BUSINESS OF THE CITY COUNCIL
YAKIMA, WASHINGTON
AGENDA STATEMENT
Item No. 7.E.
For Meeting of: May 20, 2025
ITEM TITLE: Resolution setting date of June 17, 2025 to review and adopt the Six-
year Transportation Improvement Program and Capital Facilities
Element of the Yakima Urban Area Comprehensive Plan for 2026-
2031 (No Budgetary impact)
SUBMITTED BY: Bill Preston, Acting City Engineer
SUMMARY EXPLANATION:
Each year the City of Yakima (City) is required by state statute to update its Six-year Transportation
Improvement Program (TIP)for submittal to the Washington State Department of Transportation for
inclusion in the Statewide Transportation Improvement Program (STIP). This plan must include all
transportation projects for which state gas tax revenue or federal revenue will be used.
A Public Hearing will be held to consider adoption of a Resolution approving the Six-year Transportation
Improvement Program (TIP)for 2026-2031 and amending the regional Metropolitan Transportation Plan
and Comprehensive Plan Capital Facilities Element.
Projects must be listed in the STIP in order to be approved by the Federal Highway Administration
(FHWA) and the Federal Transit Administration (FTA) to utilize federal funds by the State of Washington
for approved state funding agencies. The STIP is an annual prioritized program of transportation projects
compiled from local and regional plans that can be updated as needed any time from January through
October. The STIP, along with regional plans, provide a backbone for developing projects for the inter-
modal transportation network in the State of Washington. The STIP contains federally funded projects
plus state and local projects that are regionally significant. The projects have been identified through the
planning process as the highest priority for the available funding to the state's transportation program.
Project ranking is subjective but has been performed utilizing data supplied by City Engineering and the
Street and Traffic Division. The ranking will be integrated with other project needs and the total list will be
reviewed and adjusted to the particular need of the City of Yakima.
Planning activities of state and local governments are essential parts of integrated regional planning
processes. Long range transportation planning is a part of the comprehensive land use planning carried
out by local governments and citizen participation is an integral part of the planning process at all levels.
All local agencies are required to hold at least one public hearing during the development of the Six-year
Transportation Improvement program. The City needs to amend the Yakima Urban Area Comprehensive
Plan Capital Facilities Element to incorporate the adopted Six-year TIP for 2026 to 2031. This will ensure
that we are in compliance with the Growth Management Act and that we are consistent with the
Comprehensive Plan as required.
ITEM BUDGETED: N/A
22
STRATEGIC PRIORITY 24-25: A Resilient Yakima
RECOMMENDATION: Adopt Resolution.
ATTACHMENTS:
Resolution
TIP 2026-2031
23
RESOLUTION NO. R-2025-
A RESOLUTION setting the time and place for a hearing on June 17th, 2025 to review and
adopt the Six-year Transportation Improvement Program and amend the
Capital Facilities Element of the Yakima Urban Area Comprehensive Plan
for the period of 2026-2031.
WHEREAS, the City of Yakima annually prepares, reviews and adopts a six-year
program for the construction of streets and arterial streets in the City of Yakima for the ensuing
six-year period, all as contemplated and required by the State RCW 35.77.010 and applicable
federal law; and
WHEREAS, the City of Yakima desires to amend the Yakima Urban Area
Comprehensive Plan Capital Facilities Element to reflect the adoption of the Six-year TIP, as
contemplated and required by RCW 36.70A.070(6) to ensure compliance with the Growth
Management Act and consistency of the Comprehensive Plan and the Six-year TIP; and
WHEREAS, a public hearing must be held on said programs before final approval, now,
therefore,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA:
That said program shall be presented for hearing and determination on Tuesday, June
17th, 2025, at the hour of 6:00 p.m., in the City Council Chambers, or as soon thereafter as the
same may be heard, and the notice of such hearing be given as approved by law.
ADOPTED BY THE CITY COUNCIL this 20th day of May, 2025.
