HomeMy WebLinkAboutR-1998-088 1999-2004 6-Year TransportationRESOLUTION NO. R-98-88
A RESOLUTION fixing the time and place for hearing on the Six Year
Transportation Improvement Program for the period
of 1999 through 2004.
WHEREAS, the City of Yakima annually prepares, reviews and adopts a
Six Year Program for the construction of streets and arterial streets in the City of
Yakima for the ensuing six year period, all as contemplated and required by State
and Federal law; and
WHEREAS, a public hearing must be held on said program before final
approval, now, therefore,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
YAKIMA:
That said program shall be presented for hearing and determination on
Tuesday, June 23, 1998, at the hour of 2:00 o'clock p.m. on said day, in the Council
Chambers of the City of Yakima, at Yakima City Hall, Yakima, Washington, or as
soon thereafter as the same may be heard, and that notice of such hearing be given
as approved by law.
ADOPTED BY THE CITY COUNCIL this 2nd day of June, 1998
ATTEST:
,k/Lt(
Acting(l City Clerk
Prelimina►y Review (DRAFT)
Adopted on_,lune______ 1998Jn_Resojutlon No R-98-
5/28/98
CITY OF YAKIMA
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
1999 TO 2004
TOTAL
Federal
State
LOCAL
Pnontyl FC( Length 1
Total
1999 2000 f 2001
2002 + 2003 2004
F.'d It
tart
$
$
Enver RNV
$
$
1 11 Yakima Avenue/I-82. Modify Interchange 2 13 F
700
700
PC
35
25
Yes
10
1
Interchange Area Et Al :Phase IC
i
ROW
30
21
i Jan -94
9
May -95
CONST
635
445
STP
EA
191
TOTAL
700
491
210
2 14 Nob Hill Boulevard ,Widen/Reconstruct
SIG F
628
628
4558
Apr 93
PE
63
54
STPIU)
CE
Yes
9
171
at S 48th Avenue
4587
Feb -97
ROW
100
86
14
New Signal;
Apr -97
CONST
465
400
65
TOTAL
628
540
88
3
Various Overlay Projects
Rehabilitate Pavement
5.00
F
1,600
1,600
PE
160
160
Selected on
now
0
Local Priority Basis
CONST
1,440
1,440
TOTAL
1,600
1,600
4
Various Overlay Projects
Rehabilitate Pavement
2 00
F
575
575
(
Jan -99
PE
0
0
Selected on
_
ROW
0
_
0
Local Priority Basis
May -99
CONST
575
497
78
TOTAL
575
497
STP
78
5 1
17
Englewood Avenue
Remove Existing Bridge
0.05
F
85
85
4652
PE
9
8
1
at the bridge near
ROW
1
1
0
Powerhouse Road
CONST
75
65
11
TOTAL
85
73
12
6
00 School Safety Sidewalks
Install New Sidewalks
0 60
F
214
214
PE
21
11
11
_
_
at varioous Locations
ROW
0
0
0
CONST
193
97
97
114
I
TOTAL
214
107
107
7
Greenway Path and Dikes
Improve path and dikes
1 0 00 F
220
220
PE
22
-
22
near SR 12 & 182
ROW
0
0
CONST
198
198
TOTAL
220
220
8
14
Nob Hill Boulevard
New Signal
0.00
F
500
500
PE
50-
50
at 6th Street
Row
0
0
CONST
450
450
TOTAL
500
500
9
14
Yakima Avenue
Rehabilitate Pavement
0 23
F
772
772
4628
PE
77
66
STP
11
6th Street
ROW
00
to 10th Street
CONST
695
598
-
-
-
97
TOTAL
772
664
108
10
16
South Third Avenue
Joint Prot wkly of Union Gap
0.25
F
1
1
i
4559
PE
0
0
Valley Mall Blvd
_
ROW
0
0
to Washington
CONST
1
- -
TOTAL
-_1
1
_
-_-_
_
1
11 14 Valley Mall Boulevard
Joint Pro! wlCiy of Union Gap
2 50
F
100
100
PE
_ 10
10
1st Street
_
and Yakima County
ROW
0
0
to 3rd Avenue
CONST
90
90
TOTAL
100
100
12
O0,Sidewalks
N/A
F
155
65
10
10
10
10
10
PE
16
8
8
City Wide
-
ROW
0
0
0
CONST
139
70
70
-- -
- - - --
- - -
-
- -
--- --
--- -
-
- -
'---
TOTAL
155
---
-
' — -
--
78
78
Preliminary Review (DRAFT)
Adopted_oajune 1998 by_Resolution_No._R-98r_r
5/28/98
CITY OF YAKIMA
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
1999 TO 2004
TOTAL
Federal
Stale
LOCAL
Pnonyl FCI
1 Length l
Total
1999 1 2000 12001 l 2002 1 2003 1 2004
red x
Starr
$
$
.i.
