HomeMy WebLinkAboutR-2025-185 Resolution approving Change Order #1 for new fire panel at Yakima Air Terminal for the Terminal Modernization Baggage Claim ProjectRESOLUTION NO. R-2025-185 A RESOLUTION authorizing the City Manager to execute Change Order No. 01 for the Fire Alarm System Replacement at the Yakima Air Terminal — McAllister Field. WHEREAS, the City owns and operates the Yakima Air Terminal -McAllister Field in accordance with applicable Federal, State, and Local regulations; and WHEREAS, the City has entered into a contract with Cliff Thorn Construction for the YKM Terminal Modernization project (Contract No. 1009251, dated April 17, 2025); a WHEREAS, the existing proprietary fire alarm system at the terminal has failed, is non- operational, and cannot be repaired due to obsolescence, requiring the City to conduct a fire watch; and WHEREAS, Change Order No. 01 provides for the replacement of the fire alarm system with a new Silent Knight Voice Evacuation system, including all associated labor, materials, and programming, at a cost of $170,044.94, with no change in contract time; and WHEREAS, in accordance with City policy, change orders in excess of $100,000 require City Council approval; and WHEREAS, the City Council finds it to be in the best interest of the City and the public to proceed with the execution of Change Order No. 01 to ensure the safety and functionality of the terminal facility; BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The City Manager is hereby authorized to execute Change Order No. 01 to the contract with Cliff Thorn Construction for the YKM Terminal Modernization project, in the amount of $170,044.94, for the replacement of the fire alarm system at the Yakima Air Terminal — McAllister Field. ADOPTED BY THE CITY COUNCIL this 9th day of December, 2025. Patricia Byers ATTEST: Change Order Order#: 3 Project:To:City of Yakima 129 North Second Street Yakima WA 98901 0 Yakima Air Terminal Baggage Claim 3110 W Washington Ave Yakima WA 98903 2,471,229.00 The contractor agrees to perform and the owner agrees to pay for the following changes to this contract. Requested Amount of Change License: The original Contract Sum was Plans Attached Contractor: Owner: Date: Date: Negative changes will lower the overall contract price requiring no additional payment by owner. Order Date: Ordered By: Customer Order: 11/11/2025 159 Jess Metzger Net change by previous Change Orders The Contract Sum prior to this Change Order The Contract Sum will be changed by this Change Order The new Contract Sum including this Change Order will be The Contract Time will be changed by 25034 170,044.94 170,044.94 Days CLIFFTC891P8 Cliff Thorn Construction 1552 SE Georgia Ave Richland WA 99352 (509) 416-2007 Specifications Attached Description of Work Amount Silent Knight Voice Evacuation Fire Alarm System 142,461.95 Monitoring Contract with E3 Solutions $40/mo. NOT INCLUDED- TSA Panic Security Panel in COR#4. B&O Tax 800.91 General Liability Insurance 1,275.34 GC O&P 25,506.74 Notes 2,471,229.00 2,641,273.94 0.00 Item No. 7.J. For Meeting of: December 9, 2025 ITEM TITLE:Resolution approving Change Order #1 for new fire panel at Yakima Air Terminal for the Terminal Modernization Baggage Claim Project (No General Fund Impact) SUBMITTED