HomeMy WebLinkAboutR-2017-047 Emergency Stormwater Infrascructure Repair - 66th Avenue Between Scenic Avenue and Englewood AvenueA RESOLUTION
RESOLUTION NO. R-2017-047
ratifying the declaration by the City Manager of an emergency and
authorizing the City Manager to execute all applicable contracts
for the installation of the stormwater infrastructure required for the
repair and reopening of 66th Avenue between Scenic Avenue and
Englewood Avenue
WHEREAS, Article VI, section 6 of the City of Yakima Charter and the Yakima
Municipal Code Chapter 1 80 provide that the City Council may declare an emergency
dispensing with the necessity for bidding for services, material, and equipment and
supplies costing more than $25,000; and
WHEREAS, road damage has required the closure of 66th Avenue between
Scenic Avenue and Englewood Avenue since February 22, 2017 which has created
detours and stormwater-related safety concerns including property damage during rain
events, and
WHEREAS, the proper repair, resurfacing, and reopening of the roadway requires
prior installation of stormwater drainage infrastructure; and
WHEREAS, repairing the site requires site evaluation and careful design of the
stormwater infrastructure, which took place through March due to an unforeseen flood
emergency in another portion of Yakima which took resources and staff from Public Works
away from this project to work on the immediate emergency flooding issues, and
WHEREAS, the design was recently completed and it is imperative to complete
the stormwater infrastructure to address the immediate safety concerns associated with
future rain events, which must be done prior to road resurfacing in April, and
WHEREAS, the Stormwater Division does not have the labor resources to perform
the stormwater infrastructure installation prior to the road resurfacing that is scheduled for
the April 2017; and
WHEREAS, the asphalt plants are scheduled to open in the third week of April,
allowing Public Works to address the roadway concerns and issues surrounding detour
routes, and
WHEREAS, the formal bid process would take approximately three months after
the design plans were completed, which would continue to put property and the public at
risk during rain events for property damage, and
WHEREAS, an emergency exists because this roadway area needs to be repaired
from damage, which first requires construction of stormwater infrastructure, and the
damage presents a real, immediate threat to the proper performance of the roadway and
stormwater systems and failure to repair the roadway and construct the stormwater
infrastructure will likely result in material Toss or damage to property during future rain
events and as a result of the road closure, if immediate action is not take; and
WHEREAS, the City Council deems it to be in the best interest of the City and its
residents to ratify the City Manager's declaration of an emergency and authorize the
execution of all necessary documents for contracts for the labor and materials for the
installation of the stormwater infrastructure required to repair and reopen 66th Avenue
between Scenic Avenue and Englewood Avenue, now, therefore,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA:
The emergency is hereby ratified, the City Council resolves that there is an
emergency, and the City Manager's execution of all appropriate documents for the labor
and materials for the installation of stormwater infrastructure required to repair and
reopen 66th Avenue between Scenic Avenue and Englewood Avenue without calling for
bids, is hereby ratified and approved
ADOPTED BY THE CITY COUNCIL this 4th day of April 2017
ATTEST*
Sonya CI,-ar Tee, City Clerlet
—*®
ITEM TITLE:
SUBMITTED BY:
BUSINESS OF THE CITY COUNCIL
YAKIMA, WASHINGTON
AGENDA STATEMENT
Item No. 9.
For Meeting of: April 4, 2017
Resolution authorizing the emergency purchase of stormwater
infrastructure and installation services not to exceed
$200,000, required prior to the repair and reopening of 66th
Avenue between Scenic and Englewood Avenues
Scott Schafer, Director of Public Works
Mike Price, Wastewater/Stormwater Division Manager 249-6815
SUMMARY EXPLANATION:
Severe road damage caused by stormwater runoff required the City to close 66th Avenue
between Scenic Avenue and Englewood Avenue since February 22, 2017. This is the only road
in the City that is closed due to unsafe driving conditions.
The Stormwater Division is requesting permission from City Council to forego the formal bid
process for the stormwater structure purchase and installation. The formal bid process would
delay the project completion and road reopening until July at the earliest date. Foregoing the
formal bid process will allow the City's Streets Division to begin rebuilding the affected section of
66th Avenue as soon as the stormwater infrastructure installation was completed and begin
repaving as soon as asphalt became available. The asphalt plant is expected to open on April
10th.
Funding is identified and budgeted in the Stormwater Capital fund (441) for improved
conveyance and infiltration of stormwater.
