Loading...
HomeMy WebLinkAbout06/03/2025 08.A. Public Hearing to consider: A) Resolution adopting the amended Six- Year Transportation Improvement Program for the period of 2025- 2030, and to amend the Transportation Systems Plan 2040; and B) Resolution amending the Yakima Urban Area `y s ljlt ii! 'I!I// r<- il BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No. 8.A. For Meeting of: June 3, 2025 ITEM TITLE: Public Hearing to consider: A) Resolution adopting the amended Six- Year Transportation Improvement Program for the period of 2025- 2030, and to amend the Transportation Systems Plan 2040; and B) Resolution amending the Yakima Urban Area Comprehensive Plan Capital Facilities Element (No Budgetary Impact) SUBMITTED BY: Bill Preston, Acting City Engineer SUMMARY EXPLANATION: On July 2, 2024 the City of Yakima adopted R-2024-122 and R-2024-123 as required by state statute to update its Six-year Transportation Improvement Program (TIP)for submittal to the Washington State Department of Transportation. The City is amending the Six-year TIP to include additional projects. A public hearing will be held to consider including the additional projects in adoption of an amended Resolution approving the Six-year TIP and amending the regional Metropolitan Transportation Plan and Comprehensive Plan Capital Facilities Element. ITEM BUDGETED: N/A STRATEGIC PRIORITY 24-25: A Resilient Yakima RECOMMENDATION: Adopt both resolutions. ATTACHMENTS: Resolution A Resolution B TIP Amend 3 74 RESOLUTION NO. R-2025- A RESOLUTION amending the adopted Six-Year Transportation Improvement Program (TIP) for the period of 2025 through 2030 and amending the Transportation Systems Plan 2040. WHEREAS, on July 2, 2024, the City of Yakima (City) adopted R-2024-122 and R-2024- 123 as required by state statute to update its Six-year Transportation Improvement Program (TIP) and the Transportation Systems Plan 2040; and WHEREAS, the City of Yakima desires to amend the adopted Six-Year Transportation Improvement Program and the Transportation Systems Plan 2040 with the following additional Projects: • Nob Hill Blvd 28th Ave to 40th Ave Paving • City of Yakima— Bicycle Traffic Markings • N 16th Ave Sidewalk • 2026 Yakima Alley Paving • 72nd Ave &Washington Ave Active Transportation Components • Wendy Baker Shared-Use Path • Northeast Yakima Sidewalk Improvements • North Yakima Active Transportation Improvements; and WHEREAS, after a public hearing on the matter, held at the regular meeting of the Yakima City Council on June 3, 2025, with proper public notice as required by RCW 35.77.010, the City Council amends the Six-Year Transportation Improvement Program for the period of 2025 through 2030 and the Transportation Systems Plan 2040; and, WHEREAS, amending the Six-year Transportation Improvement Program and amending the Transportation Systems Plan 2040 are in the best interest of the City and its residents; now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The amended Six-Year Construction Program for the period of 2025 through 2030, and Transportation Systems Plan 2040, a copy of which is attached hereto and by this reference made a part thereof, is hereby adopted and approved. ADOPTED BY THE CITY COUNCIL this 3rd day of June, 2025. ATTEST: Patricia Byers, Mayor Rosalinda Ibarra, City Clerk 75 RESOLUTION NO. R-2025- A RESOLUTION amending the Yakima Urban Area Comprehensive Plan Capital Facilities Element to incorporate the amended Six-year Transportation Improvement Program (TIP) for the period of 2025 through 2030. WHEREAS, the City