BUSINESS OF THE CITY COUNCIL
YAKIMA, WASHINGTON
AGENDA STATEMENT
Item No. 7.C.
For Meeting of: September 2, 2025
ITEM TITLE: Resolution authorizing contract with Interwest Construction Inc for the
Fair Avenue & E Nob Hill Blvd. Intersection Improvements Projects
2143 and 2789 (Streets Capital Fund, Stormwater and Water Capital
Fund)
SUBMITTED BY: Bill Preston, Community Development Director
SUMMARY EXPLANATION:
The City of Yakima Fair Avenue & E Nob Hill Blvd. Intersection Improvements Projects 2143 and 2789
will reconstruct and widen the intersection, work includes excavation, storm drainage, paving, curb and
gutter, sidewalk, curb ramps, crosswalks, installing a traffic signal system, water line replacement, and
other related improvements.
The City used the procedure established by Washington State law for the bidding and awarding of public
capital improvement projects with Interwest Construction Inc being selected to provide construction on
the project in the amount not to exceed $3,081,618.05
The project is funded with federal funds, local matching arterial street funds, Stormwater and Water
funds.
ITEM BUDGETED: Yes
STRATEGIC PRIORITY 24-25: A Resilient Yakima
RECOMMENDATION: Adopt Resolution.
ATTACHMENTS:
Resolution ICW 2143.docx
ICI Contract w tax added.pdf
38
RESOLUTION NO. R-2025-
A RESOLUTION authorizing an agreement with Interwest Construction Inc. for the E. Nob
Hill Boulevard and Fair Avenue Intersection Improvement Project 2143
and 2789 (PROJECT).
WHEREAS, the City of Yakima (CITY) desires to enter into a contract with Interwest
Construction Inc. to perform construction of a new traffic signal, sidewalks, storm drainage,
water line replacement, curb and gutter, road widening improvements, crosswalks, ADA
compliant curb ramps, and other related improvements for the Nob Hill Blvd. & Fair Avenue
intersection.
WHEREAS, the City used the procedure established by Washington State law for the
bidding and awarding of public capital improvement projects; and
WHEREAS, Interwest Construction Inc. was determined to be qualified to perform the
needed construction work; and
WHEREAS, the contract will be null and void if bond, certificate, and required insurance
certificate and endorsement are not received within specified timeframe; and
WHEREAS, the Scope of Work and Budget included in this contract meets the needs
and requirements of the City for this project; and
WHEREAS, the Project received federal STP(US) funding in 2013 which requires
13.5% local match; and
WHEREAS, the Project received federal STBG funding in 2021 which requires 13.5%
local match; and
WHEREAS, the City Council of the City of Yakima finds that entering into the contract
with Interwest Construction Inc. for construction on the Nob Hill Blvd. & Fair Avenue Intersection
Improvements project is in the best interests of the City and its residents; now, therefore,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA:
The City Manager is hereby authorized to execute a contract with Interwest Construction
Inc., attached hereto and incorporated herein by this reference, not to exceed Three Million
Eighty-One Thousand Six Hundred and Eighteen Dollars and Five Cents ($3,081,618.05) to
provide construction services outlined in the contract.
ADOPTED BY THE CITY COUNCIL this 2nd day of September 2025.
Patricia Byers, Mayor
ATTEST:
Rosalinda Ibarra, City Clerk
39
CONTRACT
THIS AGREEMENT made and entered into in triplicate, this day of , 2025, by and between
the City of Yakima, hereinafter called the Owner, and Interwest Construction, Inc., a Washington Corporation,
hereinafter called the Contractor.
WITNESSETH:
That in consideration of the terms and conditions contained herein and attached and made a part of this agreement,
the parties hereto covenant and agree as follows:
I. The Contractor shall do all work and furnish all tools, materials, labor and equipment for THE BID AMOUNT OF:
$3,081,618.05, for E. Nob Hill Blvd. & Fair Avenue Intersection Improvements, City Project No. 2143, all in
accordance with, and as described in the attached specifications and the 2025 Standard Specifications for Road,
Bridge, and Municipal Construction which are by this reference incorporated herein and made a part hereof, and
shall perform any alterations in or additions to the work provided under this contract and every part thereof.
Contract time shall begin on the first working day following the Notice to Proceed Date and shall be completed in
One-Hundred (100) working days. If work has not commenced within the ten (10) days after the notice to proceed,
the first chargeable working day shall be the eleventh (11th)working day after the date on which the City issues the
Notice to Proceed.
If said work is not completed within the time specified, the Contractor agrees to pay to the Owner the sum specified
in the Standard Specifications for each and every day said work remains uncompleted after expiration of the specified
time, as liquidated damages.
The Contractor shall provide and bear the expense of all equipment;work and labor of any sort whatsoever that may
be required for the transfer of materials and for constructing and completing the work provided for in this contract and
every part thereof, except such as are mentioned in the specifications to be furnished by the City of Yakima.
II. The City of Yakima hereby promises and agrees with the Contractor to employ, and does employ the Contractor
to provide the materials and to do and cause to be done the above described work and to complete and finish the
same according to the attached plans and specifications and the terms and conditions herein contained and hereby
contracts to pay for the same according to the attached specifications and the schedule of unit or itemized prices
hereto attached, at the time and in the manner and upon the conditions provided for in this contract.
III. The Contractor for himself, and for his heirs, executors, administrators, successors, and assigns, does hereby
agree to the full performance of all the covenants herein contained upon the part of the Contractor.
IV. It is further provided that no liability shall attach to the City of Yakima by reason of entering into this contract,
except as expressly provided herein.
IN WITNESS WHEREOF the parties hereto have caused this agreement to be executed the day and year first herein
above written.
Countersigned: CITY OF YAKIMA CONTRACTOR
this day of 2025.
, a Corporation
Construction Company
By:
City Manager Signature Contractor Signature
(Printed Name) (Printed Name)
Page 1 of 2
40
Attest:
Its:
City Clerk (President, Owner, etc.)
Address:
Page 2 of 2
41