BY:Gary Ballew, Assistant City Manager BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT SUMMARY EXPLANATION: In early October, rain infiltration caused the existing airport terminal fire panel to short. The system is old and replacement parts to repair the system are unavailable. The airport has been on fire watch (regular patrols of the terminal building during occupancy) since the panel went down. This change order will replace the fire panel system within the Yakima Air Terminal that will make the terminal compliant with the fire codes, modernize the system and lower the cost of maintenance by utilizing a non-proprietary system allowing contracting with a local vendor. The existing system was proprietary and required call outs from Spokane. The replacement is added to the Baggage Claim project and costs are allocated 90% to the FAA and 10% to the YKM Airport. ITEM BUDGETED: Yes STRATEGIC PRIORITY 24-25: A Thriving Yakima RECOMMENDATION: Adopt Resolution. ATTACHMENTS: 2025_12_09_Change Order 01 Baggage Claim Project_Resolution.docx Change Order 01 Fire Alarm System Replacement Docusign Envelope ID: 27103B08-A101-893D-81 E8-BB49E6B0D896 Project Name: Project Number: Contractor: Address: City, State, Zip: City of Yakima Yakima Air Terminal -McAllister Field (YKM) AIP Supp 3-53-0089-058-2024 Cliff Thorn Construction 1552 Georgia Ave Richland, WA 99352 You are directed to make the following changes in this Contract: CTC Change Order Request (COR) #14 Spec section 265113 -Luminaires change due to ceiling) and BABA requirements. Please see the attached FAA Change order form fields. Change Order Change Order Number Change Order Date Contract Number 1009251 14 08/31/2026 Contract Date 04r17r2025 unforeseen condition (limited space in for additional details, and required signature Not valid until signed by both the Approving Authority and Contractor. Signature of the Contractor indicated agreement herewith, including any adjustment on the C r Contract Time. The original Contract Sum was $ Net change by previous Change Orders $ The Contract Sum prior to this Change Order $ The Contract Sum will be: a Increased 0 Decreased 0 Unchanged by this Change Order $ The New Contract Sum including this Change Order will be ............................................ $ 2,471,229.00 308,143.51 2,779,372,51 18,912.21 The Contract Time will be: 0 Increased 0 Decreased 0 Unchanged by 0 working days The New Contract Time will be 217 3,44444ig days Calendar Calendar 2,798,284,72 Contractor By 1.« Haw Title Project Manager Date1015/2026 Approval Recommended Project Engineer By IA sfu ruaelic Date 10/5/2026 City of Yakima - Division Manager y a26 Date Approval Recommended City of Yakima on Director By (,Lrideylu.r iSrt4�i.s Date 10/17/2026 Approved Victoria Baker, City Manager By tint,Y ,a. Date '''f1)i2812026 Based an DOT Form 570-04t EF Revised OE/2021 Original to: 0 Contractor Copies to: 0 Region 0 Construction Administrator 0 OSC Accounting 0 City Engineering CITY CONTRACT NO: Z2 °5-06'1 Co RESOLUTION NO: f,—Z025— s t C Docusign Envelope ID: 271031308-A101-893D-81 E8-BB49E6600896 Page 1 of 2 pages CONTRACT CHANGE ORDER NO. 14 or SUPPLEMENTAL AGREEMENT NO. AIRPORT Yakima Air Terminal — DATE August 31, 2026 McAllister Field (YKM) LOCATION Yakima, WA AIP