HomeMy WebLinkAboutR-2005-136 2005 to 2010 Six-Year Transportation Improvement Program (STIP)RESOLUTION NO. R-2005-136 A RESOLUTION fixing the time and place for hearing for September 20, 2005 in the Council Chambers at City Hall on an amendment to the 2005 through 2010 Six Year Transportation Improvement Program (STIP). WHEREAS, the City of Yakima annually prepares, reviews and adopts a Six Year Program for the construction of streets and arterial streets in the City of Yakima for the ensuing six year period, all as contemplated and required by State and Federal law, and WHEREAS, the City of Yakima has identified a need to amend the current Six Year Program for the construction of streets and arterial streets in the City of Yakima; and WHEREAS, a public hearing must be held on said amended program before final approval, now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: That said amended program shall be presented for hearing and determination on Tuesday, September 20, 2005, at the hour of 2:00 PM on said day, in the Council Chambers of the City of Yakima, at Yakima City Hall, Yakima, Washington, oras soon thereafter as the same may be heard, and that notice of such hearing be given as approved by law. ADOPTED BY THE CITY COUNCIL this 6th day of September, 2005. Paul P. George, Mayor ATTEST: City Clerk :' Washington State Department of Transportation W Agency: Yakima Co. No.: 39 Co. Name: Yakima Co City No.. 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2006 to 2011 Hearing Date: 6/28/2005 Adoption Date: 7/6/2004 Amend Date: 9/20/2005 Resolution No.: R-2005-96 o N tj i Priority Number Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir Type R/W Required Date (MM'yy) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 from: to: Totals 14 1 Railroad Grade Separation -'B' St -Lincoln Ave BNSF Tracks/I St from. N 1st St to: N 1st Ave Construct Grade Separations and adjacent roadway reconstructon 01 06 07 08 P 0 2 T P G 0 W S PE CN ALL 1/1/2006 1/1/2006 1/1/2006 STP(U) 7500 AIP I 12851 10001 9785 AIP I 70001 7000 AIP 5001 500 50001 47851 i 7000 5001 EA No Totals 7500 8785 1000 17285 5000 12285 17 2 Front St Rehabilitation BNSF Track/Street from: Yakima Ave to: 13 St Realignment of Front Street, curb, gutter and sidewatk reconstruction with historic district renovation including A St. rebuild 01 12 06 S 0.3 p 0 T W S PE RW CN 1/1/2006 1/1/2006 1/1/2006 OTHER1 1491 371 186 OTHER I 771 191 96 OTHER1 1702] 4261 2128 1861 I 961 I 21281 EA Yes 06/01/06 Totals 1928 482 2410 2410 14 3 W Washington Ave - S 52nd Ave to S 72nd Ave W Washington Ave from: S 52nd Ave to: S 72nd Ave Widen, reconstruct, curb. gutter, sidewalk 04 03 S 1.02 w T 0 S P PE CN 1/1/2006 1/1/2006 STP(U) 500 AIP1 3981 3531 751 AIP 1 16981 5271 2725 7511 1 27251 1 EA Yes 01/01/05 Totals 500 2096 880 3476 3476 Report Date: September 6, 2005 Page 1 Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2005 to 2010 Hearing Date: 6/28/2005 Adoption Date: 7/6/2004 Amend Date: 9/20/2005 Resolution No.: R-2005-96 o N 0 1 Priority Number Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - EndingMP or road 9 g F. Describe Work to be Done Improvement Type(s) y Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Code State Funds Local Funds Total Funds Envir Type RNV Required Date ( Date Federal Fund Code Federal Cost byFund Phase 1st 2nd 3rd 4th Thru 6th 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 16 4 W Nob Hi/ Blvd - S 68th Ave to S 80th Ave W Nob Hill Blvd from: S 68th Ave to: S 80th Ave Reconstruct to minor arterial standards 04 03 S .73 C W 0 P T S PE RW CN 1/1/2006 4/1/2006 1/1/2007 STP(U) STP(U) 370 144 AIP AIP AIP 55 216 555 370 