Management& Engineering Services $ 270,000.00
Construction Inspection Services $ 90,000.00
Total: S 3,395,000.00
Template Version 12/10/2020 208
State of Washington Department of Ecology Page 11 of 21
Agreement No: WRYBIP-2527-YaWaIr-00086
Project Title: Nelson Ph.2B Pipeline
Recipient Name: City of Yakima-Water and Irrigation
Funding Distribution Summary
Recipient/Ecology Share
Funding Distribution Name Recipient Match % Recipient Share Ecology Share Total
Nelson Ph. 2B Pipeline 0.00 % $ 0.00 $ 3,395,000.00 $ 3,395,000.00
Total $ 0.00 $ 3,395,000.00 $ 3,395,000.00
AGREEMENT SPECIFIC TERMS AND CONDITIONS
N/A
SPECIAL TERMS AND CONDITIONS
GENERAL FEDERAL CONDITIONS
If a portion or all of the funds for this agreement are provided through federal funding sources or this
agreement is used to match a federal grant award,the following terms and conditions apply to you.
A. CERTIFICATION REGARDING SUSPENSION,DEBARMENT,INELIGIBILITY OR VOLUNTARY
EXCLUSION:
1. The RECIPIENT/CONTRACTOR,by signing this agreement,certifies that it is not suspended,debarred,
proposed for debarment,declared ineligible or otherwise excluded from contracting with the federal
government,or from receiving contracts paid for with federal funds. If the RECIPIENT/CONTRACTOR is
unable to certify to the statements contained in the certification,they must provide an explanation as to why they
cannot.
2. The RECIPIENT/CONTRACTOR shall provide immediate written notice to ECOLOGY if at any time the
RECIPIENT/CONTRACTOR learns that its certification was erroneous when submitted or had become
erroneous by reason of changed circumstances.
3. The terms covered transaction,debarred, suspended,ineligible,lower tier covered transaction,participant,
person,primary covered transaction,principal,proposal, and voluntarily excluded, as used in this clause,have
the meaning set out in the Definitions and Coverage sections of rules implementing Executive Order 12549.
You may contact ECOLOGY for assistance in obtaining a copy of those regulations.
4. The RECIPIENT/CONTRACTOR agrees it shall not knowingly enter into any lower tier covered transaction
with a person who is proposed for debarment under the applicable Code of Federal Regulations, debarred,
suspended,declared ineligible,or voluntarily excluded from participation in this covered transaction.
5. The RECIPIENT/CONTRACTOR further agrees by signing this agreement,that it will include this clause titled
"CERTIFICATION REGARDING SUSPENSION, DEBARMENT,INELIGIBILITY OR VOLUNTARY
EXCLUSION"without modification in all lower tier covered transactions and in all solicitations for lower tier
covered transactions.
6. Pursuant to 2CFR180.330,the RECIPIENT/CONTRACTOR is responsible for ensuring that any lower tier
Template Version 12/10/2020 209
State of Washington Department of Ecology Page 12 of 21
Agreement No: WRYBIP-2527-YaWaIr-00086
Project Title: Nelson Ph.2B Pipeline
Recipient Name: City of Yakima-Water and Irrigation
covered transaction complies with certification of suspension and debarment requirements.
7. RECIPIENT/CONTRACTOR acknowledges that failing to disclose the information required in the Code of
Federal Regulations may result in the delay or negation of this funding agreement,or pursuance of legal
remedies,including suspension and debarment.
8. RECIPIENT/CONTRACTOR agrees to keep proof in its agreement file,that it, and all lower tier recipients or
contractors, are not suspended or debarred, and will make this proof available to ECOLOGY before requests for
reimbursements will be approved for payment. RECIPIENT/CONTRACTOR must run a search in
<http://www.sam.gov> and print a copy of completed searches to document proof of compliance.
B. FEDERAL FUNDING ACCOUNTABILITY AND TRANSPARENCY ACT (FFATA)REPORTING
REQUIREMENTS:
CONTRACTOR/RECIPIENT must complete the FFATA Data Collection Form (ECY 070-395) and return it
with the signed agreement to ECOLOGY.
Any CONTRACTOR/RECIPIENT that meets each of the criteria below must report compensation for its five
top executives using the FFATA Data Collection Form.
• Receives more than$30,000 in federal funds under this award.
• Receives more than 80 percent of its annual gross revenues from federal funds.
• Receives more than$25,000,000 in annual federal funds.
Ecology will not pay any invoices until it has received a completed and signed FFATA Data Collection Form.
