Loading...
HomeMy WebLinkAboutR-2002-004 Amended 2002 - 2007 Six-Year Transportation Improvement Program ( TIP )RESOLUTION NO. R-2002- o4 A RESOLUTION fixing the time and place for hearing on the amended Six - Year Transportation Improvement Program for the period of 2002 through 2007. WHEREAS, the City of Yakima annually prepares, reviews and adopts a Six Year Program for the construction of streets and arterial streets in the City of Yakima for the ensuing six year period, all as contemplated and required by State and Federal law; and WHEREAS, the City of Yakima has identified a need to amend the current Six -Year Program for the construction of streets and arterial streets in the City of Yakima; and WHEREAS, a public hearing must be held on said program before final approval, now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: That said program shall be presented for hearing and determination on Tuesday, January 15, 2002, at the hour of 2:00 o'clock p.m. on said day, in the Council Chambers of the City of Yakima, at Yakima City Hall, Yakima, Washington, or as soon thereafter as the same may be heard, and that notice of such hearing be given as approved by law. ADOPTED BY THE CITY COUNCIL this 8th_ day of January, 2002 ATTEST: City Clerk le"( Mary Place, Mayor Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: Page 1 Six Year Transportation Improvement Program From 2002 to 2007 Hearing Date: 6/19/2001 Adoption Date: 6/19/2001 Amend Date: Resolution No.: R-2001-97 Functional Class 7 Priority Number Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Federally Funded Projects Only Project Phase Fund Source Information Expenditure Schedule Federal Funding (Local Agency) Envir Type PJW Required Date (MMMT Phase Start (mm/dd/yyyy) Federal Fund Code Federal Cost by Phase State Fund Code State Funds Local Funds Total Funds iso 2nd 3rd 4th Thru 6th 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 1 Railroad Grade Separation - Phase 1 BNSF Tracks from: Lincoln Avenue to: Yakima Avenue New Construction 01 S 0.80 '1' O P S PE CN 1/1/2002 1/1/2004 STP STP 1644 3000 AIP AIP 256 1000 1900 4000 500 1400 3000 19001 EA No Totals 4644 1256 5900 500 4400 1900 14 2 Railroad Grade Separation - Phase 2 BNSF Tracks/1 Street from: Lincoln Avenue to: Yakima Avenue New Construction 01 P 80 T P G RW CN 5/1/2003 1 STP 6/1/2004 1 STP 2000 18000 AIPI 5001 1 25001 AIP I 30001 10001 220001 1 1 5001 1 1 2000 1 22000 CE Yes 9/1/2003 Totals 20000 3500 1000 24500 500 24000 14 3 Railroad Grade Separation - Phase 3 BNSF Track/Street from; I Street to: Washington Avenue Railroad Grade Separation including crossings at seven major intersections. Curb, gutter, sidewalk. 01 P 1.5 T P 0 G S PE RW CN 3/1/2003 I STP 6/1/2003 I STP 3/1/2004 STP 3000 2000 20000 AIP I 10001 10001 5000 AIP 1 7001 3001 3000 AIP 50001 25000 50001 1 30001 1 25000 1 EA Yes 3/1/2004 Totals 25000 6700 1300 33000 33000 00 4 Signal Upgrades Local Selection in Non -Attainment Area from: N/A to: N/A Local selection in non -attainment area 12 S N/A PE CN CN 1/1/2002 3/1/2002 3/1/2002 CMAQ CMAO 310 OTHER I OTHER 1 533 PWTF 1 80 231 23 671 910 80 231 9101 801 EA No Totals 310 613 90 1013 1013 14 5 W Washington Avenue - South 24th Ave to South 40th W Washington Avenue from: South 24th Avenue to: South 40th Avenue Widen/Reconstruct, curb, gutter, sidewalk 04 03 S N/A C G 0 P S T PE RW CN 1/1/2001 1/1/2002 6/1/2002 REV REV REV 235 290 1837 1 1 59 1 298 1 1 287 294 588 2124 2941 1 5881 1 21241 EA Yes 6/1/2002 Totals 2362 644 3006 3006 14 6 West Washington Ave - South 40th Ave to South 48th West Washington Ave from: South 40th Ave to: South 48th Ave Widen/Reconstruct, curb, gutter, sidewalk 03 04 S N/A 0 G O P S T PE RW CN 5/1/2001 1 STP(U) 1/1/2002 1 STP(U) 6/1/2002 STP(U) AIP AIP AIP 3361 1 3361 3361 1 4001 4001 4001 1 26281 1 26281 26281 1 EA Yes 6/1/2002 Totals 3364 3364 3364 Report Date: June 15, 2000 Supersedes previous editions 7iWashington State Department of Transportation Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: Page 2 Six Year Transportation Improvement Program From 2003 to 2008 Hearing Date: 6/19/2001 Amend Date: Adoption Date: Resolution No.: E. N �j ti Priority Number Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F. Describe Work to be Done Improvement Type(s) ? in Total Length 5 ci Project Costs in Thousands of Dollars Federally Funded Projects Only Project Phase Fund Source Information Expenditure Schedule Federal Funding (Local Agency) Envir Type R/VV Required Date (MMNY) Phase Start (mm/dd/yyyy) Federal Fund Code Federal Cost by Phase State Fund Code State Funds Local Funds Total Funds 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 07 7 West Washington Avenue S. 48th Avenue to S 64th West Washington Avenue from: South 48th Avenue to: South 64th Avenue Widen/reconstruct, curb, gutter and sidewalk 03 04 S 1.02 C G O P S T PE RW CN 1/1/2002 2/1/2002 7/1/2002 AIP AIP AIP 84 123 897 36 52 385 120 175 1282 120 175 1282 EA Yes 6/1/2002 Totals 1104 473 1577 1577 8 West Washington Avenue S. 64th Avenue to S. 72nd West Washington Avenue from: South 64th Avenue to: South 72nd Avenue Widen/reconstruct, curb, gutter, sidewalk 03 04 S .50 C G O P S T PE RW CN 1 1/1/2002 I 3/1/2002 7/1/2002 1 AlP1 185 AIP 229 551 3451 551 1 1851 57x1 551 1 1851 5741 EA Yes 6/1/2002 Totals 414 400 814 814 16 9 West Mead Ave - South 16th Ave to South 11th Ave West Mead Ave from: South 16th Avenue to: South 11th Avenue Reconstruct/Widen 03 S .5 C G O P S T RW CN 6/1/2002 STP(U) STP(U) 47 478 1 1 71 541 75 553 541 1 553 CE Yes 4/1/2002 Totals 525 82 607 607 19 10 Powerhouse Canal Corridor Powerhouse Road from: Robertson School to: North 24th Avenue Install Asphalt Pathway 01 S N/A S PE CN 5/1/2001 8/1/2001 STP(E) STP(U) 50 273 1 1 111 611 1 1 621 3351 611 3351 I EA No Totals 323 73 396 396 02 11 Nob Hill Blvd. W. - 68th Avenue S. to 80th Avenue S. West Nob Hill Blvd. from: South 68th Avenue to: South 80th Avenue Reconstruct to minor arterial standards 04 03 S 73 C G O P S T PE RW CN 1/1/2002 4/1/2002 1/1/2003 AIP 1 541 36 1 90 AIP 1 2161 144 360 AIP 55513701925 901 1 3601 1 9251 EA Yes 4/1/2002 Totals 825 550 1375 1375 02 12 River Road River Road from: North 16th Avenue to: Fruitvale Blvd. Widening, curb, gutter, sidewalk, reconstruction 01 04 S 11 C G P S T W PE RW CN 6/1/2001 1/1/2002 6/1/2002 AIP AIP AIP 1121 281 140 2721681340 118412961 1480 1401 1 3401 10001 4801 EA Yes 1/1/2002 Totals 1568 392 1960 1480 480 Report Date: June 15, 2000 Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: Page 3 Six Year Transportation improvement Program From 2002 to 2007 Hearing Date: 6/19/2001 Amend Date: Adoption Date: Resolution No.: Functional Class Priority Number Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - EndingMP or road g g F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Federally Funded Projects Only Project Phase Fund Source Information Expenditure Schedule Federal Funding (Local Agency) Envir Type RNV Required Date (MM/YY) Phase Start (mm/dd/yyyy) Federal Fund Code Federal Cost byFund Phase State Code State Funds Local Funds Total Funds 1st 2nd 3rd 4th Thru 6th 8 9 10 11 12 13 14 15 16 17 18 19 20 21 1 2 3 4 5 I 6 7 14 13 North 5th Ave /Fruitvale Blvd North 5th Ave/Fruitvale Roundabout from: North 5th Ave to: Fruitvale Blvd Roundabout, curb, gutter, sidewalk 04 03 S 1 C G 0 P S T PE CN 8/8/2001 5/1/2002 STP STP 27 273 4 43 31 316 31 316 EA No Totals 300 47 347 347 — 19 14 YVT Enhancement South 3th Avenue from: South 3th Avenue to: Pine Street , Car Barn and Museum Restoration 03 S N/A 1 G C S T W P PE6/1/2001 CN I 1/1/2002 STP(E) STP(E) 18 160 1 1 321 501 501 I 1 1 251 1851 1851 I EA No Totals 178 57 235 235 00 15 I Transit Operating / Capital Expenses Various Areas from: N/A to: N/A 12 21 22 23 24 S N/A CN ! 1/1/2002 STP 2200! 1 20001 42001 20001 22001 I CE i No Totals 2200 2000 4200 2000 2200 00 16 Fruitvale Canal Pathway Fruitvale Blvd/North 20th Ave from: North 20th Ave to: Englewood Ave Construct Pathway/Sidewalk 22 06 S N/A PE CN 5/1/2002 8/1/2002 STP(E) STP(E) 271 241 1 1 1 41 1 391 311 311 1 2801 2801 1 1 CE No Totals 268 43 311 311 PE 1 1/1/2002 I STP(E) I 601 1 1 121 721 721 1 I CE No 00 17 Sidewalks/Pedestrian Facilitiesl3 N/A from: N/A to: N/A Sidewalk and pedestrian facilities 01 S N/A Totals 60 12 72 72 00 18 North 16th Ave - Signal @ River Road North 16th Ave from: North 16th Ave to: River Road Install New Signal 12 S N/A PE RW CN 10/1/2003 5/1/2004 9/1/2004 1 1 401 40I 1 541 54 1 1 2501 250 1 401 1 64 1 1 250 CE Yes Totals 344 344 40 54 250 Report Date: June 15, 2000 Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: Page4 Six Year Transportation Improvement Program From 2002 to 2007 Hearing Date: 6/19/2001 Adoption Date: Amend Date: Resolution No.: Functional Class Priority Number Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - EndingMP or road g g F Describe Work to be Done Improvement Type(s) w Total Length Utility Codes Project Costs in Thousands of Dollars Federally Funded Projects Only Project Phase Fund Source Information Expenditure Schedule Agency) Federal Funding (Local Envir Type RAN Required Date (MM Y� Phase Start (mm dd/yyyy) Federal Fund Code Federal Cost byFund Phase State Code State Funds Local Funds Total Funds 1st 2nd 3rd 4th Thru 6th i 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 19 North 40th Ave - Signal @ Castlevale North 40th Ave from: North 40th Ave to: Castlevale Install new signal 01 12 S N/A C G s W CN 7/1/2001 STP(U) 75 50 125 125 EA No Totals 75 50 125 125 00 20 Bus Stop Zones - Transit Bus Stops from: N/A to: N/A , Bus Stops 22 S N/A PE CN 4/1/2003 6/1/2003 I 1 1 1 1 131 131 1 131 1161 116 1 1161 1 EA No Totals 129 129 129 19 21 CBD Parking Lots Various Areas from: N/A to: N/A i Rehabilitate Pavement 07 S N/A PE CN 6/1/2002 ` 6/1/2002 I 81 721 8 f 21 21 2 2 181 181 18 2 18 EA No Totals 80 80 20 20 20 20 09 22 • Sports Complex Access Beech Street from: Fair Avenue to: 1-82 Includes 13th and Maple Streets, curb, gutter, sidewalk, drainage, lighting 01 05 j P I � N/A C G o P S T PE CN 1/1/2003 6/1/2003 STP(U) STP(U) 2 8 1 1 281 301 1 301 1 1 2501 258 1 2581 EA Totals 10 278 288 288 17 23 4637/4566 East Nob Hill Blvd at South 6th Street East Nob Hill Blvd from: East Nob Hill Blvd to: South 6th Street Install new signal 06 01 P Signal P RW CN 2/1/2002 8/1/2003 STP(U) STP(U) 65 400 1 1 101 75 751 1 1 62 1 4621 4621 1 EA Yes Totals 465 72 537 537 00 24 East Nob Hill Blvd - Signal @ Fair Ave East Nob Hill Blvd from: East Nob Hill Blvd to: Fair Ave Install Signal @ E. Nob Hill Blvd & Fair Avenue 12 P N/A PE10/1/2003 CN I 10/1/2003 29 1 291 1 291 1 1 2571 2571 1 1 257 EA No Totals 286 286 29 257 Report Date: June 15, 2000 Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: Page 5 Six Year Transportation Improvement Program From 2002 to 2007 Hearing Date: 6/19/2001 Adoption Date: Amend Date: Resolution No.: o0 **-8N —° ti U Priority Number Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - EndingMP or road g g F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes 1 Project Costs in Thousands of Dollars Federally Funded Projects Only Project Phase Fund Source Information Expenditure Schedule Agency) Federal Funding (Local Envir R/W Required Date (MM/yy) Phase Start (mm/dd/yyyy) Federal Fund Code Federal Cost byFund Phase State Code State Funds Local Funds Total Funds 1st 2nd 3rdType 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 02 25 Nob Hill Blvd Nob Hill Blvd from: South 52nd Avenue to: South 68th Avenue Widen, curb, gutter, sidewalk, lighting, drainage 04 P .77 P C G 0 S T PE CN 1/1/2003 6/1/2003 STP(U) STP(U) 107 1183 17 193 124 1376 124 1376 EA No Totals 1290 210 1500 124 1376 00 26 Annual Signal Upgrades Local Selection from: N/A to: N/A Upgrade Signal 01 P N/A PE . 4/1/2003 CN 8/1/2003 1 1 101 101 1 10) 90 90 90 CE No Totals 100 100 100 00 27 Various Overlay Projects/Selected on Local Priority N/A from: N/A to: N/A Rehabilitate Pavement 07 P N/A CN I 7/1/2003 I STP(U) ( 1731 1 I 27) 200) 1 200) 1 EA No Totals 173 27 200 200 00 28PE Storm DrainsNegetation Local Selection from: City Wide to: City Wide 32 P NIA 1 4/1/2003 CN I 9/1/2003 80) 801 I 80) 1 1 7201 7201 ; 720I EA No Totals 800 800 800 17 29 Reconstruction Rudkin Road Rudkin Road from: East Mead to: Viola Avenue Reconstruct, excavate ballast, top course, curb, gutter, sidewalk 03 06' P 28 W T p S PE CN 1/1/2002 1/1/2003 STP(C) STP(C) 60 300 OTHER I 1 15) 751 75 OTHER 300) 70) 670 1 6701 CE No Totals 360 300 85 745 75 670 14 30 North 16th Ave - Signal @ Englewood Ave North 16th Ave from: North 96th Ave to: Englewood Ave Install New Signal 12 S N/A PE 1 1/1/2002 Rw 1/1/2002 CN 1 6/1/2002 STP STP STP 17 9 141 I 1 1I 18) 181 1 1110110 j 1 61 1471 1471 CE Yes Totals 167 8 175 175 Report Date: June 15, 2000 Supersedes previous editions AM, Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: Page 6 Six Year Transportation Improvement Program From 2002 to 2007 Hearing Date: 6/19/2001 Amend Date: Adoption Date: Resolution No.: Functional Class Priority Number Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Federally Funded Projects Only Project Phase Fund Source nformation Expenditure Schedule Federal Funding (Local Agency) Envir Type R/W Required Date (MM/YY) Phase Start (rnmidd/yyyy) Federal Fund Code Federal Cost by Phase State Fund Code State Funds Local Funds Total Funds 1st 2nd 3rd 4th Thru 6th 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 17 31 East Mead Avenue Reconstruction East Mead Avenue from: Rudkin Road to: South 10th Street Reconstruct, excavate ballast, top course, curb, gutter, storm 03 06 P .76 C G O P S T PE CN 9/1/2004 4/1/2005 STP STP 97 873 OTHER OTHER 18 163 6 55 121 1091 121 1091 CE No Totals 970 181 61 1212 1212 00 32 Intersection Improvements Selected on Local Priority from: N/A to: N/A , Curb, gutter, sidewalk, safety improvements, striping, signs 06 P N/A S G C PE CN 4/1/2002 7/1!2002 - 1 1 51 5I 51 1 45 45 451No CE Totals 50 50 50 11 33 South 18th Street & East Nob Hill Blvd South 18th Street from: South 18th Street to: East Nob Hill Blvd Widen south leg for Double LT from west bound Nob Hill; (Tie to WSDOT Project) possible curb, gutter, and sidewalk 04 01 P 1 1 C G S W PE RW CN 1/1/2002 3/1/2002 1 1/1/2003 STP(U) STP(U) STP(U) 13 18 140 1 1 21 151 151 1 1 1 21 201 201 1 1 1 251 165 1 1651 CE No Totals 171 29 200 35 165 16 34 South 6th Street - Signals @ B Street & Lincoln South 6th Street from: B Street to: Lincoln Install Signals at B Street and Lincoln 01 P N/A CN 1 2/1/2005 I STP 1 1001 1 1 501 1501 1501 1 1 CE No Totals 100 50 150 150 16 35 South 8th Street - Signals @ B Street & Lincoln South 8th Street from: B Street to: Lincdln Install Signals @l3 Street and Lincoln 01 P N/A CN 1 2/1/2005 I STP 1001 1 1 501 1501 1501 1 CE No Totals 100 50 150 150 Grand Totals for Yakima 60051 19825 9872 89748 52750 10897 2731 24270 Report Date: June 15, 2000 Supersedes previous editions BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No. y' For Meeting of January 8, 2002 ITEM TITLE: Amend Six-year Transportation Improvement Plan (STIP) to include recently annexed projects. SUBMITTED BY: Department. of Community and Economic Development - Engineering Division CONTACT PERSON/TELEPHONE: Jam R. Cook, CED Department Director, 575-6227. SUMMARY EXPLANATION: Attached is a copy of the proposed amended Six -Year Transportation Improvement Plan (STIP) for the 2002 — 2007 planning years. After the recent annexation, Washington Avenue from 48th Avenue to 72nd Avenue and Nob Hill Widening from 68th Avenue to 80th Avenue were dropped from the County' s STIP and need to be included in the City of Yakima STIP. This amendment will allow the recently annexed area to be consistent with the approved City Budget and the following years budget for these projects. This will also make the City' s agreement with Congdon match the required agreed upon improvements. A public hearing will need to be set for January 15th to amend this STIP. Resolution X Ordinance Contract Other (Specify) STIP Funding Source APPROVED FOR SUBMITTAL: /// anager Ci y ke-Aok STAFF RECOMMENDATION: Set Public Hearing date for January 15, 2002, and adopt the amended STIP. BOARD/COMMIS SION RECOMMENDATION: COUNCIL ACTION: Resolution adopted. RESOLUTION NO. R-2002-04