of Yakima annually prepares, reviews and adopts a six-year Transportation Improvement Program for transportation improvements to arterial streets in the City of Yakima for the ensuing six-year period, all as contemplated and required by the State RCW 35.77.010 and applicable Federal law; and WHEREAS, the City of Yakima desires to amend the Yakima Urban Area Comprehensive Plan Capital Facilities Element to reflect the adoption of the Six-year TIP, as contemplated and required by RCW 36.70A.070(6) to ensure compliance with the Growth Management Act and consistency of the Comprehensive Plan and the Six-year TIP; and WHEREAS, this amendment is limited to incorporation of the projects listed in the Six- Year Transportation Improvement Plan for the period of 2025 to 2030 to the Capital Facilities Element of the Yakima Urban Area Comprehensive Plan, which is required under RCW 36.70A.130(2B) and RCW 35.77.010; and WHEREAS, a public hearing was held by the Yakima City Council on the Six-year TIP on Tuesday, June 3, 2025, with the proper public notice as required by RCW 35.77.010; and WHEREAS, the City Council of the City of Yakima, after reviewing the information and holding the public hearing, finds that amending the Yakima Area Comprehensive Plan Capital Facilities Element is in the best interest of the City and its residents; now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The adopted Six-year Transportation Improvement Program for the period of 2025 through 2030 for the City of Yakima shall be incorporated as an amendment to the Capital Facilities Element of the Yakima Urban Area Comprehensive Plan. ADOPTED BY THE CITY COUNCIL this 3rd day of June, 2025. ATTEST: Patricia Byers, Mayor Rosalinda Ibarra, City Clerk 76 '"b. Washington Stet, Six Year Transportation Improvement Program reg Department of Transportation From 2025 to 2030 Agency:Yakima County:Yakima MPOIRTPO: YVCOG Y Inside N Outside -- — r — — — m,. 3 P. O ET °c c - a' z co A.PIN/Project No. B.STIP ID 3 o eg °G F C.Protect Title x as a c r S 33sv c D.Road Name or Number y mi c —I o aj= —I E. n o 9 E Begin&End Termini �' o $ g a 'm F.Project Oescripaton G.Structure ID iu E P. 07 WA-16435 06/03/25 36/03/25 R-2025-XXX 05 C O P T 0.810 t"i-. No 2026 Yakima Alley Paving Various Alleys W Lincoln Ave to Browne Ave The city of Yakima will pave approximately 4300 LF of wesUeast alleys between W Lincoln Avenue and Browne Avenue.from Lewis Avenue to Pierce Avenue. I -----— —� Funding - Status I. Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2025 CMAO 60.500 0 0. 80,500 S CN 2026 CMAQ 464,500 0 0 464,500 Totals 525,000 0 0 525,000 ExpendNurs Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 6Q500 0 0 11. CN 0 464.500•r- +; 0 0 Totals 60.500 404,004 0 0 0 Report Date:May 01,2025 -.1 -.1 .. Washington State Six Year Transportation Improvement Program ■/,! Department of Transportation From 2025 to 2030 Agency: Yakima County: Yakima MPOIRTPO:YVCOG Y Inside N OutsIo —1— t I 'e is .e o A.PINfProJeet No. B.STIP f0 3 �II .ie a m A Z C.Project Title = a 0 g r1 r E a o c D.Road Name or Number d o o. o i E. �'a 3 E.Begin&End Terminl g• I rr 0 Z 'c wr. o F.Project Description G.Structure 10 to o. P 1 o 1 i 1 06 WA-16137 06/03/25 06/03/25 R-2025-XXX 26 Cop T 0,240 No ??rO.Ave&Washington Ave Active Transportation Components 72na Avenue Washington Avenue to Coolidge Road Construct approximately 1250 LF of sidewalk from Wasrangien Ave to Coolidge Rd I to fill in a gap to provide access to residential neighborhoods. _ 1 - Funding Status Phase • Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2025 0 MAW 65.000 0 65,000� a35,000 0 435.000� S CN 2026 0 MAW Totals 6 500,000' 0 500.000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 65,000 0 0 0 0 CN 0 435,000 0 0 0 0 • Totals1 65,000. — 435,000 0 0 0 Report Date:May 01,2025 V CO �+�"= Washington State Six Year Transportation Improvement Program war Department of Transportation From 2025 to 2030 Agency: Yakima County: Yakima MPO/RTPO: YVCOG Y Inside N Outside m .