425 360 925 425 360 925 EA Yes 04/01/06 Totals 514 826 370 1710 785 925 02 5 River Road Realignment River Road from: N 16th Ave to: Fruitvale Blvd Widening, curb, gutter, sidiewalk, reconstructrion, irrigation relocation 01 04 S 11 C G P T S W RW CN 1/1/2006 4/1/2006 STP(U) 200 API 2721 681 340 AIP1 11841 2961 1680 3401 1 16801 1 CE Yes 01/01/06 Totals 200 1456 364 2020 2020 19 6 WT Barn Rehabilitation S 3rd Ave from: S 3rd St to: Pine St Car Barn and Museum Restoration, including property purchase 03 12 22 23 24 31 P S N/A N/A C' C S T W P PE CN 6/1/2006 6/1/2006 STP(E) STP(E) 18 1816 1 321 50 501 1 2721 20881 18161 2721 EA CE No No Totals 1834 304 2138 1866 272 CN 1 1/1/2006 I 5307 1 13331 1 1 10001 23331 23331 1 1 00 7 Transit Operating/Capital Expenditures Various Areas from: N/A to: N/A Supplemental Funding for Transit Service Operating Expenses Totals 1333 1000 2333 2333 Report Date: September 6, 2005 Page 2 Supersedes previous editions Washington State Department of Transportation W.1 Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2005 to 2010 Hearing Date: 6/28/2005 Adoption Date: 7/6/2004 Amend Date: 9/20/2005 Resolution No.: R-2005-96 Functional Class Priority Number Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir Type 20 R/W Required Date (MM/YY) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 I 11 12 13 14 15 16 17 18 19 21 09 8 Transit Service to Selah & WSDOT Complex (Union Gap) Demonstration Transit Project Expansion from: to' Two year pilot project to provide City of Selah and WSDOT site a Union Gap with weekday bus service 22 31 S N/A ALL 1/1/2006 30 30 301 CE No Totals 30 30 30 00 9 Facility Upgrade Transit Center Expansion Project from: to: Add 300 sq ft section to the North side of our transit center to house a secunty officer, information/ticket sales 12 21 S N/A O CN I 1/1/2005 1 5307 1 561 1 1 351 911 911 1 1CE No Totals 56 35 91 91 14 10 N 16th Ave - Signal @ River Rd N 16th Ave from: N 16th Ave to: River Rd Install new signal 12 S N/A w T P S PE RW CN 1/1/2006 4/1/2006 1/1/2006 STP(U) STP(U) STP(U) 27 40 232 1 1 1 31 30 61 46 361 268 301 1 46 2681 CE Yes 04/01/05 Totals 299 45 344 298 46 07 11 WLincolnAveSidewalks W Lincoln Ave from: N 18nd Ave to. N 29th Ave Sidewalks on the Northside 12 S .5 T P W S PE RW CN 1/1/2006 1/1/2006 6/1/2006 PSMP1 61 41 10 PSMP1 61 41 10 PSMP1 741 991 173 101 1 101 1731 CE Yes 04/01/05 Totals 86 107 193 193 Report Date: September 6, 2005 Page 3 Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2005 to 2010 Hearing Date: 6/28/2005 Adoption Date: 7/6/2004 Amend Date: 9/20/2005 Resolution No.: R-2005-96 Functional Class > 0 .= ° § n Z Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F Describe Work to be Done Improvement I Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd yyyy) Fund Source Information Federal Funding State4th Fund Code State Funds Local Funds Total Funds Envir Type RNV Required Req/yy) Date Federal Fund Code Federal Cost by Phase 1st 2nd 3rd Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 17 12 01 S N/A p PE 1/1/2006 PSMP OTHER 320 260 80 140 400 400 400 400 CE SR12 - N 40th Ave O RW CN 1/1/2006 1/1/2006 OTHER 1920 100 2020 2020 Yes SR12 - N 40th Ave from' N 40th Ave to: SR12 T W 01/01/06 Widen intersection and on-ramp, Interceptor crossing S Totals 2500 320 2820 2820 14 13 12 S Signal T RW 1/1/2006 TPPI 651 101 TPP 1 4001 621 75 462 751 4621 1 I CE E Nob Hill Blvd at S 6th St 01 W CN 6/1/2006 Yes E Nob Hill Blvd from: E Nob Hill Blvd to: S 6th St 0 01/01/05 Install signal @ E Nob Hill Blvd and S 6th St Totals 465 72 537 537 14 14 04 p 77 p PE 1/1/2006 STP(U) 107 300 I 1 171 124 1 1 401 340 1 1241 1 3401 EA Nob