BUSINESS OF THE CITY COUNCIL
YAKIMA, WASHINGTON
AGENDA STATEMENT
Item No. 7.C.
For Meeting of: May 6, 2025
ITEM TITLE: Resolution setting date of June 3, 2025 to amend the adopted Six-
Year Transportation Improvement Program and amend the Capital
Facilities Element of the Yakima Urban Area Comprehensive Plan for
the period of 2025-2030 (No budgetary impact)
SUBMITTED BY: Bill Preston, Acting City Engineer
SUMMARY EXPLANATION:
On July2, 2024 the City of Yakima adopted the Six-year Transportation Improvement Program (TIP)for
submittal to the Washington State Department of Transportation. The City is amending the Six-year TIP
to include additional projects.
A Public Hearing will be held on May 20, 2025 to consider including the additional projects in adoption of
an amended Resolution approving the Six-year TIP and amending the regional Metropolitan
Transportation Plan and Comprehensive Plan Capital Facilities Element.
ITEM BUDGETED: N/A
STRATEGIC PRIORITY 24-25: A Resilient Yakima
RECOMMENDATION: Adopt Resolution.
ATTACHMENTS:
Resolution Set Date Amendment 3.docx
May 2025 TIP Amendments.pdf
32
RESOLUTION NO. R-2025-
A RESOLUTION setting the time and place for a hearing on June 3, 2025 to review and
adopt the amended Six-year Transportation Improvement Program and
amend the Capital Facilities Element of the Yakima Urban Area
Comprehensive Plan for the period of 2025-2030.
WHEREAS, on July 2, 2024 the City of Yakima adopted the six-year program for the
construction of streets and arterial streets in the City of Yakima for the ensuing six-year period,
all as contemplated and required by the State RCW 35.77.010 and applicable federal law; and
WHEREAS, the City of Yakima desires to amend the adopted Six-Year Transportation
Improvement Program to include additional projects; and
WHEREAS, the City of Yakima desires to amend the Yakima Urban Area
Comprehensive Plan Capital Facilities Element to reflect the amended Six-year TIP, as
contemplated and required by RCW 36.70A.070(6) to ensure compliance with the Growth
Management Act and consistency of the Comprehensive Plan and the Six-year TIP; and,
WHEREAS, a public hearing must be held on said programs before final approval; now,
therefore,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA:
That said program shall be presented for hearing and determination on Tuesday, June 3,
2025, at the hour of 6:00 p.m., in the City Council Chambers, or as soon thereafter as the same
may be heard, and the notice of such hearing be given as approved by law.
ADOPTED BY THE CITY COUNCIL this 6th day of May, 2025.
ATTEST: Patricia Byers, Mayor
Rosalinda Ibarra, City Clerk
33
Ilk
may/ DWashigton rl l tote spo►ta0ion Six Year Transportation Improvement Program
al From 2025 to 2030
Agency: Yakima
County: Yakima
MPOIRTPO: YVCOG Y Inside N Outside
m
3 0<
v c
v h i 3 A
° B.STIP ID D a -' 0 A
m A.PIN/Project No. m 1°
C.Project Title = a 0 0 m a a
c D.Road Name or Number 2 a 3 0 * o 1 5.
0 3 E.Be in&End Termini 0• m z v m a 'm
wm m F.Project Description G.Structure ID i2 a P a a 0• a a
07 WA-16435 06/03/25 06/03/25 R-2025-XXX 05 COP T 0.810 CE No
2026 Yakima Alley Paving
Various Alleys
W Lincoln Ave to Browne Ave
The city of Yakima will pave approximately 4300 LF of west/east alleys between W
Lincoln Avenue and Browne Avenue,from Lewis Avenue to Pierce Avenue. -
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S PE 2025 CMAQ 60.510 0 0 60.500
S CN 2026 CMAQ 464,500 0 0 464,500
Totals 525,000 0 0 525,000
Expenditure Schedule _
Phase 1st 2nd 3rd 4th 5th&6th
PE 60,500 0 0 0 0
CN 0 464,500 0 0 0
Totals 60,500 464,500 0 0 0
Report Date:May 01,2025 Page 1
34
ANL
WapArtment shingtonSof Trtzrteansportation Six Year Transportation Improvement Program
De
From 2025 to 2030
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
m
3 '<
a
0
v m •
` o o f
a. N
.n A.PINIProject No. B.STIP ID 3 3 — d A
ZC.Project Title = a a 'o' it r1 m a a
O c D.Read Name or Number a �0 3 i 0 c,
ri g 3 E.Begin&End Termini g. 3 m z i n CO a io
N a m F.Project Description G.Structure ID ro 0. a ° a a z m a
06 WA-16437 06/03/25 06/r R-2025-XXX 28 COP T 0,240 No
72nd Ave&Washington Ave Active Transportallon Components
72nd Avenue
1 Washington Avenue to Coolidge Road
Construct approximately 1250 LF of sidewalk bum Washington Ave to Coolidge Rd
to fill in a gap to provide access to resldenliat neighborhoods.
