Loading...
HomeMy WebLinkAboutR-2001-097 2002 to 2007 Transportation Improvement ProgramRESOLUTION NO. R-2001- 97 A RESOLUTION adopting a Six -Year Transportation Improvement Program for the period of 2002 through 2007 for the construction of streets and arterial streets in the City of Yakima. WHEREAS, the City of Yakima annually prepares, reviews and adopts a Six-year Program for the construction of streets and arterial streets in the City of Yakima for the ensuing six-year period, all as contemplated and required by State and Federal law, and WHEREAS, after a public hearing on the matter, held at a regular meeting of the Yakima City Council on June 19, 2001, the City Council finds that the plan attached hereto should be adopted as the Six-year Transportation Improvement Program for the period of 2002 through 2007 for the construction of streets and arterial streets in the City of Yakima, now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The Six -Year Construction Program for the period of 2002 through 2007, a copy of which is attached hereto and by this reference made a part hereof, is hereby adopted as the official Six -Year Transportation Improvement Program for the City of Yakima, and furthermore, that proposed amendments to the Street Improvements and Maintenance Overlay Program are also approved. ADOPTED BY THE CITY COUNCIL this 19th day of June, 2001 ATTEST: City Clerk June 14, 2001 `L- ary Place, Mayor BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No. For Meeting of Tune 19, 2001 ITEM TITLE: Public Hearing & Resolution to approve the 2002 - 2007 Six -Year Transportation Improvement Program. SUBMITTED BY: William Cook, Dept. of Community and Economic Development CONTACT PERSON/ TELEPHONE: 0-k. Wendell Adams, P.E., City Engineer Engineering Division Manager / 575-6096 SUMMARY EXPLANATION: Each year the City is required by RCW 35.77.010 and RCW 36.81.121 to update its Six - Year Transportation Improvement Program (TIP) for submittal to the Washington State Department of Transportation. This plan must include all transportation projects for which state gas tax revenue or federal revenue will be used. The plan for 2002 - 2007 consists of sixteen funded projects. Funding for the remainder of the projects will continue to be sought. continued) Resolution X Ordinance _Contract _Other (Specify) Six -Year TIP Funding Source APPROVED FOR SUBMITTAL:.., ,•`` -��-- City Manager STAFF RECOMMENDATION: Adopt the attached resolution approving the 2002 - 2007 Six-year Transportation Improvement Program. BOARD/ COMMISSION RECOMMENDATION: COUNCIL ACTION: June 14, 2001 The Transportation Equity Act for the 21st Century (TEA -21) began with the passage of the Intermodal Surface Transportation Efficiency Act (ISTEA) of 1991. It specifies the systems on which certain funds can be used, expands the kinds of activities for which funds can be used and promotes the role of the Metropolitan Planning Organizations (MPO) in the planning and programming of projects. TEA -21 requires each designated MPO to develop a Transportation Improvement Program (TIP), and the state to develop a Statewide Transportation Improvement Program (STIP) as a condition to securing federal funds for transportation projects. Projects listed in the STIP are the only projects that will be approved by the Federal Highway Administration (FHWA) and the Federal Transit Administration (FTA) to utilize federal funds. The STIP is a prioritized program of transportation projects, compiled from local and regional plans, along with the Washington Transportation System Plan (WTP) which provides a backbone