— 3 < 9 o y e5 `m •-• o . f r A.PlNIFro}act No. B.STIP ID'. 3 o 3 C.Project Title O 2 c D.Road Name or Number et 0 a .i c, y . E.Begin&'End Termini � I A a . m 3r e rg 5 % S in m F.Protect CCaserip tlon G.Structure W m a 03 WA-16444 06/03/25 06/03/25 J,R2o25.XXX 28 CE No City of Yakima-Bicycle Traffic Markings Multiple to Multiple Paint green roadway crossings at mutlple:C0at.orw along the Powerhouse Canal pathway to Increase Skycloroadastrian s$ibitty and*slaty.paint bicycle Doxes and Intersection crossrc•ge at several Inter8ecLions throughout downtown Yakima. (Funding _ Status Phase Phase Start Year(YYYY) Federal Fund Code I Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2025 TA(UM) 8,965 0 0V 8,965 S CN 2026 I TA(UM) 38,000 0 0 38,000 ___] Totals 46,965 0, 0 46,965 Expenditure Schedule — _ Phase 1st 2nd 3rd 4th 5th&6th PE 8,965 0 0 0 0 CN 0 38,000 0 0 0 Totals 6,965 38,000 0 0 0 Report Date:May 01,2025 ".•1 CO _�f�` Washington State Six Year Transportation Improvement Program ■ap Oepsrtmvrit of Transportation From 2025 to 2030 Agency: Yakima County: Yakima MPO/RTPO:YVCOG Y Inside N Outside P — — a 5. v 7 a -1 3 A CI Q" A PIN/Protect No. B.STIP ID m 5 a o m z C.Protect Title x n a u r 2- S. c D.Road Name or Number I o° 3 o 1 0 3 o o 3 E.Be in&End Termini m. m Z ' m 1O 17 d m F.Project DescApNon G.Structure ID m a P _ m $ i i. 04 YAK 114 07/02/24 07/02/24 06/03/25 R-2024-122 28 C G P S T 0.310 CE Yes W N.16th Avenue Sidewalk I N.16th Avenue I River Road to US 12 Off-Ramp Construct approximately 1470 LF of curb,gutter and sidewalk,commercial approaches,and HMA pal/way along the west side of N 16th Avenue. _ i - — - - — Funding - _ - Status Phase Phase Start Year(YYYY) ' Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2025 CRP(UM) 65.000 0 u 65,000 S CN 2026 CRP(UM) 499,70ti 0 0— 499,700 Totals 564,700 0 0j 564,700, Expenditure Schedule Phase let 2nd 3rd 4th 5th&6th PE 65.000 0 0 0 0 CN 0 499.700 0 0 Totals 65,000 400,700 0T 0 f0 Report Date:May 01,2025 CO 0 ".A. Washington State Six Year Transportation Improvement Program Department at Transportation From 2025 to 2030 Agency: Yakima County: Yakima MPO/RTPO: YVCOG Y Inside N Outside m. o' n y 3�3 T A,PIN/Protect No. B.STIP 10 3 c g o g ZC,ProJact lath, I Ti. a o a n r e D.Road Name or Number aei i 3 o E. —— c E.*login 8 End Termini o. m a E F, F.Project Description G.Structure 1D m a = o m _ 03 WA-15735 07/02/24 07/02/24 R-2024-122 05 C G O P S 0,670 CE No TW Nob Hill Blvd 28ih Ave to 40th Ave Paving Ne0 Hill Boulevard 281rt Avenue to 40th Avenue Inns project will rehabilitate tare pnvemuel on Non KAI Sled by milting and paving. ADA curb ramp reptecarnxni,adjust ubGbes.cislail new water main,restripe the road,and other m rlt as Handed to rehab:1,1at4 Oa pavomenL I __ _ Funding _ Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2026 NHPP 1,414,003 0 0 1,414,000. .. S CN 2026 0 0 1,637,240 1,637,240 Totals 1,414,000 0 f 1,1337,210 34051,240 'Expandlture Schedule _ Phase let 2nd 3rd 4th 5th 8 6th CN 0 3,051,240 0 0 0 Toiale, 0 3,051.240 0` s 0 0 Report Date:May 01,2025 Co � Washington State Six Year Transportation Improvement Program v/ Department of Transportation From 2025 to 2030 Agency: Yakima County: Yakima MPOIRTPO: YVCOG Y Insides =.