BUSINESS OF THE CITY COUNCIL
YAKIMA, WASHINGTON
AGENDA STATEMENT
Item No. 8.A.
For Meeting of: June 3, 2025
ITEM TITLE: Public Hearing to consider: A) Resolution adopting the amended Six-
Year Transportation Improvement Program for the period of 2025-
2030, and to amend the Transportation Systems Plan 2040; and B)
Resolution amending the Yakima Urban Area Comprehensive Plan
Capital Facilities Element (No Budgetary Impact)
SUBMITTED BY: Bill Preston, Acting City Engineer
SUMMARY EXPLANATION:
On July 2, 2024 the City of Yakima adopted R-2024-122 and R-2024-123 as required by state statute to
update its Six-year Transportation Improvement Program (TIP)for submittal to the Washington State
Department of Transportation. The City is amending the Six-year TIP to include additional projects.
A public hearing will be held to consider including the additional projects in adoption of an amended
Resolution approving the Six-year TIP and amending the regional Metropolitan Transportation Plan and
Comprehensive Plan Capital Facilities Element.
ITEM BUDGETED: N/A
STRATEGIC PRIORITY 24-25: A Resilient Yakima
RECOMMENDATION: Adopt both resolutions.
ATTACHMENTS:
Resolution A
Resolution B
TIP Amend 3
74
RESOLUTION NO. R-2025-
A RESOLUTION amending the adopted Six-Year Transportation Improvement Program
(TIP) for the period of 2025 through 2030 and amending the
Transportation Systems Plan 2040.
WHEREAS, on July 2, 2024, the City of Yakima (City) adopted R-2024-122 and R-2024-
123 as required by state statute to update its Six-year Transportation Improvement Program
(TIP) and the Transportation Systems Plan 2040; and
WHEREAS, the City of Yakima desires to amend the adopted Six-Year Transportation
Improvement Program and the Transportation Systems Plan 2040 with the following additional
Projects:
• Nob Hill Blvd 28th Ave to 40th Ave Paving
• City of Yakima— Bicycle Traffic Markings
• N 16th Ave Sidewalk
• 2026 Yakima Alley Paving
• 72nd Ave &Washington Ave Active Transportation Components
• Wendy Baker Shared-Use Path
• Northeast Yakima Sidewalk Improvements
• North Yakima Active Transportation Improvements; and
WHEREAS, after a public hearing on the matter, held at the regular meeting of the
Yakima City Council on June 3, 2025, with proper public notice as required by RCW 35.77.010,
the City Council amends the Six-Year Transportation Improvement Program for the period of
2025 through 2030 and the Transportation Systems Plan 2040; and,
WHEREAS, amending the Six-year Transportation Improvement Program and amending
the Transportation Systems Plan 2040 are in the best interest of the City and its residents; now,
therefore,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA:
The amended Six-Year Construction Program for the period of 2025 through 2030, and
Transportation Systems Plan 2040, a copy of which is attached hereto and by this reference
made a part thereof, is hereby adopted and approved.
ADOPTED BY THE CITY COUNCIL this 3rd day of June, 2025.
ATTEST: Patricia Byers, Mayor
Rosalinda Ibarra, City Clerk
75
RESOLUTION NO. R-2025-
A RESOLUTION amending the Yakima Urban Area Comprehensive Plan Capital
Facilities Element to incorporate the amended Six-year Transportation
Improvement Program (TIP) for the period of 2025 through 2030.
WHEREAS, the City of Yakima annually prepares, reviews and adopts a six-year
Transportation Improvement Program for transportation improvements to arterial streets in the
City of Yakima for the ensuing six-year period, all as contemplated and required by the State
RCW 35.77.010 and applicable Federal law; and
WHEREAS, the City of Yakima desires to amend the Yakima Urban Area
Comprehensive Plan Capital Facilities Element to reflect the adoption of the Six-year TIP, as
contemplated and required by RCW 36.70A.070(6) to ensure compliance with the Growth
Management Act and consistency of the Comprehensive Plan and the Six-year TIP; and
WHEREAS, this amendment is limited to incorporation of the projects listed in the Six-
Year Transportation Improvement Plan for the period of 2025 to 2030 to the Capital Facilities
Element of the Yakima Urban Area Comprehensive Plan, which is required under RCW
36.70A.130(2B) and RCW 35.77.010; and
WHEREAS, a public hearing was held by the Yakima City Council on the Six-year TIP
on Tuesday, June 3, 2025, with the proper public notice as required by RCW 35.77.010; and
WHEREAS, the City Council of the City of Yakima, after reviewing the information and
holding the public hearing, finds that amending the Yakima Area Comprehensive Plan Capital
Facilities Element is in the best interest of the City and its residents; now, therefore,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA:
The adopted Six-year Transportation Improvement Program for the period of 2025
through 2030 for the City of Yakima shall be incorporated as an amendment to the Capital
Facilities Element of the Yakima Urban Area Comprehensive Plan.
