HomeMy WebLinkAbout05/13/2025 03.D. Transportation Benefit District Presentation `y � ljlt
i!
'I!I,
(7A r :
s .
BUSINESS OF THE CITY COUNCIL
YAKIMA, WASHINGTON
AGENDA STATEMENT
Item No. 3.D.
For Meeting of: May 13, 2025
ITEM TITLE: Transportation Benefit District Presentation (TBD Fund)
SUBMITTED BY: Bill Preston, Acting City Engineer
SUMMARY EXPLANATION:
Presentation of updated TBD list and RCW requirements for changes. 2024 TBD annual report is being
submitted to Council. Not part of the presentation.
ITEM BUDGETED: N/A
STRATEGIC PRIORITY 24-25: A Resilient Yakima
RECOMMENDATION: Informational Only.
ATTACHMENTS:
2025 TBD Update b_w.pdf
2024 TBD Report Final.docx
80
2025 Transportation Benefit Dis
Bill Preston- Acting City Engineer
Office: 576-6754
rrlJdi.on Ave 2
St =
Hathaway St E 1 St Hertford fir
t Z eGS EFSI
sr Walter Oilman
o Parkway N a
a I.
t'OP<rr Ave 1 Z
:5 Fairbanks Ave e V.' ,e Gateway
_ N e ^�pM P lvA i ?r Shopping
Yak..
a Yakima Ave 11
•
Yakima Nachee
Parkway -
K,'wanlS Par
Summitview Ave VTKIma p,ve Gatewd P porils
Comlex
II
•
In N
• _m •
D
lA
1
+'14
tkty(x 'OR ATE) i''
Transportation Benefit Districts
RCW 36.73
• Ordinance 2017-002: Creation of the TBD
• Ordinance 2017-011 : Modified the project list
• Ordinance 2023-035: Modified the project list
I
2024
CITY OF YAKIMA
TRANSPORTATION BENEFIT
DISTRICT __---
ANNUAL REPORT ;=.. ..•'* .• a•• r).,,','
Pr AI v ,
%u ; •��
•
1k 'kpORATgU
82
,v r
Mii, Transportation Benefit Dish' t Project Lis .
a"I.
Name District 13-May-25
MOSIln= Street Projects
N. 1st Street Revitalization, Ph. 2/3 a 1,4,5 Completed
6th Ave. Roadway 1,4 $ 15,300,000 Active
1st Street&Washington I/S 3 $ 2,897,500
Washington &Longfiber I/S 3 $ 2,456,500
16th &Fruitvale I/S 1,5 $ 2,285,100
Powerhouse Rd & Englewood I/S 5 $ 1,325,700
River Road Improvements,40th to 34th (Aquatic Center) 5 Completed
Nob Hill/Fair Ave. Intersection 2 $ 345,000 Active
Sidewalk Projects
88th Avenue Sidewalk:Tieton Drive to Summitview Ave $ 691,000 Active/grant
3rd Avenue Sidewalk: Nob Hill to Walnut 4 $ 1,523,100
Chestnut Avenue Sidewalk: 56th Ave. to 70th Ave. _ 6 $ 3,452,900
Fair Avenue Sidewalk: Pacific Avenue to Nob Hill Blvd 2 $ 1,531,900
Browne Avenue Sidewalk: 7th Ave. to 15th Ave 5 $ 936,000
Naches Avenue Sidewalk:Walnut to Pacific 2 Completed
4th Street Sidewalk: Walnut to Pacific 2 Completed
2nd Street: 'G' Street to MLK 1,4 $ 1,917,400
3rd Street: 'G' Street to MLK 1,4 $ 1,899,400 $400k grant
4th Street: 'G' Street to MLK 1,4 $ 1,783,200 $400k grant
6th Street: 'G' Street to MLK 1 $ 1,817,400
7th Street: 'G'Street to MLK 1 $ 1,869,700
Mead Avenue Pedestrian Signal at 10th Avenue 3,4
Pacific Avenue Sidewalk: Fair Avenue to Jail Property 2 Completed
44th Avenue Sidewalk: Viola to Randall Park 7 $ 791,300
N. 16th Avenue Sidewalk: Fruitvale Blvd to River Road 5 $ 564,000 Active/grant _--" �.‘Z��
Nob Hill Boulevard Sidewalk: 12th Street to 14th Street 2 ='�Ot^ A ..N,,‘,„