Enver R/W
$ o
$
13 00 Bus Stop Zones -- Transit
Bus Slops
N/A
U
150
501 50 50
PE
15
13
2
I
ROW
0
O
0
CONST
135
116
19
TOTAL
150
129
21
14 00
Traffic Signs N/A
U
450
90 9111 90' 90, 90
PE
0
0
0
Upgrade to meet new
now
0
0
0
standards
CONSr
450
387
63
LTOTAL
450
387
63
15 00 Storm Drains
N/A
P
800
200
200
200 200'
PE
80
80
City Wide
ROW
0
0
CONST
720
720
TOTAL
800
800
16
14
Nob Hill Boulevard
Upgrade Signal
0 00 U
250
250
4695
PE
25
25
at Fair Avenue
ROW
0
0
CONST
225
225
TOTAL
250
250
17
14
Lincoln Avenue
Grade Separated
0 38
U
18,400
18,400
4648
PE
1840
883
920
37
1st Street
RR Crossing
i
Row'
0
0
0
0
to 3rd Avenue
CONST
16,560
7,949
8,280
331
TOTAL
18,400
8,832
9,200
368
18
14
B street
Grade Separated
0 38
U
18,400
18,400
4694
PE
1840
883
920
37
1st Street
RR Crossing
_
Row
0
0
0
0
to 3rd Avenue
CONST
16,560
7,949
8,280
331
TOTAL
18,400
8,832
9,200
368
19 19
Yakima Avenue.
(Rehabilitate Pavement
0 4
F
703
703
PE
70
70
1st Street
ROW
0
0
to 61h Street
CONST
633
633
I
TOTAL.
703
703
20 1 00
Fruitvale Canal Pathway
'Install Pathway
N/A
U
272
272
.lan-94
PE
27
23
CE
4
North 20th Avenue
ROW
to North 34th Avenue
CONST
245
-
211
34
TOTAL
27
234
38
21
16
South 16th Avenue:
Rehabilitate Pavement
0-53
U
2,770
2,770
4555
PE
166
0
cE
-_
166
Washington Avenue
ROW
0
0
0
to Bachelor Creek
CONST
2,604
521
STP
2,083
-
TOTAL
2,770
521
2,249
22
14
Yakima Avenue
Rehabilitate Pavement
0 6
F
1,060
1,060
4690
PE
106
91
STP
15
'est Street
_
ROW_0
0
- -- -
----
-
0
to 7th Avenue
CONST
954
_ 820
1:33
_ -
-
TOTAL
1,060
911
148
23
16
Yakima Avenue:
Rehabilitate Pavement
0.6
F
709
709
4690
PE
71
61
10
7th Avenue
ROW
0
0
0
to 16th Avenue
CONST
638
549
89
TOTAL
709
610
99
24
14
North 16th Avenue
New Signal
SIG
P
238
10
4555
PE
24
at River Road
4666
ROW
CONST
214
_1
_
TOTAL
238
Page 2
Preliminary ReviewjDRAFT)
Adoptedoo.June _199QI).Y_Resolutlon-N2R_�$-..
5!28/98
CITY OF YAKIMA
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
1999 TO 2004
TOTAL
Federal
State
LOCAL
Pnonty[FCj Length 0,
Total
1999 2000 1 2001 1 2002 1 2003 12004
Fed M
Start
$
$
Enver L RIW
$
$
40
150
210
400
25 14116th Avenue
al Englewood Avenue
New Signal
0 00 U
400
I
PE
Row
CONST
TOTAL
40
150
210
400
26 14 (South 16th Avenue
16 ! at Mead
!
New Signal -
SIG U
192
i !
