RESOLUTION NO. R-99- 07
A RESOLUTION authorizing the City Manager and City Clerk of the
City of Yakima to execute an Agreement for Sanitary
Sewer Improvements and Funding between the City
of Yakima and Yakima County regarding sewer
construction on 96th . Avenue.
WHEREAS, the City of Yakima deems it prudent to install a
select piece of interceptor system pipes in conjunction with the
widening improvements to 96th Avenue and: Tieton Drive by Yakima
County Public Works; and
WHEREAS, Yakima County is agreeable to the performance and
completion of said project subject to the terms of the attached
Agreement for Sanitary Sewer Improvements and Funding; and
WHEREAS, the City Council deems it to be in the best interest
of the City to enter into said Agreement with Yakima County, now,
therefore,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA:
The City Manager and City Clerk are hereby authorized and
directed to execute the attached and incorporate Sanitary Sewer
Improvements and Funding Agreement with Yakima County.
ADOPTED BY THE CITY COUNCIL this 5th day of January. 1999.
ATTEST:
vn
City Clerk
Mayor John Puccinelli
AGREEMENT FOR SANITARY SEWER IMPROVEMENTS AND FUNDING
THIS AGREEMENT is entered into between the City of Yakima, (hereinafter the "City")
whose address is 129 North 2nd Street, Yakima, Washington 98901, and Yakima County,
Washington, (hereinafter the "County") through its Public Works Department, whose address is
128 North 2nd Street, Room 408 County Courthouse, Yakima, Washington 98901.
1. RECITALS.
1.1 The County intends to construct a road improvement project known as the C 2593:
Tieton Drive Yakima Valley Canal Improvements Improvement Project ; and, construct sewer
improvements on South 96`" Avenue known as R 2842.
1.2 The City wants to have sanitary sewer lines (hereinafter "the Sewer Project")
constructed at certain locations within the limits of the Road Project. The location of the Sewer
Project is shown on Exhibit 'A'.
1.3 The County and City agree that having the Sewer Project constructed in combination
with the Road Project is mutually beneficial.
1.4 The City has determined that it is in is best interest to provide funding for the Sewer
Project and to allow Yakima County to do the construction.
1.5 The Yakima County Engineer has determined that it is in the best interests of the
County that the Yakima County Public Works Department contract for the construction of the
Sewer Project within the same construction contract as the Road Project.
NOW, THEREFORE IT IS HEREBY AGREED:
2. THE CITY SHALL:
2.1 Provide the design, details, specifications, and estimate for the Sewer Project to the
County.
2.2 Review and approve all Source of Materials submittals regarding the Sewer Project.
2.3 Provide all on-site field inspection for the construction of the Sewer Project except
those services to be provided by the County identified in items 3.5 and 3.6 of this agreement.
The field inspection will be consistent with Sections 7-08, 7-17, and 7-18 of the Washington
State Department of Transportation's 1998 Standard Specifications for Road, Bridge, and
Municipal Construction.
2.4 Prepare a monthly progress estimate of quantities used on the Sewer Project using the
bid item schedule for the construction contract. The progress estimate will be provided to the
County no later than the 5th day of each month. The progress estimate will include all work
completed through the last day of the previous month.
2.5 Upon review and approval by the City of the amounts charged, provide monthly
progress payments to the County for work performed on the Sewer Project by the contractor.
Progress payments will be made to the County no later than the 20th day of each month. The
progress payment shall be based on the progress estimate provided for in item 2.6 of this
agreement.
2.6 Upon review and approval by the City of the amounts charged, provide a final
payment to the County for all costs reasonably incurred by the County that are directly related to
the Sewer Project. These costs shall include actual sewer construction costs made to the
contractor, County personnel labor costs for time reasonably spent on the Sewer Project work,
and material testing expenses. Final payment shall be made to the County no later than 30 days
after the City receives a reporting of final costs from the County.
3. YAKIMA COUNTY SHALL:
3.1 Incorporate the City's Sewer Project design, details, and specifications into the
County's Road Project. The Sewer Project construction bid items shall be listed under a separate
pay schedule within the contract documents.
3.2 Provide copies of all Source of Materials submittals for the Sewer Project to the City
Engineer for his review and approval before use of the materials on the project.
3.3 Provide field inspection and material testing of trench excavation, trench backfilling,
and pavement repair required for the Sewer Project.
3.4 Provide construction control surveying for the Sewer Project.
3.5 Make progress payments to the contractor.
3.6 Provide a report of final costs for the Sewer Project to the City following completion
of the construction contract. The report shall include a breakdown of costs incurred by the
County.