Hill Blvd C RW CN 6/1/2006 6/1/2007 STP(U) TPPI 11831 1931 1376 1 1376] Yes Nob Hill Blvd from. S 52nd Ave to: S 68th Ave G O 01/01/07 Widen, curb, gutter, sidewalk, lighting, drainage S Totals 407 1183 250 1840 1840 T 00 15 01 P N/A PE 8/1/2006 CMAQ STP(S) 50 150 1 AIPI 200 501 100 1 350 1001 1 1 3501 CE Annual Signal Upgrades CN CN 8/1/2006 8/1/2006 CMAQ 300 1 I 300 1 3001 No Local Selection from: N/A to: N/A Upgrade signals Totals 500 200 50 750 100 650 Report Date: September 6, 2005 Page 4 Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.. 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2005 to 2010 Hearing Date: 6/28/2005 Adoption Date: 7/6/2004 Amend Date: 9/20/2005 Resolution No.: R-2005-96 o �—°D. ti U Priority Number Project Identification A. Federal Aid No. B. Bridge No. C. Project Title Street/Road Name or Number E. Beginning MP or road - EndingMP or road g g F. Describe Work to be Done Improvement I Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/ddyyyy) Fund Source Information Federal Funding State Code State Funds Local Funds Total Funds Envir Type R/W Required Date (M,wyy) Federal Fund Code Federal Cost byFund Phase 1st 2nd 3rd 4th Thru 6th 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 00 16 Various Overlay Projects/Selected on Local Priority N/A from: N/A to: N/A 07 S N/A w S CN 7/1/2006 STP(U) 173 27 200 200 EA No Totals 173 27 200 200 00 17 Storm DrainsNegetation Local Selection from: City Wide to: City W$de 32 P N/A PE CN 1/1/2006 1/1/2006 1 1 801 80 7201 720 8o1 7201 EA No Totals 800 800 800 17 18 Reconstruction Rudkin Rd Rudkin Rd from: E Mead Ave to: Rainier Place Reconstruct, excavate ballast, top course, curb, gutter, sidewalk Partner with City of Union Gap, additional sewer force main 03 06 P .76 W T P S PE CN 1/1/2007 1/1/2008 STP(C) STP(C) 87 500 1 TPPI 5001 1 221 109 84I 1084 1 1091 1 I 1084 CE No Totals 587 500 106 1193 109 1084 17 19 E Mead Ave Reconstruction E Mead Ave from: Rudkin Rd to: Fair Ave Partner with City of Union Gap, reconstruct, excavate ballast, top course, curb, gutter, storm, acp 03 06 P .76 C G 0 P S T PE CN 9/1/2006 4/1/2007 STP(S) STP 97 873 TPPI 181 61 121 TPP1 1631 551 1091 1211 1 1091 CE No Totals 970 181 61 1212 121 1091 Report Date: September 6, 2005 Page 5 Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2005 to 2010 Hearing Date: 6/28/2005 Adoption Date: 7/6/2004 Amend Date: 9/20/2005 Resolution No.: R-2005-96 Functional Class Priority Number Project Identification A. Federal Aid No. B. Bridge No. C. Project Title 13. Street/Road Name or Number E. Beginning MP or road - EndingMP or road 9 g F Describe Work to be Done Improvement I Type(s) Status Total Length Utility Codes I Project Costs in Thousands of Dollars Expenditure Schedule Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding(Local State Code State Funds Local Funds Total Funds Envir yp Type R/W Required Date (M� Federal Fund Code Federal Cost byFund Phase 1st 2nd 3rd 4th Thru 6th 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 19 20 Longfiber Rd - Phase 2 (3 -Phases) Longfiber Rd from: Valley Mall Blvd to: W Washington Ave New roadway construction and reconstruction. 3 -lane w/turn, curb, gutter, sidewalks - Partner with City of Union Gap, waterloop with development D1 03 p .50 p S W T 0 PE CN 1/1/2008 1/1/2009 106 1183 106 1183 106 1183 CE No Totals 1289 1289 106 1183 00 21 Intersection Improvements Selected on Local Priority from: E Nob Hill Blvd to: S 6th St Curb. gutter, sidewalk, safety improvements, striping, signs p N/A S G C PE CN 4/1/2006 7/1/2006 51 451 5 45 51 451 1 1 CE No Totals 50 50 50 11 22 E Nob Hill Blvd & S 18th St E Nob Hill Blvd from: S 18th St to: E Nob Hill Blvd Widen south leg for double LT from west bound Nob Hill; (Tie to WSDOT Project) possible curb, gutter and sidewalk 04 01 P 1 C S W T PE RW CN 1/1/2006 3/1/2006 1/1/2007 STP(U) STP(U) STP(U) 13 18 140 I 21 21 251165 15 20 151 201 165 CE Yes 01/01/06 Totals 171 29 200 35 165 16 23 Roadway City Wide Shoulder Improvements City Wide from: to. City Wide shoulder improvements, PM10 abatement. 