Mead Ave: 27th Ave. to 28th Ave 3 Completed %=^�. ,,',3rd & Division I/S-Signal 4 Active/50%SIED !c �,'
TOTAL $44,087,100 ; ""'•:• S
* Note: The project list was scoped by G&O, Inc and includes Design, R/W, CN, and Construction Engineering %�V •i
83
ii. Transportationefit Districtjroj List
Name 1/10/2017 I 3/2/2017 3/21/22* 8/2/23 ** '5/13/25 ***
Street Projects
N. 1st Street Revitalization, Ph. 2 (20 yr. bond) $ 10,800,000 $ 10,802,260 $12,000,000 $ 13,800,000 Completed
6th Ave. Roadway $ 5,591,760 $ 6,900,000 $ 7,935,000 $ 15,300,000 Active
1st Street&Washington I/S $ 2,000,000 $ 2,000,000 $ 2,300,000 $ 2,645,000 $ 2,897,500
Washington &Longfiber I/S $ 1,023,000 $ 1,023,000 $ 1,330,000 $ 2,456,500
16th &Fruitvale I/S $ 816,000 $ 816,000 $ 1,061,000 $ 2,285,100 _
Powerhouse Rd & Englewood I/S $ 800,000 $ 728,000 $ 837,000 $ 962,550 $ 1,325,700
River Road Improvements,40th to 34th (Aquatic Center) $ 750,000 $ 750,000 Completed
Nob Hill/Fair Ave. Intersection $ 256,000 $ 256,000 $ 300,000 $ 345,000 $ 345,000 Active
IM Sidewalk Projects
88th Avenue Sidewalk:Tieton Drive to Summitview Ave $ 650,000 $ 650,000 $ 747,500 $ 691,000 Active/grant
3rd Avenue Sidewalk: Nob Hill to Walnut $ 480,000 $ 480,000 $ 550,000 $ 632,500 $ 1,523,100
Chestnut Avenue Sidewalk: 56th Ave. to 70th Ave. $ 448,200 $ 448,200 $ 515,000 $ 592,250 $ 3,452,900
Fair Avenue Sidewalk: Pacific Avenue to Nob Hill Blvd $ 370,000 $ 425,000 $ 488,750 $ 1,531,900
Browne Avenue Sidewalk: 7th Ave. to 15th Ave $ 336,000 $ 336,000 $ 386,000 $ 443,900 $ 936,000
Naches Avenue Sidewalk: Walnut to Pacific $ 330,000 $ 330,000 Completed
4th Street Sidewalk: Walnut to Pacific $ 315,000 $ 315,000 Completed
2nd Street: 'G' Street to MLK $ 312,000 $ 312,000 $ 406,000 $ 1,917,400
3rd Street: 'G' Street to MLK $ 312,000 $ 312,000 $ 406,000 $ 1,899,400 $400k grant
4th Street: 'G' Street to MLK $ 312,000 $ 312,000 $ 406,000 $ 1,783,200 $400k grant
6th Street: 'G' Street to MLK $ 312,000 $ 312,000 $ 406,000 $ 1,817,400
7th Street: 'G'Street to MLK $ 312,000 $ 312,000 $ 406,000 $ 1,869,700
Mead Avenue Pedestrian Signal at 10th Avenue $ 300,000 $ 345,000 $ 396,750 $ 400,000
Pacific Avenue Sidewalk: Fair Avenue to Jail Property $ 300,000 $ 345,000 Completed
44th Avenue Sidewalk: Viola to Randall Park $ 275,000 $ 315,000 $ 362,250 $ 791,300
N. 16th Avenue Sidewalk: Fruitvale Blvd to River Road $ 250,000 $ 290,000 $ 333,500 $ 564,000 Active/grant
Nob Hill Boulevard Sidewalk: 12th Street to 14th Street $ 130,000 $ 150,000 $ 172,500 $ 300,000
Mead Ave: 27th Ave. to 28th Ave $ 17,000 $ 17,000 $ 17,000 Completed
3rd & Division I/S-Signal $ 750,000 Active/50%SIED
TOTAL $19,931,200 $27,728,220 $35,819,700 1 $44,087,100 a
* Note: The project list and estimated costs were originally generated in 2017. A cost adjustment of 15% was added in 2021 to account for
inflation. The annual revenue generated from the$20 Car Tab Fee exceeds just over$1.7M.
