Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
R-2004-192b 2005 to 2010 Six-Year Transportation Improvement Program
RESOLUTION NO. R-2004-192 A RESOLUTION to amend the Six-year Transportation Improvement Program (STIP) for the period of 2005 through 2010 to include projects affecting the City's Transportation Plan. WHEREAS, the City of Yakima annually prepares, reviews and adopts a Six-year Transportation Program for the construction or repair of streets in the City of Yakima for the ensuing six year period, all as contemplated and required by State RCW 35.77.010 and applicable Federal law, and WHEREAS, the City of Yakima desires to amend the adopted 6 -Year STIP, as contemplated and required by RCW 36.70A.070(6) to ensure compliance with the Growth Management Act and consistency of the Comprehensive Plan and the 6 -Year STIP, and WHEREAS, this amendment is limited to incorporation of the projects listed in 6 - Year Transportation Improvement Plan for the period of 2005 to 2010 to the Capital Facilities Element of the Yakima Urban Area Comprehensive Plan, which is contemplated and provided under RCW 36.70A.130(2B) and RCW 35.77.010, and WHEREAS, a public hearing has been held by the Yakima City Council on amending the 6 -Year Transportation Improvement Plan on Tuesday, December 14, 2004, with proper public notice as required by RCW 35.77.010 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The adopted 6 -Year Transportation Improvement Plan for the period of 2005 through 2010 for the City of Yakima, shall be amended as shown on the revised 6 -Year Transportation Improvement Plan attached. ADOPTED BY THE CITY COUNCIL this 14th day of December, 2004. ATTEST: Paul P. George, ay City Clerk Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. • Six Year Transportation Improvement Program From 2005 to 2010 Hearing Date: 7/6/2004 Adoption Date: 7/20/2004 Resolution No.: R2004-103 Amend Date: ....yr..... r±,., .... -- •. - -— Status Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule Federally Funded Projects Only Priority Number Project Identification z Project Phase Fund Source Information A. Federal Aid No. B. Bridge No. 0 t in Federal Funding (Local Agency) RNV = v C. Project Title D. StreetlRoad Name or Number E. Beginning MP or road - Ending MP or road be Done o n� E A r° Phase Start (mm/dd/yyyy) Federal Fund Code Federal Cost by Phase State Fund Code State Funds Local Funds Total Funds 1st 2nd 17 3rd 18 4th hru Toth 19 Envir Type 20 Required Date (oeuvre) 21 F. Describe Work to 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 14 2 1 Railroad Grade Separation - '8' St- Lincoln Ave BNSF Tracks/I St N 1st St to: N 1st Ave 01 06 08 P 0.2 T P G G 0 PE CN ALL 1/1/2006 1/1/2007 1(1/2005 STP(U) 5010 AIP AIP AIP 1285 7000 500 1000 7295 7000 500 7295 7000 500 EA No from: Construct Grade Separations and adjacent roadway reconstruciton W Totals 5010 8785 1000 14795 14795 1 17 2 Front St Rehabilitation BNSF Track/Street Yakima Ave to: 'D' St 01 12 06 P 0.3 p -r PE RW CN 3/1/2005 6/1/2005 6/1/2006 OTHER 1491 371 1861 1861 OTHERI 771 191 96 961 1 OTHER I 17021 4261 2128 I 21281 EA Yes 06/01/06 from: Realignment of Front Street, curb, gutter and sidewalk reconstructor with district renovation 1928 482 2410 282 2128 Totals 11 1 14 3 histonc W Washington Ave - S 52nd Ave to S 72nd Ave W Washington Ave S 72nd Ave 04 03 S 1.02 w T 0 S PE CN 1 1/1!2005 1/1/2005 I I 5271 75122251 2225751 16981 3531 AAIPPI I 3981 1 EA Yes 01/01/05 from: S 52nd Ave to: P