01 S N/A CN 1 7/1/2006 CMAQ 4001 541 4541 4541 1I CE No Totals 400 54 454 454 Report Date: September 6, 2005 Page 6 Supersedes previous editions Washington State Department of Transportation -enAgency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2005 to 2010 Hearing Date: 6/28/2005 Adoption Date: 7/6/2004 Amend Date: 9/20/2005 Resolution No.: R-2005-96 Functional Class Priority Number Project Identification A. Federal Aid No. B. Bridge No. Project Title D. Street/Road Name or Number E. Beginning MP or road - EndingMP or road g g F Describe Work to be Done F Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (m rrddtyyyy) Fund Source Information Federal Funding State Code State Funds Local Funds Total Funds Envir ,-e yp RNV Required Date (MM/YY) Federal i Fund Code Federal Cost byFund Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 16 24 N 8th St & N 6th St - Signal Flashers @'B' St & Lincoln Ave N 6th St from: 'B' St to Lincoln Ave Install signals on N 8th Sl & N 6th St @'B' St and Lincoln, flashers 01 S Signal CN 1/1/2006 1 STP(S) 80 11 91 91 EA No Totals 80 11 91 91 14 24 E Nob Hill Blvd & Fair Ave E Nob Hill Blvd from: E Nob Hill Blvd to. Fair Ave Intersection widening & new signal, curb, gutter and sidewalk, street lighting, stormwater 31 03 04 S N/A O C P T W PEI 1/1/2006 ( STP(U) 1 721 1 1 111 831 831 1 CE Yes 10/01/06 Totals 72 11 83 83 17 26 S 80th Ave - Tieton Dr to Zier Rd S 80th Ave from' Tieton Dr to: ZierRd Major widening, curb, gutter, sidewalk 04 P 1.3 0 C P T W S PE RW CN 1/1/2006 1/1/2007 6/1/2006 AIPI 1041 AIP1 3031 AIP I 13231 161 471 2071 120 350 15301 1201 1 3501 1 1530 EA Yes 01/01/07 Totals 1730 270 2000 120 350 1530 19 27 N 7th St Reconstruction N 7th St from. Lincoln Ave to: 'H' St Street reconstruction into Yakima Resource Center 22 03 P .5 0 PEI 1/1/2006 I 5307 1 9621 1 1 1171 10791 10791 1 I CE No Totals 962 117 1079 1079 Report Date: September 6, 2005 Page 7 Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2005 to 2010 Hearing Date: 6/28/2005 Adoption Date: 7/6/2004 Amend Date: 9/20/2005 Resolution No.. R-2005-96 o U m — 1Z ° E z 2 1 Project Identification A. Federal Aid No. B. Bridge No. C. Project Title 1 D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F Describe Work to be Done Improvement l Type(s) I Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code1 State I Funds Local Funds Total Funds Envir Type R/W Required Date (/y/yyyy) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 17 28 Zier Rd - S 75th Ave to S 72nd Ave Zier Rd from: S 75th Ave to: S 72nd Ave Minor widening, curb, gutter and sidewalk 05 06 S 15 C S T PE CN 1/1/2006 6/1/2006 STP(E) STP(E) 22 75 7 20 29 95 29 95 CE Yes 03/01/05 Totals 97 27 124 124 17 29 Englewood Ave - N 40th Ave to N 56th Ave Englewood Ave from: N 40th Ave to: N 56th Ave Widen roadway, curb, gutter, sidewalk 05 06 P 2.15 W S TCN P 0 C PE RW 1/1/2009 6/1/2009 1/1/2010 STP(C) STP(C) 1 STP(C) 216 277 1367 I j 341 250 431 320 2131 1580 1 1 1 1 250 320 1580 EA Yes 04/01/09 Totals 1860 290 2150 2150 16 30 W Washington Ave Median Removal W Washington Ave from: S 16th Ave to: S 24th Ave Removal of median in Washington Ave lengthening tum lanes 05 S .5 C W PE CN 1/1/2006 1/1/2006 STP(U) STP(U) 36 228 51 411 411 1 361 