**Note: The project list and estimated costs were originally generated in 2022. A cost adjustment of 15% was added in 2023 to account for
inflation. The annual revenue generated from the$20 Car Tab Fee exceeds just over$1.7M.
*** Note: Gray&Osborne, Inc. provided updated scoping estimates. Includes Design, R/W,CN, and CE.
84
N 1st St. Phase 3
1
.,.
,------w N
.,
—— '--47---,.H110-1::—.77,... — '----- __ '-'
` r
obi �»
_ b
� it _
\------- ----'""-------- ..' -- IE— ___
E
- \ , , - ,._, ,.-
_____ ___..------------ - ----. ' ' - —- ' :.:- 1:-. -
. /
• 26 TBD projects
-o - Y,
• 6 Complete .'. ,. t+,,o�
• 2024 Ending balance $4.8 M s,'.' , ';
• 2024 Revenue: $1 .6 M %,CJ.: •>-%
•'4
+ •
+,++ks .17
(JR, ATE\)•.\ '
85
Transportation Benefit Districts
RCW 36.73
• RCW 36.73.015 - Definitions
• RCW 36.73.050 - Establishment of district—Public hearing—Ordinance
• RCW 36.73.060 — 36.73.080 - Funding
• RCW 36.73.160 -Transportation improvement projects—Material change policy—Annual report
RCW 36.73.015 — Definitions
• ... contained in the transportation plan... .
• ... .regional significance... ..
• ... .operation and maintenance of these facilities... .
RCW 36.73.160 - Establishment of district—Public hearing—Ordinance
• ... 10 days notice... .
• ... .establish or modify the district... ..
• ... .specify function and transportation improvements... .
— ``
_ or Ntt
010)
aI '
++,+ I(ku �
+k (, ,¢
,� �H ATE\�
86
Transportation Benefit Districts
RCW 36.73
• RCW 36.73.015 - Definitions
• RCW 36.73.050 - Establishment of district—Public hearing—Ordinance
• RCW 36.73.060 — 36.73.080 - Funding
• RCW 36.73.160 -Transportation improvement projects—Material change policy—Annual report
RCW 36.73.060 —Authority to levy property tax
RCW 36.73.065 — Taxes, fees, charges, tolls, rebate program
RCW36.73.070 —Authority to issue general obligation bonds, revenue bonds
RCW 36.73.080 — LID special assessment bonds
RCW 36.73.160 - Transportation improvement projects—Material change policy—Annual rz•
• ... cost exceeds its original cost by more than 20%... .hold public hearing... . -,..� .• •,!- •,•
• ... .issue annual report �•r '',
•
•
•
kOHATE\) ,¢�
87
Questions?
88
2024
CITY OF YAKIMA
TRANSPORTATION BENEFIT
DISTRICT
ANNUAL REPORT
Bill Preston
Community Development Director
May 13, 2025
89
Transportation Benefit District
RCW 35.21.225 authorizes the legislative authority of a city to establish a transportation benefit
district (TBD) for the purpose of acquiring, constructing, improving, providing, and funding
transportation improvements within the TBD, subject to the provisions of Chapter 36.73 RCW.
On January 10, 2017, the Yakima City Council passed Ordinance No. 2017-002 which created a
TBD with boundaries coterminous with the boundaries of the City of Yakima (City) in
accordance with Chapter 36.73 RCW.
The TBD is governed by the members of the City Council, acting as District Board of Directors.
With the passage of Ordinance No. 2017-002, the City Council assumed the rights, powers,
immunities, functions and obligations of a TBD in accordance with RCW 36.74.010.
Funding
The City Council passed Ordinance No. 2017-033 on December 5, 2017 establishing an annual
vehicle fee in the amount of twenty dollars ($20.00) for the purpose preserving, maintaining,
operating, construction, or reconstructing the transportation infrastructure and funding
transportation improvements that have been identified in the approved Project list.