PROJECT NO. 3-53-0089-058-2024 CONTRACTOR Cliff Thorn Construction You are requested to perform the following described work upon receipt of an approved copy of this document or as directed by the engineer: Item No. Description Unit Unit Price Quantity Amount C14 CTC Change Order Request (COR) #14 Spec section 265113 -Luminaires change due to unforeseen condition (limited space in ceiling) and BABA requirements. LS 18,912.21 18,912.21 This Change Order Eligible Total $18,912.21 This Change Order Ineligible Total $0.00 This Change Order Total $18,912.21 Previous Contract Total $2,784,475.94 Revised Contract Total $2,803,388.15 The time provided for completion in the contract is increased by 0 calendar days. This document shall become an amendment to the contract and all provisions of the contract will apply. Changes are shown on Drawing(s) No. N/A. Recommended by: Leslee Randolph Gur MWA ARCHITECTS Approved by: Accepted by: (Engineer) City ofYakima (Owner 08/31/2026 10/5/2026 Date 10/17/2026 Date 10/5/2026 (Contractor) Date Concurred by: N/A N/A State Aeronautics (if applicable) Date Docusign Envelope ID: 27103B08-A101-893D-81E8-6649E6BOD896 w ISM V 101IWG ,11„G1 ...WA. VV 1 1 ,liminaire Alterations due to Unforeseen conditions - Leslee Randolph - Outlook. Outlook RE: YKM Change Order 14 WO2 WP1 Luminaire Alterations due to Unforeseen conditions From Trinklein, Eric (FAA) <Eric.Trinklein@faa.gov> Date Wed 9/23/2026 10:18 AM To Leslee Randolph <Irandolph@mwaarchitects.com> Cc christopher.hopkins<christopher.hopkins@yakimawa.gov> Yakima Air Terminal — McAllister Field (YKM) Yakima, WA A1P: 3-53-0089-058-2024 Change Order 14 — baggage claim We have reviewed the subject Change Order and associated costs and documentation. We have determined that all the additional contract items are eligible for AIP participation. The foliowing contract items are approved in the total amount of $7,853,99 and 0 days increase in contract time: Luminaires change due to limited space in ceiling and BABA requirements. This determination is solely for the purpose of establishing eligibility of costs under the AIP program. This approval does not represent a commitment of Federal funds in addition to the original grant obligation. Please forward a copy of the executed change to my attention as soon as it is available. Your project documents and closeout report should indicate details addressed by this Change Order. Sincerely, Eric Trinklein Civil Engineer, Denver Airports District Office Office of Airports 1 Federal Aviation Administration U.S. Department of Transportation eric.Innkh. in .':.,Tov From: Leslee Randolph <Irandolph@mwaarchitects.corn> Sent: Monday, September 21, 2026 9:31 AM To: Trinklein, Eric (FAA) <Eric.Trinklein@faa.gov> Cc: Branchcomb, Chelsea L (FAA) <Chelsea.L.Branchcomb@faa.gov> Subject: Re: YKM Change Order 14 W02 WP1 Luminaire Alterations due to Unforeseen conditions CAUTION: This email originated from outside of the Federal Aviation Administration (FAA). Do not click on links or open attachments unless you recognize the sender and know the content is safe. Eric, about:blank?windowld=SecondaryReadingPane42 1/3 Docusign Envelope ID; 27103808-A101-893D-81E8-BB49E6BOD896 ,...,, , ,., ,.L. "UV, ..11011 Vi W©, V V V& VVO , Luminaire Alterations