Funding
Status Phase Phase Start Year(YYY() Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S PE 2025 0 MAW 65,000 0 65,000
S CN 2026 0 MAW 435,000 0 435,000
Totals 0 500,000 0 500,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 65,000 0 0 0 0
CN 0 435,000 0 0 0
Totals 65,000 435,000 0 0 0
Report Date:May 01,2025 Page 2
35
Adak
!// Washington
.ngtonState of r,spo.taeton Six Year Transportation Improvement Program
From 2025 to 2030
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
m
3 <
v
z
v
T A.PIN/Project No. B.STIP ID 3 0 3 ct ° a xi
B.
c z C.Project Title = D a ID a '� a
2 c D.Road Name or Number m o a a R. c � -i c,
d v E.9egln&End Termini m a z '< m tc' 'm
y d F.Project Description G.Structure ID 2 a R. . a a z a a
03 t WA-16444 06/03/25 06/03/25 R-2025-XXX 28 CE No
City of Yakima-Bicycle Traffic Markings
Muklpie to Multiple
Paint green roadway crossings at multiple locations along the Powerhouse Canal
pathway to increase bfcycle/pedestrian visibility and safely;paint bicycle boxes and
Iniorsectlon crossings at several Intersections throughout downtown Yakima ,
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S PE 2025 TA(UM) 8,965 0 0 8,965
S CN 2026 TA(UM) 38,000 0 0 38,000
•
Totals 46,965 0 0 46,965
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 8,965 0- 0 0 0
I
CN 0 38,000 0 0 0
Totals 8,965 38,000 0 0 0
Report Date:May 01,2025 Page 3
36
All.` WDopartashintgtarnenl nStoil Treteansportation Six Year Transportation Improvement Program
From 2025 to 2030
Agency: Yakima
County: Yakima
MPOIRTPO: YVCOG Y Inside N Outside
m
5.
av m < m m
'A.PIN/Project No. B.STIP ID 3 ° 3 _ d co A
C.Project Title x a a .aa. d a
mac, c D.Road Name or Number co o o. a i c r —I E.
m o 3 E,Begin&End Termini 5 m Z i C 10 a 55
co). i F.Project Description G.Structure ID to a a ° m H - m o.
04 YAK 114 07/02/24 07/0' 06/03/25 R-2024-122 28 C G P S T 0.310 CE Yes
w
N.161h Avenue Sidewalk
N.16th Avenue
River Road to US 12 Off-Ramp
Construct approximately 1470 LF of curb,gutter and sidewalk,commercial
approaches,and HMA pathway along the west side of N 16th Avenue. —-
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code _ State Funds Local Funds Total Funds
S PE 2025 CRP(UM) 65,000 0 0 65.000
S CN 2026 CRP(UM) 499,700 0 0 499,700
•
-- Totals 664,700 0 0 564,700
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 65,000 0 0 04
0
CN 0 499,700 0 0 0
Totals 65,000 499,700 0 0 0
Report Date:May 01,2025 Page 5
37
� Washington State Six Year Transportation Improvement Program
V// Department of Transportation
From 2025 to 2030
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
m
3 <
v
o'
v Si R z xi
-n A.PtN/Project No. B.STIP ID 3 3 - d
C.Project Title x n 3 c = n r jS a
=�, c D.Road Name or Number a 0 a 3 -i 0 1 S.
d o 3 E.Begin 8 End Termini 0• 3 Z v m 'm
H m t F.Project Description G.Structure ID ro a d . a Si >' a
03 WA-15735 07/02/24 07/02/24 R-2024-122 05 C G O P S 0 670 CE No
TW
Nob Hill Blvd 28Ih Ace to 40th Ave Paving
Nob Hill Boulevard
28th Avenue to 40th Avenue
This project will rehabilitate the pavement on Nob Hill Blvd by milling and paving,
ADA curb ramp replacement,adjust utilltiee,install new water main,restripe the
road,and other work as needed to rehabilitate the pavement.