ATTEST: Patricia Byers, Mayor
Rosalinda Ibarra, City Clerk
24
" Washington State Six Year Transportation Improvement Program
I; Department of Transportation
From 2026 to 2031
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
c 0
0' fD < C c x
-n A.PIN/Project No. B.STIP ID D o fD c
z C.Project Title D m m �• °' a =
a c D.Road Name or Number m c a o' ' n m °' .0
c' 0 E.Begin&End Termini -,• ' 0 E
a m z < 0 Un <<
H F.Project Description G.Structure ID a c c CD H m a
14 YAK84 06/17/25 06/17/25 R-2025-### 04 C G O P S 0.400 CE Yes
TW
16th Avenue and Tieton Drive Intersection Improvements
16th Avenue
16th Avenue to Tieton Drive
Reconstruct and widen 16th Avenue and Tieton Drive by adding left-turn lanes for all
movements at the intersection. Upgrade the traffic signal. _
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2030 0 OTHER 358,512 53,592 412,104
P RW 2030 0 OTHER 1,498,607 233,893 1,732,500
P CN 2031 0 OTHER 1,640,683 252,483 1,893,166
Totals 0 3,497,802 539,968 4,037,770
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 0 0 0 0 412,104
RW 0 0 0 0 1,732,500
CN 0 0 0 0 1,893,166
Totals 0 0 0 0 4,037,770
Report Date: May 14, 2025 Page 1 25
" Washington State Six Year Transportation Improvement Program
I; Department of Transportation
From 2026 to 2031
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
c 0
0' fD < C c x
-n A.PIN/Project No. B.STIP ID D o fD c
z C.Project Title D m m �• °' a =
,0. c D.Road Name or Number m c a o' ' c) m °' .0
c' 0 E.Begin&End Termini -,• ' 0 E
a m z < 0 Un <<
H F.Project Description G.Structure ID a c c CD H m a
14 YAK57 06/17/25 06/17/25 R-2025-### 11 CPT 0.010 CE Yes
18th Street Underpass
Yakima Avenue
Yakima Avenue to 18th Street
Replace the bridge on E.Yakima Avenue that crosses over 18th Street.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2027 BR 883,200 0 220,800 1,104,000
P RW 2028 BR 80,000 0 20,000 100,000
P CN 2029 BR 4,485,200 0 1,121,300 5,606,500
Totals 5,448,400 0 1,362,100 6,810,500
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 0 700,000 404,000 0 0
RW 0 0 100,000 0 0
CN 0 0 0 5,606,500 0
Totals 0 700,000 504,000 5,606,500 0
Report Date: May 14, 2025 Page 2 26
" Washington State Six Year Transportation Improvement Program
I; Department of Transportation
From 2026 to 2031
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
c 0
0' fD < C c x
-n A.PIN/Project No. B.STIP ID 3 o fD c
z C.Project Title D m m �• °' a =
,0. c D.Road Name or Number m c a o' ' c) m °' .0
c' 0 E.Begin&End Termini -,• ' 0 E
a m z < 0 Un <<
H F.Project Description G.Structure ID a c c CD H m a
07 WA-16435 06/17/25 06/17/25 R-2025-XXX 05 C O P T 0.810 CE No
2026 Yakima Alley Paving
Various Alleys
W Lincoln Ave to Browne Ave
The city of Yakima will pave approximately 4300 LF of west/east alleys between W ,
Lincoln Avenue and Browne Avenue,from Lewis Avenue to Pierce Avenue.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S CN 2026 CMAQ 464,500 0 0 464,500
Totals 464,500 0 0 464,500
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
CN 464,500 0 0 0 0
Totals 464,500 0 0 0 0
Report Date: May 14, 2025 Page 3 27
" Washington State Six Year Transportation Improvement Program
I; Department of Transportation
From 2026 to 2031
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
c 0
0' fD < C c x
-n A.PIN/Project No. B.STIP ID D o fD c
z C.Project Title D m m �• °' a =
,0. c D.Road Name or Number m c a o' ' c) m °' .0
c' 0 E.Begin&End Termini -,• ' 0 E
a m z < 0 <<
H F.Project Description G.Structure ID a c . m CD m a
04 YAK 111 06/17/25 06/17/25 R-2025-### 04 C G P S T 1.500 CE No
W
6th Avenue Roadway Improvements
6th Avenue
Walnut Street to River Road
Reconstruct roadway including trolley provisions.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S CN 2027 0 0 7,935,000 7,935,000
Totals 0 0 7,935,000 7,935,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
CN 0 7,935,000 0 0 0
Totals 0 7,935,000 0 0 0
Report Date: May 14, 2025 Page 4 28
" Washington State Six Year Transportation Improvement Program
I; Department of Transportation
From 2026 to 2031
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
c 0
0' fD < C c x
-n A.PIN/Project No. B.STIP ID D o fD c
z C.Project Title D m m �• °' a =
,0. c D.Road Name or Number m c a o' ' c) m °' .0
c' 0 E.Begin&End Termini -,• ' 0 E
a m z < 0 Un <<
H F.Project Description G.Structure ID a c c CD H m a
06 WA-16437 06/17/25 06/17/25 R-2025-XXX 28 C O P T 0.240 No
72nd Ave&Washington Ave Active Transportation Components
72nd Avenue
Washington Avenue to Coolidge Road
Construct approximately 1250 LF of sidewalk from Washington Ave to Coolidge Rd ,
to fill in a gap to provide access to residential neighborhoods.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S CN 2026 0 MAW 435,000 0 435,000