4555
4570
PE
Row
CONST
TOTAL
19
0
173
192
--
_
---
'
27
14
40th Avenue New Signal
at Washington Avenue
0.00 U
-
250
PE
ROW
CONST
TOTAL
25
0
225
250
-
25
0
225
250
28 14 Lincoln Avenue
at Custer Avenue
New Signal
0 00
U
350
I
L
PE
Row
CONST
TOTAL
35
100
215
350
-
-
35
100
215
350
29
19 !Tamarac Street
First Street
I to Gordon Road
Widen/Reconstruct
0 13
U
I
1,556
I
PE
ROW
CONST
TOTAL
156
_ 0
1,400
1,556
-
30
00 Tamarac Street
I Gordon Road
to 6th Avenue
New Street
New alignment
New RR Xing -
0 25
U
18,000
I
PE
Row
CONST
TOTAL
1800
0
16,200
18.000
31
14
South 1st Street:
Washington Avenue
I. to South City Limits
Rehabilitate Pavement
0.56
U
2,407
4579
PE
ROW
CONST
TOTAL
_ 241
0
2,166
2,407
_
32
17 River Road
6th Avenue
to 16th Avenue
Widen/Reconstruct
0.51
U
1,395
4666
PE
ROW0
CONST
TOTAL
139
1,256
1,395
-
-
-
33
14 8 Street
IPierce Street
to North 1st StreetCONST
Rehabilitate Pavement
0.53
U
1,501
4694
PE
Row
TOTAL
150
01
1,351
1,501
-.
_
34
17
48th Avenue:
Wide Hollow Creek
to Summitview Avenue__.CONST
Widen/Reconstruct
1 6
U
5,149
-
-
4587
PE
Row
TOTAL--
292
0
167
-
292
- -- -
--
----
_-
35+ 19 118th Street & Beech Street:
I Terrace Heights Drive
to Fair Avenue-
I
Widen/Reconstruct
1 1
U
2,986
PE
ROW
CONST
TOTAL
125
0
0
125
CE
-
36
16 {Mead Avenue
16th Avenue
to 11th Avenue
I
Widen/Reconstruct
0.5
U
1,119
4570
PE
Row
CONST
TOTAL
112
132
875
1,119
_
I
-
Page 3
Preliminary Review (DRAFT)
Adopt,ecLorLJt ne_ _1998 byResolutionNo_.i3 93'_
5/28)98
CITY OF YAKIMA
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
1999 TO 2004
TOTAL
Fedaral
Slate
LOCAL
Priority( FC! I Length 1
Total
1999 [ 2000 2001 2002 1 2003 ( 2004
F ed it
Stair
$
$
, ,p.
Env.r
R/W
$
$
37 16 Summdview Avenue New Signal SIG U
324
4596
PE
32
17 I at North 48th Avenue
4587
Row
0
CONST
292
TOTAL
324
38 00 Gilbert Parking Lot
Rebuild
U
121
PE
-12
ROW
I
CONST
- 109
-_
-
-
TOTAL
121
39 17 Englewood Avenue Widen/Reconstruct
0 68
U
1,563
4652
PE
156
Powerhouse Road
Row
to 40th Avenue
1
CONST
1,407
t
TOTAL
1563
40 16 'North 5th Avenue: Rehabilitate Pavement
0 85
U
1,143
4641
PE
114
Lincoln Avenue
now
-
to "I" Street
-
CONST
1,029
TOTAL
1143
41 117 'West Lincoln Avenue Widen/Reconstruct
121
U
2,549
4648
PE
255
40th Avenue
ROW
to 66th Avenue
CONST
2,294
_
_
TOTAL
2549
—_,__
42 16 South 3rd Avenue:
IRehabititate Pavement
1
U
1,455
4559
PE
_ 146
Washington Avenue)
ROW
to Nob Hill Boulevard
CONST
1,309
TOTAL
1455
43
19 Naches Avenue
Rehabilitate Pavement
0 95
U
411
PE41
Walnut Street
Row
to Lincoln Avenue
CONST370
_
TOTAL
411
44
14 Washington Avenue:
Widen/Reconstruct
1 88
U
3,011
4558
PE
301
-
_
16th Avenue
ROW
to 45th Avenue
CONST
2,710
_
J
TOTAL
3011
45
19 Pacific Street Widen/Reconstruct
0 6
U
441
i __
4608
PE44
South 3rd Street
ROW
_
to Fair Avenue
_
CONST
397
TOTAL
441
46
16 I Street Widen/Reconstruct
0.32
U
821
4641
PE-
- 82
North 1st Street -
ROW
to 5th Avenue_CONST
739
TOTAL
821
47
16 North & South 8th Street: Rehabilitate Pavement
0.85
U
716
4684
PE
_ 72
D Street
-
ROW
--
to Chestnut Avenue
CONST644
--
------ ---- -- -- ---
-
-
TOTAL
716
48 , 14 B Street Realign/ Rehabilitate
0.65
U
900
4694
PE
90
Pierce Street
Row
J to North 1st Street
-
_
CONST
810
-- -
I
-
- - -
-
- --
_
--
-
TOTAL
900
•
Page 4
Preliminary Review (DRAFT)
Adopted on June _199Q.by Resolution NQ
5/28/98
CITY OF YAKIMA
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
1999 TO 2004
TOTAL
Federal
State
LOCAL
PrronylFC I Lc-ngth I .
