Loading...
HomeMy WebLinkAboutR-2004-103 2005 to 2010 Six-Year Transportation Improvement Program (TIP)RESOLUTION NO. R-2004- 103 A RESOLUTION adopting a Six -Year Transportation Improvement Program for the period of 2005 through 2010 for the construction of streets and arterials streets in the City of Yakima and amending the Metropolitan Transportation Plan. WHEREAS, the City of Yakima annually prepares, reviews and adopts a Six Year Program for the construction of streets and arterial streets in the City of Yakima for the ensuing six year period, all as contemplated and required by State RCW 35.77.010 and applicable Federal law; and WHEREAS, the City of Yakima desires to amend the Metropolitan Transportation Plan to ensure compliance with the Growth Management Act and the regional transportation plan for the construction of streets and arterial streets in the City of Yakima, all as contemplated and required by State and Federal law, and WHEREAS, after public hearings on the matter, held at regular meetings of the Yakima City Council on July 6, 2004, then again on July 20, 2004, with proper public notice as required by RCW 35.77.010, the City Council finds that the plan attached hereto should be adopted as the Six -Year Transportation Improvement Program for the period of 2005 through 2010 for the construction of streets and arterial streets in the City of Yakima, now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The Six -Year Construction Program for the period of 2005 through 2010, a copy of which is attached hereto and by this reference made a part hereof, is hereby adopted as the official Six -Year Transportation Improvement Program for the City of Yakima, including proposed amendments to the Metropolitan Transportation Plan along with Street Improvements, which are also approved. ADOPTED BY THE CITY COUNCIL this 20th day of July, 2004 ATTEST: City Clerk Paul George, ayor A) Each year the City is required by RCW 35.77.010 and RCW 36.81.121 to update its Six -Year Transportation Improvement Program (TIP) for submittal to the Washington State Department of Transportation. This plan must include all transportation projects for which state gas tax revenue or federal revenue will be used. The plan for 2005 — 2010 consists of fourteen (15) funded projects totaling $11,078,000. Funding for the remainder of the projects will continue to be sought. The next authorization of TEA -21 will be called SAFETEA, standing for Safe, Accountable, Flexible, and Efficient Transportation Equity Act of 2003. The Transportation Equity Act of 1998 for the 21st Century (TEA -21) began with the passage of the Intermodal Surface Transportation Efficiency Act (ISTEA) of 1991. It specifies the systems on which certain funds can be used, expands the kinds of activities for which funds can be used and promotes the role of the Metropolitan Planning Organizations (MPO) in the planning and programming of projects. SAFETEA requires each designated MPO to develop a Transportation Improvement Program (TIP), and the state to develop a Statewide Transportation Improvement Program (STIP) as a condition to securing federal funds for the transportation projects. Projects listed in the STIP are the only projects that will be approved by the Federal Highway Administration (FHWA) and the Federal Transit Administration (FTA) to utilize federal funds. The STIP is a prioritized program of transportation projects, compiled from local and regional plans, along with the Washington Transportation System Plan (WTP), which provides a backbone for developing projects for the intermodal transportation