for developing projects for the intermodal transportation network in the State of Washington. The STIP contains federally funded projects plus state and local projects that are regionally significant. These projects have been identified through the planning process as the highest priority for the available funding to the state's transportation program. Planning activities of state and local governments are essential parts of integrated regional planning processes. Long range transportation planning is a part of the comprehensive land use planning carried out by local governments. Citizen participation is an integral part of the planning process at all levels. Local Agencies are required to develop and adopt a six-year transportation program. All local agencies are required to hold at least one public hearing during the development of the six-year transportation program. Project ranking was performed utilizing data supplied by the Street and Traffic Division. These rankings were then integrated with other project needs and the total list was reviewed and adjusted to the particular needs of the City of Yakima. 2 -- June 14, 2001 A111111111111. C— Washington State Department of Transportation AOF Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: Page i Six Year Transportation Improvement Program From 2002 to 2007 Hearing Date: 6/19/2001 Adoption Date: 6/19/2001 Amend Date: Resolution No.: R-2001-97 Supersedes previous editions Project Identification Project Costs in Thousands of Dollars Federally Funded Fund Source Information A. Federal Aid No. B. Bridge No. G „^ L Expenditure Schedule Projects Only o N ' C. Project Title Q d 0 t (focal Agency) Federal Funding R/NI D. Street/Road Name or Number a� ° ° Phase Required Federal FederalState 4th LL n- Z E. Beginning MP or road - Ending MP or road E F° Q) Start Fund Cost by Fund State Local Total 1st 2nd 3rd Thru Envir Date F. Describe Work to be Done a (mm/dd/yyyy) Code Phase Code Funds Funds Funds 6th Type (Mnyyy) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1 16 17 18 19 20 21 14 1 01 S 0.80 PE 1/1/2001 STP 1644 AIPI 2561 1 1900 5001 14001 EA Railroad Grade Separation - Phase 1 0 CN 1/1/2004 STP 18000 AIP 1 3000 10001 22000 1 30001 19001 No BNSF Tracks P from: Lincoln Avenue to: Yakima Avenue S New Construction Totals 19644 3256 1000 23900 500 4400 1900 14 2 01 P 1.50 T PE 5/1/2003 STP 2000 AIPI 5001 1 2500 1 1 500 2000 CE Railroad Grade Separation - Phase 2 P CN 6/1/2005 STP 18000 AIP 1 30001 10001 22000 1 1 22000 No BNSF Tracks/I Street G from: I Street to: Washington Avenue New Construction Totals 20000 3500 1000 24500 500 24000 00 312 S N/A PE 4/1/2001 CM I OTHER 2851 181 303 3031 1 EA Signal Upgrades CN CMAQ CM 1150 OTHER 12271 1201 2497 24971 1 No Local Selection in Non -Attainment Area from: N/A to: N/A Local selection in non -attainment area Totals 1150 1512 138 2800 2800 14 404 S N/A C PE 1/1/2001 REV 235 1 1 591 294 2941 1 EA W. Washington Avenue - South 24th Ave to South 40th 03 G RW 1/1/2002 REV 290 1 1 2981 5881 5881 1 Yes W Washington Avenue 0 CN 6/1/2002 REV 1837 i 1 2871 2124 21241 1 from: South 24th Avenue to: South 40th Avenue P Widen/Reconstruct, curb, gutter, sidewalk S Totals 2362 644 3006 3006 T 14 503 S N/A C PE 5/1/2001 STP STP(U) AIP I 3361 1 336 3361 1 West Washington Ave - South 40th Ave to South 48th 04 G RW 1/1/2002 IFA STP(U) AIP 4001 1 400 4001 1 Yes CN 6!1/2002 STP(U) AIPI 26281 1 2628 26281 I West Washington Ave p from: South 40th Ave to: South 48th Ave P Widen/Reconstruct, curb, gutter, sidewalk S JTotals 3364 3364 3364 T 16 6 03 S 5 C PEI 6/1/2001 I STP(U) I 47 1 1 71 54 