Widen, reconstruct, curb, gutter, sidewalk 0 2096 880 2976 2976 H Totals 370 AIPI 551 1 425 azs 1 1 EA 16 4 W Nob Hill Blvd - S 685 Ave to S 80th Ave W Nob Hill Blvd 04 03 S .73 W O 0P PE RW CN 1/1/2005 4/1/2006 1/1/2007 STP(U) STP(U) 144 AIPI 2161 1 360 AIPI 5551 3701 925 4251 1 1 9251 Yes 04/01/06 from: S 68th Ave to: S 80th Ave T 826 370 1710 785 925 Reconstruct to minor arterial standards Totals 514 Page 1 Report Date: July 20, 2004 Supersedes previous editions ^ 43 COD 3 0 N 3 Z 0 0) I► Washington State Department of Transportation Agency: Co. No.: • Yakima 39 Co. Name: 1dRri MPOIRTPO: Yakima Co. YVCOG Six Year Transportation Improvement Program From 2005 to 2010 Hearing Date: 7/6/2004 Adoption Date: 7/20/2004 _ Amend Date: Resolution No.: R2004-103 Federally Funded Project Costs in Thousands of Dollars Expenditure Schedule Projects Only Project Identification Fund Source Information A. Federal Aid No. B. Bridge No. E E „ " r c ° o Federal Funding (Local Agency) RNV T' y :.?•15, n Z C. Project Title D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road.E54 c r E~ m rn o �. ? t n' vy Phase Start — Federal CodeFudd Federal Cost a Phase State Code Code State Funds Local Funds Total Funds 1st 2nd 3rd 4th T6 h Envir T e Type Required Date (MMiY� F. Describe Work to be Done n (mmyy) 11 12 13 14 15 16 17 18 19 20 21 1 2 3 4 5 6 7 8 9 10 02 $ River Road Realignment River Road to: Fruitvale Blvd 01 04 S 11 C G P T RW CN 1/1/2005 4/1/2006 AIP AIP 272 1184 68 296 340 1480 340 1000 480 CE Yes 01/01/06 from: N 16th Ave S 1456 364 1820 1340 480 Widening, curb, gutter, sidiewalk, reconstmctrion WTotals PEI 6/1/2005 STP(E) 18 321 501 501 I EA 19 6 YVT Bam Rehabilitation S 3rd Ave to: Pine St 03 p N/A G CN 6/1/2006 $ T STP(E) I 1730 I 1 1 2701 2000 17301 2701 No from: S 3rd St W 302 2050 1780 270 Car Barn and Museum Restoration P Totals 1748 5307 1 12721 1 1 10001 22721 227211 CE - 00 7 Transit Operating/Capital Expenses Various Areas N/A 12 22 2324 S WA CN 1 1/1/2005 I No from: N/A to: 31 — Funding for Transit Services Operating Expenses 1272 1000 2272 2272 jSupplemental Totals 1 301 301 301 1 1 CE ALLI 1/1/2005 1 1 1 1 No 09 8 Street Asset Amenities Route Maintenance, Repair & Improvements 22 31 S N/A C from: to: benches and signage throughout our route system ---- --- 30 30 30 Maintenance of shelters, Totals L — Page 2 Report Date: July 20, 2004 Supersedes previous editions Wir Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2005 to 2010 Hearing Date: 7/6/2004 Adoption Date: 7/20/2004 Amend Date: Resolution No.: R2004-103 o N i ° E d z Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F. Describe Work to be Done A I Improvement I Type(s) Status rn Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir Type RM/ Required Date (MM/Yy) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 8 9 10 11 12 13 14 15 16 17 18 19 20 21 00 14 07 17 9 Facility Upgrade Transit Center Expansion Project from: to: Add 300 sq ft section to the North side of our transit center to house a security officer, information/ticket sales 12 21 S N/A 0 CN 1/1/2005 5307 56 35 91 91 CE No Totals 56 35 91 91 10 11 N 16th Ave - Signal © River Rd N 16th Ave from: N 16th Ave to: River Rd Install new signal 12 S N/A w T P PE RW CN 1/1/2005 4/1/2005 1/1/2006 STP(U) STP(U) STP(U) 27 40 232 1 1 31 30 1 1 61 46 361 268 301 1 1 481 268 1 CE Yes 04/01/05 Totals 299 45 344 298 46 W Lincoln Ave Sidewalks W Lincoln Ave from: N 18nd Ave to: N 29th Ave Sidewalks on the Northside 12 S .5 T P PE RW CN 1/1/2005 1/1/2005 6/1/2005 PSMP1 61 