network in the State of Washington. The STIP contains federally funded projects plus state and local projects that are regionally significant. These projects have been identified through the planning process as the highest priority for the available funding to the state's transportation program. Planning activities of state and local governments are essential parts of integrated regional planning processes. Long range transportation planning is a part of the comprehensive land use planning carried out by local governments. Citizen participation is an integral part of the planning process at all levels. Local Agencies are required to develop and adopt a six-year transportation program. All local agencies are required to hold at least one public hearing during the development of the six-year transportation program. Project ranking was performed utilizing data supplied by the Street and Traffic Division. These rankings were then integrated with other project needs and the total list was reviewed and adjusted to the particular need of the City of Yakima. B) The City needs to amend the Yakima Urban Area Comprehensive Plan Capital Facilities Element to incorporate the adopted the Six-year Transportation Plan for 2005 to 2010. This will ensure that we are in compliance with the Growth Management Act and that we are consistent with the Comprehensive Plan as required. This amendment is limited to incorporate only those projects that are adopted in the STIP and is not subject to the "once a year" change required under the laws of the Growth Management Act. 2 -- July 15, 2004 The following projects that have been added since last year's TIP submittal: Street Asset Amenities: Route maintenance, repair & improvements Modified from "Bus Stop Zones" for more broad application Facility Upgrade: Transit Center Expansion Project Add 300 sq. ft. to the north side of transit center for security officer, information, and sales. West Lincoln Sidewalks: 29th to 18th Avenues Extended the limits for new sidewalk to 18th Avenue Longfiber Road - Phase 2: W. Washington to Valley Mall Blvd. New 3 -lane roadway; partnership with City of Union Gap Intersection Improvements: Selected on local priority, East Nob Hill Blvd., to 6th Street West Lincoln Sidewalks: 56th to 40th Avenues New sidewalks West Lincoln Avenue & 'B' Street Realignment: 5th Avenue to Custer Realignment including sidewalks, curb, gutter, lights. School Safety Projects: Various Locations, Citywide Solar -powered crossing flashers, sidewalks, signing East Nob Hill Blvd. Reconstruction: 6th to 18th Streets Roadway widening to 5 -lanes, new curb, gutter & sidewalk, and lighting. The above additions to the TIP have been selected for addition from: City Council; Pavement Management Systems rating (PMS) input; Community input via public hearings and other communication; Bicycle Pedestrian Committee; TransAction Committee; Other Committee Recommendations; Collision reporting and ratings; Adjacent Communities. July 15, 2004 4111111. Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2005 to 2010 Hearing Date: 7/6/2004 Adoption Date: 7/20/2004 Amend Date: Resolution No.: R-2004-103 Functional Class Priority Number Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir Type RNV Required Date (M�yyy) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 1 Railroad Grade Separation -'B' St- Lincoln Ave BNSF Tracks/I St from: N 1st St to: N 1st Ave Construct Grade Separations and adjacent roadway reconstruciton 01 06 07 08 P 0.2 T P G 0 W PE CN CN 1/1/2005 1/1/2006 1/1/2007 5010 AIP AIP AIP 500 1285 7000 1000 500 7295 7000 