Ecology is required to report the FFATA information for federally funded agreements,including the required Unique
Entity Identifier in www.sam.gov<http://www.sam.gov/>within 30 days of agreement signature. The FFATA
information will be available to the public at www.usaspending.gov<http://www.usaspending.gov/>.
For more details on FFATA requirements, see www.fsrs.gov<http://www.fsrs.gov/>.
C. FEDERAL FUNDING PROHIBITION ON CERTAIN TELECOMMUNICATIONS OR VIDEO SURVEILLANCE
SERVICES OR EQUIPMENT:
As required by 2 CFR 200.216,federal grant or loan recipients and subrecipients are prohibited from obligating or
expending loan or grant funds to:
1. Procure or obtain;
2. Extend or renew a contract to procure or obtain; or
3. Enter into a contract(or extend or renew a contract)to procure or obtain equipment, services, or systems that
use covered telecommunications equipment,video surveillance services or services as a substantial or essential
component of any system,or as critical technology as part of any system. As described in Public Law 115-232
<https://www.govinfo.gov/content/pkg/PLAW-115pub1232/pdf/PLAW-115pub1232.pdff , section 889,covered
telecommunications equipment is telecommunications equipment produced by Huawei Technologies Company
or ZTE Corporation(or any subsidiary or affiliate of such entities).
Recipients, subrecipients, and borrowers also may not use federal funds to purchase certain prohibited equipment,
systems,or services,including equipment, systems,or services produced or provided by entities identified in section
889, are recorded in the System for Award Management(SAM)<https://sam.gov/SAM/>exclusion list.
Template Version 12/10/2020 210
State of Washington Department of Ecology Page 13 of 21
Agreement No: WRYBIP-2527-YaWaIr-00086
Project Title: Nelson Ph.2B Pipeline
Recipient Name: City of Yakima-Water and Irrigation
GENERAL TERMS AND CONDITIONS
Pertaining to Grant and Loan Agreements With the state of Washington,Department of Ecology
GENERAL TERMS AND CONDITIONS
For DEPARTMENT OF ECOLOGY GRANTS and LOANS
07/01/2023 Version
1. ADMINISTRATIVE REQUIREMENTS
a)RECIPIENT shall follow the "Administrative Requirements for Recipients of Ecology Grants and Loans—EAGL
Edition." (hops://fortress.wa.gov/ecy/publications/SummaryPages/2301002.html)
b)RECIPIENT shall complete all activities funded by this Agreement and be fully responsible for the proper
management of all funds and resources made available under this Agreement.
c)RECIPIENT agrees to take complete responsibility for all actions taken under this Agreement,including ensuring
all subgrantees and contractors comply with the terms and conditions of this Agreement. ECOLOGY reserves the
right to request proof of compliance by subgrantees and contractors.
d)RECIPIENT's activities under this Agreement shall be subject to the review and approval by ECOLOGY for the
extent and character of all work and services.
2. AMENDMENTS AND MODIFICATIONS
This Agreement may be altered, amended,or waived only by a written amendment executed by both parties.No
subsequent modification(s)or amendment(s) of this Agreement will be of any force or effect unless in writing and
signed by authorized representatives of both parties. ECOLOGY and the RECIPIENT may change their respective
staff contacts and administrative information without the concurrence of either party.
3. ACCESSIBILITY REQUIREMENTS FOR COVERED TECHNOLOGY
The RECIPIENT must comply with the Washington State Office of the Chief Information Officer, OCIO Policy no.
188,Accessibility (https://ocio.wa.gov/policy/accessibility)as it relates to"covered technology."This requirement
applies to all products supplied under the Agreement,providing equal access to information technology by
individuals with disabilities,including and not limited to web sites/pages,web-based applications, software
systems,video and audio content, and electronic documents intended for publishing on Ecology's public web site.
4. ARCHAEOLOGICAL AND CULTURAL RESOURCES
RECIPIENT shall take all reasonable action to avoid,minimize,or mitigate adverse effects to archaeological and
historic archaeological sites,historic buildings/structures,traditional cultural places, sacred sites,or other cultural
resources,hereby referred to as Cultural Resources.
The RECIPIENT must agree to hold harmless ECOLOGY in relation to any claim related to Cultural Resources
discovered,disturbed, or damaged due to the RECIPIENT's project funded under this Agreement.
RECIPIENT shall:
a) Contact the ECOLOGY Program issuing the grant or loan to discuss any Cultural Resources requirements for
their project:
• Cultural Resource Consultation and Review should be initiated early in the project planning process and must be
completed prior to expenditure of Agreement funds as required by applicable State and Federal requirements.