CITY OF YAKIMA BOARD OF YAKIMA COUNTY COMMISSIONERS
R. A. Zais, Jr. City Manager
/- 7 -ter y
Date Signed
Ai .t EST:
Imes M. Lewis, Chairman
BettiF Ingham, Commissio%r
Je se S. Palacios, Commissioner J'� - G1. ON *'•O'�/
S. 'yr
•:.
A I hST:
ft
City Clerk Syl1 . Hinojosa, Clerk of the Board
99-06
City Contract No. A rproved as to fo
Resolution No. R-99-07
Deputy Prosecu ing Attorne
1 31830— 22401)
(131725-11409)
2C 0
� I
17:,!
zl
20
40
60
STA. 1+69.6
BEGIN NEW CONSTRUCTION.
MATCH EXISTING CURB,
GUTTER, AND SIDEWALK.
CL ELEV: 1241.01
TC ELEV: 1241.08
SECTION 30, TOWNSHIP 7,
PAY
A-7(
99RAVEL/
DRIVE
/� N
/ \ o
/ \ tn,„
HOUSE
MEM
A%
EXISTING UTILITY POLES
TO BE RELOCATED BY
OTHERS. TYPICAL ALL
LOCATIONS.
\ \ / SECTION 25, TOWNSHIP 13
!• • • • • • • • • • . ' ' • ' • • • • ' • ' ' ' . . . . . . . . . . . ROADWAY •EXCAVA'11ONINCLUDING H
•II z EMBANKMENT 331 C.Y
1255'I a w....•......... .......• ...............•...........•....
1250'
os .o f
rn t r
.oup0+ N E
<73
O 0N(�V L ` 0
± .rf Q w
Q J h
(n W \ i w c•
1245' <
cn
1240
1235'
1230' `
3'
1225
.
nr
EXISTING PROFILE AT +
SURVEY,CENTI=RUNE, , , , , , , , N
f-
U >
w
=--2••50% w
•
• 5Tu,3 c•31.
. VW.*') u?"
3se) '
7 .' 72.
m
•ri
.
BUSINESS OF THE CITY COUNCIL
YAKIMA, WASHINGTON
AGENDA STATEMENT
Item No. ) 44
For Meeting Of January 5. 1999
ITEM TITLE: County Agreement for Tieton Drive Yakima Valley Canal Improvements
Sewer Improvements
SUBMITTED BY: Doug Mayo, Acting Wastewater Manager
CONTACT PERSON/TELEPHONE: Doug Mayo/575-6077
SUMMARY EXPLANATION: The City of Yakima, Wastewater Division, in cooperation with
Yakima County Public Works, is preparing to have approximately 60 feet of sewer interceptor
installed during Yakima County's R-2842 Tieton Drive Yakima Valley Canal Improvements
Improvement Project. It is considered prudent to install this sanitary sewer pipe in
conjunction with the County's project for widening and improving the intersection of South
96th Avenue and Tieton Drive in order to prevent the future disruption of the new roadway
and the newly installed canal siphon. All of the proposed sewer pipelines are within the
Yakima Urban Reserve.
The Yakima Wastewater Division has tentatively agreed, subject to Council approval, to pay
for the construction of these improvements from available reserves in the 476 Fund. The
estimated cost is $30,000-$40,000. The City of Yakima Engineering Division has prepared
the necessary Design and Specifications for the anticipated construction. Yakima County
Public Works has included this design in their Plans and Specifications for their project.
Yakima County has prepared an Agreement for Sanitary Sewer Improvements and Funding
setting out the responsibilities, conditions, and methods of payment by the City of Yakima for
the anticipated construction. Upon execution of this agreement, Yakima County will include
the Sanitary Sewer Improvements in the project.
This project has already gone to bid.
Resolution.XC Ordinance Contract Other (Specify) Agreement for Sanitary Sewer
Improvements and Funding
Funding Source Wastewater 476 Fund
APPROVED FOR SUBMITTAL:
STAFF RECOMMENDATION: Adopt the attached resolution authorizing the City Manager to
execute the Agreement.
BOARD/COMMISSION RECOMMENDATION:
COUNCIL ACTION:
To:
From: Doug Mayo/Acting Wastewater Manager
Re:
Memorandum
January 4, 1999
Honorable Mayor, Members of City Council, City Manager
Proposed Project 1859 Trunk Construction near 96th and
Tieton Drive.
Concern has been expressed over the City's ability to recoup
investments made on pipelines which my remain "dry" for several
years.
The Connection Charge Program looks all City investment in a zone
when establishing connection rates for that zone. Therefore, the
cost of this project would be included in the next update to the
connection charge as historic cost and would be spread across the
future connectors.
The City has no time limit to when it can recover costs. There is a
15 year limit to the time during which a developer may recover his
cost. After the 15 years, all fees paid remain with the City.