500 7295 7000 EA No Totals 5010 8785 1000 14795 14795 17 2 Front St Rehabilitation BNSF Track/Street from: Yakima Ave to: 'D' St Realignment of Front Street, curb, gutter and sidewalk reconstruction with historic district renovation 01 12 06 P 0.3 p 0 T PE RW CN 3/1/2005 6/1/2005 6/1/2006 OTHER OTHER OTHER 1491 371 186 771 191 96 17021 4261 2128 186 96 I I 21281 EA Yes 06/01/06 Totals 1928 482 2410 282 2128 14 3 W Washington Ave - S 52nd Ave to S 72nd Ave W Washington Ave from: S 52nd Ave to: S 72nd Ave Widen, reconstruct, curb, gutter, sidewalk 04 03 S 1.02 w T 0 S P PE CN 1/1/2005 1/1/2005 AIP 3981 3531 751 AIP1 16981 5271 2225 7511 22251 1 EA Yes 01/01/05 Totals 2096 880 2976 2976 16 4 W Nob Hill Blvd - S 68th Ave to S 80th Ave W Nob Hill Blvd from: S 68th Ave to: S 80th Ave Reconstruct to minor arterial standards 04 03 S .73 C WYes 0 P T PE RW CN 1/1/2005 4/1/2006 1/1/2007 STP(U) STP(U) 370 144 AIP I 551 I 425 AIP1 2161 360 AIP 1 5551 3701 925 4251 1 3601 1 9251 EA 04/01/06 Totals 514 826 370 1710 785 925 Report Date: July 20, 2004 Page 1 Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 3g City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2005 to 2010 Hearing Date: 7/6/2004 Adoption Date: 7/20/2004 Amend Date: Resolution No.: R-2004-103 Functional Class Priority Number Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only r a m ° a.tthh Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Code State Funds Local Funds Total Funds Envir Type R/W Required Date (MM/1,Y) Federal Fund Code Federal Cost byFund Phase 1st 2nd 3rd 4th T 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 02 5 River Road Realignment River Road from: N 16th Ave to: Fruitvale Blvd Widening, curb, gutter, sidiewalk, reconstructrion 01 04 S 1.1 c G P T S W RW CN 1/1/2005 4/1/2006 AIP AIP 272 1184 68 296 340 1480 340 1000 480 CE Yes 01/01/06 Totals 1456 364 1820 1340 480 19 6 Barn BaRehabilitation S 3rd Ave from: S 3rd St to: Pine St Car Barn and Museum Restoration 03 P N/A G C S T W P PE CN 6/1/2005 6/1/2006 STP(E) STP(E) 18 1730 I 1 321 50 501 I 2701 20001 17301 2701 EA No Totals 1748 302 2050 1780 270 00 7 Transit Operating/Capital Expenses Various Areas from: N/A to: N/A Supplemental Funding for Transit Service Operating Expenses 12 22 23 24 31 S N/A 1 CN I 1/1/2005 1 5307 1 12721 I I 10001 22721 22721 I CE No Totals 1272 1000 2272 2272 09 8 Street Asset Amenities Route Maintenance, Repair & Improvements from: to: Maintenance of shelters, benches and signage throughout our route system 22 31 S N/A Q ALL I 1/1/2005 1 1 1 I 1 301 301 301 I CE No Totals 30 30 30 Report Date: July 20, 2004 Page 2 Supersedes previous editions ', Washington State Department of Transportation ir Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: WCOG Six Year Transportation Improvement Program From 2005 to 2010 Hearing Date: 7/6/2004 Adoption Date: 7/20/2004 Amend Date: Resolution No.: R-2004-103 Functional Class Priority Number Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir Type RNV Required Date (/ fwyy) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 00 9 12 S N/A O CN 1/1/2005 5309(Bus) 56 35 91 91 CE Facility Upgrade 21 No Transit Center Expansion Project from: to: Add 300 sq ft section to the North side of our transit center to house a security officer,information/ticket sales Totals 56 35 91 91 14 10 12 S N/A w PE 1/1/2005 STP(U) 27 1 1 31 30 301 1 CE N 16th Ave - Signal @ River Rd T RW 4/1/2005 STP(U) 40 1 1 61 46 1 461 Yes N 16th Ave from: N 16th Ave to: River Rd P CN 1/1/2006 STP(U) 232 1 1 361 268 2681 04/01/05 Install new signal Totals 299 45 344 298 46 07 