* For state funded construction,demolition,or land acquisitions, comply with Governor Executive Order 21-02,
Archaeological and Cultural Resources.
•For projects with any federal involvement, comply with the National Historic Preservation Act of 1966 (Section
Template Version 12/10/2020 211
State of Washington Department of Ecology Page 14 of 21
Agreement No: WRYBIP-2527-YaWaIr-00086
Project Title: Nelson Ph.2B Pipeline
Recipient Name: City of Yakima-Water and Irrigation
106).
b)If required by the ECOLOGY Program, submit an Inadvertent Discovery Plan(IDP)to ECOLOGY prior to
implementing any project that involves field activities. ECOLOGY will provide the IDP form.
RECIPIENT shall:
• Keep the IDP at the project site.
• Make the IDP readily available to anyone working at the project site.
• Discuss the IDP with staff,volunteers, and contractors working at the project site.
• Implement the IDP when Cultural Resources or human remains are found at the project site.
c)If any Cultural Resources are found while conducting work under this Agreement,follow the protocol outlined in
the project IDP.
• Immediately stop work and notify the ECOLOGY Program,who will notify the Department of Archaeology and
Historic Preservation at(360) 586-3065, any affected Tribe, and the local government.
d)If any human remains are found while conducting work under this Agreement,follow the protocol outlined in the
project IDP.
• Immediately stop work and notify the local Law Enforcement Agency or Medical Examiner/Coroner's Office,the
Department of Archaeology and Historic Preservation at (360) 790-1633, and then the ECOLOGY Program.
e) Comply with RCW 27.53, RCW 27.44, and RCW 68.50.645, and all other applicable local, state, and federal
laws protecting Cultural Resources and human remains.
5. ASSIGNMENT
No right or claim of the RECIPIENT arising under this Agreement shall be transferred or assigned by the
RECIPIENT.
6. COMMUNICATION
RECIPIENT shall make every effort to maintain effective communications with the RECIPIENT's designees,
ECOLOGY, all affected local, state,or federal jurisdictions, and any interested individuals or groups.
7. COMPENSATION
a)Any work performed prior to effective date of this Agreement will be at the sole expense and risk of the
RECIPIENT. ECOLOGY must sign the Agreement before any payment requests can be submitted.
b)Payments will be made on a reimbursable basis for approved and completed work as specified in this Agreement.
c)RECIPIENT is responsible to determine if costs are eligible. Any questions regarding eligibility should be
clarified with ECOLOGY prior to incurring costs. Costs that are conditionally eligible require approval by
ECOLOGY prior to expenditure.
d)RECIPIENT shall not invoice more than once per month unless agreed on by ECOLOGY.
e)ECOLOGY will not process payment requests without the proper reimbursement forms,Progress Report and
supporting documentation. ECOLOGY will provide instructions for submitting payment requests.
f)ECOLOGY will pay the RECIPIENT thirty(30)days after receipt of a properly completed request for payment.
g)RECIPIENT will receive payment through Washington State's Office of Financial Management's Statewide
Payee Desk. To receive payment you must register as a statewide vendor by submitting a statewide vendor
registration form and an IRS W-9 form at website,https://ofm.wa.gov/it-systems/statewide-vendorpayee-services. If
you have questions about the vendor registration process,you can contact Statewide Payee Help Desk at(360)
407-8180 or email PayeeRegistration@ofm.wa.gov.
h)ECOLOGY may, at its sole discretion,withhold payments claimed by the RECIPIENT if the RECIPIENT fails to
satisfactorily comply with any term or condition of this Agreement.
i)Monies withheld by ECOLOGY may be paid to the RECIPIENT when the work described herein,or a portion
thereof,has been completed if, at ECOLOGY's sole discretion, such payment is reasonable and approved according
Template Version 12/10/2020 212
State of Washington Department of Ecology Page 15 of 21
Agreement No: WRYBIP-2527-YaWaIr-00086
Project Title: Nelson Ph.2B Pipeline
Recipient Name: City of Yakima-Water and Irrigation
to this Agreement, as appropriate,or upon completion of an audit as specified herein.
j)RECIPIENT must submit within thirty(30)days after the expiration date of this Agreement, all financial,
performance, and other reports required by this Agreement. Failure to comply may result in delayed reimbursement.