Total
1999 1 2000 { 2001 1 2002 1 2003 1 2004
t"r'd a
Jtart
$
$
.ro.
Enve WA/
$ 1 .i.
$
49
14 B Street 'Rehabilitate Pavement 0 8 U
673
4694
rE
67
North 1st Street
1nw
to 10th Street
�
CONPT
606
TOTAL
673
50
16 ISouth
3rd Avenue
New Signal
SIG U
268
4559
Pt
27
16
at Division
4641
ROW
CONST
241
TOTAL
268
51 14
Lincoln Avenue at
North 281h Avenue
New Signal
SIG U
214
4648
PE
now
21
_
CONST
193
TOTAL
214
52
17
Powerhouse Road
1WidenlReconstruct
0.4
U
1,362
4660
PE
136
Lincoln Avenue
ROW
to Englewood
CONST
1,226
TOTAL
1362
53
17
Englewood Avenue:
Widen/Reconstruct
1 63
U
3,329
4652
PE
333
401h Avenue
Row
to 66th Avenue
CONST
2,996
TOTAL
3329
54
19 Yakima Avenue:
Rehabilitate Pavement
1
U
1,486
PE
149
16th Avenue
ROW
to 32nd Avenue
CONST_
1,337
TOTAL
1486
55
i 17 East "G" Street:
Rehabilitate Pavement
0.53
U
845
4684
PE
85
North 1st Street
ROW
to North 8th Street
I
CONST
760
TOTAL
845
56
17
South 6th Street:
Rehabilitate Pavement
1 55
U
2,345
4637
PE
234
Yakima Avenue)
ROW
_
to South 1st Street
CONST
_ 2,111
TOTAL
2345
57
17
FechterRoad:
Widen/Reconstruct
042 U
1,637
4669
PE
164
North 40111 Avenue
ROW
._.._
to Scenic Drive
_
_
CONST
TOTAL
1,473
1637
` _ _.
_.--_
_ ------.
58
16 Fruitvale Boulevard:
Rehabilitate Pavement
2.18 I U
5,088
4606
PE
_ 509
_
5th Avenue
l
ROW
_ ._
---
to North 40th Avenuei
CONST
4,579
i
TOTAL
5088
59 17 Washington Avenue:
Widen/Reconstruct
0.22 U
2,574
4558
PE
257
_
1st Street
ROW
to South 14th Street
CONST
2,317
---- - - -- - - - - -�-
TOTAL
_
2574
_
60
19
Chestnut Avenue:
Rehabilitate Pavement
0 4
U
382
PE _
38
_
,. _
1st Street
ROW
to 6th Street
---
-
CONST
TOTAL
344
382
- -
-
Page 5
Preliminary Review (DRAFT}
Adopts Lon_June __11-99@ by_ResolutioftNo_ 98-__,-
5/28/98
CITY OF YAKIMA
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
1999 TO 2004
TOTAL
Federal
State
LOCAL
Prionyl FCJ I t P n g I h
Total
1999 12000
12001 2002 J 2003 2004
r ed 1
Start
$
$
.i,•
Emir RM
$
.1. $
61
19 iNorth
2nd Avenue
Lincoln Avenue
Rehabilitate Pavement I 0 1 U
79
PE
now
8
to "D" Street
!