Totals 0 435,000 0 435,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
CN 435,000 0 0 0 0
Totals 435,000 0 0 0 0
Report Date: May 14, 2025 Page 5 29
" Washington State Six Year Transportation Improvement Program
I; Department of Transportation
From 2026 to 2031
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
c 0
0' fD < C c x
-n A.PIN/Project No. B.STIP ID D o fD c
z C.Project Title D m m �• °' a =
,0. c D.Road Name or Number m c a o' ' c) m °' .0
c' 0 E.Begin&End Termini -,• ' 0 E
a m z < 0 <<
H F.Project Description G.Structure ID a c . m CD m a
07 /4789(001) YAK 107 06/17/25 06/17/25 R-2025-### 28 C G P S T 0.450 CE No
W
88th Ave Apple Valley
88th Avenue
Tieton Drive to Summitview Avenue
Construct sidewalk on east side of roadway.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S CN 2026 0 SRTS 591,000 0 591,000
Totals 0 591,000 0 591,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
CN 591,000 0 0 0 0
Totals 591,000 0 0 0 0
Report Date: May 14, 2025 Page 6 30
'`' Washington State Six Year Transportation Improvement Program
Department of Transportation
From 2026 to 2031
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
c 0
0' fD < C c x
-n A.PIN/Project No. B.STIP ID D o fD c
z C.Project Title D m m �• °' a =
a c D.Road Name or Number m c a o' ' n m °' .0
c' 0 E.Begin&End Termini -,• ' 0 E
a m z < 0 Un <<
H F.Project Description G.Structure ID a c c CD H m a
04 YAK11 06/17/25 06/17/25 R-2025-### 01 O P S T W 0.280 EA No
Bravo Company Boulevard, Phase 1
Bravo Company Blvd
Railroad Tracks to'D'Street
Construct four-lane roadway section with median,bike lanes and roundabouts,install
curb,gutter,sidewalk,street lighting and storm drainage system,along with water
and sewer systems.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P CN 2026 0 0 6,000,000 6,000,000
Totals 0 0 6,000,000 6,000,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
CN 2,000,000 4,000,000 0 0 0
Totals 2,000,000 4,000,000 0 0 0
Report Date: May 14, 2025 Page 7 31
" Washington State Six Year Transportation Improvement Program
I; Department of Transportation
From 2026 to 2031
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
c 0
0' fD < C c x
-n A.PIN/Project No. B.STIP ID D o fD c
z C.Project Title D m m �• °' a =
,0. c D.Road Name or Number m c a o' ' c) m °' .0
c' 0 E.Begin&End Termini -,• ' 0 E
a m z < 0 <<
H F.Project Description G.Structure ID a c . m CD m a
04 WA-13520 06/17/25 06/17/25 R-2025-### 01 S W 0.280 EA No
Bravo Company Boulevard, Phase 2
Bravo Company Boulevard
"H"Street to Railroad Tracks
Construct four-lane roadway section with median,bike lanes and roundabouts,install
curb,gutter,sidewalk,street lighting and storm drainage system,along with water
and sewer systems.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P CN 2028 0 OTHER 6,500,000 0 6,500,000
Totals 0 6,500,000 0 6,500,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
CN 0 0 6,500,000 0 0
Totals 0 0 6,500,000 0 0
Report Date: May 14, 2025 Page 8 32
'`' Washington State Six Year Transportation Improvement Program
Department of Transportation
From 2026 to 2031
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
c 0
0' fD < C c x
-n A.PIN/Project No. B.STIP ID D o fD c
z C.Project Title D m m �• °' a =
a c D.Road Name or Number m c a o' ' n m °' .0
c' 0 E.Begin&End Termini -,• ' 0 E
a m z < 0 Un <<
H F.Project Description G.Structure ID a c c CD H m a
07 WA-13522 06/17/25 06/17/25 R-2025-### 28 C G P S T 0.530 CE No
W
Browne Avenue Sidewalk
Browne Avenue
7th Avenue to 16th Avenue
Replace damaged sidewalk panels.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2030 0 0 108,000 108,000
P CN 2031 0 0 828,000 828,000
Totals 0 0 936,000 936,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 0 0 0 0 108,000
CN 0 0 0 0 828,000
Totals 0 0 0 0 936,000
Report Date: May 14, 2025 Page 9 33
'`' Washington State Six Year Transportation Improvement Program
Department of Transportation
From 2026 to 2031
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
c 0
0' fD < C c x
-n A.PIN/Project No. B.STIP ID D o fD c
z C.Project Title D m m �• °' a =
,0. c D.Road Name or Number m c a o' ' c) m °' .2
c' 0 E.Begin&End Termini -i• ' 0 E
a m z < 0 <<
H F.Project Description G.Structure ID a c . m CD m a
03 WA-16444 06/17/25 06/17/25 R-2025-XXX 28 CE No
City of Yakima-Bicycle Traffic Markings
Multiple to Multiple
Paint green roadway crossings at multiple locations along the Powerhouse Canal
pathway to increase bicycle/pedestrian visibility and safety;paint bicycle boxes and
intersection crossings at several intersections throughout downtown Yakima.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S CN 2026 TA(UM) 38,000 0 0 38,000
Totals 38,000 0 0 38,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
CN 38,000 0 0 0 0
Totals 38,000 0 0 0 0