264 2641 1 CE No Totals 264 41 305 305 17 31 Englewood Ave - N 24th Ave to N 16th Ave Englewood Ave from: N 16th Ave to: N 24th Ave Widen, curb, gutter and sidewalk, water and sewer lines 05 06 P 2 C W S PE RW CN 1/1/2007 1/1/2008 6/1/2009 STP(U) STP(U) STP(U) 173 259 1865 1 1 271 200 1 1 411 300 1 1 1351 2000 1 2001 1 1 300 1 1 2000 EA Yes 01/01/09 Totals 2297 203 2500 200 300 2000 Report Date: September 6, 2005 Page 8 Supersedes previous editions Washington State Department of Transportation -en Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2005 to 2010 Hearing Date: 6/28/2005 Adoption Date: 7/6/2004 Amend Date: 9/20/2005 Resolution No.: R-2005-96 Functional Class Priority Number Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - EndingMP or road g g F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Phase Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding g State Code State Funds Local Funds Total Funds Envir Type yp R/W Required Date (MM/YY) Federal Fund Code Federal Cost byFund Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 00 32 Pedestrian Bridge Pedestrian Bridge from: N 10th St to: Yakima Greenway Construct pedestrian bridge from Gateway area to Yakima Greenway. power, handicap accessible. lights 14 32 P .25 T P 0 PE CN 1/1/2008 3/1/2009 STP(E) STP(E) 200 2000 27 270 227 2270 227 2270 CE No Totals 2200 297 2497 227 2270 00 33 Gravel Road B.S.T Various Areas from: City Wide to: PM -10 Abatement. Street Sweeper Acquisition 07 S N/A s CN i 4/1/2006 CN 1 6/1/2006 CMAQ 155 1 1 2001 1 1 301 200 185 1001 501 50 1851 1 CE No Totals 155 230 385 285 50 50 08 34 Powerhouse Rd & Englewood Ave Powerhouse Rd from: Powerhouse Rd to: Englewood Ave Intersection, realignment, curb. gutter, sidewalk, Safety Flashing Signal, possible roundabout 12 P N/A T P 0 S C W PE RW CN 5/1/2006 9/1/2006 9/1/2006 STP(S) STP(S) STP(S) 20 400 300 1 1 31 231 231 1 541454 4541 1 451 345 3451 1 CE Yes 09/01/20 Totals 720 102 822 822 07 35 S 48th Ave & Summitview Ave Signalization S 48th Ave from: S 48th Ave to: Summitview Ave Signalization 12 P N/A p T PE RW CN 1/1/2010 6/1/2010 8/1/2010 STP(S) STP(S) STP(S) 20 20 340 1 1 3 1 1 3 1 1 51 23 23 391 1 1 1 1 1 1 23 23 391 CE Yes 06/01/10 Totals 380 57 437 437 Report Date: September 6, 2005 Page 9 Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2005 to 2010 Hearing Date: 6/28/2005 Adoption Date: 7/6/2004 Amend Date: 9/20/2005 Resolution No.. R-2005-96 Functional Class Priority Number Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F Describe Work to be Done Improvement I Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir Type RIVI Required (" Date Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 07 36 S 3rd Ave & W Washington Ave Signal S 3rd Ave from: S 3rd Ave to: W Washington Ave Signal Upgrades 12 P N/A p T PE CN 4/1/2006 6/1/2006 10 140 10 140 10 140 CE No Totals 150 150 150 07 37 S 16th Ave & W Washington Ave Signal S 16th Ave from: S 16th Ave to: W Washington Ave Included in Union Gap's Valley Mall Blvd. project 12 P N/A p T PE CN 1/1/2006 6/1/2006 STP(S) STP(S) 10 60 1 1 101 1 601120 201 201 120 1 CE No Totals 70 70 140 140 07 38 W Nob Hill Blvd Sidewalks W Nob Hill Blvd from. S 16th Ave to: E 182 Overpass Sidewalks on southside 12 P 2 p T W S PE RW CN 1/1/2008 6/1/2008 3/1/2009 STP(S) STP(S) STP(S) 43 85 255 71 151 451 50 100 300 1 50 100 300 CE Yes 09/01/08 Totals 383 67 450 150 300 00 39 Beech St Pedestrian Connection Beech St from: Fair Ave to: Chalmers/Riverside Construct pedestrian under SR82 to Greenway 06 32 P 1 p T PE RW CN 1/1/2009 6/1/2009 1/1/2010 STP(S) STP(S) STP(S) 45 150 400 1 1 61 1 1 201 1 1 541 51 170 454 1 51 1 1 170 454 CE