8. COMPLIANCE WITH ALL LAWS
RECIPIENT agrees to comply fully with all applicable federal, state and local laws,orders,regulations, and permits
related to this Agreement,including but not limited to:
a)RECIPIENT agrees to comply with all applicable laws,regulations, and policies of the United States and the
State of Washington which affect wages and job safety.
b)RECIPIENT agrees to be bound by all applicable federal and state laws,regulations, and policies against
discrimination.
c)RECIPIENT certifies full compliance with all applicable state industrial insurance requirements.
d)RECIPIENT agrees to secure and provide assurance to ECOLOGY that all the necessary approvals and permits
required by authorities having jurisdiction over the project are obtained. RECIPIENT must include time in their
project timeline for the permit and approval processes.
ECOLOGY shall have the right to immediately terminate for cause this Agreement as provided herein if the
RECIPIENT fails to comply with above requirements.
If any provision of this Agreement violates any statute or rule of law of the state of Washington,it is considered
modified to conform to that statute or rule of law.
9. CONFLICT OF INTEREST
RECIPIENT and ECOLOGY agree that any officer,member, agent,or employee,who exercises any function or
responsibility in the review, approval, or carrying out of this Agreement, shall not have any personal or financial
interest,direct or indirect,nor affect the interest of any corporation,partnership,or association in which he/she is a
part,in this Agreement or the proceeds thereof.
10. CONTRACTING FOR GOODS AND SERVICES
RECIPIENT may contract to buy goods or services related to its performance under this Agreement. RECIPIENT
shall award all contracts for construction,purchase of goods, equipment, services, and professional architectural and
engineering services through a competitive process,if required by State law. RECIPIENT is required to follow
procurement procedures that ensure legal,fair, and open competition.
RECIPIENT must have a standard procurement process or follow current state procurement procedures.
RECIPIENT may be required to provide written certification that they have followed their standard procurement
procedures and applicable state law in awarding contracts under this Agreement.
ECOLOGY reserves the right to inspect and request copies of all procurement documentation, and review
procurement practices related to this Agreement. Any costs incurred as a result of procurement practices not in
compliance with state procurement law or the RECIPIENT's normal procedures may be disallowed at ECOLOGY's
sole discretion.
11. DISPUTES
When there is a dispute with regard to the extent and character of the work,or any other matter related to this
Agreement the determination of ECOLOGY will govern, although the RECIPIENT shall have the right to appeal
decisions as provided for below:
a)RECIPIENT notifies the funding program of an appeal request.
b)Appeal request must be in writing and state the disputed issue(s).
c)RECIPIENT has the opportunity to be heard and offer evidence in support of its appeal.
d)ECOLOGY reviews the RECIPIENT's appeal.
Template Version 12/10/2020 213
State of Washington Department of Ecology Page 16 of 21
Agreement No: WRYBIP-2527-YaWaIr-00086
Project Title: Nelson Ph.2B Pipeline
Recipient Name: City of Yakima-Water and Irrigation
e)ECOLOGY sends a written answer within ten (10)business days,unless more time is needed, after concluding
the review.
The decision of ECOLOGY from an appeal will be final and conclusive,unless within thirty (30)days from the date
of such decision,the RECIPIENT furnishes to the Director of ECOLOGY a written appeal. The decision of the
Director or duly authorized representative will be final and conclusive.
The parties agree that this dispute process will precede any action in a judicial or quasi-judicial tribunal.
Appeals of the Director's decision will be brought in the Superior Court of Thurston County. Review of the
Director's decision will not be taken to Environmental and Land Use Hearings Office.
Pending final decision of a dispute,the RECIPIENT agrees to proceed diligently with the performance of this
Agreement and in accordance with the decision rendered.
Nothing in this Agreement will be construed to limit the parties'choice of another mutually acceptable method,in
addition to the dispute resolution procedure outlined above.
12. ENVIRONMENTAL DATA STANDARDS
a)RECIPIENT shall prepare a Quality Assurance Project Plan (QAPP)for a project that collects or uses
environmental measurement data. RECIPIENTS unsure about whether a QAPP is required for their project shall
contact the ECOLOGY Program issuing the grant or loan. If a QAPP is required,the RECIPIENT shall:
•Use ECOLOGY's QAPP Template/Checklist provided by the ECOLOGY,unless ECOLOGY Quality Assurance
(QA)officer or the Program QA coordinator instructs otherwise.
• Follow ECOLOGY's Guidelines for Preparing Quality Assurance Project Plans for Environmental Studies,July
2004 (Ecology Publication No. 04-03-030).