Report Date: May 14, 2025 Page 10 34
'`' Washington State Six Year Transportation Improvement Program
Department of Transportation
From 2026 to 2031
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
c 0
0' fD < C c x
-n A.PIN/Project No. B.STIP ID D o fD c
z C.Project Title D m m �• °' a =
a c D.Road Name or Number m c a o' ' n m °' .0
c' 0 E.Begin&End Termini -,• ' ° E
a m z < 0 <<
H F.Project Description G.Structure ID a c c CD H m a
05 WA-14955 06/17/25 06/17/25 R-2025-### 04 0.750 CE Yes
Coolidge Road from 72nd Ave to 84th Ave-Roadway Improvements
Coolidge Road
72nd Avenue to 84th Avenue
Rehabilitate existing pavement and update roadway to current city standards.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2028 0 0 200,000 200,000
P RW 2029 0 0 200,000 200,000
P CN 2030 0 0 1,100,000 1,100,000
Totals 0 0 1,500,000 1,500,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 0 0 200,000 0 0
RW 0 0 0 200,000 0
CN 0 0 0 0 1,100,000
Totals 0 0 200,000 200,000 1,100,000
Report Date: May 14, 2025 Page 11 35
'`' Washington State Six Year Transportation Improvement Program
Department of Transportation
From 2026 to 2031
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
c 0
0' fD < C c x
-n A.PIN/Project No. B.STIP ID D o fD c
z C.Project Title D m m �• °' a =
,0. c D.Road Name or Number m c a o' ' c) m °' .0
c' 0 E.Begin&End Termini -,• ' 0 E
a m z < 0 Un <<
H F.Project Description G.Structure ID a c c CD H m a
16 YAK10 06/17/25 06/17/25 R-2025-### 01 O P S T W 0.550 EA Yes
E."H"Street Extension, Phase 1
E."H"Street
1st Street to 7th Street
Construct new roadway inlcuding water,sewer,curb,gutter,sidewalk,street lighting ,
and storm drainage system.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2027 0 OTHER 566,500 0 566,500
P RW 2027 0 OTHER 150,000 0 150,000
P CN 2028 0 OTHER 6,758,400 0 6,758,400
Totals 0 7,474,900 0 7,474,900
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 0 566,500 0 0 0
RW 0 150,000 0 0 0
CN 0 0 6,758,400 0 0
Totals 0 716,500 6,758,400 0 0
Report Date: May 14, 2025 Page 12 36
i
V7/ Washington State Six Year Transportation Improvement Program
I'I/► Department of Transportation
From 2026 to 2031
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
c 0
0' fD < C a x
-n A.PIN/Project No. B.STIP ID 3 o fD c
z C.Project Title D m m ,�• °' a
,0. c D.Road Name or Number m c a o' ' c) m °' .0
c' 0 E.Begin&End Termini -,• ' 0 E
a m z < 0 CO <<
H CD F.Project Description G.Structure ID a . CDCD a
04 YAK 109 06/17/25 06/17/25 R-2025-### 28 C G P S T 0.500 CE Yes
W
Fair Avenue Sidewalk
Fair Avenue
Pacific Avenue to Nob Hill Boulevard
Construct sidewalk on west side of roadway.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2030 0 0 1,531,900 1,531,900
Totals 0 0 1,531,900 1,531,900
Expenditure Schedule
Phase 1st 2nd -I 4th 5th&6th
ALL 0 0 0 0 1,531,900
Totals 0 0 0 0 1,531,900
Report Date: May 14, 2025 Page 13 37
i
V7/ Washington State Six Year Transportation Improvement Program
I'I/► Department of Transportation
From 2026 to 2031
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
c 0
0' fD < C a x
-n A.PIN/Project No. B.STIP ID D o fD c
z C.Project Title D m m �• °' a
a c D.Road Name or Number m c a o' ' c) m °' .0
c' 0 E.Begin&End Termini -,• ' 0 E
a m z < 0 CO <<
H CD F.Project Description G.Structure ID a . CDCD a
03 WA-15117 06/17/25 06/17/25 R-2025-### 15 CO P S T 0.200 CE Yes
W
Fred Meyer Active Transportation Pathway-40th Ave& Fruitvale Blvd Roundabout
Various to Various
Roundabout, Rectangular Rapid Flashing Beacons(RRFB), New Marked Crosswalk,
Green Pavement/Bicycle Intersection Crossing Markings,ADA Curb Ramps,Audible
Pedestrian Signal, Bicycle Wayfinding Signs/Markings,Shared-use Path/Trail
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S RW 2026 0 Ped/Bike Program 100,000 0 100,000
S CN 2027 0 Ped/Bike Program 1,230,904 0 1,230,904
Totals 0 1,330,904 0 1,330,904
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
RW 100,000 0 0 0 0
CN 0 1,230,904 0 0 0
Totals 100,000 1,230,904 0 0 0
Report Date: May 14, 2025 Page 14 38
i
V7/ Washington State Six Year Transportation Improvement Program
I'I/► Department of Transportation
From 2026 to 2031
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
c 0
0' fD < C a x
-n A.PIN/Project No. B.STIP ID D o fD c
z C.Project Title D m m �• °' a
a c D.Road Name or Number m c a o' ' c) m °' .0
c' 0 E.Begin&End Termini -,• ' 0 E
a m z < 0 Un <<
H CD F.Project Description G.Structure ID a c CD H a
03 WA-16326 06/17/25 06/17/25 R-2025-### 21 G P S T W 0.010 CE No
Intersection Safety Improvements at E Nob Hill Blvd and S 18th St
Nob Hill Boulevard
Nob Hill Blvd to 18th St
Replace existing pedestrian pushbutton devices with an Accessible Pedestrian
System(APS)and repaint/replace existing stop and crosswalk lines. Replace non-
ADA compliant sidewalks and curb ramps.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S PE 2026 HSIP 32,000 0 0 32,000
S CN 2026 HSIP 196,000 0 0 196,000
Totals 228,000 0 0 228,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 32,000 0 0 0 0
CN 196,000 0 0 0 0
Totals 228,000 0 0 0 0
Report Date: May 14, 2025 Page 15 39
" Washington State Six Year Transportation Improvement Program
I; Department of Transportation
From 2026 to 2031
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
c 0
0' fD < C c x
-n A.PIN/Project No. B.STIP ID D o fD c
z C.Project Title D m m �• °' a =
,0. c D.Road Name or Number m c a o' ' c) m °' .0
c' 0 E.Begin&End Termini -,• ' 0 E
a m z < 0 <<
H F.Project Description G.Structure ID a c . m CD m a
04 YAK 113 06/17/25 06/17/25 R-2025-### 28 C G P S T 0.010 CE No
W
Mead Avenue Pedestrian Signal
Mead Avenue
10th Avenue to 12th Avenue
Install school zone flashers and pedestrian signal RRFBs.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2028 0 OTHER 50,000 0 50,000
P CN 2029 0 OTHER 346,750 0 346,750
Totals 0 396,750 0 396,750
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 0 0 50,000 0 0
ALL 0 0 0 346,750 0
Totals 0 0 50,000 346,750 0
Report Date: May 14, 2025 Page 16 40
'`' Washington State Six Year Transportation Improvement Program
Department of Transportation
From 2026 to 2031
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
c 0
0' fD < C c x
-n A.PIN/Project No. B.STIP ID D o fD c
z C.Project Title D m m �• °' a =
,0. c D.Road Name or Number m c a o' ' c) m °' .0
c' 0 E.Begin&End Termini -,• ' 0 E
a m z < 0 <<
H F.Project Description G.Structure ID a c . m CD m a
16 YAK102 06/17/25 06/17/25 R-2025-### 21 P T 0.030 CE No
N 1st St& R St Signal
N. 1st St.
R Street to R Street
Install traffic signal at the intersection.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2028 0 OTHER 66,990 10,395 77,385
P CN 2029 0 OTHER 401,709 62,722 464,431
Totals 0 468,699 73,117 541,816
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 0 0 77,385 0 0
CN 0 0 0 464,431 0
Totals 0 0 77,385 464,431 0
Report Date: May 14, 2025 Page 17 41
i
V7/ Washington State Six Year Transportation Improvement Program
I'I/► Department of Transportation
From 2026 to 2031
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
c 0
0' fD < C a x
-n A.PIN/Project No. B.STIP ID D o fD c
z C.Project Title D m m �• °' a
,0. c D.Road Name or Number m c a o' ' c) m °' .0
c' 0 E.Begin&End Termini -,• ' 0 E
a m z < 0 CO <<
H CD F.Project Description G.Structure ID a . CDCD a
04 YAK 114 06/17/25 06/17/25 R-2025-### 28 C G P S T 0.310 CE Yes
W
N. 16th Avenue Sidewalk
N. 16th Avenue
River Road to US 12 Off-Ramp
Construct approximately 1470 LF of curb,gutter and sidewalk,commercial
approaches,and HMA pathway along the west side of N 16th Avenue.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S CN 2026 CRP(UM) 499,700 0 0 499,700
Totals 499,700 0 0 499,700
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
CN 499,700 0 0 0 0
Totals 499,700 0 0 0 0
Report Date: May 14, 2025 Page 18 42
'm Washington State Six Year Transportation Improvement Program
Department of Transportation p p g
From 2026 to 2031
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
c 0
0' fD < C a x
-n A.PIN/Project No. B.STIP ID D o fD e
z C.Project Title D m m �• °' a
a c D.Road Name or Number m c a o' ' n m °'
c' o E.Begin&End Termini -,• ' ° E
a m z < 0 Un <<
H CD F.Project Description G.Structure ID a e CD H a
00 WA-15913 06/17/25 06/17/25 R-2025-### 47 0.060 CE No
Naches River Bridge Repair
Naches River to Naches River
The project will complete repairs to the Yakima Valley Trolley Bridge over the Naches 08593100 <416 ,
River. Repairs include removing and replacing decayed timber elements,regrading
and compacting approach fills, replacements of the timber sill footings and the timber
backwall,and scour protection of a bridge pier.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S CN 2026 STBG(UM) 276,800 0 43,200 320,000
S CN 2026 0 WSDOT 333,000 0 333,000
Totals 276,800 333,000 43,200 653,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
CN 653,000 0 0 0 0
Totals 653,000 0 0 0 0
Report Date: May 14, 2025 Page 19 43
'm Washington State Six Year Transportation Improvement Program
Department of Transportation p p g
From 2026 to 2031
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
c 0
0' fD < C a x
-n A.PIN/Project No. B.STIP ID D o fD e
z C.Project Title D m m �• °' a
a c D.Road Name or Number m c a o' ' n m °'
c' o E.Begin&End Termini -,• ' 0 E
a m z < 0 Un <<
H CD F.Project Description G.Structure ID a e CD H a
03 WA-15735 06/17/25 06/17/25 R-2025-### 05 C G O P S 0.670 CE No
TW
Nob Hill Blvd 28th Ave to 40th Ave Paving
Nob Hill Boulevard
28th Avenue to 40th Avenue
(141. .
This project will rehabilitate the pavement on Nob Hill Blvd by milling and paving,
ADA curb ramp replacement,adjust utilities, install new water main,restripe the
road,and other work as needed to rehabilitate the pavement.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S CN 2026 N H P P 1,414,000 0 0 1,414,000
S CN 2026 0 0 1,637,240 1,637,240
Totals 1,414,000 0 1,637,240 3,051,240
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
CN 3,051,240 0 0 0 0
Totals 3,051,240 0 0 0 0
Report Date: May 14, 2025 Page 20 44
'`' Washington State Six Year Transportation Improvement Program
Department of Transportation
From 2026 to 2031
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
c 0
0' fD < C c x
-n A.PIN/Project No. B.STIP ID D o fD c
z C.Project Title D m m �• °' a =
a c D.Road Name or Number m c a o' ' n m °' .0
c' 0 E.Begin&End Termini -,• ' 0 E
a m z < 0 <<
H F.Project Description G.Structure ID a c . m CD m a
04 YAK 110 06/17/25 06/17/25 R-2025-### 28 C G P S T 1.500 CE Yes
W
Nob Hill Boulevard Sidewalk
Nob Hill Boulevard
12th Street to 14th Street
Construct sidewalk on south side of roadway.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2030 0 0 172,500 172,500
Totals 0 0 172,500 172,500
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
ALL 0 0 0 0 172,500
Totals 0 0 0 0 172,500
Report Date: May 14, 2025 Page 21 45
'`' Washington State Six Year Transportation Improvement Program
Department of Transportation
From 2026 to 2031
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
c 0
0' fD < C c x
-n A.PIN/Project No. B.STIP ID D o fD c
z C.Project Title D m m �• °' a =
,0. c D.Road Name or Number m c a o' ' c) m °' .0
c' 0 E.Begin&End Termini -,• ' 0 E
a m z < 0 <<
H F.Project Description G.Structure ID a c . m CD m a
07 YAK103 06/17/25 06/17/25 R-2025-### 28 C O P T 0.500 CE No
Nob Hill Elementary School Safety Improvements
various streets
various locations to various locations
This project will make various pedestrian safety improvements in the vicinity of Nob ,
Hill Elementary School,such as new sidewalk and constructing ADA ramps.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2028 0 SRTS 101,200 0 101,200
P CN 2029 0 SRTS 674,520 0 674,520
Totals 0 775,720 0 775,720
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 0 0 101,200 0 0
CN 0 0 0 674,520 0
Totals 0 0 101,200 674,520 0
Report Date: May 14, 2025 Page 22 46
" Washington State Six Year Transportation Improvement Program
I; Department of Transportation
From 2026 to 2031
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
c 0
0' fD < C c x
-n A.PIN/Project No. B.STIP ID 3• o fD c
z C.Project Title D m m �• °' a =
,0. c D.Road Name or Number m c a o' ' c) m °' .0
c' 0 E.Begin&End Termini -,• ' 0 E
a m z < 0 Un <<
H F.Project Description G.Structure ID a c c CD H m a
03 WA-15881 06/17/25 06/17/25 R-2025-### 47 0.160 CE No
Nob Hill RR#2 and 72nd Ave S#87 Bridges-Joint Replacement
Nob Hill Boulevard,72nd Avenue
Nob Hill Blvd to 72nd Avenue
Replace expansion joints on the Nob Hill RR#2 bridge and expansion joints and 8548900,839000
girder grout channels on the 72nd Ave S#87 bridge.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2027 0 OTHER 189,390 0 189,390
P CN 2028 0 OTHER 1,172,552 0 1,172,552
Totals 0 1,361,942 0 1,361,942
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 0 189,390 0 0 0
CN 0 0 1,172,552 0 0
Totals 0 189,390 1,172,552 0 0
Report Date: May 14, 2025 Page 23 47
'm Washington State Six Year Transportation Improvement Program
Department of Transportation p p g
From 2026 to 2031
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
c 0
0' fD < C a x
-n A.PIN/Project No. B.STIP ID D o fD e
z C.Project Title D m m �• °' a
a c D.Road Name or Number = c a o' ' c) m °' .2
c' 0 E.Begin&End Termini -,• ' 0 E
a m z < 0 CO <<
H CD F.Project Description G.Structure ID a e CDCD a
07 WA-16439 06/17/25 06/17/25 R-2025-XXX 28 C G O P S Yes
TW
North Yakima Active Transportation Improvements
"I"Street to Lincoln Avenue
Install new sidewalk,ADA compliant curb ramps,and remove and replace damaged
and non-ADA compliant sidewalk and curb ramps,and add bike lanes on 3rd Street
(141EL '
and 4th Street.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2026 0 Ped/Bike Program 75,000 0 75,000
P RW 2026 0 Ped/Bike Program 75,000 0 75,000
P CN 2027 0 Ped/Bike Program 650,000 0 650,000
Totals 0 800,000 0 800,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 45,000 0 0 0 0
RW 75,000 0 0 0 0
CN 0 650,000 0 0 0
Totals 120,000 650,000 0 0 0
Report Date: May 14, 2025 Page 24 48
'`' Washington State Six Year Transportation Improvement Program
Department of Transportation
From 2026 to 2031
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
c 0
0' fD < C c x
-n A.PIN/Project No. B.STIP ID D o fD c
z C.Project Title D m m �• °' a =
,0. c D.Road Name or Number m c a o' ' c) m °' .0
c' 0 E.Begin&End Termini -,• ' 0 E
a m z < 0 Un <<
H F.Project Description G.Structure ID a c c CD H m a
07 WA-16438 06/17/25 06/17/25 R-2025-XXX 28 C G O P S CE Yes
TW
Northeast Yakima Sidewalk Improvements
"T"Street to Lincoln Avenue
Install new sidewalk,ADA compliant curb ramps,and remove and replace damaged
and non-ADA compliant sidewalk and curb ramps in the Barge-Lincoln Elementary
School area of northeast Yakima.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2026 0 CWA 100,000 0 100,000
P RW 2026 0 CWA 100,000 0 100,000
P CN 2027 0 CWA 800,000 0 800,000
Totals 0 1,000,000 0 1,000,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 100,000 0 0 0 0
RW 100,000 0 0 0 0
CN 0 800,000 0 0 0
Totals 200,000 800,000 0 0 0
Report Date: May 14, 2025 Page 25 49
" Washington State Six Year Transportation Improvement Program
I; Department of Transportation
From 2026 to 2031
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
c 0
0' fD < C c x
-n A.PIN/Project No. B.STIP ID D o fD c
z C.Project Title D m m �• °' a =
,0. c D.Road Name or Number m c a o' ' c) m °' .0
c' 0 E.Begin&End Termini -,• ' 0 E
a m z < 0 <<
H F.Project Description G.Structure ID a c . m CD m a
05 YAK 112 06/17/25 06/17/25 R-2025-### 04 C G P S T 0.030 CE No
W
Powerhouse Road and Englewood Avenue Intersection Improvements
Powerhouse Road
Englewood Avenue to Englewood Avenue
Intersection improvements.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2030 0 0 1,325,700 1,325,700
Totals 0 0 1,325,700 1,325,700
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
ALL 0 0 0 0 1,325,700
Totals 0 0 0 0 1,325,700
Report Date: May 14, 2025 Page 26 50
'`' Washington State Six Year Transportation Improvement Program
Department of Transportation
From 2026 to 2031
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
c 0
0' fD < C c x
-n A.PIN/Project No. B.STIP ID D o fD c
z C.Project Title D m m �• °' a =
,0. c D.Road Name or Number m c a o' ' c) m °' .0
c' 0 E.Begin&End Termini -,• ' 0 E
a m z < 0 <<
H F.Project Description G.Structure ID a c . m CD m a
07 WA-15118 06/17/25 06/17/25 R-2025-### 28 P T 0.300 CE No
Prasch Avenue Sidewalk Improvements
Prasch Avenue
S 20th Avenue to S 16th Avenue
Construct sidewalks against existing curbing on Prasch Avenue from S. 16th Avenue ,
to S.20th Avenue,and along S 16th Ave from Prasch Avenue to Nob Hill Blvd.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2027 0 OTHER 25,000 0 25,000
P CN 2028 0 OTHER 185,000 0 185,000
Totals 0 210,000 0 210,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 0 25,000 0 0 0
CN 0 0 185,000 0 0
Totals 0 25,000 185,000 0 0
Report Date: May 14, 2025 Page 27 51
" Washington State Six Year Transportation Improvement Program
I; Department of Transportation
From 2026 to 2031
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
c 0
0' fD < C c x
-n A.PIN/Project No. B.STIP ID D o fD c
z C.Project Title D m m �• °' a =
a c D.Road Name or Number m c a o' ' n m °' .0
c' 0 E.Begin&End Termini -,• ' 0 E
a m z < 0 <<
H F.Project Description G.Structure ID a c . m CD m a
04 YAK 108 06/17/25 06/17/25 R-2025-### 03 C G P S T 0.030 CE No
W
S. 1st Street and E.Washington Avenue Intersection Improvements
1st Street
Washington Avenue to Washington Avenue
Realign intersection,widen E.Washington Ave.for additional lane,replace curb,
gutter,sidewalk,and construct new signal. _
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2030 0 0 2,897,500 2,897,500
Totals 0 0 2,897,500 2,897,500
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
ALL 0 0 0 0 2,897,500
Totals 0 0 0 0 2,897,500
Report Date: May 14, 2025 Page 28 52
'`' Washington State Six Year Transportation Improvement Program
Department of Transportation
From 2026 to 2031
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
c 0
0' fD < C c x
-n A.PIN/Project No. B.STIP ID D o fD c
z C.Project Title D m m �• °' a =
a c D.Road Name or Number m c a o' ' n m °' .0
c' 0 E.Begin&End Termini -,• ' 0 E
a m z < 0 <<
H F.Project Description G.Structure ID a c . m CD m a
04 YAK104 06/17/25 06/17/25 R-2025-### 05 C G O P S 1.530 CE No
TW
Tieton Drive Resurfacing
Tieton Drive
S.48th Ave.to S.72nd Ave.