ITEM BUDGETED:
STRATEGIC PRIORITY:
APPROVED FOR
SUBMITTAL:
Yes
Public Safety
City Manager
STAFF RECOMMENDATION:
Adopt resolution.
BOARD/COMMITTEE RECOMMENDATION:
ATTACHMENTS:
Description Upload Date
D Emergency Resdution - 66th A\,,e 3/29/2017
D Emergency PO Justification 3/29/2017
D quote 3/29/2017
Type
Resolution
Backup Material
Omer Memo
Requestor Name:
Requestor Phone:
Requested Vendor:
Vendor's Address:
City of Yakima # 1703-E
Emergency Purchase Order Justification
Mike Price
509-249-6815
TTC Construction
P.O. Box 365, Yakima, WA 98907
Vendor Contact Name:
A. J. Heckart
Your Department/Division:
Requisition (PR) Number:
Cost Estimate (incl TAX):
Vendor E -Mail :
Vendor Phone:
Stormwater
PR -18941
Not to exceed $200,000.
ajheckart.ttc@gmail.com
509-457-3969
1. What is the emergency situation? Describe damages or loss of property or essential services that
are/may be a result of this emergency. (Attach extra sheet if necessary.)
Repair and reopening of 66th Ave between Scenic and Englewood requires stormwater infrastructure placement
prior to April repaving. Existing detours are unsafe. Formal bid process would delay reopening until July.
2. What labor and/or materials are required? Attach a copy of your quote or estimate.
See attached quote/estimate
3. Did vendor quote prevailing wages, if applicable (e.g. repairs, construction, maintenance)?
Yes x No
4. Was vendor informed of the Intent and Affidavit filing requirements with L&I?
Yes No
5. Does vendor have a current certificate of insurance on file with the City? Check ICE:
http: //cityice/purchasing/contractor
Yes
No
6. Are federal funds being used? If federal funds are being used, a cost price analysis
must be done at earliest opportunity and a copy sent to Purchasing.
Yes
No
x
STATEMENT OF NEED:
My division's recommendation for an emergency purchase order and waiver of the quote or bid requirements is based
upon an objective review of the emergency situation and appears to be in the best interest of the City.
I understand that if this purchase is over $24,999, or if any change orders to this purchase increase the amount to
$25,000 or over, that our division must initiate and prepare necessary information (Resolution) to advise City Council that
there has been an emergency situation requiring immediate action.
Approval b ''Manager
Please complete entire form and forward to Purchasing.
Purchasing will fo and to the City Manager for final approval.
Quote To:
Phone:
Fax:
217028 N. 66th Ave Drainage Improvements
T.T.C. CONSTRUCTION INC
12871 Summitview Road
YAKIMA WA 98908
Contact: A.J. / Victor
Phone: (509) 457-3969 (509 728 2534 or 509 654 8278)
Fax: (509) 457-2945
Job Name:
Date of Plans:
Revision Date:
ITEM
DESCRIPTION
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Mobilization
1.00
LS
8,002.220
8,002.22
2
Clearing & Grubbing
1.00
LS
4,306.380
4,306.38
3
Ditch Excavation
1,307.00
CY
23.340
30,505.38
4
Catch Basin Type 2 48 IN. Diam
3.00
EA
3,107.730
9,323.19
5
Drop inlet Type 1
5.00
EA
3,092.310
15,461.55
6
Solid Wall PVC Sewer Pipe 12 IN. Diam
80.00
LF
54.510
4,360.80
7
12 IN. Diam Corrugated Metal Culvert Pipe
120.00
LF
52.940
6,352.80
8
Crushed Surfacing Top Course for Trench Backfill
342.00
TN
17.440
5,964.48
9
Saw Cutting
640.00
LF
2.400
1,536.00
12
Infiltration Trench W/24 IN. Diam. Pipe
120.00
LF
278.030
33,363.60
13
2 1/2" Angular Rock For Lining Ditch
613.00
TN
36.400
22,313.20
14
Check Dams
34.00
EA
101.750
3,459.50
16
Base Bid
$144,949.10
18
Remove Paving Englewood to Senic Drive
1,273.00
LF
9.260
11,787.98
GRAND TOTAL
$156,737.08
NOTES:
Inclusions:
Items supplied by Randy Meloy
Exclusions
Sales tax
Permits
Traffic control
Bond
Page 1 of 1