11 12 S .5 T PE 1/1/2005 PSMP I 6 41 10 10 1 CE W Lincoln Ave Sidewalks P RW 1/1/2005 PSMP I 6 41 10 10 1 Yes CN 6/1/2005 PSMPI 74 991 173 1731 W Lincoln Ave from: N 18nd Ave to: N 29th Ave 04/01/05 Sidewalks on the Northside Totals 86 107 193 20 173 17 12 01 P N/A p PE 1/1/2005 TPPI 3201 801 400 4001 1 CE SR12 - N 40th Ave o RW 1/1/2006 TPP I 9601 2401 1200 12001 1 Yes SR12 - N 40th Ave from: N 40th Ave to: SR12 T W CN 1/1/2006 TPP I 19201 4801 2400 24001 01/01/06 Widen intersection and on-ramp Totals 3200 800 4000 4000 Report Date: July 20, 2004 Page 3 Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2005 to 2010 Hearing Date: 7/6/2004 Adoption Date: 7/20/2004 Amend Date: Resolution No.: R-2004-103 Functional Class Priority Number Project Identification A. Federal Aid No. B. Bridge No. C. Project Title Street/Road Name or Number E. Beginning MP or road - Ending MP or road F. Describe Work to be Done Improvement I Type(s) 'A in Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir Type RNVD. Required Date (MN/1 Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 13 E Nob Hill Blvd at S 6th St E Nob Hill Blvd from: E Nob Hill Blvd to: S 6th St Install signal @ e Nob Hill Blvd and S 6th St 12 01 S Signal T W 0 RW CN 1/1/2005 6/1/2005 TPP TPP 65 400 10 62 75 462 75 462 CE Yes 01/01/05 Totals 465 72 537 537 14 14 Nob Hill Blvd Nob Hill Blvd from: S 52nd Ave to: S 68th Ave Widen, curb, gutter, sidewalk, lighting, drainage 04 P .77 p C G 0 S T PE RW CN 1/1/2006 6/1/2006 6/1/2007 STP(U) STP(U) 107 300 1 1 171 124 1 1 401 340 TPP I 11831 1931 1376 1241 I 3401 I 13761 i EA Yes 01/01/07 Totals 407 1183 250 1840 1840 00 15 Annual Signal Upgrades Local Selection from: N/A to: N/A Upgrade signals 01 P N/A PE CN CN 4/1/2005 8/1/2005 8/1/2005 CMAQ STP(S) CMAQ 50 150 300 1 AIPI 200 50 100 350 300 1001 1 1 3501 1 3001 CE No Totals 500 200 50 750 100 650 00 16 Various Overlay Projects/Selected on Local Priority N/A from: N/A to: N/A 07 S N/A CN 1 7/1/2005 I STP(U) ( 1731 1 1 271 2001 2001 1 EA No Totals 173 27 200 200 Report Date: July 20, 2004 Page 4 Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2005 to 2010 Hearing Date: 7/6/2004 Adoption Date: 7/20/2004 Amend Date: Resolution No.: R-2004-103 o H tj rii Priority Number Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F. Describe Work to be Done Improvement I Type(s) zFederal in Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Funding State Fund Code State Funds Local Funds Total Funds Envir Type R/W Required Date (tigiyy) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 00 17 Storm DrainsNegetation Local Selection from: City Wide to: City Wide 32 P N/A PE CN 1/1/2005 1/1/2005 80 720 80 720 80 720 EA No Totals 800 800 800 17 18 Reconstruction Rudkin Rd Rudkin Rd from: E Mead Ave to: Rainier Place Reconstruct, excavate ballast, top course, curb, gutter, sidewalk Partner with City of Union Gap 03 06 P .76 W T P S PE CN 1/1/2007 1/1/2008 STP(C) STP(C) 87 500 1 1 221 1091 1091 TPP1 5001 841 1084 1 1 1 1084 CE No Totals 587 500 106 1193 109 1084 17 19 E Mead Ave Reconstruction E Mead Ave from: Rudkin Rd to: Fair Ave Partner with City of Union Gap, reconstruct, excavate ballast, top course, curb, gutter, storm, acp 03 06 P .76 C G O P S T PE CN 9/1/2006 4/1/2007 STP(S) STP 97 873 TPP1 181 61 121 TPP 1 1631 551 1091 1211 1 1 10911 CE No Totals 970 181 61 1212 121 1091 19 20 Longfiber Rd - Phase 2 (3 -Phases) Longfiber Rd from: Valley Mall Blvd to: W Washington Ave New roadway construction and reconstruction, 3 -lane w/tum, curb, gutter, sidewalks - Partner with City of Union Gap 01 03 P .50 p S W T