541 1 I CE West Mead Ave - South 16th Ave to South 11th Ave G CN 6!1/2002 STP(U) 478 1 1 751 553 5531 1 West Mead Ave 0 from: South 16th Avenue to: South 11th Avenue P Reconstruct/Widen S Totals 525 82 607 607 T Supersedes previous editions .wh� MWashington State Department of Transportation AOF Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: Page Six Year Transportation Improvement Program From 2002 to 2007 Hearing Date: 6/19/2001 Adoption Date: Amend Date: Resolution No.: Supersedes previous editions Project Identification Project Costs in Thousands of Dollars Federally Funded Fund Source Information A Federal Aid No. B. Bridge No.d_ Expenditure Schedule Projects Only v N°c (Local Agency) Federal Funding R/Vi/ o y C. Project Title ci �j D. Street/Road Name or Number ar' in S? —_�� ° Phase Federal Federal State Required 4th UL d Z E. Beginning MP or road - Ending MP or road g 9 g }°- 2 Start Fund Cost b Fund State Local Total 1st 2nd 3rd Envir. Date F. Describe Work to be Done 2 a (mm/dd/yyyy) Code Phase Code Funds Funds Funds 6thThruType 6th (muyy) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 19 7 01 S N/A $ PE 4 5/1/2001 I STP(E) 50 1 111 61 611 1 EA Powerhouse Canal Corridor CN I 8/1/2001 STP(U) 273 1 621 335 3351 1 I No Powerhouse Road from: Robertson School to: North 24th Avenue Install Asphalt Pathway Totals 323 73 396 396 02 8 01 S 1.1 C PE 6/1/2001 AIP 1121 281 140 140 1 1 EA River Road 04 G RW 1/1/2002 I AIP 1 2721 681 340 340 Yes CN 6/1!2002 AIP 1184 296 1480 1000 480 River Road p from: North 16th Avenue to: Fruitvale Blvd. S 01/01/02 Widening, curb, gutter, sidewalk, reconstruction T Totals 1568 392 1960 1480 480 W 14 9 04 S 1 C PE 1 8/8/2001 STP 27 1 1 41 31 311 1 EA North 5th Ave /Fruitvale Blvd 03 G CN 5/1/2002 STP 273 1 431 316 3161 1 No North 5th Ave/Fruitvale Roundabout 0 from: North 5th Ave to: Fruitvale Blvd P Roundabout, curb, gutter, sidewalk S Totals 300 47 347 347 T 19 10 03 S NIA C, PE 6/112001 STP(E) 18 1 32 50 501 1 1 EA YVr Enhancement C CN 1/1/2002 STP(E) 160 251 185 185 No South 3th Avenue S from: South 3th Avenue to: Pine Street T Car Barn and Museum Restoration W lTotals 178 57 235 235 P 00 1122 S N/A PE 1 5/1/2002 I STP(E) 271 1 1 41 31 311 1 CE Fruitvale Canal Pathway 06 CN 8/1/2002 V STP(E) 241 39 280 2801 1 No Fruitvale Blvd/North 20th Ave from: North 20th Ave to: Englewood Ave Construct Pathway/Sidewalk Totals 268 43 311 311 00 12 12 S N/A CN 1 1/1/2002 1 STP 1 22001 1 1 20001 42001 20001 22001 I CE Transit Operating / Capital Expenses 21 No Various Areas 22 from: N/A to: N/A 23 24 Totals 2200 2000 4200 2000 2200 Supersedes previous editions Amhk M"P Washington State Department of Transportation Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: Page 3 Six Year Transportation Improvement Program From 2002 to 2007 Hearing Date: 6/19/2001 Adoption Date: Amend Date: Resolution No.: Supersedes previous editions Project Identification Project Costs in Thousands of Dollars Federally Funded Fund Source Information A. Federal Aid No. B. Bridge No. zects d c N xpenditure Schedule Pro j Onl Y o y m C. Project Title E h m y 3 c o 0 �' s (Local Agency) Federal Funding R/N/ D. Street/Road Name or Number aj- o Phase Federal Federal State Required 4th U- 0- Z E. Beginning MP or road - Ending MP or road E F°- 9 Start Fund Cost by Fund State Local Total 1st 2nd 3rd Th ru Envir. Date F. Describe Work to be Done a (mm/dd/yyyy) Code Phase Code Funds Funds Funds 6th Type (MM/M 1 2 3 4 1 5 6 1 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 00 13 01 S N/A PEI 1/1/2002 I STP(E) 1 601 1 121 72 721 1 I CE Sidewalks/Pedestrian Facilities13 No N/A from: N/A to: N/A Sidewalk and pedestrian facilities Totals 60 12 72 72 00 14 12 S N/A PE 10/1/2003I 1 401 40 1 401 CE North 16th Ave - Signal @ River Road RW CN 5/1/2004 9/1/2004 1 1 1 541 2501 54 250 1 1 1 54 1 I 250 Yes North 16th Ave from: North 16th Ave to: River Road Install New Signal Totals 344 344 40 54 250 14 15 01 S N/A C CN 1 7/1/2001 I STP(U) 1 751 1 1 501 1251 1251 1 1 EA North 40th Ave - Signal @ Castlevale 12 G No North 40th Ave S from: North 40th Ave to: Castlevale W Install new signal Totals 75 50 125 125 00 16PE 22 S N/A I 4/1/2003 I 1 131 13 1 131 EA Bus Stop Zones - Transit CN 6/1/2003 Il 1 1 1161 116 1 1161 ` No Bus Stops from: N/A to: N/A Bus Stops Totals 129 129 129 19 17PE 07 S NIA 1 6/1/2002 1 81 8 21 21 2 2EA CBD Parking Lots CN 6/1/2002 1 1 721 72 181 181 18 18 No Various Areas from: N/A to: N/A Rehabilitate Pavement Totals 80 80 20 20 20 20 09 18 01 P N/A C PE 1 1/1/2003 1 STP(U) I 2 1 1 281 30 1 301 EA Sports Complex Access 05 G CN 6/1/2003 STP(U) 8 1 2501 258 1 2581 Beech Street 0 from: Fair Avenue to: 1-82 P Includes 13th and Maple Streets, curb, gutter, sidewalk, drainage, S Totals 10 278 288 288 lighting T Supersedes previous editions .dMi. Washington State Department of Transportation -enAggency: Yakima Co. NO.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: Page Six Year Transportation Improvement Program From 2002 to 2007 Hearing Date: 6/19/2001 Adoption Date: Amend Date: Resolution No.: Supersedes previous editions Project Identification Project Costs in Thousands of Dollars Federally Funded Fund Source Information A. Federal Aid No. B. Bridge No. d c � H � Expenditure Schedule Projects J Only Y d m (Local Agency) Federal Funding RIVV o N - C. Project Title d a m 0 r E D. Street/Road Name or Number 8.� in w a Phase State Required Federal Federal 4th LL o- Z E. Beginning MP or road - Ending MP or road E r° Start Fund Cost by Fund State Local Total 1st 2nd 3rd Thru Envir Date F. Describe Work to be Done a'ff (mm/dd/yyyy) Code Phase Code Funds Funds Funds 6th Type (muM 1 2 3 4 5 1 6 7 8 9 10 11 12 13 14 1 15 16 1 17 18 19 20 21 17 19 4637/4566 0 P Signal P RW 2/1/2002 STP(U) 65 1 1 101 75 751 i EA East Nob Hili Blvd at South 6th Street 011 CN 8/1/2003 STP(U) 40 1 621 462 4621 1 Yes East Nob Hill Blvd from: East Nob Hill Blvd to: South 6th Street Install new signal Totals 465 72 537 537 14 20 12 P N/A PE 1/1/2002 STP 17 1 11 18 181 I CE North 16th Ave -Signal @Englewood Ave RW 1/1/2002 STP 9 1 11 10 101 1 Yes North 16th Ave CN 6/1/2002 STP 141 1 61 147 1471 1 from: North 16th Ave to: Englewood Ave Install New Signal Totals 167 8 175 175 00 21 32 P N/A PE 4/1/2003 1 801 80 1 - 801 EA Storm DrainsNegetation CN 9/1/2003 1 7201 720 1 7201 No Local Selection from: City Wide to: City Wide Totals 800 800 800 02 22 04 P 77 P PE 1/1/2003 STP(U) 107 1 171 124 1241 EA Nob Hill Blvd C CN 6/1/2003 STP(U) 1183 1 1931 1376 1 13761 No Nob Hill Blvd C, from: South 52nd Avenue to: South 68th Avenue O Widen, curb, gutter, sidewalk, lighting, drainage S Totals 1290 210 1500 124 1376 T 00 2312 P N/A PE 1 10/1/2003 1 291 29 1 291EA East Nob Hill Blvd - Signal @ Fair Ave CN 10/1/2003 2571 257 1 1 257 No East Nob Hill Blvd from: East Nob Hill Blvd to: Fair Ave Install Signal @ E. Nob Hill Blvd & Fair Avenue Totals 286 286 29 257 00 24 01 P N/A PE 1 4/1/2003 11 101 10 1 101 CE Annual Signal Upgrades CN 1 8/1/2003 1 901 90 1 901 No Local Selection from: N/A to: N/A Upgrade Signal Totals 100 100 100 Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: Page Six Year Transportation Improvement Program From 2002 to 2007 Hearing Date: 6/19/2001 Adoption Date: Amend Date: Resolution No.: Supersedes previous editions Project Identification Project Costs in Thousands of Dollars Federally Funded Fund Source Information A. Federal Aid No. B. Bridge No. a ^ r m Expenditure Schedule Projects Only o •— C. Pro ect Title j d d a d o L (Local Agency) Federal Funding RfW M ° 2 D. Street/Road Name or Number ` c in w a Phase State Required Federal Federal 4th �- a Z E. Beginning MP or road - Ending MP or road E t°- Start Fund Cost b Fund State Local Total T Envir Date F. Describe Work to be Done L (mmlddlyyyy) Code Phase Code Funds Funds Funds 1st 2nd 3rd 6th 6th Type (M",M CL 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 19 20 21 00 25 07 P N/A CN 1 7/1/2003 1 STP(U) 1 1731 1 271 200 i 200 EA Various Overlay Projects/Selected on Local Priority No N/A from: N/A to: N/A Rehabilitate Pavement Totals 173 27 200 200 17 26 03 P 28 W PE 1/1/2002 STP(C)60 OTHER 1 151 75 751 1 CE Reconstruction Rudkin Road 06 T CN 1/1!2003 STP(C) 300 OTHER 300 701 670 1 6701 No Rudkin Road P from: East Mead to: Viola Avenue S Reconstruct, excavate ballast, top course, curb, gutter, sidewalk Totals 360 300 85 745 75 670 17 27 03 P C PE 9/1/2004 1 STP 1 97 OTHER 1 181 61 121 1211 1 CE East Mead Avenue Reconstruction 06 .76 G CN 4/1/2005 STP 873 OTHER 1631 551 1091 10911 1 No East Mead Avenue O from: Rudkin Road to: South 10th Street P Reconstruct, excavate ballast, top course, curb, gutter, storm S Totals 970 181 61 1212 1212 T 00 2806 P N/A S PE 4/1/2002 1 1 51 5 51 1 CE Intersection Improvements G CN 7/1/2002 451 45 451 No Selected on Local Priority C from: N/A to: N/A Curb, gutter, sidewalk, safety improvements, striping, signs Totals 50 50 50 11 29 04 P 1 C PE 1/1/2002 STP(U) 13 1 21 15 151 1 CE South 18th Street & East Nob Hill Blvd 01 G RW 3/1/2ooz STP(u) 1S I 21 20 201 1 No South 18th Street S CN 1/1/2003 STP(U) 140 251 165 1 1651 from: South 18th Street to: East Nob Hill Blvd 1/I/ Widen south leg for Double LT from west bound Nob Hill; (rte to Totals 171 29 200 35 165 WSDOT Project) possible curb, gutter, and sidewalk 16 30 01 P N/A CN 1 2/1/2005 I STP 1 1001 1 1 501 1501 1501 1 1 CE South 6th Street - Signals @ B Street & Lincoln No South 6th Street from: B Street to: Lincoln Install Signals at B Street and Lincoln Totals 100 50 150 150 Supersedes previous editions AM. MW Washington State Department of Transportation Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: Page Six Year Transportation Improvement Program From 2002 to 2007 Hearing Date: 6/19/2001 Adoption Date: Amend Date: Resolution No.: Grand Totals for Yakima 50891 13681 8197 72769 17771 10897 2731 24270 Supersedes previous editions Project Identification Project Costs in Thousands of Dollars Federally Funded A. Federal Aid No. B. Bridge No. z N r o, w 0 �, Fund Source Information Expenditure Schedule Projects Only o y C. Project Title a ' v = (Local Agency) Federal Funding RM ° E D. StreettRoad Name or Number CL a~ in ° Phase State Required Federal Federal 4th LL ti Z E. Beginning MP or road - Ending MP or road 9 g 9 E _ o : Start Fund Cost b State Local FundThru Total 1st 2nd 3rd Envir. Date F. Describe Work to be Done 2 (-Wdd/yyyy) a Code Phase Code Funds Funds Funds 6th Type (M1UM 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 16 31 01 P N/A CN I 2/1/2005 I STP 1001 1 501 150 150 1 I CE South 8th Street - Signals @ B Street & Lincoln No South 8th Street from: B Street to: Lincoln Install Signals @ B Street and Lincoln Total, 100 50 150 150 Grand Totals for Yakima 50891 13681 8197 72769 17771 10897 2731 24270 Supersedes previous editions