41 10 PSMP 1 61 41 10 PSMP! 741 991 173 101 1 101 1 1731 CE Yes 04/01/05 Totals 86 107 193 20 173 12 SR12 - N 40th Ave SR12 - N 40th Ave from: N 40th Ave to: SR12 Widen intersection and on-ramp 01 P N/A p O T. W PE RW CN 1/1/2005 1/1/2006 1/1/2006 TPP! 320 TPP 1 960 TPPI 19201 801 400 2401 1200 480 2400 4001 1200 1 2400 1 CE Yes 01/01/06 Totals 3200 800 4000 4000 Report Date: July 20, 2004 Page 3 Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: City No.: 39 Co. Name: 1485 MPO/RTPO: Yakima Co. YVCOG Six Year Transportation Improvement Program From 2005 to 2010 Hearing Date: 7/6/2004 Amend Date: Adoption Date: 7/20/2004 Resolution No.: R2004-103 Report Date: July 20, 2004 Page 4 Supersedes previous editions o o — _ Priority Number Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F. Describe Work to be Done --- Improvement Type(s) H 5 rn Total Length I " Utility Codes Project Costs in Thousands of Dollars Expenditure (Local __ 1st --- 16 Agency) 2nd 17 Schedule Federally Funded Projects Only -- — d t rl o a 8 Phase Start (mrWdd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds 15 Envir Type 20 RNV Required Date (MhVYY) Federal Fund Code Federal Cost by Phase 11 3rd 4th Thru 6th 12 — — 13 — 14 18 19 21 — — -- 3 9 10 14 E Nob Hill Blvd at S 6th Sl E Nob Hill Blvd from: E Nob Hill Blvd to: S 6th St Install signal @ e Nob Hill Blvd and S 6th St 0162 01 S Signal T w 0 RW CN 1/1/2005 6/1/2005 TPP TPP 65 400 10 75 462 75 462 CE Yes 01/01/05 Totals 465 72 537 537 PE RW CN 1/1/2006 6/1/2006 6/1/2007 STP(U) STP(U) 107 300 124 1 1 171 340 TPPI 11831 1931 1376 1241 3401 1 13761 EA CE Yes 01/01/07 No 14 --- 00 14 15 Nob Hill Blvd Nob Hill Blvd from: S 52nd Ave to: S 68th Ave Widen, curb, gutter, sidewalk, lighting, drainage 04 P .77 p C 0 S T1183 Totals 407 50 150 300 250 1840 1840 1 1 501 1001 1001 1 AIPI 2001 1 350 1 3501 1 1 1 300 1 300 PE CN CN 4/1/2005 8/1/2005 8/1/2005 CMAQ STP(S) CMAQ Annual Signal Upgrades Local Selection from: N/A to: N/A Upgrade signals 01 p N/A Totals 500 200 50 750 100 650 1 1731 1 1 271 2001 2001 1 1 EA No 00 16 Various Overlay Projects/Selected on Local Priority N/A from: N/A to: N/A 07 S N/A CN 17/1/2005 1 STP(U) Totals 173 27 200 200 Report Date: July 20, 2004 Page 4 Supersedes previous editions Washington State Department of Transportation Agency. Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2005 to 2010 Hearing Date: 7/6/2004 Adoption Date: 7/20/2004 Resolution No.: R2004-103 Amend Date: Report Date: July 20, 2004 Page 5 Supersedes previous editions j n IH Priority Number Project Identification A. Federal Atd No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road Done Improvement Type(s) H cn Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only col Project Phase Phase Start (mrn/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds 4th Tfith Enve Type R/W Required Date (MM/YY) 21 Federal Fund Code Federal Cost by Phase 1st 2nd 3rd F. Describe Work to be 3 5 9 10 11 12 13 14 15 16 17 18 19 20 00 Storm DrainsNegetation Local Selection from: City Wide to: City Wide 32 P N/A PE CN 1/1/2005 1/1/2005 80 720 80 720 80 720 EA No Totals 800 800 800 17 18 Reconstruction Rudkin Rd Rudkin Rd from: E Mead Ave to: Rainier Place Reconstruct, excavate ballast, top course, curb, gutter, sidewalk Partner with City of Union Gap 03 06 P .76 W T P S PE CN 1/1/2007 1/1/2008 STP(C) STP(C) 87 500 1 1 221 1091 1091 1I TPP1 5001 841 1084 1 1 1084 CE No - Totals 587 TPP1 TPP1 500 106 1193 109 1084 181 61 121 1631 551 1091 1211 1 I 10911 CE - No 17 