O PE CN 1/1/2008 1/1/2009 1 1 1061 1061 1 1 106 1 1 11831 11831 1 1 1183 CE No Totals 1289 1289 1289 Report Date: July 20, 2004 Page 5 Supersedes previous editions Washington State Department of Transportation Agency' Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2005 to 2010 Hearing Date: 7/6/2004 Adoption Date: 7/20/2004 Amend Date: Resolution No.: R-2004-103 o h tn 1i Priority Number Project Identification A. Federal Aid No. B. Bridge No. Project Title D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir Type RNVC. R Required Date (Mm/YY) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 21 Intersection Improvements Selected on Local Priority from: E Nob Hill Blvd to: S 6th St Curb, gutter, sidewalk, safety improvements, striping, signs p N/A s G C PE CN 4/1/2005 7/1/2005 5 45 5 45 5 45 CE No Totals 50 50 50 11 22 E Nob Hill Blvd & S 18th St E Nob Hill Blvd from: S 18th St to: E Nob Hill Blvd Widen south leg for double LT from west bound Nob Hill; (Tie to WSDOT Project) possible curb, gutter and sidewalk 04 01 P 1 UC/)�H PE RW CN 1/1/2006 3/1/2006 1/1/2007 STP(U) STP(U) STP(U) 13 18 140 2 2 25 15 20 165 15I 1 20 1 1651 CE Yes 01/01/06 Totals 171 29 200 35 165 16 23 S 6th St - Signals @13' St & Lincoln S 6th St from: 'B' St to: Lincoln Ave Install signals at B St and Lincoln Ave 01 S N/A CN 1 2/1/2005 1 STP(S) 1 1001 AIPI 1501 501 3001 3001 1 1 CE No Totals 100 150 50 300 300 16 24 N 8th St - Signals @'B' St & Lincoln Ave N 8th St from: 'B' St to: Lincoln Ave Install signals @ 'B' St and Lincoln, flashers 01 P Signal CN 1 2/1/2005 1 STP(S) 1 801 1 1 111 911 911 1 1 EA No Totals 80 11 91 91 Report Date: July 20, 2004 Page 6 Supersedes previous editions Washington State Department of Transportation -Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2005 to 2010 Hearing Date: 7/6/2004 Adoption Date: 7/20/2004 Amend Date: Resolution No.: R-2004-103 Functional Class Priority Number Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mmfdd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type RNV Required Date (MM1vyy) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 25 E Nob Hill Blvd & Fair Ave E Nob Hill Blvd from: E Nob Hill Blvd to: Fair Ave Intersection widening & new signal, curb, gutter and sidewalk, street lighting 31 03 04 P N/A O C P T W PE RW CN 1/1/2006 10/1/2006 1/1/2007 STP(S) STP(S) STP(S) 72 62 789 11 10 123 83 72 912 83 72 912 CE Yes 10/01/06 Totals 923 144 1067 83 72 912 17 26 S 80th Ave - Tieton Dr to Zier Rd S 80th Ave from: Tieton Dr to: Zier Rd Major widening, curb, gutter, sidewalk 04 P 1.3 0 C P T W PE RW CN 1/1/2006 1/1/2007 6/1/2006 AIP 1 104 AIP 1 303 AIP1 1323 161 120 471 350 2071 1530 1201 3501 1 1530 EA Yes 01/01/07 Totals 1730 270 2000 470 1530 19 27 N 7th St Reconstruction N 7th St from: Lincoln Ave to: 'H' St Street reconstruction into Yakima Resource Center 03 P .5 PE i 1/1/2006 I 11I 1 4001 4001 1 4001 1 CE No Totals 400 400 400 17 28 Zier Rd - S 75th Ave to S 72nd Ave Zier Rd from: S 75th Ave to: S 72nd Ave Minor widening, curb, gutter and sidewalk 05 06 S 15 C S T P PE CN 1/1/2005 6/1/2005 STP(E) STP(E) 22 75 I I 1 71 291 1 201 95 291 951 1 1 CE Yes 03/01/05 Totals 97 27 124 124 Report Date: July 20, 2004 Page 7 Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2005 to 2010 Hearing Date: 7/6/2004 Amend Date: Adoption Date: 7/20/2004 Resolution No.: R-2004-103 Functional Class Priority Number Project Identification A. Federal Aid No. B. Bridge No. C. Project TitleRNV D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only o -Phase a� ° a Start (mm/dd/yyyy) Fund Source Information Federal