CONST
71
TOTAL
79
62 19
2nd Avenue:
Rehabilitate Pavement
0 47 I U
482
PE
48
Lincoln Avenue
ROW
to Walnut Avenue
CONST 434
TOTAL 482
63
14
North 40th Avenue Rehabilitate Pavement
0.51
U
1,508
4583
PE 151
Fruitvale Boulevard,
to Powerhouse Road
ROW
CONST 1,357
-
-
TOTAL 1508
64
14
North 40th Avenue:
Widen/Reconstruct
0 45
U
1,699
4583
PE _ 170
-
Powerhouse Road to
Row
to Englewood Avenue
CONST 1,529
- -
TOTAL 1699
-
65
19
4th Street:Rehabilitate Pavement
0 61
U
428
PE 43
Walnut Street
Row
to Pacific Street 11
CONST 385
-
I
TOTAL 428
66
19
I Street Widen/Reconstruct
0.58
U
1,300
—
PE _ 130
-
5th Avenue-
Row
--
to 16th Avenue
CONST 1,170
_
TOTAL 1300
67
19
I North 6th Avenue Widen/Reconstruct
r 0 92
U
2,274
PE 227
_
_
R
Gordon oad
ROW
to Fruitvale Blvd.
CONST2,047
TOTAL 2274
--
-
---- -----
-
68
19
Gordon Road Widen/Reconstruct
0.55
U
3,943'
PE 394
__ _
_
__
North 1st Street
ROW
to North 6th Street
- --- --- - -
-
CONST 3,549
TOTAL 3943
—
—
69
19
Chestnut Avenue Rehabilitate Pavement
0.51
U
517
PE 52
8th Street
ROW
to Fair Avenue
CONST 465
TOTAL 517
70
19
Front Street Rehabilitate Pavement
0 10
U
12'1
PE 12
Yakima Avenue
ROW
to A Street
CONST 109
TOTAL 121
71
16
Fair Avenue Widen/Reconstruct
0 69
U
1,177
4611
PE 118
101
STP(U)
EA
Yes
17
Pacific Avenue
ROW
100
86
Jul -36
14
to (north) Spruce Street
CONST
959_
825
134
TOTAL
1,177
1,012
165
Total
131,066
5,970 40 895 1,410 1,009 100 100®17=
s
_r Funded 9,985 5,948 2,780 10 10 10 10 23,818
Unfunded 121,082 22 38,115 1,400
999 90 90
Page 6
Preliminary ReviewfDRAFT)
Adopted onJsane_ 1.998_by ResolutionJ1o_ _R.98- _ -_
5/28/98
CITY OF YAKIMA
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
1999 TO 2004
TOTAL
Federal
State
LOCAL
Pnontyl FC t Length I 1,m,. Total
1999 F2000 12001 2002 1 2003 1 2004
Ped N
Start
$
$
.ro,
Envir R/W
$ .w.
$
GMA T RANSPORTATION PLAN 1996-2001 (CAPACITY IMPROVEMENTS)
Yr 1 Yr 2 Yr 3 Yr 4 Yr 5 Yr 6
16
Tieton Drive Realignment I
7th Avenue'
to 3rd Street
0.92 i1 U
3.557
4562
PE
ROW
CONST
TOTAL
14
I
16th Avenue
SR 12
to Washington Avenue
Widen/Reconstruct
358 1 U
8,901
4555
PE
Row
CONST
TOTAL
14
North 40th Avenue
Englewood Avenue
to Washington Avenue
Widen/Reconstruct
2.25
F U
8,348
4583
PE
Row
CONST
TOTAL
14
16
Fruitvale Boulevard:
5th Avenue
to N. 1st Street
Realignment
0 41
U
3,139
4606
PE
ROW
CONST
TOTAL
_
_
17
East "G" Street
North 1st Street
to North 8th Street
Widen/Reconstruct
-.-- - -
0.53
U
3,139
4684
PE
ROW
CONST
TOTAL
- -
— -
---
-- -
17
Pacific Street
South 3rd Street
to Fair Avenue
Widen/Reconstruct_
— --__- -
__- -- -- -
0 6
U
3,139
4608
PE
Row
CONST
TOTAL
--
-
_
-
-__- -
--
-
Total for 1996 -2001
30,223
0 0 0 0 0 0
..
Page 7
Preliminary Review (DRAFT)
Adoptedon_June_-__ _1998
5i28/98
CITY
CITY OF YAKIMA
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
1999 TO 2004
TOTAL
Federal
State
LOCAL
Priority' FC1 Length I
.
Total
1999 12000 12001 2002 2003 2004
Yr 7 Yr 8 Yr 9 Yr 10 Yr 11 Yr 12
Fed N
Start
$
$
a,•
Envir
RAN
$
e,
$
GMA TRANSPORTATION PLAN 2002-2007 (CAPACI TY IMPROVEMENTS)
16
17
North & South 8th Street.