19 E Mead Ave Reconstruction E Mead Ave from: Rudkin Rd to: Fair Ave Partner with City of Union Gap, reconstruct, excavate ballast, top :curse, curb, gutter, storm, acp 03 06 p 76 C G 0 PS T PE CN 9/1/2006 4/1/2007 I STP(S) STP 971 873 Totals 970 181 61 1212 121 1091 01 03 P .50 S W T PE CN 1/1/2008 1/1/2009 1 1 1 1061 1061 1 1 11831 1183 1 1 1061 1 1 1183 1289 --- CE No 19 20s Longfiber Rd - Phase 2 (3 -Phases) Longfiber Rd from: Valley Mall Blvd to: W Washington Ave New roadway construction and reconstruction, 3 -lane w/tum, curb, gutter, Partner with City of Union Gap --- — Totals 1289 1289 sidewalks - Report Date: July 20, 2004 Page 5 Supersedes previous editions WIF Washington State Department of Transportation Agency: Yakima Co. No.: 39 • Co. Name. Yakima Co. TPO: Six Year Transportation Improvement Program From 2005 to 2010 Hearing Date: 7/6/2004 Adoption Date: 7/20/2004 Resolution No.. R2004-103 Amend Date. o „ tiCi Priority I `: Number I: Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F. Describe Work to be Done E n m m o n a� E N m to z Ti s 9 - Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only o o N r u ?� P. a Phase Start mm/dd ( /yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir Type RNV Required Date (M at e 1st 2nd 3rd 4th 6th 19 Federal Fund Code Federal Cost by Phase 15 16 17 18 20 21 3 4 5 6 7 8 9 10 11 12 13 14 1 11 2 21 22 Intersection Improvements Selected on Local Priority from: E Nob Hill Blvd to: S 6th St Curb, gutter, sidewalk, safety improvements, striping, signs P N/A $ G C PE CN 4/1/2005 7/1/2005 5 I 451 5 45 5 45 CE CE No Yes 01/01/06 Totals 50 50 50 21 151 151 I ( 21 20 201 I 1 251 165 1 1651 E Nob Hill Blvd & S 18th St E Nob HiBlvd from: S 18th St to: E Nob Hill Blvd Widen south leg for double LT from west bound Nob Hill; (Tie to WSDOT Project) possible curb, gutter and sidewalk 04 01 P 1 c S W T PE RW CN 1/1/2006 3/1/2006 1/1/2007 STP(U) STP(U) STP(U) 13 18 140( I I I 171 29 200 Totals 35 165 3001 I I CE No CNI 2/1/2005 1 STP(S) 1 1001 AIPI 1501 501 300f 16 23 S 618 St - Signals © 'B' St & Lincoln S 6th St from: '8' St to: Lincoln Ave Install signals at 8 St and Lincoln Ave 01 S N/A Totals 1 pp 150 1 50 300 300 1 111 911 911 1 EA No __ ____ 16 24 N 8th St - Signals @ 'B' St & Lincoln Ave N 8th St from: '8' St to: Lincoln Ave Install signals @'8" St and Lincoln, flashers 01 P Signal CNI 2/1/2005 1 STP(S) 1 801 80 11 91 91 __ Totals Report Date: July 20, 2004 Page 6 Supersedes previous editions ViWashington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2005 to 2010 Hearing Date: 7/6/2004 Adoption Date: 7/20/2004 Amend Date: Resolution No.. R-2004- — o CO ti :...1.1C. ° E ClZ Project Identification A. Federal Ald No. B. Bridge No. Project Title D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F Describe Work to be Done m, > m a� E ' m m 0 I-. v v Project Costs In Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only .c aRNV a a Phase Start (mrn/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Required DateThru (MM YY) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th 6th Envir Type 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 25 5 Nob Hill Blvd & Fair Ave E Nob Hill Blvd from: E Nob Hill Blvd to: Fair Ave Intersection widening & new signal, curb, gutter and sidewalk, Millet lighting 31 U3 04 P N/A O C P T W PE RW CN 1/1/2006 1011;2005 1/1/2007 STP(S) STP(S) STP(S) 72 62 789 11 10 123 83 72 912 83 72 912 CE Yes 10/01/06 Totals 923 144 1067 83 72 912 17 26 S 80th Ave - Tieton Dr to Zier Rd S 80th