Funding State Code State Funds Local Funds Total Funds Envir Type Required Date (M y) Federal Fund Code Federal Cost byFund Phase 1st 2nd 3rd 4th Thru6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 17 29 05 P 2.15 w PE 1/1/2009 STP(C) 216 34 250 250 EA Englewood Ave - N 40th Ave to N 56th Ave 06 S RW 6/1/2009 STP(C) 277 43 320 320 Yes Englewood Ave from: N 40th Ave to: N 56th Ave T P CN 1/1/2010 STP(C) 1367 213 1580 1580 04/01/09 Widen roadway, curb, gutter, sidewalk O C Totals 1860 290 2150 2150 16 30 05 S .5 O PE 1/1/2005 STP(U) 36 1 1 51 411 411 1 CE W Washington Ave Median Removal CN 1/1/2005 STP(U) 228 1 361 264 2641 1 No W Washington Ave from: S 16th Ave to: S 24th Ave Removal of median in Washington Ave lengthening tum lanes Totals 264 41 305 305 17 31 05 P 2 O PE 1/1/2007 STP(U) 173 271 200 2001 1 EA Englewood Ave - N 24th Ave to N 16th Ave Englewood Ave from: N 24th Ave to: N 40th Ave 06 RW CN 1/1/2008 6/1/2009 STP(U) STP(U) 259 865 411 300 1351 1000 3001 1 10001 Yes 01/01/09 Widen, curb, gutter and sidewalk Totals 1297 203 1500 1500 00 32 14 p .25 T PE 1/1/2008 STP(E) 200 1 1 271 2271 2271 1 CE Pedestrian Bridge 32 P CN 3/1/2009 STP(E) 2000 1 1 2701 2270 22701 1 No Pedestrian Bridge from: N 10th St to: Yakima Greenway 0 Construct pedestrian bridge from Gateway area to Yakima Greenway, power, handicap accessible, lights Totals 2200 297 2497 2497 Report Date: July 20, 2004 Page 8 Supersedes previous editions � Washington State Department of Transportation V Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2005 to 2010 Hearing Date: 7/6/2004 Amend Date: Adoption Date: 7/20/2004 Resolution No.: R-2004-103 Functional • Class Priority Number Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only d t a m 2 a. Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir Type R/VV Required Date (mmiyy) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 00 33 Gravel Road B.S.T Various Areas from: to: PM -10 Abatement 07 S N/A CN 4/1/2005 200 200 100 50 50 CE No Totals 200 200 100 50 50 08 34 Powerhouse Rd & Englewood Ave Powerhouse Rd from: Powerhouse Rd to: Englewood Ave Intersection, realignment, curb, gutter, sidewalk, Safety Flashing Signal 12 P N/A T P O PE RW CN 5/1/2005 9/1/2005 9/1/2005 STP(S) STP(S) STP(S) 20 400 300 1 1 31 23 1 1 541 454 1 1 451 345 231 4541 3451 CE Yes 09/01/20 Totals 720 102 822 822 07 35 S 48th Ave & Summitview Ave Signalization S 48th Ave from: S 48th Ave to: Summitview Ave Signalization 12 P N/A p T PE RW CN 1/1/2010 6/1/2010 8/1/2010 STP(S) STP(S) STP(S) 20 20 340 1 1 3 3 51 23 23 391 1 231 1 231 391 I CE Yes 06/01/10 Totals 380 57 437 437 07 36 S 3rd Ave & W Washington Ave Signal S 3rd Ave from: S 3rd Ave to: W Washington Ave Signal Upgrades 12 p N/A p T PE CN 4/1/2006 6/1/2006 1 1 1 101 10I 101 1401140 1401 CE No Totals 150 150 150 Report Date: July 20, 2004 Page 9 Supersedes previous editions Washington State Department of Transportation -Aggeenncy: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2005 to 2010 Hearing Date: 7/6/2004 Adoption Date: 7/20/2004 Amend Date: Resolution No.: R-2004-103 UC. tj ti Priority Number Project Identification A. Federal Aid No. B. Bridge No. Project Title D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Schedule (Local Agency) Federally Funded Projects Only Project Phase N N Fund Source Information Expenditure Federal Funding State Fund Code State Funds Local Funds Total Funds Envir Type RAN Required Date (Mwt' Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Th 6th 1 t 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 07 37 S 16th Ave & W Washington Ave Signal S 