•,-. --- m 3 9 a L0 S ` ^ y 2• A.PtNJProlect No., B STIP ID 3 2. 3 g C.Project Title a 2 . y O c D.Read Name or Number u 90 3 a i n 0 1 S. o B E.Begin A End Termini �• s z a ro w 'e m m F.Project Dear Option G.Structure ID ro' a a P P g a 07 WA-16439 06/03/25 0$'13125 R-2025-XXX 26 COOP S Yes TW Noah Yakima Acbee Trsimpamauon Improvements 1-Sweet to Luncole Avenue MEMO new sidewalk,ADA compliant curb ramps,and remove and replace damaged and non-ADA comphenr sidewalk and curb ramps,and add bike lanes on 3rd Street and 4th Street. .- r — — — — Funding Status Phase Phase Start Year(YYYY) Federal Fund Code I Federal Funds 7 State Fund Code State Funds Local Funds Total Funds P PE 2025 0` Ped/Blke Program 75,000 0 75,000 P RW 2026 r 0 PedlBike Program 75,000 0 75,000 P CN _ 2027 0 PedlBike Program 650,000 0 650.0CC Total; 0 600,000 0 600,000 Expenditure Schedule Phase 1st 2nd 3rd 41h 5th&6th PE 30,000 v 45,000 0 0 0 RW 0 75,000 0 0 0 CN 0 0 650,000 0 0 Totals 30,000 120,000 650,000_` 0 0j Report Date:May 01,2025 CO N AM W of Stets Six Year Transportation Improvement Program Wir From 2025 to 2030 Agency: Yakima County: Yakima MPO/RTPO: YVCOG Y Inside N Outside _,._ - __— ---- — m 3 '< a 9 A a o > " a g 0 3 73 73 r A.PlNWr0Ject No. B.STIP ID 2 m S. e A = C.Project Title = a ' o n m a » c D.Road rveme or Number- T. o n 0 nc E.Begin End Tal,orr G.Structure @ a » 9 n L�m e 2 F.Project Descrlplion 07 WA-16438 06003/25 06/03025 R-2025-XXX I 28 COOP S CE Yes TW Ncnneast Yakima Sidewalk Improvements "T"S.-eel to Lincoln Avenue !mall new sidewalk,ADA compliant curb ramps,and remove and replace damaged and non-ADA compliant sidewalk end curb ramps in the Barge-Lincoln Elementary ,Scnoal area o!rrorttaa51 Yaklrn;a. - - Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE " 2025 0' CWA 100.000 0- 100"0Q0 P r RW 2026 0 CWA W 100,000 0 100.000 P _ CN 2027 0 CWA 800,000 0 600.000 Totals 0 1,000,000 0 1,000,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 40,000 60,0001 D 0 0 RW 0 100,000 0 0 0 CN 0 0 800,000 0 0 Totals 40,000 160,000 800,000. 0 0 Report Date:May 01,2025 CO W a�,�, Washington State Six Year Transportation Improvement Program w/! Department al Transportation From 2025 to 2030 Agency: Yakima County: Yakima MPOIRTPO: YVCOG Y Inside N Outside m 3 5. 0 A m �• A.PMllProJed No. B.STIP ID 3 c 3 - d 3 A n z C.Project Title x a 3 m '� r E 2 c P.Road Name or Number o o a o R. o n E. 3 E.Origin&End Termini a• its 3 a - m N a 5. F.Project Description G.Structure ID ,o a 3 P a_ m 06 WA-16436 06/03/25 06/03/25 R-2025-XXX 28 C O P T W 0.550 Yes Wendy Baker Shared-Use Path Powpmease Road Pecks Canyon Rd to Cawiche Canyon Rd 1 Conshuct shared-use pain,high visibility crosswalk.bicycle intersection crossing mark,ngs•RRFBa.and tricycle wayftnding signing along Powernousa Road. 1 I Funding Status Phase Phase Start Year(YYYY) . Federal Fund Code Federal Funds State Fund Code State Funds Local Funds l Total Funds P PE 2025 0 Ped/Blke Program 167.200 0 167200, P RW 2026 0 Ped(Bike Program 300.000 0 300,000 P CN 2027 0,' Pad/Bike Program 932 800 C 932,800 e Toluts 0 t 1,400,000 0 1,400,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th ' PE sJ/1/i 77,200 0 0 0 RW 0 300,000 0 0 0 CN 0 0'I 932,800 0 0 Totals 90,000,, 377,200 932,800 0 0 Federal Funds State Funds Local Funds Total Funds Grand Totals for Yakima 2,773,665 6,500,000i 3,067,240_ 12,365,905. Report Date:May 01,2025 CO