due to Unforeseen conditions - Leslee Randolph - Outlook Please see attached updated CO#14 that includes the RCP for the location. Thank you and let me know if you need any further clarifications. Thank you. From Memorial Day through Labor Day, I will be working summer hours. I will be available Mon-Thurs from 8:30 am-6:30 pm, and Fridays from 8:00 am-12:30 pm. Leslee Randolph (she/her) Director of Transportation and Resource Management kMWA ARCHITECTS 1NC, San Francisco l Portland 0 503.973.5151 I C 503.827,4514 Irandolph@mwaarchitects.com I www.rnwaarchitects.corn From: Leslee Randolph <Irandolph@mwaarchitects.com> Sent: Wednesday, September 16, 2026 7:23 AM To: Trinklein, Eric (FAA) <eric.trinkleinPfaa.g©v> Subject: Re: YKM Change Order 14 WO2 WP1 Baggage Claim SIDA Fence Yes. Apologies. I am out on site all day today so I will try to get the team to get this over to you. I had this printed, but didn't get a chance to combine and mark the locations. Sorry for the delay. Sent from my T-Mobile 5G Device Get Outlook for Android From: Trinklein, Eric (FAA) <Eric.Trinkleinjfaa.gov> Sent: Wednesday, 16 September 2026 07:16:01 To: Leslee Randolph <Irandolpti_@mwaarchitects.com> Subject: FW: YKM Change Order 14 WO2 WP1 Baggage Claim SIDA Fence Hi Leslee As vve discussed, Please provide a quick sketch or highlight the fixtures in the plans to indicate the impact from this change order. Sincerely, Eric Trinklein Civil Engineer, Deriver Airports District Office Office of Airports I Federal Aviation Administration 250 U.S. Department of Transportation ericJrinkl4in(40a°a.ago' From: Branchcomb, Chelsea L (FAA) <Chelsea.L.Branchcomb(faa.gov> Sent: Thursday, September 10, 2026 5:01 PM To: Trinklein, Eric (FAA) <Eric.Trinklein@faa.g©v> Subject: final part FW: YKM Change Order 14 WO2 WP1 Baggage Claim SIDA Fence about:blank?windowld=SecondaryReadingPane42 2/3 Docusign Envelope ID: 27103B08-A101-893D-81E8-BB49E6B0D896 <.,, I..,, , ,.! , ISM ..11011ya t, ,.GI ,, .Y VI- WWI I Luminaire Alterations due to Unforeseen conditions - Leslee Randolph - Outlook Chelsea Branchcomb, PE Lead Engineer, Seattle Airports District Office Office of Airports l Federal Aviation Administration 0 U.S. Department of Transportation 0: (206) 231-4231 chelsealbrarichcomb@faa.gov From: Leslee Randolph <Irandolph@mwaarchitects.corn> Sent: Tuesday, September 8, 2026 2:53 PM To: Branchcomb, Chelsea L (FAA) <Chelsea.L.BranchcombPfaa.gav> Subject: YKM Change Order 14 WO2 WP1 Baggage Claim SIDA Fence CAUTION: This email originated from outside of the Federal Aviation Administration (FAA). D© not click on links or open attachments unless you recognize the sender and know the content is safe. Chelsea, Please see attached for proposed Change Order. Thank you and let me know if you need me to change anything or have any questions. From Memorial Day through Labor Day, I will be working summer hours. I will be available Mon-Thurs from 8:30 am-6:30 pm, and Fridays from 8:00 am-12:30 prn. Leslee Randolph (shelher) Director of Transportation and Resource Management , WA ARCHITECTS INC. San Francisco I Portland C 503.973.5151 I C 503.E 27.4514 Irandolph(a1mvvaarchitects.con� chitects,corr about:blank?windowld=SecondaryReadingPane42 3/3 Docusign Envelope ID: 27103B08-A101-893D-81E8-BE349E6BOD896 Page 2 of 2 pages AIP PROJECT NO. 3-53-0089-058-2024 CHANGE ORDER NO. 14 (Supplemental Agreement) AIRPORT Yakima Air Terminal — McAllister LOCATION City of Yakima, WA Field (YKM) JUSTIFICATION FOR CHANGE I. Brief description of the proposed contract change(s) and location(s). Change to specified architectural luminaires (Spec Section 265113) within the baggage claim ceiling. Substitute fixtures required due to limited available ceiling space and Build America, Buy America (BABA) sourcing requirements. No other bid -day cost changes associated with this luminaire package. 2. Reason(s) for the change(s) (Continue on reverse if necessary) Field verification revealed insufficient ceiling cavity space to accommodate the originally specified luminaires as designed — an unforeseen condition not evident during design. Additionally, BABA compliance requirements restricted product sourcing options. Replacement fixtures meeting both physical clearance and domestic -sourcing requirements carry a cost premium and a 12-16 week lead time, necessitating this change to keep procurement on schedule. 3. Justifications for unit prices or total cost. An independent cost analysis has been prepared as follows: Sub Contractor Materials: Luminaires $12,000.00 Total Material Costs: $12,000.00 Sub Contractor Labor: Electrical Subcontractor, 24 hours, Fully Burdened Prevailing Wage at $131.13/hour for demolition = $3,147.12 Total Labor Costs: $3,147.12 Sub Contractor Total: $15,147.12 Sub Contractor Markup 10% $1,514.72 Prime Contractor Markup 15% $1,666.19 Total cost of independent estimate: $18,328.03 Detailed costs provided by the contractor were as follows: Sub Contractor Materials: Luminaires $11,126.50 Total Material Costs + Markup: $12,795.47 Sub Contractor Labor: Electrical Subcontractor, 20 hours, Fully Burdened Prevailing Wage at $131.13/hour for demolition = $2,622.60 Total Labor Costs + Markup: $3,015.99 Docusign Envelope ID: 27103808-A101-893D-81E8-BB49E6B00896 Sub Contractor Total: B&O Tax General Liability Insurance GC O&P Total cost: $15,844.46 $89.08 $141.84 $2,836.83 $18,912.21 4. The sponsor's share of this cost is available from: County funding made available to the City/Airport for matchingfunds. 5. If this is a supplemental agreement involving more than $2,000, is the cost estimate based on the latest wage rate decision? Yes No 0 Not Applicable Z. 6. Has consent of surety been obtained? Yes U Not Necessary 7. Will this change affect the insurance coverage? Yes 0 No Z. 8. If yes, will the policies be extended? Yes 0 No 0 Not Applicable Comment Docusign Envelope ID: 27103B08-A101-893D-81E8-8849E6B0D896 Cliff Thorn Construction 1552 SE Georgia Ave Richland WA 99352 (509) 416-2007 License: CLIFFTC891P8 To: City of Yakima 129 North Second Street Yakima WA 98901 Change Order Order#: 14 Order Date: 05/27/2026 Project: 25034 Yakima Air Terminal Baggage Claim 3110 W Washington Ave Yakima WA 98903 The contractor agrees to perform and the owner agrees to pay for the following changes to this contract. Ordered By: 159 Jess Metzger Customer Order: Plans Attached Specifications Attached n Description of Work Amount Architectural Luminaires- Kinter Electric 15,844.46 Spec section 265113 -Luminaires change due to unforeseen condition (limited space in ceiling) and BABA requirements. Purchase of fixtures on Hold waiting for release. 12-16 week lead time. Added cost to rneet requirements- Kinter will not have any Bid Day added costs besides these Luminaires, Price Includes Subcontractor 10% Mark -Up B&O Tax General Liability Insurance GC O&P Notes Negative changes will lower the overall contract price requiring no additional payment by owner. Requested Amount of Change 89.08 141,84 2,836.83 18,912.21 Theoriginal Contract Sum was......._,.,...._......................................................._...,_.,.................._.-..-..........................,...._.................._.._..._ Netchange by previous Change Orders_.................._........,,.........,..................,.......................,.......;.......,...,,.,....,............, The Contract Sum prior to this Change Order The Contract Sum will be changed by this Change Order.................................................._....__._........_.....,......_ The new Contract Sum including this Change Order will be TheContract Time will be changed by.................._......,,...,.,,_....,,....e.,...,.......,..........,..........................,........,......,..,......,,....., Owner: Contractor: 2,471,229.00 238, 558.92 2,709,787.92 18, 912.21 2,728,700.13 0 Days Date: Date: 5/27/2026 C�'.cLs-a+�.,w>e=•e s>•s-�,Usa�a,z�-cwwe�anvcre�: C " REFLECTED CEILING PLAN FIRST FLOOR SCALE ira/r° w 1-a- Docusign Envelope ID: 27103808-A101-893D-81E8-BB49E6B0D896 YKM WP-01 Baggage Claim 10092501 2300 W. Washington Ave, Yakima, Washington, 98903 Kinter Electric 2761 E Edison Rd. , Sunnyside, Washington, 98944 Phone (425) 830-2270 Change Order Request No. 1 Architec due to unforeseen conditions. Return By 05/27/2026 a urninaires - Change KINTERELECTRIC TO REPLY TO Jess Metzger (CTC) Josh Radosevich Kinter Electric) Jess@ctcbuilds.com josh@kinterelectric.com (509) 792-2386 GENERAL INFO Date Days Valid Work Type 10/28/2025 7 Directed Change SCOPE OF WORK Architectural luminaires change due to unforeseen conditions. SCHEDULE IMPACT Comments nts Purchase Order Hold for Release. DETAILED VIEW No. LABOR 1. Journeyman No. MATERIAL Hours 20.00 hrs GC COR No. No. of Days 112 Workers Rate 1 $131.13 Total Labor Expense Extended $2,622.60 $2,622.60 Qty UM Rate Extended 1. 265113 - ARCHITECTURAL LUMINAIRES 1 Each $11,126.50 $11,126.50 Notes: 265113 - ARCHITECTURAL LUMINAIRES Total Material Expense $11,126.50 SUMMARY Category Extended Markup Total YKM WP-01 Baggage Claim 10092501 Page 1 of 2 Change Order Request No. 1 Docusign Envelope ID. 27103B08-A101-893D-81E8-BB49E6B0D896 Labor Material RESERVATION OF RIGHTS $2,622.60 $11,126.50 $393.39 150 $1,668.97 15% $3,015.99 $12,795.47 Total $15,811.46 Tax $0.00 GRAND TOTAL $15,811.46 This COR does not include any amount for impacts such as interference, disruptions, rescheduling, changes in the sequence of work, delays and/or associated acceleration. We expressly reserve the right to submit our request for any of these items. YKM WP-01 Baggage Claim 10092501 Page 2 of 2 Change Order Request No. 1 Docusign Envelope ID: 27103808-A101-893D-81 E8-B849E6BDD896 P PACIFIC LAMP'SUPPI:_Y COMPANY PHILIPS ej SYLVRMLS YMIMA ASR ATA LUMSHASRE LOT TOTAL rvv.aaaExRRB.s'rt.aaw- 'H-Ls'ol.rwM.NeL-FTsmWt NV-14L^3-C11-E2!ATTTRR2-90-13Pi'E15-FSMSS it CE A,317G' MOUN i,V, TawE 2B. a>Iv�MaaaJ wT;NGTwla-n° TA. o240.1 JV.S'M.O4Our4TINGTV 'L k14" ikCPEiiTBv., C'i1P] iAPE2.5.P5E5 {L kt MEL5TE S5W'E ALPrSW-MOUNfi WE:T.'