H Street
to Walnut Avenue
Widen/Reconstruct
1
0.95 , U
1,988
4684
PE
ROW
CONST
TOTAL
-
17'
18th Street
Pacific Avenue
to Valley Mall Blvd
U
0
I
4608
PE
Row
CONST
TOTAL
-
14
16
19
South 6th Street Rehabilitate Pavement
H Street
to Yakima Avenuel
0 75 U
1,949
_
4637
PE
now
CONST
TOTAL
_
14
16
5th Avenue
1" Street
to Tieton Drive
Widen/Reconstruct
1 64 U
1,789
4641
PE
ROW
CONST
TOTAL
-
- -
16
3rd Avenue
Yakima Avenue
to Washington Avenue
Rehabilitate Pavement
2.15
U
7,428
4559
PE
Row
CONST
TOTAL
_
19
32nd Avenue
Englewood Avenue
to Washington Avenue
Widen/Reconstruct
_
2.25
U
5,754
PE
Row
CONST
TOTAL
19
17
10th Avenue
Summitview Avenue
to Washington AvenueCONST
Widen/Reconstruct
2.01
U
4,185
4553
PE
ROW
TOTAL
_
_
17
48th Avenue
Summitview Avenue
to Washington Avenue
Widen/Reconstruct
_
2.01
-
U
4,499
- 1
4587
PE
ROW
CONST
TOTAL
-
16
56th Avenue
Englewood Avenue
Nob Hill Blvd
Widen/Reconstruct
- - _
1 50
U
3,453
- 1
-
4681
PE
Row
CONST
TOTAL
—
—
Total for 2002- 2007
31,045
Page 8
Preliminary Review (DRAFT)
Adopted on_June_ _1998 by.,Re olutton_No_R9
5/28/98
CITY OF YAKIMA
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
1999 TO 2004
TOTAL
Federal
State
LOCAL
r'rronty(FC Length [
Total
1999 I 2000 I 2001 12002 2003 1 2004
Fed N
'•tad
$
$
, v
Envrr
RAN
$
m
$
GMA TRANSPORTATION PLAN 2008 - 2015
(CAPACITY IMPROVEMEN TS)
Widen/Reconstruct
l
3.41 U
14,333
Yr 13 Yr 14
Yr 15
Yr 16
I
Yr 17
1
Yr 18
4562
PE
ROW
CONST
TOTAL
16
Tieton Drive
5th Avenue)
to 56th Avenue
14
16
Washington Avenue
1st Street
to 56th Avenue
Widen/Reconstruct
4 70 U
7,324
I
4558
PE
ROW
CONST
TOTAL
114
Summitview Avenue Widen/Reconstruct
Yakima Avenue
to 56th Avenue _
3.07
U
10,881
1
i
4596
PE
Row
CONST
TOTAL
17
River Road
16th Avenue
to 40th Avenue
Widen/Reconstruct
_
1.53
U
3,839
4666
PE
Row
CONST
TOTAL
1
17
19
3rd Street
1 Street
to S 1st Street
Rehabilitate Pavement
_
1.91 1 U
I
3,871
4653
PE
Row
CONST
TOTAL
Total for 2008- 2015
40,248
9,985 5,948 2,780 10 10 10 10
222,597 22 38,115 1,400 999 90 90
232,582 5,970 40,895 1,410 1,009 100 100
FUNDED
UNFUNDED
GRAND TOTAL - ALL NEEDS
1 I I I
Page 9
BUSINESS OF THE CITY COUNCIL
YAKIMA, WASHINGTON
AGENDA STATEMENT
Item No. cam' ! 1 —
For Meeting of June 2, 1998
ITEM TITLE: 1999 - 2004 Six -Year Transportation Improvement Program
SUBMITTED BY: Department of Community and Economic Development
Engineering Division
CONTACT PERSON/TELEPHONE: Fred French, Cite Engineer / 575-6096
SUN IN 1 ARY EXPLANATION:
Set the date of the public hearing for the 1999 - 2004 Six Year Transportation Irnprovement
Program (TIP) for June 23,1998.
A draft copy of the proposed plan is submitted for City Council review.
XX Resolution
Ordinance
Contract
Plan/Map
XX Other (Spcctf10 Draft City of Yakima 1999-2004 Six Year Transportation Improvement Program
APPROVED FOR SUBMITTAL:
City Manager
STAFF RECOMMENDATION: Adopt the attached resolution to set the date of hearing
for the 1999 - 2004 Six Year Transportation Improvement
Program for June 23, 1998.
BOARD/COMMISSION RECOMMENDATION:
COUNCIL ACTION: