HomeMy WebLinkAbout03/04/2025 07.B. Project Completion and Contract Acceptance for the Snow Removal Equipment (SRE) Procurement AIP# 3-53-0089-054-2023 `yIljlt r:- 'I!I l':41 ..\\zik s . BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No. 7.B. For Meeting of: March 4, 2025 ITEM TITLE: Project Completion and Contract Acceptance for the Snow Removal Equipment (SRE) Procurement AIP# 3-53-0089-054-2023 SUBMITTED BY: Robert Hodgman, Yakima Airport Director SUMMARY EXPLANATION: This project included the procurement of Snow Removal Equipment (SRE) which were two high speed runway plows. The airport had two 1992 Oshkosh runway plows that had exceeded their useful life and the aging equipment continued to have major maintenance problems. The high-speed runway plows are essential to keep operations and the airport open during the winter months. Project cost was about $1.5 million of which the Federal Aviation Administration (FAA) paid for 90°/o through Bipartisan Infrastructure Law (BIL) grant and 10°/o from the airport's Passenger Facility Charge account ITEM BUDGETED: Yes STRATEGIC PRIORITY 24-25: A Resilient Yakima RECOMMENDATION: Accept Project ATTACHMENTS: Substantial Completion Form_Signed.pdf L- Project Substantial Completion 2-12-25.pdf 53 CITY OF YAKIMA YAKIKMA AIR TERMINAL, MCALLISTER FIELD SNOW REMOVAL EQUIPMENT(SRE) PROCUREMENT AIP#3-53-0089-054-2023 CERTIFICATE OF SUBSTANTIAL COMPLETION PROJECT: Snow Removal Equipment(SRE) Procurement DATE OF ISSUANCE: January 15, 2025 OWNER: City of Yakima OWNER's Contract No.: N/A ENGINEER's Contract No.: 45-22-036 CONTRACTOR: M-B Companies, Inc. ENGINEER: J-U-B ENGINEERS,,Inc. This Certificate of Substantial Completion applies to all Work under the Contract Documents or to the following specified parts thereof: All Work To: City of Yakima //,-/ And To: M-B Companies, Inc. CONTRACTOR The Work to which this Certificate applies has been inspected by authorized representatives of OWNER, CONTRACTOR and ENGINEER, and that Work is hereby declared to be substantially complete in accordance with the Contract Documents on DATE OF SUBSTANTIAL COMPLETION: December 27th, 2024 A tentative list of items to be completed or corrected is attached hereto.This list may not be all-inclusive, and the failure to include an item in it does not alter the responsibility of the CONTRACTOR to complete all the Work in accordance with the Contract Documents. 45-22-036/Yakima Air Terminal,McAllister Field J-U-B Master Revision Date 04-26-17 54 CITY OF YAKIMA YAKIKMA AIR TERMINAL, MCALLISTER FIELD SNOW REMOVAL EQUIPMENT (SRE) PROCUREMENT AIP#3-53-0089-054-2023 The responsibilities between OWNER and CONTRACTOR for security, operation, safety, maintenance, heat, utilities, insurance and warranties and guarantees shall be as follows: RESPONSIBILITIES: OWNER City of Yakima CONTRACTOR: M-B Companies, Inc. The following documents are attached to and made a part of this Certificate: Project Punch List dated January 13, 2025 This certificate does not constitute an acceptance of Work not in accordance with the Contract Documents nor is it a release of CONTRACTOR's obligation to complete the Work in accordance with the Contract Documents. Executed by ENGINEER on January 15, 2025 J-U-B ENGINEERS, Inc. ENGINEER By: . (Authorized Signature) CONTRACTOR accepts this Certificate of Substantial Completion on 1/16 _ , 2025 M-B Companies,Inc. CONTRACTOR By: (Authorized Signature)Joshua Abler OWNER accepts this Certificate of Substantial Completion on .., 20_ 'ty of Yaki By: a------- ( h ()Zed Sign 45-22-036/Yakima Air Terminal,McAllister Field J-U-B Master Revision Date 04-26-17 55 HELPING EACH OTHER CREATE BETTER COMMUNITIES ® THE GATEWAY LAAYDON GATEWAY GROUP INC. J-U-B FAMILY OF COMPANIES January 15,2025 Mark Meaders, General Manager M-B Companies, Inc. 201 MB Lane Chilton,WI 53014 RE CITY OF YAKIMA—YAKIMA AIR TERMINAL/MCALLISTER FIELD SNOW REMOVAL EQUIPMENT (SRE) PROCUREMENT AIP#3-53-0089-054-2023 Dear Mark, The work on the above referenced project has been determined to be Substantially Complete as of Friday December 27, 2024.As of this date, M-B Companies, Inc. has used four hundred and ninety-eight (498) of the five hundred (500)working days made available per the contract documents. This notice does not relieve M-B Companies, Inc.of any responsibilities or guarantees stated within the original contract. The attached punch list items were identified during an overview on January 13, 2025, and will need to be completed prior to final acceptance of the project.The punch list items may not be all-inclusive,and the failure to include an item in it does not alter the responsibility of the M-B Companies to complete all obligations in accordance with the Contract Documents. You will be notified if any additional documentation or contract requirements are identified which require completion before acceptance. In the event that the remaining items are not completed in a timely manner, the Owner reserves the right to restart the charging of working days. Sincerely, L Spencer L. Stephens, P.E. J-U-B ENGINEERS, Inc. West 999 Riverside, Suite 700, Spokane,WA 99201 www.jub.com 509.458.3727 56 T- -�' - :-„-_ r ' .7' 12 r\C\CW7,tr%1 Z . r _ ! 1 !a n1e h I C I _ I_I. I !. I THE GATEWAY e O, 1. I stir �j� LANGDON MAPPING • 1 •� - C�•U•� �/" GROUP INC. J U B ENGINEERS,INC. J-U•B FAMILY OF COMPANIES EQUIPMENT OVERVIEW JANUARY 13, 2025 AND PUNCH LIST ITEMS COMPLETION ITEM DATE COMPLETED Equipment Training 12/30/2024 Delivery of Spare/Service Parts 2/4/2025 Delivery of Manuals, Preventative 2/4/2025 Maintenance Schedule, Certifications, Etc. Address Hydraulic/Transmission Fluid Leak 2/11/2025 2 57