Yes 09/01/09 Totals 595 80 675 51 624 Report Date: September 6, 2005 Page 10 Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2005 to 2010 Hearing Date: 6/28/2005 Adoption Date: 7/6/2004 Amend Date: 9/20/2005 Resolution No.: R-2005-96 Functional Class Priority Number Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only t a o 2 Phase Start (mm/dd7YYYY) Fund Source Information Federal Funding State4th Code State Funds Local Funds Total Funds Envir Type yp R/W Required Date (M y) Federal Fund Code Federal Cost byFund Phase 1st 2nd 3rd Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 07 40 W Lincoln Ave Sidewalks W Lincoln Ave from: N 56th Ave to: N 29th Ave Sidewalks, meters and fire hydrants replacement or relocation 12 P 2 p T S W PE RW CN 1/1/2009 6/1/2009 1/1/2010 STP(S) STP(S) STP(S) 34 68 454 6 12 70 40 80 524 40 80 524 CE Yes 09/01/10 Totals 556 88 644 644 08 41 W Lincoln Ave &'B' St Realignment W Lincoln Ave from: W 5th Ave to: Custer St Realignment of W Lincoln Ave. sidewalks, curb, gutter, lights 01 12 P .5 W T S P 0 G PEI 1/1/2008 RW 1 1/1/2009 CN I 1/1/2010 STP(E) STP(E) STP(E) 337 831 1429 1 1 531 390 1 1 1291 960 1 2231 1652 1 1 1 390 960 1650 CE Yes 09/01/10 Totals 2597 405 3002 390 2610 16 42 School Safety Projects Various Locations - Citywide from: to: Crossing flashers, sidewalks, signing, other features 12 S N/A W PE CN 1 1/1/2006 1 1/1/2006 PSMP1 101 PSMP 1 1901 21 381 12 121 2281 1901 CE No Totals 200 40 240 202 02 43 E Nob Hill Blvd. Reconstruction E Nob Hill Blvd. from: S 6th Street to: S 18th Street Major roadway widening and reconstruction to 5 lanes with intersection improvements, curb, gutter. sidewalks, replacement or relocation of meters 03 04 06 P .85 C G O P S T PE RW CN 1/1/2008 1/1/2009 1/1/2010 STP(C) STP(C) STP(C) 433 865 5190 1 671 500 1 1351 1000 1 8101 6000 1 1 1 1 1 1 500 1000 6000 EA Yes 1/1/09 Totals 6488 1012 7500 7500 Report Date: September 6, 2005 Page 11 Supersedes previous editions Washington State Department of Transportation VA Aggency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2005 to 2010 Hearing Date: 6/28/2005 Adoption Date: 7/6/2004 Amend Date: 9/20/2005 Resolution No.. R-2005-96 Functional Class Priority Number Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F. Describe Work to be Done Improvement I Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir Type RP Required Date wy (My) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 44 Transit Service to Selah & WSDOT Complex (Union Gap) Demonstration Pilot Project Expansion from: to: 2 yr demonstration project of provide City of Selah and WSDOT site in Union Gap with weekday bus service. Yakima Transit will offer peak and of ' h„c 22 S N/A ALL 7/4/2005 CMAQ 450 60 510 275 235 No Totals 450 60 510 275 235 14 45 nnwr4 unlh niir cv,cfinn mifac 4579 S 1st St. - E. Washington Ave, Intersection Improvement S 1st St. from: S 1st St. to: E Washington Ave. Realign intersection, upgrade traffic signal 12 S N/A p W S T 0 PEI 7/1/2006 1 STP 2001 1 1 301 2301 2301 1 EA Yes 01/01/06 Totals 200 30 230 230 06 — 46 4562 Tieton Dr - S 5th Ave. Intersection Project Tieton Drive from: 5th Ave. Intersection to: Replace traffic signal with roundabout 12 P N/A p W T 0 S ALL! 4/4/2006 STP(U) 2001 WSDOT! 