Proiect List
Street Projects District Est. Cost Status
N. 1st St. Revitalization 1,4,5 Complete
6th Ave. Roadway 1,5 $12,800,000 Active
1st St./Washington Ave. Intersection 2 $2,897,500
Washington Ave & Longfibre I/S 3 $2,456,500
16th Ave & Fruitvale Blvd I/S 1,5 $2,285,100
Powerhouse Rd./Englewood Intersection 5 $1,325,700
River Road Imp. 40th to 34th 5 Complete
Nob Hill/Fair Ave. Intersection 2 $345,000 Active
3rd Ave & Division Signal 4 $750,000 Active
Sidewalk Projects District Est. Cost Status
Mead Ave. —27th Ave. to 28th Ave. 3 $37,000 Complete
88th Ave. —Summitview to Tieton 6 $691,000 Active
3rd Ave. — Nob Hill to Walnut 4 $1,523,100
Chestnut Ave.- 56th Ave. to 70th Ave. 6 $3,452,900
Fair Ave. — Pacific to Nob Hill 2 $1,531,900
Browne Ave. —7th Ave. to 16th Ave. 5 $936,000
Naches Ave Sidewalk: Walnut to Pacific 2 Complete
4th St Sidewalk: Walnut to Pacific 2 Complete
Mead Ave. Pedestrian Signal at 10th Ave. 3 $400,000
Pacific Ave. — Fair Ave. to Jail Property 2 $345,000 Complete
90
2nd St: G to MLK 1,4 $1,917,400
3rd St: G to MLK 1,4 $1,899,400
4th St: G to MLK 1,4 $1,783,200
6th St: G to MLK 1 $1,817,400
7th St: G to MLK 1 $1,869,700
44th Ave. —Viola to Randall Park 7 $791,300
N. 16th Ave. —SR-12 to River Rd. 5 $564,000 Active
Nob Hill Blvd. — 12 St. to 14th St. 2,3 $300,000
Note: The project list and estimated costs were originally generated in 2017. 2025 costs were estimated
by G& 0, Inc. The annual revenue generated from the$20 Car Tab Fee is approximately$1.6M.
2024 Financial Report
2024 Financial Summary of the TBD activity for the City of Yakima:
Beginning Fund Balance $ 5,211,580
2024 Revenue $ 1,568,792
Expenditures:
it
Professional Services
• Yakima Herald — Public Notification $ 111
• Interfund - City Services $ 36,435
Capital Outlay
• N. 1st St. Phase 3 $ 1,591,239
• 6th Avenue Reconstruction $ 271,411
Transfer Out
• Debt Service— River Rd. 34th to 40th (SEID Loan Payment) $ 62,800
Total 2024 Expenditure $ 1,961,996
Ending Fund Balance $4,818,376
2024 Proiects
Street Projects
• N. 1st St. Revitalization Phase 3 —Work began in 2023 and is be a three-year project in
total. Early material procurement (streetlights, luminaires) was conducted to avoid
delays once construction started in early 2024. The project consisted of upgrading the
water mains, addition of necessary stormwater drainage system, sidewalk, curb, gutter,
ADA ramps, total reconstruction of the roadway, including the upgrade/addition of
pedestrian lighting and traffic signals. The project was funded by Water and Stormwater
Capital Funds, federal and state grants, and TBD funds. Approximate final construction
cost= $14M (approx.$2.5M TBD) —
91
• 6th Avenue Reconstruction —Work began in 2024 on the design of 6th Ave from
Walnut to River Road. A comprehensive public outreach effort began to get feedback
regarding the roadway elements such as the William 0 Douglas Trail, Yakima Valley
Trolley, and bike lanes along the roadway.
2025 Scheduled Projects
Street Projects
• N. 1st St. Revitalization Phase 3 —Complete the project described above.
PilliK_. ___„_____
____.,
. _ ___:..,„_..,
cL,.,.,
. ._ _ _ :: _ _____________
„N..,
F _=
_ _ _ __
-- ' (5091489.028
B - F
_ .;,tea
--------------.------- \ .'41,eVP'
// \ 1
• 6th Ave. Roadway— Estimated cost = $7.5M —$15.3M —The design work for the
reconstruction of 6th Ave including subgrade, base course, HMA, curb, gutter, sidewalk,
bike lanes and the replacement of the trolley tracks and other improvement to 6th Ave.
began in 2024 with the Public Outreach efforts.
• 3rd Avenue & Division Signal —A new traffic signal will be constructed at the
intersection of 3rd Avenue and Division. Construction will begin in 2025. The project
received SIED funding Yakima County with TBD proving the loan payments associated
with the SIED loan.
• Nob Hill/Fair Ave. Intersection — Estimated cost = $2.8M ($345,000 TBD) - Widen Nob
Hill Boulevard through the intersection, construct left-turn lane, curb, gutter, sidewalk,
street lighting and drainage. Upgrade signal, including mast arm structures. Design
work continues. TBD funds provide for the sidewalk and street lighting.
92