• Submit the QAPP to ECOLOGY for review and approval before the start of the work.
b)RECIPIENT shall submit environmental data that was collected on a project to ECOLOGY using the
Environmental Information Management system (EIM), unless the ECOLOGY Program instructs otherwise. The
RECIPIENT must confirm with ECOLOGY that complete and correct data was successfully loaded into EIM,find
instructions at: http://www.ecy.wa.gov/eim.
c)RECIPIENT shall follow ECOLOGY's data standards when Geographic Information System (GIS)data is
collected and processed. Guidelines for Creating and Accessing GIS Data are available at:
https://ecology.wa.gov/Research-Data/Data-resources/Geographic-Information-Systems-GIS/Standards.
RECIPIENT,when requested by ECOLOGY, shall provide copies to ECOLOGY of all final GIS data layers,
imagery,related tables,raw data collection files,map products, and all metadata and project documentation.
13. GOVERNING LAW
This Agreement will be governed by the laws of the State of Washington, and the venue of any action brought
hereunder will be in the Superior Court of Thurston County.
14. INDEMNIFICATION
ECOLOGY will in no way be held responsible for payment of salaries,consultant's fees, and other costs related to
the project described herein, except as provided in the Scope of Work.
To the extent that the Constitution and laws of the State of Washington permit,each party will indemnify and hold
the other harmless from and against any liability for any or all injuries to persons or property arising from the
negligent act or omission of that party or that party's agents or employees arising out of this Agreement.
15. INDEPENDENT STATUS
The employees,volunteers, or agents of each party who are engaged in the performance of this Agreement will
continue to be employees,volunteers, or agents of that party and will not for any purpose be employees,volunteers,
or agents of the other party.
Template Version 12/10/2020 214
State of Washington Department of Ecology Page 17 of 21
Agreement No: WRYBIP-2527-YaWaIr-00086
Project Title: Nelson Ph.2B Pipeline
Recipient Name: City of Yakima-Water and Irrigation
16. KICKBACKS
RECIPIENT is prohibited from inducing by any means any person employed or otherwise involved in this
Agreement to give up any part of the compensation to which he/she is otherwise entitled to or receive any fee,
commission,or gift in return for award of a subcontract hereunder.
17. MINORITY AND WOMEN'S BUSINESS ENTERPRISES (MWBE)
RECIPIENT is encouraged to solicit and recruit,to the extent possible,certified minority-owned(MBE) and
women-owned(WBE)businesses in purchases and contracts initiated under this Agreement.
Contract awards or rejections cannot be made based on MWBE participation;however, the RECIPIENT is
encouraged to take the following actions,when possible, in any procurement under this Agreement:
a)Include qualified minority and women's businesses on solicitation lists whenever they are potential sources of
goods or services.
b)Divide the total requirements,when economically feasible,into smaller tasks or quantities,to permit maximum
participation by qualified minority and women's businesses.
c)Establish delivery schedules,where work requirements permit,which will encourage participation of qualified
minority and women's businesses.
d)Use the services and assistance of the Washington State Office of Minority and Women's Business Enterprises
(OMWBE) (866-208-1064) and the Office of Minority Business Enterprises of the U.S. Department of Commerce,
as appropriate.
18. ORDER OF PRECEDENCE
In the event of inconsistency in this Agreement,unless otherwise provided herein,the inconsistency shall be
resolved by giving precedence in the following order: (a) applicable federal and state statutes and regulations; (b)
The Agreement; (c) Scope of Work; (d) Special Terms and Conditions; (e)Any provisions or terms incorporated
herein by reference, including the "Administrative Requirements for Recipients of Ecology Grants and Loans"; (f)
Ecology Funding Program Guidelines; and(g) General Terms and Conditions.
19. PRESENTATION AND PROMOTIONAL MATERIALS
ECOLOGY reserves the right to approve RECIPIENT's communication documents and materials related to the
fulfillment of this Agreement:
a)If requested, RECIPIENT shall provide a draft copy to ECOLOGY for review and approval ten (10)business
days prior to production and distribution.
b)RECIPIENT shall include time for ECOLOGY's review and approval process in their project timeline.
c)If requested, RECIPIENT shall provide ECOLOGY two (2)final copies and an electronic copy of any tangible
products developed.
Copies include any printed materials, and all tangible products developed such as brochures,manuals,pamphlets,
videos, audio tapes, CDs,curriculum,posters,media announcements,or gadgets with a message, such as a
refrigerator magnet, and any online communications, such as web pages,blogs, and twitter campaigns. If it is not
practical to provide a copy,then the RECIPIENT shall provide a description (photographs,drawings,printouts,etc.)
that best represents the item.