ADOPTED BY THE CITY COUNCIL this 3rd day of June, 2025.
ATTEST: Patricia Byers, Mayor
Rosalinda Ibarra, City Clerk
76
'"b.
Washington Stet, Six Year Transportation Improvement Program
reg Department of Transportation From 2025 to 2030
Agency:Yakima
County:Yakima
MPOIRTPO: YVCOG Y Inside N Outside
-- — r — — — m,.
3
P. O ET
°c c - a' z
co
A.PIN/Project No. B.STIP ID 3 o eg °G F
C.Protect Title x as a c r S 33sv
c D.Road Name or Number y mi c —I o aj= —I E.
n o 9 E Begin&End Termini �' o $ g a
'm F.Project Oescripaton G.Structure ID iu E P.
07 WA-16435 06/03/25 36/03/25 R-2025-XXX 05 C O P T 0.810 t"i-. No
2026 Yakima Alley Paving
Various Alleys
W Lincoln Ave to Browne Ave
The city of Yakima will pave approximately 4300 LF of wesUeast alleys between W
Lincoln Avenue and Browne Avenue.from Lewis Avenue to Pierce Avenue. I -----— —�
Funding -
Status I. Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S PE 2025 CMAO 60.500 0 0. 80,500
S CN 2026 CMAQ 464,500 0 0 464,500
Totals 525,000 0 0 525,000
ExpendNurs Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 6Q500 0 0 11.
CN 0 464.500•r- +; 0 0
Totals 60.500 404,004 0 0 0
Report Date:May 01,2025
-.1
-.1
.. Washington State Six Year Transportation Improvement Program
■/,! Department of Transportation From 2025 to 2030
Agency: Yakima
County: Yakima
MPOIRTPO:YVCOG Y Inside N OutsIo
—1— t
I 'e
is
.e o A.PINfProJeet No. B.STIP f0 3 �II .ie a m A
Z C.Project Title = a 0 g r1 r E a
o c D.Road Name or Number d o o. o i E.
�'a 3 E.Begin&End Terminl g• I rr 0 Z 'c
wr. o F.Project Description G.Structure 10 to o. P 1 o 1 i 1
06 WA-16137 06/03/25 06/03/25 R-2025-XXX 26 Cop T 0,240 No
??rO.Ave&Washington Ave Active Transportation Components
72na Avenue
Washington Avenue to Coolidge Road
Construct approximately 1250 LF of sidewalk from Wasrangien Ave to Coolidge Rd
I to fill in a gap to provide access to residential neighborhoods. _ 1 -
Funding
Status Phase • Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S PE 2025 0 MAW 65.000 0 65,000�
a35,000 0 435.000�
S CN 2026 0 MAW
Totals 6 500,000' 0 500.000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 65,000 0 0 0 0
CN 0 435,000 0 0 0
0 •
Totals1 65,000. —
435,000 0 0 0
Report Date:May 01,2025
V
CO
�+�"= Washington State Six Year Transportation Improvement Program
war Department of Transportation
From 2025 to 2030
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
m .—
3 <
9
o y e5 `m •-•
o . f
r A.PlNIFro}act No. B.STIP ID'. 3 o 3
C.Project Title
O 2 c D.Road Name or Number et 0 a .i c,
y . E.Begin&'End Termini �
I
A
a . m 3r e rg 5
%
S in m F.Protect CCaserip tlon G.Structure W m a
03 WA-16444 06/03/25 06/03/25 J,R2o25.XXX 28 CE No
City of Yakima-Bicycle Traffic Markings
Multiple to Multiple
Paint green roadway crossings at mutlple:C0at.orw along the Powerhouse Canal
pathway to Increase Skycloroadastrian s$ibitty and*slaty.paint bicycle Doxes and
Intersection crossrc•ge at several Inter8ecLions throughout downtown Yakima.