.lU.4 2-ENCf1". 12 i1RIVER OR 410N-51P'OEPENT) d;ali%%-UFdY-2a.PldN)-1 G'V 444511 2.E^44M."v`iR'_2A,fsttHb•If3V.PIk9Pa4'i L,1 'Yd-[th5555 F'kik1 tUV.€'.255SN 8. CS'd1N.13HV".2445 kk17V d+NISN HATTERY 555525P NG5T AVA UA 12U 82324€M5GUSPEA`CU 44PY3-530-01 aUA,FiL5 €1NI5N ALT51 LOT TOTAL •UNV.4OW-Co 44212442. W.ia7."F 24.ALTI.F44.2242.F 2'95 iG IGL5AGE A-1+JV. MOUNTING T 51745v4d 1r5505555 B 54154#T HCM5CR1S 525 I bF07 1T NECt M'V015 ENC 2 575441T NPi70,UC1515 GX 4P. 7 N4,7G4XT 1'S& OOMhOX.YIA 11 S s 5110447 NPP15051545M I i NLIGHT pa4NV 540T12211, 5 5 SCW O¢g7555 PRUL 51 1 'RESTRGOMAD011 ®N8 RUP1i H7121052555.4�5 54154li"',,, 550055545 qX 1M1i 1 4154457 _NPPIS U EFP Bht_ ...M.IGHT NWV1525 i555515 CA5577542.2 ID TING CONTROLS. 2224.124.22 7 RIE.U. I"OI&S SINCE 19i2 it Ann: A OT BUDGETARY QUOTE BASED ON INFQRMATIONPR0VkDEA AT TIME OF REQUEST BUDGETARY QUOTE RASED ON INFOR EATTQW PROVEDEO AT TIME OF REQUEST BUDGETARY QUOTE BASED ON 14FORMA'P10N PRO Vf0E0 AT TYME OF REQUEST 8006145ARY QUOTE RASED ON MiFORIPAT19H PROV#}Etl A7 TIME OF REQUEST TARP 9501E SA 'EOM €NFORMATRN5 PROVIDED AT TIME OF REQUEST .. .. _.__.__.... ..-._._ _.— UAW'UAW'DUDE E BASED ON UiFORMkTR3N PROVBYED AT TIME OF REQUEST PIRY 0UT1TE RASED ON INEGRMAPQN PROVIDED AT TIME OE REQUEST ETARY PRIORIG, MUSH SELECT FINISH PRIOR TO 0RU 12' EACH LAI., 25411115751 ' L11515 5 #Fm2024 P 221.T4C 17X302 15,12371 1012 .47 Docusign Envelope ID: 2.7103B08-A101-893D-81 E8-BB49E6B0©896 Quoted to: Protract Name: Location: Line I TYPE DIY YAKIMA AI T CATALOG N 3RR•TFTIFF AETR€E.TLMP SW"D'F-ASE-UNV-VJWJ.G1V iEWV FREICa1IT 4TG-3111-LT"�GD=AH.7 t}V,L-hME TGi-3R,LP,1 D+YX-4'-DML. 0Y __.... - SA -PM g1TL t3AS02 5"PM"RT pAYO<S-PM1RTt PACIFIC i. A. PHIUPS • SYLYANIA SiPPLY CC PANY ARn. Per plan sot: Revised: DESCRIPTION UMINAIRE LOT TOTAL YAERRRE146i,tY+001K3.dtiTP-WER11-3511462 aL"TLRo-l?.CdOL,-PFMW-F i'M'rV t41id.Cltt"eETRFS-SWIM-taMEG-257P-5ACRI T {?„it'-3..aCJL.71- 4$1.C)9-CEitALTRRP,Sed,141N-66117FAR-2S1P,SPERi 2511"LSEL-TEM,401,F14"N- '-wfLrw-!'3brrdE2RRR-S'vV-aSW.,BPDE STF"-351{'RI,T5Ki.F,,Y.'L-TLtAWfidL-FTNk'n'-FfP T P 4(1G it Y 25K-LSIYt- il, Fd P-EJ 0 L- F T M W IJV- PUV-iSpgV- V>i7900tF "UNV=11APt. F t 1 M!!{1 D ASP C ASG2 Fs PMwR'i L-WP F{52.20d+. C91YOPAV-t79flVV7507LF-YF7: HRF'E26-?h1 RT4.-TEMPf.ATE-SH$IFE VAS-SW-FSb•SE1-W k?. l6"-iNET-.7C4 REIRCx'Tt-ai-lW24.O tf7WE-SGCiC.CA5'°, t2C-240101G.1.2 5-71-5-l3A-NIA 1TTFN-r' €iACkt4s HOT AVAIL70010101 FOR 0174£' 4'12" 42•W 11,S97.,D3bE-DA€S-RAL' AE2RP-11MP-SW-OF-A A-2722- ALT At LOT TOTAL UNV.1116V,13'I NEFRRS-SW"1NW -A Ur .IDW"C81YE(i-AE20ItH"SUV"t HOMING C011TR 0IUR0 8 KI1 S+CA9 10 RJT} UAA NECY MVOLT 66C NaV GENF NPoc 45 DX W1{13M NPO6MA TASTE IT E i'R000AMM1NG SERVICES ESTR00M ADDITIVE ALTERNATE CM 10 RJU [IAA POOMA 4S ON WH EAA PP1fi D EFP 13AA W VP 17: kt i 5".T'Mmf -T'T CATIT 010100,c`. •FTMV0 JOSH RADQ0EVICH TLMP NC}L-FiMW,FTMW _.. 'ANY 0001142 ON IN PART NMI* QUANTITY WILL SE SudJECT TO A REO}OOTE TOTAL; Date.: Quoted try: Bid Date: SELL PRICE EACH 51152026 JM 411712025 EXTENDED TOTAL 770146 760 16 3,043.20 REFLECTED CEILING PLAN FIRST FLOOR `�/sccr ara,i=�'