16th Ave from: S 16th Ave to: W Washington Ave Signal Upgrades 12 P N/A p T PE CN 1/1/2006 6/1/2006 STP(S) STP(S) 10 60 10 60 20 120 20 120 CE No Totals 70 70 140 140 07 38 W Nob Hill Blvd Sidewalks W Nob Hill Blvd from: S 16th Ave to: E 182 Overpass Sidewalks on Southside 12 P 2 p T PE RW CN 1/1/2008 6/1/2008 3/1/2009 STP(S) 1 43 STP(S) 85 STP(S) 1 255 1 1 7 1 1 15 1 45 50 100 300 501 1 1001 1Yes 3001 CE 09/01/08 Totals 383 67 450 450 00 39 Beech St Pedestrian Connection Beech St from: Fair Ave to: Chalmers/Riverside Construct pedestrian under SR82 to Greenway 06 32 p l p T PE RW CN 1/1/2009 6/1/2009 1/1/2010 STP(S) STP(S) STP(S) 45 150 400 1 1 61 51 1 1 201 170 1 541 454 1 1 51 1 1 170 1 454 CE Yes 09/01/09 Totals 595 80 675 221 454 07 40 W Lincoln Ave Sidewalks W Lincoln Ave from: N 56th Ave to: N 40th Ave Sidewalks 12 P 2 p T PE RW CN 1/1/2009 6/1/2009 1/1/2010 STP(S) STP(S) STP(S) 34 68 204 1 1 61 40 1 1 121 80 11361 240 1 40 1 80 240 CE Yes 09/01/10 Totals 306 54 360 360 Report Date: July 20, 2004 Page 10 Supersedes previous editions 7TWashington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2005 to 2010 Hearing Date: 7/6/2004 Adoption Date: 7/20/2004 Amend Date: Resolution No.: R-2004-103 Functional Class Priority Number Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir Type RNV Required Date (Mlvf/vy) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 08 41 W Lincoln Ave &'B' St Realignment W Lincoln Ave from: W 5th Ave to: Custer St Realignment of W Lincoln Ave, sidewalks, curb, gutter, lights 01 12 P .5 w T S P 0 G PE RW CN 1/1/2008 1/1/2009 1/1/2010 STP(E) STP(E) STP(E) 337 831 1429 53 129 223 390 960 1652 390 960 1650 CE Yes 09/01/10 Totals 2597 405 3002 3000 16 4212 School Safety Projects Various Locations - Citywide from: to: Crossing flashers, sidewalks, signing, other features S N/A PE CN 1/1/2005 1/1/2005 PSWIP I PSMPI 101 21 12 121 1 1901 381 2281 1901 � CE No Totals 200 40 240 202 02 43 E Nob Hill Blvd. Reconstruction E Nob Hill Blvd. from: S 6th Street to: S 18th Street Major roadway widening and reconstruction to 5 lanes with intersection improvements, curb, gutter, sidewalks 03 04 06 p .85 C G 0 P S T PE RW CN 1/1/2008 1/1/2009 1/1/2010 STP(C) STP(C) STP(C) 433 865 5190 1 1 671 500 1 1 1351 1000 1 1 8101 6000 1 1 1 500 1000 6000 EA Yes 1/1/09 Totals 6488 1012 7500 7500 Report Date: July 20, 2004 Grand Totals for Yakima 30067 22986 12119 65172 27900 21682 5446 10104 Page 11 Supersedes previous editions BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No. For Meeting of Tuly 20, 2004 ITEM TITLE: Public Hearing to: A) Adopt the Six-year Transportation Improvement Program (STIP) for years 2005 to 2010, and to amend the Metropolitan Transportation Plan; and B) Amend the Yakima Urban Area Comprehensive Plan Capital Facilities Element to incorporate the adopted Six-year Transportation Improvement Program (STIP). SUBMITTED BY: atment of Community and Economic Development - William Cook, Director CONTACT PERSON/TELEPHONE: K. Wendell Adams, P.E., Engineering Manager, 575-6111. SUMMARY EXPLANATION: See Attached explanation and list of new projects added since 2003. Resolution X Ordinance Contract Other (Specify) STIP Funding Source APPROVED FOR SUBMITTAL: City Manager STAFF RECOMMENDATION: 1) Hold Public Hearing, 2)Adopt Resolution approving the STIP and amend the regional Metropolitan Transportation Plan, 3) Adopt Resolution amending the Comprehensive Plan Capital Facilities Element. BOARD/COMMISSION RECOMMENDATION: COUNCIL ACTION: Resolution adopted. RESOLUTION NO. R-2004 —103. Resolution adopted. RESOLUTION NO. 2004-104