Ave from: Tieton Dr to: Zier Rd Major widening, curb, gutter, sidewalk 04 P 1.3 O C P T W PE RW CN 1/1/2006 1/1/2007 6/1/2006 AIP I 1041 161 120 AIP 1 3031 471 350 AIPI 13231 2071 1530 1201 1 3501 1 1 1530 EA Yes 01/01/07 Totals 1730 270 2000 470 1530 19 17 27 28 N 7th St Reconstruction N 7th St from: Lincoln Ave to: 'H' St Street reconstruction into Yakima Resource Center 03 P 5 PE I Totals 1/1/2006 I 1 I1 1 4001 4001 1 4001 I CE CE No Yes 03/01/05 400 400 400 1 1 71 291 291 1 201 95 951 1 Zier Rd - S 75th Ave to S 72nd Ave Zier Rd from: S 75th Ave to: S 72nd Ave Minor widening, curb, gutter and sidewalk 05 06 S 15 c S T P PE CN 1/1/2005 6/1/2005 STP(E) STP(E) 22 75 Totals 97 27 124 124 Report Date: July 20, 2004 Page 7 Supersedes previous editions Washington State Department of Transportation -en Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2005 to 2010 Hearing Date: 7/6/2004 Adoption Date: 7/20/2004 Amend Date: Resolution No.: R-2004-103 o w 0 rii ' iu a 9 E a- z Project Identification A.Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F. Describe Work to be Done E n o`a . E rn .c ti o, 10 o 2 Utility Codes I Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir Type 20 RNV Required (Dat e Date 21 Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thrut 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 17 29 Englewood Ave - N 40th Ave to N 56th Ave Englewood Ave from: N 40th Ave to: N 56th Ave Widen roadway, curb, gutter, sidewalk 05 06 p 2.15 W S T P 0 C PE RW CN 1/1/2009 6/1/2009 1/1/2010 STP(C) STP(C) STP(C) 216 277 1367 34 43 213 250 320 1580 250 320 1580 EA Yes 04/01/09 Totals 1860 290 2150 2150 16 30 W Washington Ave Median Removal W Washington Ave from: S 16th Ave to: S 24th Ave Removal of median in Washington Ave lengthening tum lanes 05 S .5 O PE CN 1/1/2005 1/1/2005 STP(U) STP(U) 36 228 1 1 51 411 411 1 361 264 641 1 1No CE2 Totals PE RW CN 1/1/2007 1/1/2008 6/1/2009 STP(U) STP(U) STP(U) 264 173 259 865 41 305 271 200[ 1 411 300 � 135 1 1000 305 2001 3001 1000 1 1 1 17 31 Englewood Ave - N 24th Ave to N 16th Ave Englewood Ave from: N 24th Ave to: N 40th Ave Widen, curb, gutter and sidewalk 05 06 P 2 O EA CE _ Yes 01/01/09 __ Totals 1297 203 1500 1500 [2271 22701No 1 I 00 32 Pedestrian Bridge Pedestrian Bridge from: N 10th St to: Yakima Greenway Construct pedestrian bridge from Gateway area to Yakima Greemvay, power, handicap accessible, lights 14 32 P .25 T P 0 PEI 1/1/2008 CN 3/1/2009 STP(E) STP(E) I 200 2000 1 1 271 227 1 2701 2270 Totals 2200 297 2497 2497 —. Report Date: July 20, 2004 Page 8 Supersedes previous editions Washington State Department of Transportation Agency Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2005 to 2010 Hearing Date: 7/6/2004 Adoption Date: 7/20/2004 Amend Date: Resolution No.: R-2004-103 o H (.j 1 Priority Number Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F. Describe Work to be Done Improvement Type(s) N Status at Total Length Utility Codes l Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only m Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envtr Type RNV Required Date (MM/YY) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 3 9 10 11 12 13 14 15 16 17 18 19 20 21 00 _. 