2001 1 4001 4001 CE No Totals 200 200 400 400 17 1 47 4587 S 48th Ave. Reconstruction S 48th Avenue from: Summitview Ave. to: Nob Hill Blvd. Widen, curb, gutter, sidewalk, lighting, drainage 03 P 1.00 p T W S 0 ALL 1 4/1/2006 STP 18001 I 1 2431 20431 501 19931 EA No Totals 1800 243 2043 50 1993 Report Date: September 6, 2005 Page 12 Supersedes previous editions Washington State Department of Transportation W.1 Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2005 to 2010 Hearing Date: 6/28/2005 Adoption Date: 7/6/2004 Amend Date: 9/20/2005 Resolution No.: R-2005-96 o N i U Priority Number Project Identification A. Federal Aid No. B. Bridge No. C. Project Title 1 D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds 1 Local Funds Total Funds Envir Type RM/ Required Date (M� Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 48 South 72nd Ave & Mead Ave Intersection South 72nd Ave from: South 72nd Ave to: Mead Ave New intersection, signals, curb, gutter and sidewalk 03 12 S N/A O P S T PE CN 1/1/2006 6/1/2006 STP(U) STP(U) 41 304 7l 48 ] 48 352 48 352 CE No Totals 345 55 400 400 00 49 E Mead & S 1st St Signal E Mead from: E Mead to: S 1st St Signal 12 S N/A _ p S T W CN I 1/1/2006 I CMAQ 87 ] ] 131 1001 1001 CE No Totals 87 13 100 100 08 50 Yakima Ave. Historic District from: Front Street to: 9th St/A St Install historical lighting. sidewalk modifications and other improvements, pedestrian corridor 06 12 S 75 p W S T PE CN 1/1/2006 9/1/2006 OTHER] 870] OTHER1 4000] ] 870 4000 8701 40001 ] CE No Totals 4870 4870 4870 00 51 William 0 Douglas Pathway from: Pine St to: Cowiche Canyon Pathway improvements and signage, to Cowiche Canyon 14 32 P N/A O S P W PE CN 1/1/2006 7/1/2006 STP(E) STP(E) 8 87 l 1 l 21 ] 131 10 100 101 I 1001 1 CE No Totals 95 15 110 110 Report Date: September 6, 2005 Page 13 Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2005 to 2010 Hearing Date: 6/28/2005 Adoption Date: 7/6/2004 Amend Date: 9/20/2005 Resolution No.: R-2005-96 Functional Class Priority Number Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - EndingMP or road g g F Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding(Local State Code State Funds Local Funds Total Funds Envir Type R/W Required Date (MM/YY) Federal Fund Code [ Federal Cost byFund Phase 1st I4th 2nd 3rd Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 53 W Washington Ave - S 24th Ave to S 52nd Ave W Washington Ave from: S 24th Ave to: S 52nd Ave Widen, reconstruct, curb, gutter, sidewalk 03 04 06 S 1.02 p S T W CN 6/1/2005 STP(U) 800 125 925 925 EA No Totals 800 125 925 925 Grand Totals for Yakima 39197 27206 11834 78237 34259 19347 6056 18535 Report Date: September 6, 2005 Page 14 Supersedes previous editions BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No. For Meeting of September 6, 2005 ITEM TITLE: Set a Public Hearing to Amend the Six-year Transportation Improvement Program (STIP) to include additional Federal Funding for Washington Avenue Reconstruction Project. SUBMITTED BY: partment of Community and Economic Development - Engineering Division CONTACT PERSON/TELEPHONE: K. Wendell Adams, City Engineer, 575-6111. SUMMARY EXPLANATION: Attached is a copy of the proposed amended Six -Year Transportation Improvement Plan (STIP) for the 2005-2010 planning years. The City of Yakima has identified a need to amend the current Six Year Program for the construction of streets and arterial streets in the City of Yakima to include additional federal funding to the Washington Avenue Reconstruction Project which effects the Federal Surface Transportation Program (STP) funds the City receives to accomplish improvements within the City (see attached). This amendment needs to be included in the City of Yakima STIP to receive the additional funding. Resolution X Ordinance Contract Other (Specify) Amended STIP Funding Source APPROVED FOR SUBMITTAL: ,\ City Manager STAFF RECOMMENDATION: Adopt Resolution to Set Public Hearing date for September 20, 2005. BOARD/COMMISSION RECOMMENDATION: COUNCIL ACTION: Resolution adopted. RESOLUTION NO. R-2005-136