(Funding _
Status Phase Phase Start Year(YYYY) Federal Fund Code I Federal Funds State Fund Code State Funds Local Funds Total Funds
S PE 2025 TA(UM) 8,965 0 0V 8,965
S CN 2026 I TA(UM) 38,000 0 0 38,000
___]
Totals 46,965 0, 0 46,965
Expenditure Schedule — _
Phase 1st 2nd 3rd 4th 5th&6th
PE 8,965 0 0 0 0
CN 0 38,000 0 0 0
Totals 6,965 38,000 0 0 0
Report Date:May 01,2025
".•1
CO
_�f�` Washington State Six Year Transportation Improvement Program
■ap Oepsrtmvrit of Transportation
From 2025 to 2030
Agency: Yakima
County: Yakima
MPO/RTPO:YVCOG Y Inside N Outside
P
— — a 5.
v 7 a -1 3 A
CI Q" A PIN/Protect No. B.STIP ID m 5 a o m
z C.Protect Title x n a u r 2- S.
c D.Road Name or Number I o° 3 o 1 0 3
o o 3 E.Be in&End Termini m. m Z ' m 1O
17 d m F.Project DescApNon G.Structure ID m a P _ m $ i i.
04 YAK 114 07/02/24 07/02/24 06/03/25 R-2024-122 28 C G P S T 0.310 CE Yes
W
N.16th Avenue Sidewalk
I
N.16th Avenue I
River Road to US 12 Off-Ramp
Construct approximately 1470 LF of curb,gutter and sidewalk,commercial
approaches,and HMA pal/way along the west side of N 16th Avenue. _ i - — - - —
Funding - _ -
Status Phase Phase Start Year(YYYY) ' Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S PE 2025 CRP(UM) 65.000 0 u 65,000
S CN 2026 CRP(UM) 499,70ti 0 0— 499,700
Totals 564,700 0 0j 564,700,
Expenditure Schedule
Phase let 2nd 3rd 4th 5th&6th
PE 65.000 0 0 0 0
CN 0 499.700 0 0
Totals 65,000 400,700 0T 0 f0
Report Date:May 01,2025
CO
0
".A. Washington State Six Year Transportation Improvement Program
Department at Transportation From 2025 to 2030
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
m.
o'
n
y 3�3
T A,PIN/Protect No. B.STIP 10 3 c g o g
ZC,ProJact lath, I Ti. a o a n r
e D.Road Name or Number aei i 3 o E.
—— c E.*login 8 End Termini o. m
a E F, F.Project Description G.Structure 1D m a = o m _
03 WA-15735 07/02/24 07/02/24 R-2024-122 05 C G O P S 0,670 CE No
TW
Nob Hill Blvd 28ih Ave to 40th Ave Paving
Ne0 Hill Boulevard
281rt Avenue to 40th Avenue
Inns project will rehabilitate tare pnvemuel on Non KAI Sled by milting and paving.
ADA curb ramp reptecarnxni,adjust ubGbes.cislail new water main,restripe the
road,and other m rlt as Handed to rehab:1,1at4 Oa pavomenL I __ _
Funding _
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S CN 2026 NHPP 1,414,003 0 0 1,414,000.
.. S CN 2026 0 0 1,637,240 1,637,240
Totals 1,414,000 0 f 1,1337,210 34051,240
'Expandlture Schedule _
Phase let 2nd 3rd 4th 5th 8 6th
CN 0 3,051,240 0 0 0
Toiale, 0 3,051.240 0` s 0 0
Report Date:May 01,2025
Co
� Washington State Six Year Transportation Improvement Program
v/ Department of Transportation
From 2025 to 2030
Agency: Yakima
County: Yakima
MPOIRTPO: YVCOG Y Insides =.•,-.
--- m
3
9 a
L0 S ` ^ y
2• A.PtNJProlect No., B STIP ID 3 2. 3 g
C.Project Title a 2 . y
O c D.Read Name or Number u 90 3 a i n 0 1 S.
o B E.Begin A End Termini �• s z a ro w 'e
m m F.Project Dear Option G.Structure ID ro' a a P P g a
07 WA-16439 06/03/25 0$'13125 R-2025-XXX 26 COOP S Yes
TW
Noah Yakima Acbee Trsimpamauon Improvements
1-Sweet to Luncole Avenue
MEMO new sidewalk,ADA compliant curb ramps,and remove and replace damaged
and non-ADA comphenr sidewalk and curb ramps,and add bike lanes on 3rd Street
and 4th Street. .- r — — — —
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code I Federal Funds 7 State Fund Code State Funds Local Funds Total Funds
P PE 2025 0` Ped/Blke Program 75,000 0 75,000
P RW 2026 r 0 PedlBike Program 75,000 0 75,000
P CN _ 2027 0 PedlBike Program 650,000 0 650.0CC
Total; 0 600,000 0 600,000
Expenditure Schedule
Phase 1st 2nd 3rd 41h 5th&6th
PE 30,000 v 45,000 0 0 0
RW 0 75,000 0 0 0
CN 0 0 650,000 0 0
Totals 30,000 120,000 650,000_` 0 0j
Report Date:May 01,2025
CO
N
AM
W of Stets Six Year Transportation Improvement Program
Wir From 2025 to 2030
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_,._ - __— ---- — m
3 '<
a
9 A a
o > " a g 0 3 73
73
r A.PlNWr0Ject No. B.STIP ID 2 m S.
e A
= C.Project Title = a ' o n m a
» c D.Road rveme or Number- T. o n 0
nc E.Begin End Tal,orr G.Structure @ a » 9 n
L�m e 2 F.Project Descrlplion
07 WA-16438 06003/25 06/03025 R-2025-XXX I 28 COOP S CE Yes
TW
Ncnneast Yakima Sidewalk Improvements
"T"S.-eel to Lincoln Avenue
!mall new sidewalk,ADA compliant curb ramps,and remove and replace damaged
and non-ADA compliant sidewalk end curb ramps in the Barge-Lincoln Elementary
,Scnoal area o!rrorttaa51 Yaklrn;a. - -
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE " 2025 0' CWA 100.000 0- 100"0Q0
P r RW 2026 0 CWA W 100,000 0 100.000
P _ CN 2027 0 CWA 800,000 0 600.000
Totals 0 1,000,000 0 1,000,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 40,000 60,0001 D 0 0
RW 0 100,000 0 0 0
CN 0 0 800,000 0 0
Totals 40,000 160,000 800,000. 0 0
Report Date:May 01,2025
CO
W
a�,�, Washington State Six Year Transportation Improvement Program
w/! Department al Transportation
From 2025 to 2030
Agency: Yakima
County: Yakima
MPOIRTPO: YVCOG Y Inside N Outside
m
3 5.
0 A
m �• A.PMllProJed No. B.STIP ID 3 c 3 - d 3 A
n z C.Project Title x a 3 m '� r E 2
c P.Road Name or Number o o a o R. o n E.
3 E.Origin&End Termini a• its 3 a - m
N a 5. F.Project Description G.Structure ID ,o a 3 P a_
m
06 WA-16436 06/03/25 06/03/25 R-2025-XXX 28 C O P T W 0.550 Yes
Wendy Baker Shared-Use Path
Powpmease Road
Pecks Canyon Rd to Cawiche Canyon Rd 1
Conshuct shared-use pain,high visibility crosswalk.bicycle intersection crossing
mark,ngs•RRFBa.and tricycle wayftnding signing along Powernousa Road. 1 I
Funding
Status Phase Phase Start Year(YYYY) . Federal Fund Code Federal Funds State Fund Code State Funds Local Funds l Total Funds
P PE 2025 0 Ped/Blke Program 167.200 0 167200,
P RW 2026 0 Ped(Bike Program 300.000 0 300,000
P CN 2027 0,' Pad/Bike Program 932 800 C 932,800
e Toluts 0 t 1,400,000 0 1,400,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th '
PE sJ/1/i 77,200 0 0 0
RW 0 300,000 0 0 0
CN 0 0'I 932,800 0 0
Totals 90,000,, 377,200 932,800 0 0
Federal Funds State Funds Local Funds Total Funds
Grand Totals for Yakima 2,773,665 6,500,000i 3,067,240_ 12,365,905.