Any communications intended for public distribution that uses ECOLOGY's logo shall comply with ECOLOGY's
graphic requirements and any additional requirements specified in this Agreement. Before the use of ECOLOGY's
logo contact ECOLOGY for guidelines.
RECIPIENT shall acknowledge in the communications that funding was provided by ECOLOGY.
20. PROGRESS REPORTING
Template Version 12/10/2020 215
State of Washington Department of Ecology Page 18 of 21
Agreement No: WRYBIP-2527-YaWaIr-00086
Project Title: Nelson Ph.2B Pipeline
Recipient Name: City of Yakima-Water and Irrigation
a)RECIPIENT must satisfactorily demonstrate the timely use of funds by submitting payment requests and progress
reports to ECOLOGY. ECOLOGY reserves the right to amend or terminate this Agreement if the RECIPIENT does
not document timely use of funds.
b)RECIPIENT must submit a progress report with each payment request. Payment requests will not be processed
without a progress report. ECOLOGY will define the elements and frequency of progress reports.
c)RECIPIENT shall use ECOLOGY's provided progress report format.
d) Quarterly progress reports will cover the periods from January 1 through March 31,April 1 through June 30,July
1 through September 30, and October 1 through December 31. Reports shall be submitted within thirty(30)days
after the end of the quarter being reported.
e)RECIPIENT must submit within thirty (30)days of the expiration date of the project,unless an extension has
been approved by ECOLOGY, all financial,performance, and other reports required by the Agreement and funding
program guidelines. RECIPIENT shall use the ECOLOGY provided closeout report format.
21. PROPERTY RIGHTS
a) Copyrights and Patents. When the RECIPIENT creates any copyrightable materials or invents any patentable
property under this Agreement,the RECIPIENT may copyright or patent the same but ECOLOGY retains a royalty
free,nonexclusive, and irrevocable license to reproduce,publish,recover,or otherwise use the material(s)or
property, and to authorize others to use the same for federal, state,or local government purposes.
b)Publications. When the RECIPIENT or persons employed by the RECIPIENT use or publish ECOLOGY
information;present papers,lectures,or seminars involving information supplied by ECOLOGY; or use logos,
reports,maps,or other data in printed reports, signs,brochures,pamphlets, etc., appropriate credit shall be given to
ECOLOGY.
c)Presentation and Promotional Materials. ECOLOGY shall have the right to use or reproduce any printed or
graphic materials produced in fulfillment of this Agreement,in any manner ECOLOGY deems appropriate.
ECOLOGY shall acknowledge the RECIPIENT as the sole copyright owner in every use or reproduction of the
materials.
d)Tangible Property Rights. ECOLOGY's current edition of"Administrative Requirements for Recipients of
Ecology Grants and Loans," shall control the use and disposition of all real and personal property purchased wholly
or in part with funds furnished by ECOLOGY in the absence of state and federal statutes,regulations,or policies to
the contrary, or upon specific instructions with respect thereto in this Agreement.
e)Personal Property Furnished by ECOLOGY. When ECOLOGY provides personal property directly to the
RECIPIENT for use in performance of the project,it shall be returned to ECOLOGY prior to final payment by
ECOLOGY. If said property is lost, stolen,or damaged while in the RECIPIENT's possession, then ECOLOGY
shall be reimbursed in cash or by setoff by the RECIPIENT for the fair market value of such property.
f)Acquisition Projects. The following provisions shall apply if the project covered by this Agreement includes
funds for the acquisition of land or facilities:
1. RECIPIENT shall establish that the cost is fair value and reasonable prior to disbursement of funds provided for
in this Agreement.
2. RECIPIENT shall provide satisfactory evidence of title or ability to acquire title for each parcel prior to
disbursement of funds provided by this Agreement. Such evidence may include title insurance policies, Torrens
certificates,or abstracts, and attorney's opinions establishing that the land is free from any impediment,lien,or
claim which would impair the uses intended by this Agreement.
g) Conversions. Regardless of the Agreement expiration date,the RECIPIENT shall not at any time convert any
equipment,property, or facility acquired or developed under this Agreement to uses other than those for which
assistance was originally approved without prior written approval of ECOLOGY. Such approval may be
conditioned upon payment to ECOLOGY of that portion of the proceeds of the sale,lease,or other conversion or
encumbrance which monies granted pursuant to this Agreement bear to the total acquisition,purchase,or
construction costs of such property.
Template Version 12/10/2020 216
State of Washington Department of Ecology Page 19 of 21
Agreement No: WRYBIP-2527-YaWaIr-00086
Project Title: Nelson Ph.2B Pipeline
Recipient Name: City of Yakima-Water and Irrigation
22. RECORDS,AUDITS,AND INSPECTIONS
RECIPIENT shall maintain complete program and financial records relating to this Agreement,including any
engineering documentation and field inspection reports of all construction work accomplished.
All records shall:
a)Be kept in a manner which provides an audit trail for all expenditures.
b)Be kept in a common file to facilitate audits and inspections.
c) Clearly indicate total receipts and expenditures related to this Agreement.
d)Be open for audit or inspection by ECOLOGY,or by any duly authorized audit representative of the State of
Washington,for a period of at least three (3)years after the final grant payment or loan repayment,or any dispute
resolution hereunder.
RECIPIENT shall provide clarification and make necessary adjustments if any audits or inspections identify
discrepancies in the records.
ECOLOGY reserves the right to audit, or have a designated third party audit, applicable records to ensure that the
state has been properly invoiced. Any remedies and penalties allowed by law to recover monies determined owed
will be enforced. Repetitive instances of incorrect invoicing or inadequate records may be considered cause for
termination.
All work performed under this Agreement and any property and equipment purchased shall be made available to
ECOLOGY and to any authorized state,federal or local representative for inspection at any time during the course
of this Agreement and for at least three (3)years following grant or loan termination or dispute resolution
hereunder.
RECIPIENT shall provide right of access to ECOLOGY,or any other authorized representative, at all reasonable
times,in order to monitor and evaluate performance,compliance, and any other conditions under this Agreement.
23. RECOVERY OF FUNDS
The right of the RECIPIENT to retain monies received as reimbursement payments is contingent upon satisfactory
performance of this Agreement and completion of the work described in the Scope of Work.
All payments to the RECIPIENT are subject to approval and audit by ECOLOGY, and any unauthorized
expenditure(s)or unallowable cost charged to this Agreement shall be refunded to ECOLOGY by the RECIPIENT.
RECIPIENT shall refund to ECOLOGY the full amount of any erroneous payment or overpayment under this
Agreement.
RECIPIENT shall refund by check payable to ECOLOGY the amount of any such reduction of payments or
repayments within thirty(30)days of a written notice. Interest will accrue at the rate of twelve percent(12%)per
year from the time ECOLOGY demands repayment of funds.
Any property acquired under this Agreement, at the option of ECOLOGY,may become ECOLOGY's property and
the RECIPIENT's liability to repay monies will be reduced by an amount reflecting the fair value of such property.
24. SEVERABILITY
If any provision of this Agreement or any provision of any document incorporated by reference shall be held invalid,
such invalidity shall not affect the other provisions of this Agreement which can be given effect without the invalid
provision, and to this end the provisions of this Agreement are declared to be severable.
25. STATE ENVIRONMENTAL POLICY ACT(SEPA)
RECIPIENT must demonstrate to ECOLOGY's satisfaction that compliance with the requirements of the State
Environmental Policy Act(Chapter 43.21C RCW and Chapter 197-11 WAC)have been or will be met. Any
reimbursements are subject to this provision.
26. SUSPENSION
Template Version 12/10/2020 217
State of Washington Department of Ecology Page 20 of 21
Agreement No: WRYBIP-2527-YaWaIr-00086
Project Title: Nelson Ph.2B Pipeline
Recipient Name: City of Yakima-Water and Irrigation
When in the best interest of ECOLOGY, ECOLOGY may at any time, and without cause, suspend this Agreement
or any portion thereof for a temporary period by written notice from ECOLOGY to the RECIPIENT. RECIPIENT
shall resume performance on the next business day following the suspension period unless another day is specified
by ECOLOGY.
27. SUSTAINABLE PRACTICES
In order to sustain Washington's natural resources and ecosystems,the RECIPIENT is fully encouraged to
implement sustainable practices and to purchase environmentally preferable products under this Agreement.
a) Sustainable practices may include such activities as: use of clean energy,use of double-sided printing,hosting
low impact meetings, and setting up recycling and composting programs.
b)Purchasing may include such items as: sustainably produced products and services, EPEAT registered computers
and imaging equipment,independently certified green cleaning products,remanufactured toner cartridges,products
with reduced packaging, office products that are refillable,rechargeable, and recyclable, 100%post-consumer
recycled paper, and toxic free products.
For more suggestions visit ECOLOGY's web page, Green Purchasing,
https://ecology.wa.gov/Regulations-Permits/Guidance-technical-assistance/Sustainable-purchasing.
