Loading...
HomeMy WebLinkAbout01/06/2026 08.C. Resolution - Set date to amend the adopted 6-Year TIP and the Capital Facilities Element r 'V ii _�ii •• i i t, gin.;—* _1a _- '^ BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No. 8.C. For Meeting of: January 6, 2026 ITEM TITLE: Resolution setting date of February 3, 2026 to amend the adopted Six-Year Transportation Improvement Program and amend the Capital Facilities Element of the Yakima Urban Area Comprehensive Plan for the period of 2026-2031 (No Budgetary Impact) SUBMITTED BY: Robert Washabaugh, City Engineer SUMMARY EXPLANATION: On June 17, 2025 the City of Yakima adopted the 2026-2031 Six-year Transportation Improvement Program (TIP)for submittal to the Washington State Department of Transportation. The City is proposing to amend the Six-year TIP to include additional projects, which are the S. 1st St Pavement rehabilitation project and the Yakima Ave S. Overlay project. A Public Hearing will be held on February 3, 2026 to consider including the additional projects in adoption of an amended Resolution approving the Six-year TIP and amending the regional Metropolitan Transportation Plan and Comprehensive Plan Capital Facilities Element. ITEM BUDGETED: N/A STRATEGIC PRIORITY 24-25: A Resilient Yakima RECOMMENDATION: Adopt Resolution. ATTACHMENTS: Resolution-6_year_TIP-_Set_public_hearing 2026.docx S 1st St and Yakima Ave Amendments.pdf 20 RESOLUTION NO. R-2026- A RESOLUTION setting the time and place for a hearing on February 3rd, 2026 to review and adopt the amended Six-year Transportation Improvement Program and amend the Capital Facilities Element of the Yakima Urban Area Comprehensive Plan for the period of 2026-2031. WHEREAS, on June 17, 2025 the City of Yakima adopted the six-year program for the construction of streets and arterial streets in the City of Yakima for the ensuing six-year period, all as contemplated and required by the State RCW 35.77.010 and applicable federal law; and WHEREAS, the City of Yakima desires to amend the six-year program to include two (2) additional projects: • S. 1st St Pavement Rehabilitation • Yakima Ave S. Overlay and WHEREAS, the City of Yakima desires to amend the Yakima Urban Area Comprehensive Plan Capital Facilities Element to reflect the amended Six-year TIP, as contemplated and required by RCW 36.70A.070(6) to ensure compliance with the Growth Management Act and consistency of the Comprehensive Plan and the Six-year TIP; and WHEREAS, a public hearing must be held on said programs before final approval, now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: That said program shall be presented for hearing and determination on Tuesday, February 3, 2026, at the hour of 6:00 p.m., in the City Council Chambers, or as soon thereafter as the same may be heard, and the notice of such hearing be given as approved by law. ADOPTED BY THE CITY COUNCIL this 6th day of January, 2026. ATTEST: Mayor Rosalinda Ibarra, City Clerk 21 i V7/ Washington State Six Year Transportation Improvement Program I'I/► Department of Transportation From 2026 to 2031 Agency: Yakima County: Yakima MPO/RTPO: YVCOG Y Inside N Outside _ m v c CD < c � ' x A.PIN/Project No. B.STIP ID 3 o 3 c o m c Z C.Project Title D m E m z' °' F. X n 0. c D.Road Name or Number C cr. Q. 0' ' n m °' c i,g a E.Begin&End Termini m Z a q H F.Project Description G.Structure ID a M o m CD 3 m CD 03 YAK118 02/03/26 06 C G P S T 0.540 CE No W S. 1st St. Pavement Rehabilitation S. 1st Street W.Walnut Street to Pacific Ave The proposed improvements consist of milling and overlaying the existing asphalt, crack sealing,new pavement markings,and replacement of sidewalks,curb and gutter and curb ramps,and illumination. Improvements include spot pavement repair areas where pavement has failed in isolated locations. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2026 NHPP 945,300 0 0 945,300 S CN 2027 NHPP 6,497,700 0 750,000 7,247,700 Totals 7,443,000 0 750,000 8,193,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 675,000 270,300 0 0 0 CN 0 6,497,700 0 0 0 Totals 675,000 6,768,000 0 0 0 Report Date: December 29, 2025 Page 1 22 i V7/ Washington State Six Year Transportation Improvement Program I'I/► Department of Transportation From 2026 to 2031 Agency: Yakima County: Yakima MPO/RTPO: YVCOG Y Inside N Outside _ m v c o < c � c x A.PIN/Project No. B.STIP ID 3 o 3 c o m c z C.Project Title D m E m z' °' F. xi n 0. c D.Road Name or Number C c Q. o' ' n m °' c �, a E.Begin&End Termini Z ,< Q. um ,< H E - F.Project Description G.Structure ID 2 Q. o m CD m c. 03 YAK117 02/03/26 05 G P S W 1.000 CE No Yakima Ave S.Overlay Yakima Avenue S.6th Street to Yakima River Bridge The proposed improvements consist of milling and overlaying the existing asphalt, crack sealing,new pavement markings,and replacement of non-ADA compliant curb ramps. Improvements include spot pavement repair areas where pavement has failed in isolated locations. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2026 NHPP 297,000 0 0 297,000 S CN 2027 NHPP 2,273,000 0 0 2,273,000 Totals 2,570,000 0 0 2,570,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 225,000 72,000 0 0 0 CN 0 2,273,000 0 0 0 Totals 225,000 2,345,000 0 0 0 Federal Funds State Funds Local Funds Total Funds Grand Totals for Yakima 10,013,000 0 750,000 10,763,000 Report Date: December 29, 2025 Page 2 23