08 33 .,rave, road B.S.T Various Areas from: to: PM -10 Abatement 07 S N/A CN 4/1/2005 200 200 100 50 50 CE No Totals 200 200 100 50 50 34 Powerhouse Rd & Englewood Ave Powerhouse Rd from: Powerhouse Rd to: Englewood Ave ntersection, realignment, curb, gutter, sidewalk, Safety Flashing Signal 12 p N/A T P 0 PE RW CN 5/1/2005 9/1/2005 9/1/2005 STP(S) STP(S) STP(S) 20 400 300 1 1 31 23 1 1 541 454 1 1 451 345 231 1 4541 1 3451 CE CE Yes 09/01/20 Yes 06/01/10 Totals 720 102 822 822 23r 1 231 231 1 231 391 1 3911 07 35 S 48th Ave & Summitview Ave Signalization S 48th Ave from: S48thAve to: SummitviewAve Signalization 12 P N/A p T PE RW CN 1/1/2010 6/1/2010 8/1/2010 STP(S) STP(S) STP(S) 20 20 340 1 1 3 3 51 Totals 380 57 437 437 07 36 S 3rd Ave & W Washington Ave Signal S 3rd Ave from: S 3rd Ave to: W Washington Ave Signal Upgrades 12 p N/A p T PE CN 4/1/2006 6/1/2006 1 1 101 10) 101 1 1 1 1401 140 1401 1 CE No Totals 150 150 150 Report Date: July 20, 2004 Page 9 Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2005 to 2010 Hearing Date: 7/6/2004 Amend Date: Adoption Date: 7/20/2004 Resolution No.: R-2004-103 o :,,,..2115, E a Z Project Identification A. Federal Aid No. B. Bridge No. c. Project Title D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes m r ..z.; ° a Project Costs In Thousands of Dollars Expenditure Schedule (Local Agency) Federally Projects --- Envir Type Funded Only Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds RAW Required Date (MM/YY) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 07 37 S 16th Ave & vv wasnington Ave Signal S 16th Ave from: S 16th Ave to: W Washington Ave Signal Upgrades 12 P N/A p T PE CN 1/1/2006 6/1/2006 STP(S) STP(S) 10 60 10 601 20 120 20 120 CE No Totals 70 70 140 140 07 38 W Nob Hill Blvd Sidewalks W Nob Hill Blvd from: S 16th Ave to: E 182 Overpass Sidewalks on southside 12 P 2 p T PE RW CN 1/1/2008 6/1/2008 3/1/2009 STP(S) STP(S) STP(S) 43 85 1 255 1 1 1 1 1 1 7 15 45 501 501 100 1001 300 3001 1 1 CE Yes 09/01/08 Totals 383 67 450 450 00 07 I_ 39 Beech St Pedestrian Connection Beech St from: Fair Ave to: Chalmers/Riverside Construct pedestrian under SR82 to Greenway 06 32 P 1 p T PE RW CN 1/1/2009 6/1/2009 1/1/2010 STP(S) S STP(S) STP(S) 45 150 400 1 1 1 1 1 1 6 20 54 51 170 454 1 1 1 1 51 1 170 1 454 CE Yes 09/01/09 Totals 595 80 675 221 454 40 _L_ W Lincoln Ave Sidewalks W Lincoln Ave from: N 561h Ave to: N 40th Ave Sidewalks 12 p 2 p T PE RW CN 1/1/2009 6/1/2009 1/1/2010 STP(S) STP(S) STP(S) 34 68 204 1 1 1 1 1 1 61 40 121 80 361 240 1 1 1 1 40 1 80 1 240 CE 1 Yes 09/01/10 Totals 306 54 360 360 Report Date: July 20, 2004 Page 10 Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: _39_ Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2005 to 2010 Hearing Date: 7/6/2004 Adoption Date: 7/20/2004 Amend Date: Resolution No.: R-2004-103 --('.2 N O Priority Number Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Local Funds Total Funds Envir Type RIN Required DateFunds (M Y) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 08 41 42 W Lincoln Ave &'B' St Realignment W Lincoln Ave from: W 5th Ave to: Custer St Realignment of W Lincoln Ave, sidewalks, curb, gutter, lights 01 12 P .5 w T S P 0 G PE RW CN _ Totals 1/1/2008 1/1/2009 1/1/2010 STP(E) STP(E) STP(E) 337 831 1429 53 129 223 390 960 1652 390 960 1650 CE Yes 09/01/10 2597 405 3002 3000 16 School Safety Projects Various Locations - Citywide from: to: Crossing flashers, sidewalks, signing, other features 12 S N/A PE CN 1/1/2005 1/1/2005 I PSMP j 101 21 12 121 1 PSMP I 1901 381 2281 1901 1 CE No Totals 200 40 240 202 02 43 E Nob Hill Blvd. Reconstruction E Nob Hill Blvd. from: S 6th Street to: S 18th Street Major roadway widening and reconstruction to 5 lanes with intersection improvements, curb, gutter, sidewalks 03 04 06 P 65 C G 0 P S T PE RW CN 1/1/2008 1/1/2009 1/1/2010 STP(C) STP(C) STP(C) 433 865 5190 1 1 671 500 1 1 1351 1000 I 1 8101 6000 1 1 1 1 1 500 1000 6000 EA Yes 1/1/09 Totals 6488 1012 7500 7500 44 Transit Service to Selah & W SDOT Complex (Union Gap) Demonstration Pilot Project Expansion from: to: 2 yr demonstration project to provide City of Selah and WSDOT site in Union Gap with weekday bus service. Yakima Transit will offer peak and .. . ale r.ntmnv IncnnnecLmtb nitcsuur.ticte.htic rd,mc-11lcnuinn 22 P ALL I 4/4/2005 I CMAQ 1 4501 1 1 601 510 2751 2351 I CE No Totals 450 60 510 275 235 Report Date: July 20, 2004 Page 11 Supersedes previous editions Washington State Department of Transportation -Aggeenncy: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: ¥VCOG Six Year Transportation Improvement Program From 2005 to 2010 Hearing Date: 7/6/2004 Adoption Date: 7/20/2004 Amend Date: Resolution No.: R-2004-103 o N Ci ti Priority Number Project Identification A.Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number)., E. Beginning MP or road - Ending MP or road F Describe Work to be Done Improvement Type(s) Status t c 3 t° t° m o r, Project Costs In Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir Type RNV Required Date IMM/1 Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 41h Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 06 45 4579 S lst St. - E. Washington Ave. Intersection Improvement S 1st St. from: S lst St. to: E Washington Ave. Realign intersection, upgrade traffic signal 12 P ALL 1/1/2006 CMAQ 200 PWTF 150 15 365 15 350 EA Yes 01/01/06 Totals 200 150 15 365 15 350 46 4562 Tieton Dr - S 5th Ave. Intersection Project Tieton Drive from: 5th Ave. Intersection to: Replace traffic signal with roundabout 12 P N/A p ALLI 4/4/2006 I STP(U) I 2001 WSDOTI 2001 400 4001 1 I CE EA No No Totals 200 200 400 400 I 1 2431 213:61-501 19931 1 17 47 4587 S 48th Ave. Reconstruction S 48th Avenue from: Summitview Ave. to: Nob Hill Blvd. Widen, curb, gutter, sidewalk, lighting, drainage 03 P 1.00 p T W S ALLI 4/1/2006 I STP I 18001 Totals 1800 243 2043 50 1993 Report Date: July 20, 2004 Grand Totals for Yakima 32717 23336 12437 68490 28640 24260 5446 10104 Page 12 Supersedes previous editions BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No. (0 For Meeting of December 14, 2004 ITEM TITLE: Public Hearing to Amend Six-year Transportation Improvement Program (STIP) to include additional Transit and Roadway Projects SUBMITTED BY: Department of Community and Economic Development - Engineering Division CONTACT PERSON/TELEPHONE K. Wendell Adams, City Engineer, 575-6111. SUMMARY EXPLANATION: Attached is a copy of the proposed amended Six -Year Transportation Improvement Plan (STIP) for the 2005- 2010 planning years. The City of Yakima has identified a need to amend the current Six Year Program for the construction of streets and arterial streets in the City of Yakima to include additional Transit and Roadway projects affecting the Federal Surface Transportation Program funds the City receives accomplish improvements within the City (see attached). This amendment needs to be included in the City of Yakima STIP. This amendment will allow the City to construct various Transit and Roadway projects that were not included in the previously adopted STIP. Resolution X Ordinance Contract Other (Specify) Amended STIP Funding Source APPROVED FOR SUBMITTAL: City Manager STAFF RECOMMENDATION: Adopt the amended STIP. BOARD/COMMISSION RECOMMENDATION: COUNCIL ACTION: Resolution adopted. RESOLUTION NO. R-2004-192