28. TERMINATION
a)For Cause
ECOLOGY may terminate for cause this Agreement with a seven (7)calendar days prior written notification to the
RECIPIENT, at the sole discretion of ECOLOGY,for failing to perform an Agreement requirement or for a material
breach of any term or condition. If this Agreement is so terminated,the parties shall be liable only for performance
rendered or costs incurred in accordance with the terms of this Agreement prior to the effective date of termination.
Failure to Commence Work. ECOLOGY reserves the right to terminate this Agreement if RECIPIENT fails to
commence work on the project funded within four(4) months after the effective date of this Agreement, or by any
date mutually agreed upon in writing for commencement of work,or the time period defined within the Scope of
Work.
Non-Performance. The obligation of ECOLOGY to the RECIPIENT is contingent upon satisfactory performance by
the RECIPIENT of all of its obligations under this Agreement. In the event the RECIPIENT unjustifiably fails,in
the opinion of ECOLOGY,to perform any obligation required of it by this Agreement,ECOLOGY may refuse to
pay any further funds,terminate in whole or in part this Agreement, and exercise any other rights under this
Agreement.
Despite the above,the RECIPIENT shall not be relieved of any liability to ECOLOGY for damages sustained by
ECOLOGY and the State of Washington because of any breach of this Agreement by the RECIPIENT. ECOLOGY
may withhold payments for the purpose of setoff until such time as the exact amount of damages due ECOLOGY
from the RECIPIENT is determined.
b)For Convenience
ECOLOGY may terminate for convenience this Agreement,in whole or in part,for any reason when it is the best
interest of ECOLOGY,with a thirty(30)calendar days prior written notification to the RECIPIENT, except as
noted below. If this Agreement is so terminated,the parties shall be liable only for performance rendered or costs
incurred in accordance with the terms of this Agreement prior to the effective date of termination.
Non-Allocation of Funds. ECOLOGY's ability to make payments is contingent on availability of funding. In the
event funding from state,federal or other sources is withdrawn,reduced, or limited in any way after the effective
date and prior to the completion or expiration date of this Agreement,ECOLOGY, at its sole discretion,may elect
to terminate the Agreement,in whole or part,or renegotiate the Agreement, subject to new funding limitations or
conditions. ECOLOGY may also elect to suspend performance of the Agreement until ECOLOGY determines the
Template Version 12/10/2020 218
State of Washington Department of Ecology Page 21 of 21
Agreement No: WRYBIP-2527-YaWaIr-00086
Project Title: Nelson Ph.2B Pipeline
Recipient Name: City of Yakima-Water and Irrigation
funding insufficiency is resolved. ECOLOGY may exercise any of these options with no notification or restrictions,
although ECOLOGY will make a reasonable attempt to provide notice.
In the event of termination or suspension, ECOLOGY will reimburse eligible costs incurred by the RECIPIENT
through the effective date of termination or suspension. Reimbursed costs must be agreed to by ECOLOGY and the
RECIPIENT. In no event shall ECOLOGY's reimbursement exceed ECOLOGY's total responsibility under the
Agreement and any amendments.
If payments have been discontinued by ECOLOGY due to unavailable funds,the RECIPIENT shall not be obligated
to repay monies which had been paid to the RECIPIENT prior to such termination.
RECIPIENT's obligation to continue or complete the work described in this Agreement shall be contingent upon
availability of funds by the RECIPIENT's governing body.
c)By Mutual Agreement
ECOLOGY and the RECIPIENT may terminate this Agreement,in whole or in part, at any time,by mutual written
agreement.
d)In Event of Termination
All finished or unfinished documents,data studies, surveys,drawings,maps,models,photographs,reports or other
materials prepared by the RECIPIENT under this Agreement, at the option of ECOLOGY,will become property of
ECOLOGY and the RECIPIENT shall be entitled to receive just and equitable compensation for any satisfactory
work completed on such documents and other materials.
Nothing contained herein shall preclude ECOLOGY from demanding repayment of all funds paid to the
RECIPIENT in accordance with Recovery of Funds,identified herein.
29. THIRD PARTY BENEFICIARY
RECIPIENT shall ensure that in all subcontracts entered into by the RECIPIENT pursuant to this Agreement,the
state of Washington is named as an express third party beneficiary of such subcontracts with full rights as such.
30. WAIVER
Waiver of a default or breach of any provision of this Agreement is not a waiver of any subsequent default or
breach, and will not be construed as a modification of the terms of this Agreement unless stated as such in writing
by the authorized representative of ECOLOGY.
End of General Terms and Conditions