Grind and overlay,and ADA curb ramp replacement.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2028 0 OTHER 97,000 24,260 121,260
P CN 2029 0 OTHER 1,108,800 277,200 1,386,000
Totals 0 1,205,800 301,460 1,507,260
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 0 0 121,260 0 0
CN 0 0 0 1,386,000 0
Totals 0 0 121,260 1,386,000 0
Report Date: May 14, 2025 Page 29 53
'`' Washington State Six Year Transportation Improvement Program
Department of Transportation
From 2026 to 2031
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
c 0
0' fD < C c x
-n A.PIN/Project No. B.STIP ID 3 o fD c
z C.Project Title D m m �• °' a =
a c D.Road Name or Number m c a o' ' n m °' .0
c' 0 E.Begin&End Termini -,• ' 0 E
a m z < 0 Un <<
H F.Project Description G.Structure ID a c c CD H m a
14 YAK14 06/17/25 06/17/25 R-2025-### 21 CO P S T CE Yes
W
Washington Avenue&Longfiber Road Intersection Improvements
Washington Avenue
Washington Avenue to Longfiber Road
Improve the Washington Avenue/Longfiber Road intersection by construction of
channelization,a signal,or a roundabout. _
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2026 0 0 269,000 269,000
P RW 2026 0 0 125,000 125,000
P CN 2027 0 0 2,062,500 2,062,500
Totals 0 0 2,456,500 2,456,500
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 100,000 169,000 0 0 0
RW 150,000 0 0 0 0
CN 0 1,000,000 0 0 0
Totals 250,000 1,169,000 0 0 0
Report Date: May 14, 2025 Page 30 54
'`' Washington State Six Year Transportation Improvement Program
Department of Transportation
From 2026 to 2031
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
c 0
0' fD < C c x
-n A.PIN/Project No. B.STIP ID 3 o fD c
z C.Project Title D m m �• °' a =
,0. c D.Road Name or Number m c a o' ' c) m °' .0
c' 0 E.Begin&End Termini -,• ' 0 E
a m z < 0 <<
H F.Project Description G.Structure ID a c . m CD m a
06 WA-16436 06/17/25 06/17/25 R-2025-XXX 28 C O P T W 0.550 Yes
Wendy Baker Shared-Use Path
Powerhouse Road
Pecks Canyon Rd to Cowiche Canyon Rd
Construct shared-use path, high visibility crosswalk, bicycle intersection crossing ,
markings, RRFBs,and bicycle wayfinding signing along Powerhouse Road.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2026 0 Ped/Bike Program 167,200 0 167,200
P RW 2027 0 Ped/Bike Program 300,000 0 300,000
P CN 2028 0 Ped/Bike Program 932,800 0 932,800
Totals 0 1,400,000 0 1,400,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 100,000 67,200 0 0 0
RW 0 300,000 0 0 0
CN 0 0 932,800 0 0
Totals 100,000 367,200 932,800 0 0
Report Date: May 14, 2025 Page 31 55
'`' Washington State Six Year Transportation Improvement Program
Department of Transportation
From 2026 to 2031
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
c 0
0' fD < C c x
-n A.PIN/Project No. B.STIP ID 3 o fD c
z C.Project Title D m m �• °' a =
,0. c D.Road Name or Number m c a o' ' c) m °' .0
c' 0 E.Begin&End Termini -,• ' 0 E
a m z < 0 <<
H F.Project Description G.Structure ID a c . m CD m a
05 YAK116 06/17/25 06/17/25 R-2025-### 28 1.130 CE Yes
Zier Road Sidewalk Improvements
Zier Road
75th Avenue to West Valley High School
Add sidewalk.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2027 0 OTHER 196,600 0 196,600
P RW 2028 0 OTHER 150,000 0 150,000
P CN 2029 0 OTHER 1,130,400 0 1,130,400
Totals 0 1,477,000 0 1,477,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 0 196,600 0 0 0
RW 0 0 120,000 0 0
CN 0 0 0 1,130,400 0
Totals 0 196,600 120,000 1,130,400 0
Federal Funds State Funds Local Funds Total Funds
Grand Totals for Yakima 8,369,400 29,258,517 28,712,185 66,340,102
Report Date: May 14, 2025 Page 32 56