Funding ,
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S CN 2026 NHPP 1,414,000 0 0 1,414,000
S CN 2026 0 0 1,637,240 1,637,240
Totals 1,414,000 0 1,637,240 3,051,240
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th 8 6th
CN 0 3,051,240 0 0 0
Totals 0 3,051,240 0 0 0
Report Date:May 01,2025 Page 6
38
� Washington State Six Year Transportation Improvement Program
�// Department of Tlraneportation
From 2025 to 2030
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
m
i3 'I
v m c a A
m A.PINIProject No. B.STIP ID m c W - o A
z C.Project Title = Da a r g a
n n, a D.Road Name or Number a -a 3 B. -1 c i S.
d o 3 E.Begin&End Termini a• Fir a z < m al
a
m m F.Project Description G.Structure ID ,o a 9 "g m m" A a
07 WA-16439 06/03/25 06/03/25 R-2025-XXX 28 C G O P S Yes
TW
North Yakima Active Transportation Improvements
"I"Street to Lincoln Avenue
Install new sidewalk,ADA compliant curb ramps,and remove and replace damaged
and non-ADA compliant sidewalk and curb ramps,and add bike lanes on 3rd Street
and 4111 Street. l _ - .
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2025 0 Ped/Bike Program 75,000 0 75,000
P RW 2026 0 Ped/Bike Program 75,000 0 75,000
P CN 2027 0 Ped/Bike Program 650,000 0 650,000
Totals 0 800,000 0 800,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 30,000 45,000 0 0 0
RW 0 75,000 0 0' 0
CN 0 0 650,000 0 0
Totals 30,000 120,000 650,000 0 0
Report Date:May 01,2025 Page 7
39
AM..WIWapartmshingtonent sof Ttagrarnepertatl�on Six Year Transportation Improvement Program
De
From 2025 to 2030
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
m
3 '<
v -
v m •'o 0 x1
c A.PIN/Project No.9. B.STIP ID 3 g 3 C m z C.Project Title x n CD a r a a
c D.Road Name or Number d o a c co C.
n o c E.Begin&End Termini 0 3 z `� 0 i0 m'
2 d m F.Project Description G.Structure ID . 0 a P 1 H > o
07 WA-16438 06/03/25 06/r,. R-2025-XXX 28 C G O P S CE Yes
TW
Northeast Yakima Sidewalk improvements
"T"Slreel to Lincoln Avenue
Install new sidewalk,ADA compliant curb ramps,and remove and replace damaged
and non-ADA compliant sidewalk and curb ramps in the Barge-Lincoln Elementary
School area of norlhaasi Yakima. _ _
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2025 0 CWA —- 100,000„._ 0- 100,000
P RW 2026 0 CWA 100,000 0 100,000
P CN 2027 0 CWA 800,000 0 800,000
Totals 0 1,000,000 0 1,006,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 40,000 60,000 0 0 0
RW 0 100,000 0 0 0
CN 0 0 800,000 0 0
_
Totals 40,000 160,000 800,000 0 0
Report Date:May 01,2025 Page 8
40
Washington State Six Year Transportation Improvement Program
■/,r Department:of hansportatiOn
From 2025 to 2030
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
m
3 0
0
g a ` o ,
-n xi
A.PIN/Project N0. B.STIP ID 3 c 3 _ d A
c C.Project Title = a ,00, , r a
n E.: c D.Road Name or Number d 90 3 i c m 1 c
si 0 3 E.Began i End TerminY �• m m z '4 ta co
a d 9, F.Project Description G.Structure ID t0 a a ° 1 H 0- a
06 WA-16436 06/03/25 06/03/25 R-2025-XXX 28 COP T W 0.550 Yes
Wendy Baker Shared-Use Path
Powerhouse Road
Pecks Canyon Rd to Cawtche Canyon Rd
Construct shared-use parr,high visibility crosswalk,bicycle intersection crossing
markings.RRFBs,and bicycle wayfinding signing along Powerhouse Road.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2025 0 Ped/Bike Program 167,200 0 167,200
P RW 2026 0 Ped/Bike Program 300,000 0 300,000
P CN 2027 0/ Ped/Bike Program 932,800 0 932,800
Totals 0 1,400,000 0 1,400,000
Expenditure Schedule ,
Phase 1st 2nd 3rd 4th 5th&6th
PE 90,000 77,200 0 0 0
RW 0 300,000 0 0 0
CN 0 0 932,800 0 0
Totals 90,000 377,200 932,800 0 0
Federal Funds State Funds Local Funds Total Funds
Grand Totals for Yakima 2,778,665 6,500,000 3,007,240 12,365,905
Report Date:May 01,2025 Page 11
41